Republic of the Philippines


SUPREME COURT
Manila

FIRST DIVISION

G.R. No. 125792 November 9, 1998

PHILIPPINE AIRLINES, INC., petitioner,


vs.
NATIONAL LABOR RELATIONS COMMISSION, LABOR ARBITER MANUEL ASUNCION; MANUEL PARENAS,
DANIEL GACO, RODOLFO SIARON, ALFREDO C. MONTILLA, ROMULO S. CASTRO, ELSA CASTRO,
MARCELO PARAGAS, ROMULO PARANE, RAFAEL SANCHEZ, INOCENCIO ALCANTARA, REYNALDO
PARAISO, ROBERTO GERONIMO, NOMER E. PESCANTE, BENEDICTO SANTOS, ALBERTO TOMAS,
BONIFACIO BAYETA JR., DANILO RODRIGUEZ, CARLETO DE LA CRUZ, RAFAEL BEQUIO, EDUARDO
SITJAR, RUBEN TANSECO, TODORO K. DISCAYA, ERNESTO EVARDONE, ARNULFO LAVILLA, GLECERIO
ELABARIN, MARCELINO CANEDA, EPIFANIO GALIBO, BENJAMIN GANDELARIA, LINO B. DAHOHOY,
AVELINO MULLET, JIMMY M. CORDERO, IVANHOE MAGINO, FELIX V. CATINDOY, RUBEN DALUZ, ABENIR
YARA, SANTIAGO CORTEZ JR., ARMANDO P. LUCIDO, ALBERTO MONTILLA, RENERIO CAPON,
LEONARDO BARROZO, IRENEO FRONDOZO, DIONESIO BANARES, MARCELO MANZON, ALFREDO STA.
MARIA, BERNARDO MAMARIL, CARLOS DELLORO, ALCON DE LA TORRE, FLORENTINO PESTIDO and
STELLAR INDUSTRIAL SERVICES, INC., respondents.

PANGANIBAN, J.:

In legitimate job contracting, an independent contractor undertakes to perform work on its own account, under its
own responsibility and according to its own manner and method, free from the control and direction of the principal.
No employment relationship arises between its employees and the principal. Consequently, the said employees can
claim separation pay only from the independent contractor, and not from the principal.

The Case

These principles are used by the Court in granting this special civil action for certiorari, seeking to nullify the July 13,
1994 Decision and the June 27, 1996 Resolution of the National Labor Relations Commission, which held
Philippines Airlines, Inc. liable for separation pay.

In five separate complaints for separation pay1 filed by the individual private respondents against Philippine
Airlines (PAL), Inc. (herein petitioner) and Stellar Industrial Services, Inc. (STELLAR, for brevity), Labor
Arbiter Manuel P. Asuncion rendered on October 29, 1993 a Decision which held: 2

WHEREFORE, premises considered, . . . PAL is hereby ordered to pay the following


complainants separation pay at the rate of one month salary for every year of service, thus:

1.) Manuel F. Parenas — P17,264.75

2.) Daniel Gaco — 37,982.45

3.) Rodolfo Siaron — 31,076.55

4.) Alfredo C. Montilla — 31,076.55

5.) Romulo S. Castro — 27,623.60

6.) Elsa C. Castro — 31,076.55

https://lawphil.net/judjuris/juri1998/nov1998/gr_125792_1998.html 1/10
5/21/2020 G.R. No. 125792

