Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
93 views
Questions and Answers in Ect
Uploaded by
126 N.EZHILARASAN EEER
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Questions and answers in ect For Later
Download
Save
Save Questions and answers in ect For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
93 views
Questions and Answers in Ect
Uploaded by
126 N.EZHILARASAN EEER
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Questions and answers in ect For Later
Carousel Previous
Carousel Next
Save
Save Questions and answers in ect For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 12
Search
Fullscreen
f | PARA 1, Moa Many, Subdaauts cre anequived fe Residential single Bed Room | pdt (3B 2 | Te way 5 | Room Flat 2, What 1s the need of rey the needs of Fregy, Gruesvation ase. bedgg ond sup py, geclucing the emivonmerdedl Omission tocegh NCte Saving eke g,| What i meant by Socondeory, Frengy) sheverclesey erengy Sepwrcer Gre those whith axe Converted from privacy Crecyy’ tite nether fom Be industicl Adilisction, 0 3 or hy subtiouihy required fe Residential single Bed Conservation 7 the op between demand a 4 Define Eneeqy management | Fe _juciciows and effective we of enigy te maximize potits | Gnininnize Costs) Gnd enhonce Competitive postion. cost) * das dhe paile ah s| wreck & meant by Energy, | Enesgy cork ig define “guld er Casteme™ utich_ enekgy 36 s te be fettewed & preparing ploctsical estimate ? jhaltuoal Installation” wate length ef PVC conduit: | _PART-B. 6, Who ase dhe Step’ ChemostiC, andustiial and O97 ()Derow the pion Aicgpm | (vii) Ge re power ee | (np Coloulate lngh of ae int) Declase noe Subersaot Deetnian ; Gv) Digide the if, & ach suxacuts | Ge) Schedule ms ae fy Calwulati. Ine curent ard ting fo | equired. Moin coith i Select wie Size (vi) Doo wig diegrem & single ling diagaam& & z 5 g : & (P/Difeentisle er | Grnenerrciall Freigy, 4, the Available inthe manket for o definite price dow Krewn as Gmmescic Lvegy. 2.These includes futls foewntd, cattle dung and 4 Agpicubtured Wastes. omrnercial mrordy ase blocky , Cal ard. sreFina petieleum produ $. Smmencial fuels axe pas 3,Thase one ose called BuHlOs nok Renomic — | tyaditienal fuls, ancl it prrdudion but alio for many ip, eften ignored In neagy hevaehdld tasks ef geneva —[Ceunting, Population, | a! e 2 CRE 2, he most hee foams of | & | Weite short nofe on Ereagy Comesvation @nd. HS tmpoxtance, | Enesg y nsenvatton : | Gah ard ober fist Fels, which have 4am s mili gear te ams ave [iKely to deplel Seon. cn the Last 200 yoars we have torsumed G6/. Pall veroures. for surtainable dlovolepment,we reed + adopt ererqy efficiency rreasunes. Today, Bsy. primary energy mos som non - yenewalole and pst Source’, These qeyerver doe Continieurly diminishing with incaeaaing Groumption And will not ist for fiseae grnevation,2 Skate the objectives ¥ Froxgy Mmaregemont (To Achieve Ancl maintain optimum enen gy paocusement ane willzation, Ahsreughout dhe Onprization, To minimize enesgy Ost fasste without cafecting poedudtion sqyelity to wivimize ervidermental offer tal Waite Shoat notes on Energy balan ce. | Fragy “AKO mang fooms Such as heat, kinetic energy energy, patio! enesgy but -becawe & inter conversions tt | chwouy Ory to tsolate Separate. Consents Of ergy balance. here fose balance ¢cxn be calculateon the boss of ecteanal enedgy used per ktlogram of poodyct ov Haw mateyial pooceced, gaiids ov Some bay © nent The Oneegy Gesurned feed pocductin rebuder aired eneegy cuhich 1s fuel and electeity used th the fom. emical ig not PART | Ms Seplain in detail Qrexgy Gomesvection AT 200! and its feats | Enesgy @nsesiyasion Act | “the. | saving patertial and its | “ith he outgrown. q bigh energy, benofits, badging the gob between demand and Se ppl reducng j onvbonment emission