Maximo Work Order Application Training
Maximo Work Order Application Training
Application Training
MAINTENANCE TECHNICIAN
WORK ORDER INSTRUCTIONS
ACTUALS, PREMIUM PAY, MATERIALS, FAILURE
REPORTING AND WORK ORDER COMPLETION
LOG ON TO MAXIMO WEBSITE. WITHIN THE FACILITIES SERVICES
DEPARTMENT MOST COMPUTERS WILL HAVE THE “WELCOME TO
MAXIMO” ICON ON THE DESKTOP.
IF YOU ARE LOGGING ON FOR THE 1ST TIME, REPEAT YOUR USER
NAME AS YOUR PASSWORD AND THEN CLICK THE SIGN ON ICON.
ONCE YOU ARE IN THE APPLICATION YOU WILL BE PROMPTED TO
CREATE YOUR OWN UNIQUE USER PASSWORD USING THE
CRITERIA GIVEN ABOVE.) If you try to log on 3 times with either the wrong
user name or password, you will be blocked from
FROM THEN ON, YOU WILL USE YOUR UNIQUE PASSWORD. the system and then you will need to call the help
NOTE: DO NOT HAVE WINDOWS SAVE THE PASSWORD. desk at 387-0708 to get back into the program.
COMMIT IT TO MEMORY OR LOG IT SOMEWHERE FOR REFERENCE.
S:\MNT\Apps\Documentation\17 1 Revised 01/26/09
Your personal homepage will open.
Type the WO number in the “Find” Box located to the left of the “Select Action” Box just under the blue Maximo Tool and
press the enter key. The WO you chose will appear on the screen.
Fill in the “Craft” box with the correct craft code, if it does not automatically populate once your labor code is entered.
Fill in the “Start Date” box with the correct date or choose from the calendar by clicking on the gray calendar button to the right of the
box. From the calendar, select the correct date and enter.
Fill in the “End Date” using the same instructions as the “Start Date”.
NOTE: Start Date and End Date will always be the same, and must be entered or selected for calendar.
Fill in “Start Time” box. Example 11:00 am or 2:15 pm. The program will automatically default to AM if you are making an AM entry. If
you are entering a PM time, you will need to designate PM. If you are accustomed to and like to use military time, the computer will
automatically fill in the PM based on a military entry. Example: 13:00 will automatically change to 1:00 PM when you tab or enter after
your entry. Actual time worked on the job. DO NOT COUNT TRAVEL TIME OR LUNCH OR BREAKS.
Example: Arrived @ 8:30am, finished the job at 1:30pm. Sometime during the job took 15 minute break and a 30 minute lunch. Actual
time should reflect only actual time worked. Start time 8:30am, End time 12:45pm. Total 4:15 hours actual time for this WO.
Fill in the “End Time” box using the same directions as used for the “Start Time” above. Tab or Enter to see hours.
Your regular hours will automatically calculate based on your other entries.
Fill in the “Labor” box with the word “TRIP” and enter key.
Fill in the “Truck # for Trip Charge” box with truck used for this WO.
Fill in the “Start Date” box and the “End Date” box with correct date, (should match the date of the other labor entered). Pick from
calendar for more accuracy.
Fill in the “Regular Hours” box with a “1” and then hit the tab key or select the enter key.
NOTE: IF MULTIPLE VEHICLES RESPONDED, THERE SHOULD BE ONE TRIP CHARGE PER TRUCK. THERE WILL NEED TO BE A NEW
ROW FOR EACH VEHICLE, BECAUSE THERE IS ONLY ROOM FOR ONE TRUCK # IN THE FIELD. TWO TRUCKS WOULD REQUIRE TWO
LABOR ROWS TO RECORD THE TRIP CHARGES.
Fill in the “Labor” field and then tab or enter, application will populate other boxes with the necessary labor information.
***(Confirm “Craft” field, computer will normally auto fill this field. If it does not, you will need to put in your correct craft code.)
Choose a “Start Date” from the calendar or type the correct date.
Choose an “End Date” from the calendar or type in the correct date. (Start and end date are always the same.)
Below the Premium Pay column at the middle of the page near the bottom, fill in the “Premium Pay Code” Field. If unsure of code, choose by clicking
on the magnifying glass to the right of the field and pick from the drop down menu.
Go down to the very last field under Premium Pay and fill in “OT Justification” field. If unsure of code, choose justification by clicking on the
magnifying glass to the right of the field.
Go back up to the “Premium Pay Hours” field and enter the number of hours worked. If you need to use half and quarter hour increments, the follow-
ing are examples: .25 for 15 minutes, .5 for 30 minutes, .75 for 45 minutes. Confirm that the program populated the “Line Cost” field before saving
the entry.
***
Confirm there is a line cost after your entry
Confirm is complete, before your save
Must be entered in
proper order :
1. Pay Code
2. OT Justification
3. Pay Hours
Fill in “Line Type” by using drop down menu (blue arrow a the right of the box) and select “Material”.
Fill in “Description” box with description of part used. Refer to the “Entering Materials in Maximo Quick Steps” form for procedures
for the different types of entries, i.e. Credit Card, Shop Stock, and Purchase Requisitions.
If you have extra information that is important, you can enter it into the long description box to the right of the “Description” Box.
Fill in “Quantity” - Numeric only..........1. 3. 10. or fractions of a whole such as .5 .25 .75
Fill in “Unit Cost”. Total cost per unit or if you know the per foot price, etc, you can just put the exact amount used. Press enter key.
FAILURE CODES
To report failure codes click on the “Failure Reporting” tab to record the failure, cause and remedy codes.
A window will open with “Failure Code Problem” choices. Click on the underlined choice from the list and click on select
button (Lower Right) for next selection box to open.
“Failure Code Remedy” Window will open. Click on underlined choice in first column and click on Select button.
If you responded on a W/O and determined upon arrival that the work was already done and the WO is a duplicate. In order
to complete, you must remove the “Asset” number and “Failure Class” on the main W/O page in order to complete without
having to do “Failure Reporting”. Place curser in “Asset” field and highlight contents and hit delete key. Repeat in the
“Failure Class” field. Make sure you put a notation in the short description field: See below
Once you have completed all the entries outlined in this training. The status will need to be changed if the work order is
ready to be completed.
When determining which status you want, consider the following:
If you have completed the WO and nothing further needs to be added, change the status to ‘COMPLETE’.
If your supervisor is going to need to craft it and send to another craft for some reason, change to ‘IN PROGRESS’.
If you are going to put more time against the WO (maybe a week long job) change the status to ‘IN PROGRESS’ after you
have put your first day’s actuals on it. NOTE: If you are waiting on materials or have other status info, please put notes in
the long description to be viewed by others, such as dispatch, FSR’s, etc.
If you have a need to create a follow up to a different craft, please see trainers for “How to Create A Follow-Up WO”.
When in doubt on a status, check with dispatch or trainers for assistance.
Be sure to properly log your Materials, refer to the training documentation for entering materials, if further information is necessary.
See trainers for other documents to cover these topics.
*****IMPORTANT******PLEASE NOTE********
Again, all employees should change the status of the WO to “In Progress” once any time has been added to the WO. This
will enable everyone else, including maintenance dispatch to see if someone has already responded when they get inquiry
phone calls.