7.) Marcelo Paragas — 44,888.35

8.) Romulo Parane — 13,411.80

9.) Rafael Sanchez — 31,076.55

10.) Inocencio Alcantara — 51,794.25

11.) Reynaldo Paraiso — 17,264.75

12.) Roberto Geronimo — 58,700.15

13.) Nomer E. Pescante — 24,170.65

14.) Benedicto Santos — 55,247.20

15.) Alberto Tomas — 20,717.70

16.) Bonifacio Bayeta, Jr.— 27,623.60

17.) Danilo Rodriguez — 27,623.60

18.) Carleto de la Cruz — 44,888.35

19.) Rafael Bequio — 20,717.70

20.) Eduardo Sitjar — 20,717.70

21.) Ruben M. Tanseco — 20,717.70

22.) Teodoro K. Discaya — 44,888.35

23.) Ernesto Evardone — 48,341.30

24.) Arnulfo Lavilla — 10,358.85

25.) Glecerio Elabarin — 27,623.60

26.) Marcelino Caneda — 27,623.60

27.) Epifanio Galibo — 20,717.70

28.) Benjamin Gandalera — 58,700.15

29.) Lino B. Dagohoy — 27,623.60

30.) Avelino Mullet — 27,623.60

31.) Jimmy M. Cordero — 20,717.70

32.) Ivanhoe Magno — 41,435.40

33.) Felix V. Catindoy — 24,170.65

34.) Ruben Daluz — 37,982.45

35.) Abenir R. Yarra — 41,435.40

36.) Santiago Cortes Jr. — 24,170.65

37.) Armando P. Lucido — 24,170.65

38.) Alberto Montilla — 34,529.50

39.) Renerio Capon — 17,264.75

40.) Leonardo Barroso — 6,905.90

41.) Ireneo Frondozo — 62,153.10

https://lawphil.net/judjuris/juri1998/nov1998/gr_125792_1998.html 2/10
5/21/2020 G.R. No. 125792

42.) Dionesio Banares — 24,170.65

43.) Marcelo Marzan — 20,717.70

44.) Alfredo Sta. Maria — 55,247.20

45.) Bernardo Mamaril — 13,811.80

46.) Carlos Delloro — 44,888.35

47.) Alcon de la Torre — 24,170.65

48.) Florentino Pestijo — 24,170.65

The complaints of Edwin Pilapil, Pedro Bermas, and Orlando Orpiada against Stellar Industrial
Services, Inc., are dismissed for lack of merit.

On appeal, the National Labor Relations Commission (NLRC)3 affirmed the labor arbiter's Decision in this
wise:4

WHEREFORE, except insofar as Stellar Industrial Services, Inc. is held jointly and severally
liable with Philippine Airlines for the payment of complainants' separation benefits, the
Decision appealed from is hereby AFFIRMED.

However, acting on the Motions for Reconsideration separately filed by petitioner and STELLAR, the NLRC
modified its earlier Decision and ruled: 5

WHEREFORE, our July 13, 1994 decision is hereby modified in that the separation pay adjudged
in this case is hereby declared to be the sole liability of [Petitioner] Philippine Airlines, Inc.

The Facts

The undisputed facts of this case, as summarized by the solicitor general, are as follows:6

Sometime in 1977, PAL, a local air carrier, entered into a service agreement with STELLAR, a
domestic corporation engaged, among others, in the business of job contracting janitorial
services (PAL and STELLAR's Agreement, Annex "1" of PAL's Position Paper, Annex "F", id.).

Pursuant to their service agreement, which was impliedly renewed year after year, STELLAR
hired workers to perform janitorial and maintenance services for PAL. Among those employed
were [Complainants] Manuel Parenas, Daniel Gaco, Rodolfo Siaron, Alfredo C. Montilla, Romulo
S. Castro, Elsa C. Castro, Marcelo Paragas, Romulo Parane, Rafael Sanchez, Inocencio
[Alcantara], Reynaldo Paraiso, Roberto Geronimo, Nomer E. Pescante, Benedicto Santos,
Alberto Tomas, Bonifacio Bayeta, Jr., Danilo Rodriguez, Carleto dela Cruz, Rafael Bequio,
Eduardo Sitjar, Ruben Tanseco, Teodoro K. Discaya, Ernesto Evardone, Arnulfo Lavilla, Glecerio
Elabarin, Marcelino Caneda, Epifanio Galibo, Benjamin Gandelaria, Lino B. Dahohoy, Avelino
Mullet, Jimmy M. Cordero, Ivanhoe Magino, Felix B. Catindoy, Ruben Daluz, Abenir Yara,
Santiago Co[r]tez, Jr., Armando P. Lucido, Alberto Montilla, Renerio Capon, Leonardo Barrozo,
Ireneo Frondozo, Dionesio Banares, Marcelo Marzon, Alfredo Sta. Maria, Bernardo Mamaril,
Carlos Delloro, Aldon dela Torre and Florentino Pestido, who were assigned at PAL's various
premises under the supervision of STELLAR's supervisors/foremen and timekeepers. The
workers were also furnished by STELLAR with janitorial supplies, such as vacuum cleaner and
polisher (Please see Manuel Parenas' Contract of Employment with STELLAR, Annex "1" of
Annex "E", id.; STELLAR's Position Paper, pp. 2-5, supra; TSN, May 20, 1993, pp. 15-16 and 19-
20).

