MR Flanges
MR Flanges
MR Flanges
MATERIAL REQUISITION
FOR
CS & SS FLANGES
TABLE OF CONTENT
Page 1 of 5
MATERIAL REQUISITION
FOR
CS & SS FLANGES
Refineries Division
PJ-Engg REV-0
DATED 12.07.2018
MR NO. : PJ-ENGG/PDR/PHPL/FLANGES/04
SCOPE OF WORK
Page 2 of 5
MATERIAL REQUISITION
FOR
CS & SS FLANGES
Refineries Division
PJ-Engg REV-0
DATED 12.07.2018
MR NO. : PJ-ENGG/PDR/PHPL/FLANGES/04
4. Item Description :
6. Scope of Supply:
The Items, which are to be supplied by vendor as a minimum, but not limited to, are
included in ‘Scope of Supply’ as listed below
a. For the purpose of this Material requisition following definition shall hold:
Page 3 of 5
MATERIAL REQUISITION
FOR
CS & SS FLANGES
Refineries Division
PJ-Engg REV-0
DATED 12.07.2018
MR NO. : PJ-ENGG/PDR/PHPL/FLANGES/04
b. In case of any discrepancy / conflict among various documents, the following order of
precedence shall govern :
I. Item Specification
II. Licensors/IOCL Specifications
III. Standard engineering specifications
IV. Codes & standards
In case of any queries, vendor shall contact the Purchaser as per information given
in bid notification.
f. All Items (IBR as well as Non-IBR items) shall be inspected by approved TPIA (Third
Party Inspection Agency).The scope of inspection shall be as given in IOCL
Technical notes for flanges, spectacle blinds and drip rings, enclosed with Tender.
g. In addition to TPI inspection, Flanges under the purview of “IBR” (Indian Boiler
Regulations) shall be accompanied with original IBR certificate in Form III-C duly
approved and countersigned by IBR authority/ local authority/ manufacturer
empowered by Central Boiler Board of India and issue inspection certificate.
Photocopy of the original certificate duly attested by the local boiler inspector where
the supplier is located is the minimum requirement for acceptance.
Page 4 of 5
MATERIAL REQUISITION
FOR
CS & SS FLANGES
Refineries Division
PJ-Engg REV-0
DATED 12.07.2018
MR NO. : PJ-ENGG/PDR/PHPL/FLANGES/04
Annexure-1
Material
SL No Item Description Code Unit Qty
1 FL,WN,RF,CS,A105,150,24IN,20/STD 4529011764 EACH 30
2 FL,WN, RF,CS,A105,150,8IN,40 4529010994 EACH 40
3 FL,WN,RF,CS,A105,150,6IN,40 4529010904 EACH 26
4 FL,WN,RF,CS,A105,300,6IN,40 4529013044 EACH 20
5 FL,WN,RF,CS,A105,150,4IN,40 4529010764 EACH 26
6 FL,WN,RF,CS,A105,300,4IN,40 4529012904 EACH 20
7 FL,WN,RF,CS,A105,150,3IN,40 4529010634 EACH 18
8 FL,WN,RF,CS,A105,300,3IN,40 4529012784 EACH 14
9 FL,WN,RF,CS,A105,150,2IN,80 4529010514 EACH 30
10 FL,WN,RF,CS,A105,300,2IN,80 4529012674 EACH 22
11 FL,SW,RF,CS,A105,150,3/4IN,SCH160 4526010124 EACH 16
12 FL.A105 SW RF 3/4IN 300 S160 4526012454 EACH 11
13 FL,WN,RF,SS,A182,F316L,150,6IN,10 4569130884 EACH 30
14 FL,WN,RF,SS,A182,F316L,150,2IN,80 4569130514 EACH 30
15 FL,WN,RF,SS,A182,F316L,150,3/4IN,80 4569130214 EACH 30
16 FL,BL,RF,SS,A182,F316L,150,3/4IN 4562130124 EACH 30
Page 5 of 5
TECHNICAL NOTES
(GENERAL SPECIFICATION)
FOR
FLANGES, SPECTACLE BLINDS
AND
DRIP RINGS
Date
1.0 GENERAL
2.0 TESTING
2.1.1 Test reports shall be supplied for all mandatory tests as per the
relevant material specifications. Test reports shall also be furnished for
any supplementary tests as specified in the requisition & clauses.