dbyeugh energy Soving,, and to effectivdly | overcome the hostess, the Government g srdia hos enacted ate Rneagy, conervalien Act -2os!, fe Act psovides the much needed Pegal poornework and institutional, ainangpmnent for emanking en On neg, fficrere, ve, 7 Undeot this provoien x the Ad, Busan cf fEneagy EGficiency hoa | eon 2stablished with efedk faom 45 Merch Zo0r by mesging | Cx stuhile Frongyy Management rie of Ministey cf pours,ef Ssump tie ® Height GO Ne. | | The buvem woud be SteSponsilte few lnplermentation gy Pee a - chic a implemen’ atien ef Cneage, | 'Grseowvadion activities. ty a she Presigy, Comscsvedion ACE asie, sndoon ds » Bion has been identified a5 a key | aetvily fer ere gy, efficiency, rmpoveren ; ca (i the S&L porgpicen» when in place ysould Erswre thot only energy efficent equipment and appliance would be made avaihble to the Consumes. dasds and labelling ef eC ack en stardands and tcbelbieg ane: a pesfeemance standards he maid pouson Fvdve minimum eneagy Coons an v ratified eqpipment and appliances Pyhibit roanufectue, SAe and impoot ¢ Such equipment, “whith dees net Confess 4o te Standards, Triieduuce mandate oy Latelting Scheme fe notified egpiproert appliances fo enable Grsumers to make, Imfostned choices. Disseminate tofoverstiom On the benefis & Gesu tress, Me Gumate the Quawtity of metetals sequised fos Stoeeb ight | gesrviee having, 1a lamp fighr Frings, |® big 4 each pest iS Tm fom grend level No. 4 post Is 12 (qo Drstance between each put i Bom a) Main Switth fer alt 12 Lamps at the JS pat | 0) Main Bitch iS Sen height for 9 sound level Oa a ee bea which : I5in height fiom grcvrd Tevel, (vi) Wide 15 SVAKINg ro below gaan level (id Guppy is fafeen ffoorn the ote box which if &m away fer hy 46 Gordait | with Q30V Supply prefected. ELeVOTION) INGRAM, TT | eee “UW % pda 4a wll) ll | fe HL got o_- | atl | ke 3 ar at 4 ee | | Loan CAE CULATION: No.of bulbs (Fitting) = 1 Pourerr sf tach bulb = dow Total 12 Oxo = lowa queut \ 4 qco? mpin Girl 5A 5A FUSE oe aoo0p ) bh Bw te & G te | bo In | Mitenins Re @uIRED: MATE RIALS ‘tron Clod Double pole Switch Kit ket wowiaable fise A mm dia PVE Gndvit | Bm | Aon, Ceppess wite Pv inyuloted | 25mm | tom / Specification | umnny 5A 4 5A 4 tlo Canes asim Toon clod Box Whing ‘tape lomm SCBEWSKroc the i ff cep net ee, of rratestals dequived fr BHP pevegation Asumptions_ mai: om itrension g 90m 1s Bro x fom Gi) Height ¢ tho Horizontal Ru aft flow 1s Bom | SOkergh aH the ceiling rom flor 8 35m ‘tw Height ef #e Switch (Main beced fom fe oe (Hecght 9 the moter foundation is [oor from fer | | | Dot Ace (vi) The pone wom hos 2 Light peint + wa) Supply fe pomp seem x Ore away oom pore poor. (i the distance between note PotvP Roorn Ln| atti oo SHP motoy ssid tn ett the ; Mabe qe oh mts a Thpst pour = Onis powor Ebhicien “4 ee & Tp = W3e8.030 Goren Cy) = nee 4385.05 ( Mhokor NOX 05 x03 : = (i) Bulb: fo 2 O3q4- DOKO-8 Wk current = TQT 4 0.54 7.537 4 Ta time, the cwvedt inceares t TDtal Cusorat = 21.64 0.34 Th Meter ok soot T = Algy py A “Bigle Pole switch ts wed a | with Nouttal Link Poovided } yoy gpage Dor widing Gnd Service Grneckion Qosy, Tron clad distsibution bags.) 5 tued wie WL provided| lent €f Gauits_ depsstaed Maximum 5 wees to be Bun tothe Gnduih 8 Qin dia | Grduit: sequined. | (APSE fe Pot Stostern: Gm | 4 BonlUgagg) # Bem (HE) t5inlVarp) = ADL starter, to Moto L5moWewp) + BmCUG) + tm Waive) = 7-5 gin se fe lights pom (Wrise) +O
ce lamp 4. run cle Teiple pole Switch 5. Dol stacey 6. | Bush switch a pulb holder swe (Revsirable eit cab) 25mm asian 32 mm BoA BHP 5A As0W/FA ashGFetifation Quant 5 Materials BOqasved gq. | pve insulcted @ppor vive broen® Jom to.} ZswG wire Asseen olour | 23m t. | GT pipe oO6 men 5m | I. | Tron clad Disbibutton box 2Way No fy inch fo dozen Sesews Deesfiom) | (0 Nos.