On December 31, 1990, the service agreement between PAL and STELLAR expired. PAL then
called for [the] bidding of its janitorial requirements. This notwithstanding, STELLAR exerted
efforts to maintain its janitorial contract with PAL which, in the meantime, allowed Manuel
Parenas and others to work at the PAL's premises (STELLAR's Position Paper, pp. 2-5, supra,
and Memorandum of Appeal, Annex "H", pp. 3-4, id.; Carlos Callanga's Affidavit, p. 2, pp. 156-
160 Records; Annex "2" of STELLAR's Position Paper, supra; PAL's Memorandum of Appeal, p.
2, Annex "G", Petition).

Subsequently, in a letter dated October 31, 1990, PAL formally informed STELLAR that the
service agreement would no longer be renewed effective November 16, 1991, since PAL's
janitorial requirements were bidded to three other job contractors (Annex "2" of STELLAR's
Position Paper, supra; PAL's Memorandum of Appeal, p. 2, supra).
https://lawphil.net/judjuris/juri1998/nov1998/gr_125792_1998.html 3/10
5/21/2020 G.R. No. 125792

Alleging that they were illegally dismissed, the aforenamed individual private respondents filed,
from January to June 1992, five complaints against PAL and STELLAR for illegal dismissal and
for payment of separation pay (Annexes "C", "C-1" to "C-19", id.).

The Ruling of Respondent Commission

In its Decision affirming the ruling of the labor arbiter, Respondent Commission held petitioner, as an
indirect employer, jointly and severally liable with STELLAR for separation pay. First, the individual private
respondent's work, although not directly related to the business of petitioner, was necessary and desirable
for the maintenance of the petitioner's premises and airplanes. Second, the individual private respondents
were retained for thirteen long years, despite the fact that the contract, which petitioner had entered into
STELLAR in 1977, was only for one year.

On reconsideration, the NLRC modified its earlier Decision by absolving STELLAR of liability, thereby
making PAL solely responsible for the award decreed by the labor arbiter. It held that, first, petitioner was
the employer of the individual private respondents, for it engaged in labor-only contracting with STELLAR.
This was shown by the failure of petitioner to refute the factual finding that it continued to employ the
individual private respondents after the expiration of the service contract on December 31, 1990. Second,
the individual private respondents' admission in their Complaint that they were employees of STELLAR was
not conclusive, as the existence of an employer-employee relation was a question of law that could not be
the subject of stipulation. Respondent Commission concluded that their dismissal was without just and
valid cause. Because they were no longer seeking reinstatement, petitioner was liable for separation pay.

Hence, this petition. 7 When required by the Court to comment on behalf of Respondent Commission, the
solicitor general manifested his disagreement with the assailed Decision and Resolution. Thus, Respondent
Commission, in compliance with the February 5, 1997 Resolution of this Court,8 filed its own Comment.

The Issues

In its Memorandum,9 petitioner imputes grave abuse of discretion to Respondent Commission in this wise:
10

(a) [I]n holding that the janitorial service agreement with STELLAR was a labor-only
arrangement;

(b) [I]n holding that PAL continued with the services of the individual respondents after
November 16, 1991, when the janitorial agreement with STELLAR expired; and

(c) [I]n holding PAL liable for payment of separation pay to the individual respondents.