2.2 Ends of weld neck flanges shall be beveled to suit the schedule/
thickness of matching pipe, as specified in the requisition.
2.3 Bevel end details for welding neck flanges shall be as per ASME
B16.25. Contour of bevel end shall be as follows:
2.4 Bore of socket weld flanges & reducing blind flanges shall suit the
outside diameter and schedule / thickness of matching pipe.
2.5 Bore of slip on flanges shall suit the outside diameter of matching pipe.
2.8 Ends of screwed flanges unless otherwise specified shall have taper
threads as per ASME / ANSI B1.20.1 (upto 1.5” NB) & IS 554 (for 2” to
6” NB).
2.9 For ring joint flanges, blinds and spacers the hardness shall be as
follows:
2.10 For ring joint flanges, blinds and spacers, the hardness shall be
recorded in the test report.
2.12.1 For all austenitic stainless steel flanges, blinds, drip rings intergranular
corrosion test shall have to be conducted as per following:
ASTM A262 Practice ‘B’ with acceptance criteria of “60 mils/ year
(max.)”.
OR
2.12.3 For the IGC test as described as above two sets of samples shall be
drawn from each solution treatment lot; one set corresponding to
highest carbon content and the other corresponding to the highest
rating/ thickness.
2.13 All types of 321 or 347 stainless steel flanges shall be in a stabilized
heat-treated condition. Stabilizing heat treatment shall be carried out
subsequent to the normal solution annealing. Soaking temperature and
IOC/M&I/MECH/P/3/2011 Flanges, Spectacle Blinds and Drip Rings Rev.-01 Page 3 of 11
holding time for stabilizing heat treatment shall be 9000C and 4 hours
respectively.
2.15 Dimensions for handle projection for spacers & blinds ½”-24” (150#,
300# & 600# FF) shall be as specified in Table-4 attached herewith
and standard for spacers & blinds >=26” (150#, 300# & 600# FF) as
specified in table 1, 2 & 3.
2.16 Dimensions standard for flanges shall be ASME/ ANSI B16.5 for size
upto 24” (150# to 1500#) & upto 12” (2500#). For 26” and above (150#
to 1500#) – ANSI B16.47 SERIES-B shall be applicable unless
otherwise specified.
2.18 Blind flanges, spacers & blinds if specified as plate material are
acceptable in forging material also in the corresponding material
grades.
2.19 All 1Cr-0.5 Moly & 1.25 Cr-0.5 Moly Flanges shall be normalized and
tempered.
3.1.1 Flanges coming under the purview of IBR (Indian Boiler Regulations)
shall be accompanied with IBR Certificate original in Form-III C duly
approved and countersigned by IBR authority / local authority
empowered by Central Boiler Board of India. Photocopy of original
certificate duly attested by the local boiler inspector where the supplier
is located is the minimum requirement of acceptance.
4.1.1 All carbon steel flanges having wall thickness 9.53 mm and above shall
be normalized. The normalizing heat treatment shall be a separate
heat treatment operation and not a part of the hot forming operation.
4.1.2 All alloy steel (Cr-Mo) flanges shall be normalized and tempered. The
normalizing and tempering shall be separate heat treatment operation
and not a part of the hot forming operation.
4.2.1 For all carbon steels and alloy steels with wall thickness over 19mm,
Charpy-V Notch impact testing shall be carried out in accordance with
paragraph UG-84 of ASME Section VIII, Div-1 per heat of material and
per heat treating batch. Impact test specimen shall be in accordance
with ASTM A370. Impact energies at 00C shall average greater than
27J (20 ft-lb) per set of 3 specimens, with a minimum of 19J (15ft-lb).
5.1 Flanges under this category shall meet the requirements given in
NACE MR-0103-2007 and the special requirements as per purchase
requisition specification.
6.1 All raw materials shall be verified with certificate for chemical and
physical properties issued by the manufacturer’s quality control section
and will be endorsed by Third Party Inspector as identification of
material.
6.4 The manufacturer shall provide the following reports as per ASTM
specification mentioned in enquiry/ Purchase Order. All reports to be
endorsed by Third Party Inspection Agency.
7.1 The scope of inspection shall be read with item description, codes
stipulated in the purchase requisition, requirement of test and
inspection as per this specification.