You might also like
Vitotres343 TechGuide PDF
PDF
No ratings yet
Vitotres343 TechGuide PDF
32 pages
UNIT.....
PDF
No ratings yet
UNIT.....
43 pages
Page 61
PDF
No ratings yet
Page 61
19 pages
LIODR DR-Series-Manual 25911 10-12 r2
PDF
No ratings yet
LIODR DR-Series-Manual 25911 10-12 r2
24 pages
Aplication Guide Size Tube SS Odissey
PDF
No ratings yet
Aplication Guide Size Tube SS Odissey
32 pages
ASHRAE Mechanical Pocket Guide PDF
PDF
No ratings yet
ASHRAE Mechanical Pocket Guide PDF
7 pages
ASHRAE Mechanical Pocket Guide PDF
PDF
100% (1)
ASHRAE Mechanical Pocket Guide PDF
7 pages
ASHRAE Mechanical Pocket Guide-2 PDF
PDF
No ratings yet
ASHRAE Mechanical Pocket Guide-2 PDF
7 pages
Liodr r23014
PDF
No ratings yet
Liodr r23014
24 pages
TC 150301
PDF
No ratings yet
TC 150301
64 pages
Baldor
PDF
No ratings yet
Baldor
24 pages
Eee Assignment
PDF
No ratings yet
Eee Assignment
8 pages
DocScanner Apr 12, 2023 2-57 PM
PDF
No ratings yet
DocScanner Apr 12, 2023 2-57 PM
24 pages
Vito Tres Vent House Sistem
PDF
No ratings yet
Vito Tres Vent House Sistem
32 pages
Prextherm RSW Manual2
PDF
No ratings yet
Prextherm RSW Manual2
18 pages
EVS project_Energy audit
PDF
No ratings yet
EVS project_Energy audit
18 pages
Engineering Guide EFE825
PDF
No ratings yet
Engineering Guide EFE825
121 pages
Solar PV Material
PDF
No ratings yet
Solar PV Material
50 pages
ASK T SCB
PDF
No ratings yet
ASK T SCB
108 pages
1
PDF
No ratings yet
1
10 pages
DRV-5 202108 Syjs-08-2023
PDF
No ratings yet
DRV-5 202108 Syjs-08-2023
123 pages
Gas Engine Training Notes by Neon
PDF
No ratings yet
Gas Engine Training Notes by Neon
34 pages
0introduction of Electric Hoist
PDF
No ratings yet
0introduction of Electric Hoist
36 pages
DPWH Standard Plan and Bill of Quantities For Odette Temporary Resettlement Housing
PDF
No ratings yet
DPWH Standard Plan and Bill of Quantities For Odette Temporary Resettlement Housing
6 pages
Centrifuga Jouan C3i Multif OpMan
PDF
No ratings yet
Centrifuga Jouan C3i Multif OpMan
36 pages
Westinghouse Jan. 1980 Large Lamp Catalog
PDF
100% (1)
Westinghouse Jan. 1980 Large Lamp Catalog
58 pages
Greenstar 440 and 500 CDi Highflow Combi ErP Installation and Servicing Instructions
PDF
No ratings yet
Greenstar 440 and 500 CDi Highflow Combi ErP Installation and Servicing Instructions
56 pages
Centrifugeuse Br4i
PDF
No ratings yet
Centrifugeuse Br4i
36 pages
n273539d Manuale Installazione Airleaf Rev06 en
PDF
No ratings yet
n273539d Manuale Installazione Airleaf Rev06 en
20 pages
Canada - Natural Gas Table Sizing
PDF
No ratings yet
Canada - Natural Gas Table Sizing
3 pages
Estimate
PDF
No ratings yet
Estimate