The petition raises two main issues. First, whether the individual private respondents are regular employees
of PAL. Second, whether petitioner is liable to them for separation pay. The resolution of the first issue
involves a determination of (1) whether petitioner was a labor-only contractor; and (2) whether the
individual private respondents became regular employees of PAL because they were allowed to continue
working for petitioner after the expiration of the service contract.

The Court's Ruling


The petition is meritorious.

First Issue: No Employer-Employee Relation


Between Complainants and Petitioner

Janitorial Service Agreement Is


Not Labor-Only Contacting

Prohibited labor-only contracting is defined in Article 106 of the Labor Code as follows:

Art. 106. Contractor or subcontractor. — . . .

xxx xxx xxx

There is "labor-only" contracting where the person supplying workers to an employer does not
have substantial capital or investment in the form of tools, equipment, machineries, work
premises, among others, and the workers recruited and placed by such persons are performing
activities which are directly related to the principal business of such employer. In such cases,
the person or intermediary shall be considered merely as an agent of the employer who shall be
responsible to the workers in the same manner and extent as if the latter were directly
employed by him.
https://lawphil.net/judjuris/juri1998/nov1998/gr_125792_1998.html 4/10
5/21/2020 G.R. No. 125792

This definition covers any person who undertakes to supply workers to an employer, where such person:

(1) Does not have substantial capital or investment in the form of tools, equipment, [machinery],
work premises and other materials; and

(2) The workers recruited and placed by such person are performing activities which are
directly related to the principal business or operations of the employer in which workers are
habitually employed. 11

On the other hand, permissible job contracting requires the following conditions:

(1) The contractor carries on an independent business and undertakes the contract work on his
own account under his own responsibility according to his own manner and method, free from
the control and direction of his employer or principal in all matters connected with the
performance of the work except as to the results thereof; and

(2) The contractor has substantial capital or investment in the form of tools, equipment,
[machinery], work premises, and other materials which are necessary in the conduct of his
business. 12

Applying the foregoing provisions to the present case, the Court finds no basis for holding that PAL
engaged in labor-only contracting. The true nature of the individual private respondents' employment is
evident from the service agreement between petitioner and STELLAR, which we reproduce hereunder:

1. The CONTRACTOR [STELLAR] undertakes to provide the following cleaning and janitorial
maintenance services.

Daily Routine:

(a) Dusting and/or damp-wiping of other vertical and horizontal surfaces


that require daily attention;

(b) Sweeping and mopping of floors;

(c) Polishing and spot-scrubbing of [illegible];

(d) Dusting, damp-wiping and polishing of [furniture], counters, . . . and


other office fixtures;

(e) Emptying and cleaning of ash trays;

(f) Cleaning and disinfecting of toilets and washrooms;

(g) Cleaning of inside windows, glasses, surfaces, [partitions], etc.;

(h) On-the-job supervision.

2. The CONTRACTOR shall provide sufficient personnel, equipments [sic], supplies, and
materials to carry out the undertakings; specified in the preceding paragraph, except that water
and electricity consumption shall be for the account of the OWNER. The CONTRACTOR
expressly represents that to adequately and suitably comply with the undertakings under
paragraph 1 of this Agreement, the CONTRACTOR shall assign at least eight (8) employees, six
(6) days a week except Legal Holidays, to the OWNER's premises to perform the work
undertaken by the CONTRACTOR under this Agreement. To comply with such minimum
requirements, the CONTRACTOR shall at all times be ready with relievers and/or replacements
to ensure continuous and uninterrupted work in case of absences of each assigned employee.

(3) The equipment, materials and supplies to be used by the CONTRACTOR in connection with
its aforesaid undertakings shall be of high quality and shall not cause any damage to OWNER's
premises and properties or cause any injury or annoyance to the persons working or present in
the premises. The OWNER shall place at the disposal of the CONTRACTOR a suitable storage
space with lock and key for the safe-keeping of the cleaning equipment and materials which the
. . . CONTRACTOR shall use in connection with its undertakings in . . . Agreement.

