CV Sample
CV Sample
Professional Profile
As a brief introduction, my name is Gita Gotama, I am a 29-year-old male, who graduated from a reputable university.
I can communicate in English both written and spoken. I have experience of 5 years in the position you offered. I am
also familiar with computer software for building information management. I am a hard worker, able to work both
individually and in a team.
With extensive experience in hospitality projects, I have built some skills that would be useful in the next
upcoming projects. I can collaborate with senior stakeholders, lead project teams and deliver to the client
Career Summary
Outline
I am responsible for Pramana Sepa Resort Project, Located in Kepulauan Seribu - Jakarta. Built on 2.5 Ha Owner
Privat Privat Island.
Key Responsibilities
Key achievements/projects
• Make sure all component of the resort finish within time frame of the owner and grand plan of the Hotel
Operator.
• Quality control over all of the item so the building is fit with SOP Hotel Operator.
Outline
I am responsible for La Casa Modular Project in developing the modular design so the company can sell the
product to the domestic and international markets.
Key Responsibilities
Key achievements/projects
• making the product can be more modular
• the product is ready for the customer to buy, for some of the initial unit.
Outline
Supporting KEK Morotai, by providing assistance as a government representative. Improving the
quality of people's homes to costs, by adding one room to be used as a homestay.
Key responsibilities
• Preparing Local Residence so they can understand the benefit of supporting the government planning.
• Preparing DED (Detail Engineering Drawing) and For Construction Drawing, before the project start.
• Quality control of all 20 units of the house in the construction process.
• Produce As Built Drawing.
Key achievements/projects
All 20 houses are on schedule.
Outline
Supporting KEK Mandalika, by providing residents with assistance from the government. Improving the
quality of people's homes to receive guests, by adding one room to be used.
Key responsibilities
• Preparing Local Residence so they can understand the benefit of supporting the government planning.
Preparing DED (Detail Engineering Drawing) and For Construction Drawing, before the project start.
• Quality control of all 25 units of the house in the construction process.
• Make As Built Drawing.
Key achievements/projects
All 25 houses were completed on schedule.
• Presenting Completed Mockup unit to Consultant and Owner for Reviewing Process as needed for
approval, so that the project can continue to the mass production stage.
• Successfully coordinated over 20 different Vendor, to finish the mockup unit as targeted schedule.
Personal Information
Language: Bahasa Indonesia → Mother Tongue
English → Fluent Spoken and Written