7.4 Third party inspection shall issue a release note on their letterhead
giving correlation-marking details. The note shall contain the
information on tests witnessed, documents reviewed, observations/
remarks, identifications, order status and date(s) of inspection. All the
documents along with original certificate & release note shall be
furnished with supplies also the released note shall mention
compliance to special requirement such as hydrogen service/ NACE
etc.
8.2 All items coming under the purview of “IBR”, “CRYO”, “NACE”, “H2”
(Hydrogen) shall be painted in red stripes, light purple stripes, canary
yellow stripes & sea green stripes (25mm width) respectively for easy
identification.
8.3 Paint or ink for marking shall not contain any harmful metal or metal
salts such as zinc, lead or copper which cause corrosive attack on
heating.
8.5 All items shall be protected from rust, corrosion and mechanical
damage during transportation, shipment and storage.
8.7 Each end of flange shall be protected with the following materials:
8.9 All alloy materials tested by PMI shall be identified using either of the
following methods by indicating “PMI OK”.
Table-4 - Dimensions for Handle Projection for Spacers & Blinds: ½”-24”
NB (150#, 300#, 600# FF)
Notes:
1. All dimensions are in millimeters.
IOC/M&I/MECH/P/3/2011 Flanges, Spectacle Blinds and Drip Rings Rev.-01 Page 10 of 11
2. All other dimensions shall be as per ASME B16.48.
3. Material shall be as per specification.
The handle may be integral or attached to the line blank/ spacer by welding.
In case of attachment of handle by welding, heat treatment and welding shall
be in accordance with ASME B31.3
MATERIAL SPECIFICATION : ASTM A-182 GR. F304, ANSI B 16.11 , ASTM A262.
1 of 2
SR ACTIVITY INSPECTION REFERENCE ACCEPTANCE FORMAT INSPECTION BY REMARK
NO. COMPONENT DESCRIPTION DOCUMENT CRITERIA OF MFR TPI IOCL
RECORD
1.0 Materials
Receiving
Review of -Chemical Purchase Order ASTM A-182 Purchase H R R
Certificate Composition Specifications Gr. F304 Order
- Mechanical Specifications
Properties
2. In Process
Surface Condition -Visual Purchase Order Purchase Order Purchase H RW R
-Sand Blasting Specifications Specifications & Order
-Grinding Purchase Specifications
-Pickling Requisitions.
-Surface Finish
-Workmanship
-Making
-Marking & Colour
Code
Dimension -Outer Diameter Purchase Order Purchase Order Purchase H RW R
-Inner Diameter Specifications Specifications & Order
-Thickness Purchase Specifications
-Centre to Face Requisitions.
end thrd.
-End Finish
Back To Index
213
Quality Assurance Plans (QAPs) for Mechanical Equipment
QUALITY ASSURANCE PLAN
FOR
STAINLESS STEEL FLANGES
MATERIAL SPECIFICATION : ASTM A-182 GR. F304, ANSI B 16.11 , ASTM A262.
2 of 2
SR ACTIVITY INSPECTION REFERENCE ACCEPTANCE FORMAT INSPECTION BY REMARK
NO. COMPONENT DESCRIPTION DOCUMENT CRITERIA OF MFR TPI IOCL
RECORD
Heat Treatment Solution Annealed Purchase Order ASTM A 262 Purchase H RW R
IGC Practice ‘E’ Specifications Order
Specifications
Non – Destructive Dye Penetration Test ANSI B 16.11 Purchase Order Purchase H RW R
Testing (S.W./SCRD) Specifications & Order
Mrg’s Std. Purchase Specifications
Requisitions.
3. Final
Despatch Conditions -Inspection Purchase Order Purchase Order Purchase H R R
Release Note Specifications Specifications Order
-Packing Specifications
-Final Documents
-Flange Supply
Condition
Legends : H-Hold ( Offer for Witness & obtain clearance), W-Witness, A-Approval, R-Review, I-Information, X-Submit, PO-Purchase Order, PR-
Purchase Requisition, VDR – Vendor Data Requirements.
All the NDT / Leak testing / Heat treatment / Special manufacturing procedures have to be specially approved or only previously approved procedures
have to be used. In case of conflict between purchase specification, contract documents and ITP more stringent conditions shall be applicable. This
document describes generally the requirements pertaining to all types of Pressure Vessels / Columns. Requirements specific to the item are only
applicable.
Back To Index
214