4. The CONTRACTOR warrants that the persons it shall employ to perform the work subject to
this Agreement shall be honest, reliable, carefully screened, trained, cooperative, and in
possession of health certificates and police clearances; they will be neat, presentable in

https://lawphil.net/judjuris/juri1998/nov1998/gr_125792_1998.html 5/10
5/21/2020 G.R. No. 125792

appearance, attired in identifying uniforms and provided with identification cards. The uniforms
and identification cards shall be at the expense of the CONTRACTOR.

5. In consideration of the services to be rendered by the CONTRACTOR, the OWNER shall pay
to the CONTRACTOR the sum of PESOS: THREE THOUSAND EIGHT HUNDRED FORTY
(P3,840.00) per month in Philippine Currency, payable in two equal payments on the 15th and
end of each month without necessity of demand. In the event that the minimum wage rate shall
be increased by the operation of law, there shall be a corresponding automatic increase in the
consideration of the contract price to be paid by the OWNER to the CONTRACTOR in
consideration of the latter's services.

6. In case the OWNER shall require the CONTRACTOR to perform the work provided under
paragraph 1 hereof in excess of eight hours on: (1) any regular working day, the OWNER shall
pay the CONTRACTOR an additional amount to be computed in the following manner:

xxx xxx xxx

7. It is agreed that no authority has been conferred upon the CONTRACTOR by the OWNER to
hire any person on behalf of the latter and that each person employed or hired by the
CONTRACTOR in carrying out its part of this Agreement shall be paid by the CONTRACTOR,
and that no such person employed or hired shall be deemed [an] employee or agent of the
OWNER.

8. It is furthermore agreed that the CONTRACTOR shall select, engage and discharge its
employees and shall have direct . . . control [of their] services. The CONTRACTOR shall likewise
have absolute prerogative to determine the rate of wages or salaries of the employees.

9. It is further agreed that the CONTRACTOR shall comply with all the requirements of laws,
decrees, municipal ordinances, and regulations including but not limited to payment of State
Insurance Fund, Medicare contributions, SSS contributions, and the Withholding Taxes of its
employees.

10. This agreement shall be for a period of one (1) year from May 1, 1977 to April 30, 1978 and
[illegible].

The foregoing agreement clearly indicates that an employee-employer relation existed between the
individual private respondents and STELLAR, not PAL. The provisions of the agreement demonstrate that
STELLAR possessed these earmarks of an employer: (1) the power of selection and engagement of
employees (Stipulation Nos. 1, 4, 7 and 8), (2) the payment of wages (Stipulation Nos. 5, 6, 7 and 8), (3) the
power of dismissal, and (4) the power to control the employee's conduct (Stipulation No. 8). 13

Aside from these stipulations in the service agreement, other pieces of evidence support the conclusion
that STELLAR, not PAL, was the employer of the individual private respondents. A contract of employment
14
existed between STELLAR and the individual private respondents, proving that it was said corporation
which hired them. It was also STELLAR which dismissed them, as evidenced by Complainant Parenas'
termination letter, which was signed by Carlos P. Callanga, vice president for operations and comptroller of
STELLAR. 15 Likewise, they worked under STELLAR's own supervisors, Rodel Pagsulingan, Napoleon
Parungao and Renato Topacio. 16 STELLAR even had its own collective bargaining agreement with its
employees, including the individual private respondents. 17 Moreover, PAL had no power of control and
dismissal over them.

In fact, STELLAR claims that it falls under the definition of an independent job contractor. Thus, it alleges
that it has sufficient capital in the form of tools and equipment, like vacuum cleaners and polishers, and
substantial capitalization as proven by its financial statements. 18 Further, STELLAR has clients other than
petitioner, like San Miguel Corporation, Hongkong and Shanghai Bank, Eveready, Benguet Management
Corporation and Japan Airlines. 19

All these circumstances establish that STELLAR undertook said contract on its account, under its own
responsibility, according to its own manner and method, and free from the control and direction of the
petitioner. Where the control of the principal is limited only to the result of the work, independent job
contracting exists. 20 The janitorial service agreement between petitioner and STELLAR is definitely a case
of permissible job contracting.