119 pages
easi-flo-installation-and-servicing
PDF
No ratings yet
easi-flo-installation-and-servicing
28 pages
Easi-Flo Le: Water Heater
PDF
No ratings yet
Easi-Flo Le: Water Heater
28 pages
Grundfosliterature NB NBE NK NKE 60Hz
PDF
No ratings yet
Grundfosliterature NB NBE NK NKE 60Hz
20 pages
Handbook - Piping Engineering Guide
PDF
No ratings yet
Handbook - Piping Engineering Guide
117 pages
Installation Manual
PDF
No ratings yet
Installation Manual
16 pages
Engineering Guide
PDF
No ratings yet
Engineering Guide
121 pages
Ve117000-001 of 02
PDF
No ratings yet
Ve117000-001 of 02
2 pages
DocScanner 30-Mar-2022 10.02 PM
PDF
No ratings yet
DocScanner 30-Mar-2022 10.02 PM
69 pages
BOP Handling System 20 To 200 Metric Ton Lifting Capacity
PDF
No ratings yet
BOP Handling System 20 To 200 Metric Ton Lifting Capacity
90 pages
Compress 3000 Hot Water Heat Pump
PDF
No ratings yet
Compress 3000 Hot Water Heat Pump
56 pages
Slimsplit - 1.0 Manual PDF
PDF
86% (7)
Slimsplit - 1.0 Manual PDF
206 pages
AGEMP Assignment 1
PDF
No ratings yet
AGEMP Assignment 1
13 pages
Hydronic 1.2
PDF
No ratings yet
Hydronic 1.2
44 pages
unit 5;3;2
PDF
No ratings yet
unit 5;3;2
33 pages
Residential Tankless Infiniti High Efficiency Iomanual 50793
PDF
No ratings yet
Residential Tankless Infiniti High Efficiency Iomanual 50793
56 pages
Worcester Bosch 28i RSF Combi Installation Manual
PDF
No ratings yet
Worcester Bosch 28i RSF Combi Installation Manual
40 pages
PV IT2
PDF
No ratings yet
PV IT2
36 pages
3000 Diesel Engine Series Install (Tablas de Trabajo FMCE) PDF
PDF
No ratings yet
3000 Diesel Engine Series Install (Tablas de Trabajo FMCE) PDF
217 pages
Fujitsu Water Stage High Power Service Manual 2
PDF
0% (1)
Fujitsu Water Stage High Power Service Manual 2
60 pages
Download Complete Energy conservation guidebook Third Edition Patrick PDF for All Chapters
PDF
100% (8)
Download Complete Energy conservation guidebook Third Edition Patrick PDF for All Chapters
77 pages
Carrier 59SC2A 100 Series Installation Manual
PDF
No ratings yet
Carrier 59SC2A 100 Series Installation Manual
84 pages
Elective Theory
PDF
No ratings yet
Elective Theory
9 pages
AE Syllabus
PDF
No ratings yet
AE Syllabus
4 pages
Encoder
PDF
No ratings yet
Encoder
8 pages
PLC Notes Unit 1
PDF
No ratings yet
PLC Notes Unit 1
14 pages
Murugappa Polytechnic College, Chennai - 62: Prepared by Approved by
PDF
No ratings yet
Murugappa Polytechnic College, Chennai - 62: Prepared by Approved by
1 page
Programmable Logic Controller
PDF
No ratings yet
Programmable Logic Controller
98 pages
Localisation of Cable Fault
PDF
No ratings yet
Localisation of Cable Fault
8 pages