Extension of Service Contract is


Not a Source of Employer-Employee
Relation

https://lawphil.net/judjuris/juri1998/nov1998/gr_125792_1998.html 6/10
5/21/2020 G.R. No. 125792

Respondent NLRC found that petitioner was the individual private respondents' employer, based primarily
on the continued engagement of the employees after the expiration of the service contract. It ruled: 21

Our taking cognizance of the fact that PAL, despite the expiration of its contract with Stellar on
December 31, 1990 continued with the service of some of the complainants "as late as 1991",
should have been enough notice for them to refute this fact come [the] . . . motion for
reconsideration.

But again, perusing PAL's motion for reconsideration, we note that . . . it never refuted the finding below
that it continued employing the complainants after its service contract with Stellar expired. We thus cannot
but hold on to our view that PAL should be answerable to the separation pay awarded below not only for its
engaging in a labor-only contract with Stellar but more importantly for its continued employment of
complainants after its service contract with Stellar (the argued employer of complainants) expired.

In its Comment, 22 NLRC, citing Loadstar Shipping Co, Inc. v. Gallo, 23 defended its position on the ground
that judicial review by this Court does not include appreciation of the evidence, but is confined only to
issues of jurisdiction or grave abuse of discretion.

In trying to support this finding, the individual respondents presented, on the other hand, an entirely
different theory — that petitioner, by allowing them to continue working after the expiration of the service
agreement, because their successor — employer. In their Memorandum, 24 they argue:

. . . [T]he records and evidence show that the janitorial service contract between PAL and Stellar
expired on December 31, 1990, and not on November 16, 1991 [as stated in the October 31, 1990
letter of the petitioner].

xxx xxx xxx

As a consequence of petitioner's letter and upon knowledge of the termination of [the] janitorial
service contract, respondent Stellar formally notified each of the [complainants] that their
individual employment contract likewise be terminated effective November 16, 1991.
Furthermore, it has been expressly and uniformly stated in each of [complainants'] employment
contract that their services would last upon the termination of the janitorial service contract
between PAL and Stellar which was of course supposedly on December 31, 1990. By working up
to the time of the final termination which is November 16, 1991, from December 31, 1990, private
respondents became direct employees of PAL.

xxx xxx xxx

Petitioner's continued employment of [complainants] inspite of the expiration of the janitorial


contract is an implied absorption to the point of making them its regular employees and making
illegal their subsequent termination from service. . . . As held by the Supreme Court, employees
absorbed by [a] successor employer enjoy the continuity of their employment status and their
rights and privileges (International Container Terminal Services, Inc. vs. NLRC, G.R. N[o].
982950-99, April 10, 1996, citing the case of Sumandi vs. Leogardo, et al., G.R. N[o]. 67635,
January 17, 1985). . . . . 25

Both contentions are untenable. First, while the issue of labor-only contracting may involve some factual
considerations, the existence of an employer-employee relation is nonetheless a question of law. 26 Thus, it
falls squarely within the ambit of this Court's judicial review. Second, individual private respondents'
invocation of the successor-employer doctrine is not warranted. This doctrine involves a transfer of
ownership of the business to a new employer. Where the change of ownership is in bad faith or is used to
defeat the rights of labor, the successor-employer is deemed to have absorbed the employees and is held
liable for the transgressions of his or her
predecessor. 27 Petitioner, however did not become the successor-employer of the individual private
respondents when the service contract expired. There was no transfer of the business of STELLAR in this
particular case. The separate undertakings of petitioner and STELLAR continued even after the expiration
of the service contract and the dismissal of individual private respondents.

Indeed, we agree with the solicitor general's explanation of this matter: 28

. . . What actually happened was that PAL and STELLAR impliedly renewed, as they had
previously done before, their service agreement until PAL's janitorial requirements were bidded
to other job contractors. This explains why the individual private respondents remained
working at PAL's premises even after December 31, 1990.

https://lawphil.net/judjuris/juri1998/nov1998/gr_125792_1998.html 7/10
5/21/2020 G.R. No. 125792

From the foregoing disquisition, it is evident that petitioner was engaged in permissible job contracting and
that the individual private respondents, for the entire duration of their employ, were employees not of
petitioner but of STELLAR. In legitimate job contracting, no employer-employee relation exists between the
principal and the job contractor's employees. The principal is responsible to the job contractor's employees
only for the proper payment of wages. 29 But in labor-only contracting, an employer-employee relation is
created by law between the principal and the labor-only contractor's employees, such that the former is
responsible to such employees, as if he or she had directly employed them. 30 Besides, the Court has
already taken judicial notice of the general practice adopted in several government and private institutions
of securing janitorial services on an independent contractor basis. 31

Second Issue:
STELLAR Is Liable for Separation Pay

Short of expressly admitting to be the employer of the individual private respondents, STELLAR avers that
the former were project employees, whose employment was coterminous with the service agreement, 32 as
evidenced by the following stipulations in their contract: 33

1. The EMPLOYER hereby contracts the services of the EMPLOYEE to work as Janitor-CPD at
the project of the EMPLOYER with PAL.

2. It is expressly agreed and understood that the work of the EMPLOYEE shall last only during
and shall in no case extend beyond the period fixed for the duration of the contract between the
EMPLOYER and PAL covering the project to which the EMPLOYEE is assigned as specified in
the second "WHEREAS" hereof. Upon the expiration of said contract the employment of the
said employee is deemed automatically terminated without further notice.

In order to avoid liability for separation pay, STELLAR argues that it terminated the services of the
individual private respondents for a just and valid cause: the completion of a specific project. Thus, they
are not entitled to separation pay.

The Court is not convinced. The position of STELLAR that individual private respondents were its project
employees is totally unfounded. A regular employee is distinguished from a project employee by the fact
that the latter is employed to carry out a specific project or undertaking, the duration or scope of which was
specified at the time the employees were engaged. 34 A "project" has reference to a particular job or
undertaking that may or may not be within the regular or usual business of the employer. 35 In either case,
the project must be distinct, separate and identifiable from the main business of the employer, and its
duration must be determined or determinable.

In the case at bar, despite the protestations of STELLAR, the service agreement was not a project because
its duration was not determined or determinable. While the service agreement may have had a specific term,
STELLAR disregarded it, repeatedly renewed the service agreement, and continued hiring the individual
private respondents for thirteen consecutive years. Had STELLAR won the bidding, the alleged "project"
would have never ended. In any event, the aforesaid stipulations in the employment contract are not
included in Articles 282 and 283 of the Labor Code as valid causes for the dismissal of employees.

Again, we must emphasize that the main business of STELLAR is the supply of manpower to perform
janitorial services for its clients, and the individual private respondents were janitors engaged to perform
activities that were necessary and desirable to STELLAR's enterprise. 36 In this case, we hold that the
individual private respondents were STELLAR's regular employees, and there was no valid cause for their
dismissal.

WHEREFORE, the petition is hereby GRANTED. The assailed Decision and Resolution are SET ASIDE
insofar as they held PAL liable for separation pay. The July 13, 1994 Decision is however reinstated insofar
as it ORDERED STELLAR liable for such award.

SO ORDERED.

Davide, Jr., Vitug and Quisumbing, JJ., concur.

Bellosillo, J., is on official business abroad.

Footnotes

1 These claims were docketed as Case Nos. NLRC-NCR 00-01-00489-92, 00-05-02819-92,00-06-


03382-92, 00-06-03391-92 and 00-06-03074-92.

2 Labor Arbiter's Decision, p. 9; rollo, p. 28.

https://lawphil.net/judjuris/juri1998/nov1998/gr_125792_1998.html 8/10
5/21/2020 G.R. No. 125792

3 First Division, composed of Comm. Vicente S.E. Veloso, ponente; Pres. Comm. Bartolome S.
Carale, and Comm. Alberto R. Quimpo, member:

4 NLRC Decision, p. 8; rollo, p. 129.

5 NLRC Resolution, p. 14, rollo, p. 43.

6 Manifestation and Motion (In Lieu of Comment), pp. 2-5; rollo, pp. 236-239. This was signed by
former Solicitor General Silvestre II, Bello III, Asst. Solicitor General Magdangal M. de Leon and
Associate Solicitor Eric O. Panga.

7 This case was deemed submitted for decision upon receipt by this Court of the individual
private respondents' Memorandum on March 6, 1998.

8 Rollo, p. 253.

9 Signed by Attys. Jose C. Blanco and Paulino D. Ungos Jr. of the PAL Labor Affairs
Department.

10 Rollo, p. 104.

11 Sec. 9, Rule VIII, Book III of the Implementing Rules of the Labor Code.

12 Sec. 8, Rule VIII, Book III of the Implementing Rules.

13 Sandigan Savings & Loan Bank, Inc. v. National Labor Relations Commission, 254 SCRA 126,
133, February 26, 1996; Philippines Airlines, Inc. v. National Labor Relations Commission, 263
SCRA 638, 654, October 28, 1996; Encyclopaedia Britannica (Philippines), Inc. v. National Labor
Relations Commission, 264 SCRA 1, 6-7, November 4, 1996.

14 Annex "1" of Petition, rollo, p. 82.

15 Records, p. 163.

16 Memorandum for STELLAR, p. 7; rollo, p. 328, signed by Atty. Ma. Carmela C. Lajom of Belo,
Gozon, Elma, Parel, Asuncion & Lucila.

17 Ibid., p. 9; id., p. 330.

18 Annexes "A," "B," and "C" of the Supplemental Motion for Reconsideration of STELLAR;
Records, pp. 601-612.

19 TSN, May 20, 1993, pp. 21 and 23.

20 Sandigan v. NLRC, supra, p. 135.

21 NLRC Resolution, pp. 12-13; rollo, pp. 41-42.

22 Signed by Renaldo O. Hernandez, Attorney IV, NLRC, Legal and Enforcement Division.

23 229 SCRA 654, 659-660, February 4, 1994.

24 Signed by Atty. Isidro G. Pasana.

25 Complainants' Memorandum, pp. 4-6; rollo, pp. 344-346.

26 PCI Automation Center, Inc. v. National Labor Relations Commission, 252 SCRA 493, 506,
January 29, 1996.

27 International Container Terminal Services, Inc. v. National Labor Relations Commission, 256
SCRA 124, 132-133, April 10, 1996; Cruz v. Philippine Association of Free Labor Unions (PAFLU),
42 SCRA 68, 77-78, October 29, 1971; Majestic and Republic Theaters Employees' Association v.
Court of Industrial Relations, 4 SCRA 457, 461-462, February 28, 1962; San Felipe Neri School of
Mandaluyong, Inc. v. National Labor Relations Commission, 201 SCRA 478, 485-486, September
11, 1991; Central Azucarera del Davao v. Court of Appeals, 137 SCRA 295, 306, June 29, 1985;
and Marina Port Services, Inc. v. Cresencio Iniego et al., 181 SCRA 304, 307, January 22, 1990.

28 Manifestation and Motion, pp. 11-12; rollo, pp. 245-246.

https://lawphil.net/judjuris/juri1998/nov1998/gr_125792_1998.html 9/10
5/21/2020 G.R. No. 125792

29 PCI v. NLRC, supra, p. 504.

30 Ibid.

31 Kimberly Independent Labor Union v. Drilon, 185 SCRA 205, 190, May 9, 1990; and Rhone-
Poulenc Agrochemicals Philippines, Inc. v. National Labor Relations Commission, 217 SCRA
249, 259, January 19, 1993.

32 Memorandum for STELLAR, pp. 12-15; rollo, pp. 333-335.

33 Annex "1" of the Petition, rollo, p. 82.

34 Cosmos Bottling Corporation v. National Labor Relations Commission, 255 SCRA 358, 364,
March 29, 1996.

35 Ibid., pp. 364-365; ALU-TUCP v. National Labor Relations Commission, 234 SCRA 678, 686-
687, August 2, 1994; and Raycor Aircontrol Systems, Inc. v. National Labor Relations
Commission, 261 SCRA 589, 606, September 9, 1996.

36 Art. 280, Labor Code.