Guidelines For Voyage Planning
Guidelines For Voyage Planning
Guidelines For Voyage Planning
IMO
ASSEMBLY A 2/Res.893
21st session 4 February 2000
Agenda item 9 Original: ENGLISH
RESOLUTION A.893(21)
adopted on 25 November 1999
THE ASSEMBLY,
RECALLING ALSO section A-VIII/2, Part 2 (Voyage planning) of the Seafarers' Training,
Certification and Watchkeeping Code,
RECOGNIZING the essential importance for safety of life at sea, safety of navigation and
protection of the marine environment of a well planned voyage, and therefore the need to update the
1978 Guidance on voyage planning issued as SN/Circ.92,
NOTING the request of the Assembly in resolution A.790(19) that the Maritime Safety
Committee consider the issue of voyage planning in conjunction with its review of the Code for the
Safe Carriage of Irradiated Nuclear Fuel, Plutonium and High-Level Radioactive Wastes in Flasks on
Board Ships (INF Code), and the Committee's decision that consideration of the issue of voyage
planning should not be restricted to vessels carrying materials subject to the INF Code but should
apply to all ships engaged on international voyages,
1. ADOPTS the Guidelines for voyage planning set out in the Annex to the present resolution;
2. INVITES Governments to bring the annexed Guidelines to the attention of masters of vessels
flying their countries' flag, shipowners, ship operators, shipping companies, maritime pilots, training
institutions and all other parties concerned, for information and action as appropriate;
3. REQUESTS the Maritime Safety Committee to keep the said Guidelines under review and to
amend them as appropriate.
For reasons of economy, this document is printed in a limited number. Delegates are
kindly asked to bring their copies to meetings and not to request additional copies.
ANNEX
1 Objectives
1.1 The development of a plan for voyage or passage, as well as the close and continuous
monitoring of the vessel's progress and position during the execution of such a plan, are of essential
importance for safety of life at sea, safety and efficiency of navigation and protection of the marine
environment.
1.2 The need for voyage and passage planning applies to all vessels. There are several factors
that may impede the safe navigation of all vessels and additional factors that may impede the
navigation of large vessels or vessels carrying hazardous cargoes. These factors will need to be taken
into account in the preparation of the plan and in the subsequent monitoring of the execution of the
plan.
1.3 Voyage and passage planning includes appraisal, i.e. gathering all information relevant to the
contemplated voyage or passage; detailed planning of the whole voyage or passage from berth to
berth, including those areas necessitating the presence of a pilot; execution of the plan; and the
monitoring of the progress of the vessel in the implementation of the plan. These components of
voyage/passage planning are analysed below.
2 Appraisal
2.1 All information relevant to the contemplated voyage or passage should be considered. The
following items should be taken into account in voyage and passage planning:
.1 the condition and state of the vessel, its stability, and its equipment; any operational
limitations; its permissible draught at sea in fairways and in ports; its manoeuvring
data, including any restrictions;
.2 any special characteristics of the cargo (especially if hazardous), and its distribution,
stowage and securing on board the vessel;
.4 requirements for up-to-date certificates and documents concerning the vessel, its
equipment, crew, passengers or cargo;
.5 appropriate scale, accurate and up-to-date charts to be used for the intended voyage or
passage, as well as any relevant permanent or temporary notices to mariners and
existing radio navigational warnings;
.6 accurate and up-to-date sailing directions, lists of lights and lists of radio aids to
navigation; and
.5 existing ships' routeing and reporting systems, vessel traffic services, and
marine environmental protection measures;
.9 any additional items pertinent to the type of the vessel or its cargo, the
particular areas the vessel will traverse, and the type of voyage or passage to
be undertaken.
2.2 On the basis of the above information, an overall appraisal of the intended voyage or passage
should be made. This appraisal should provide a clear indication of all areas of danger; those areas
where it will be possible to navigate safely, including any existing routeing or reporting systems and
vessel traffic services; and any areas where marine environmental protection considerations apply.
3 Planning
3.1 On the basis of the fullest possible appraisal, a detailed voyage or passage plan should be
prepared which should cover the entire voyage or passage from berth to berth, including those areas
where the services of a pilot will be used.
3.2 The detailed voyage or passage plan should include the following factors:
.1 the plotting of the intended route or track of the voyage or passage on appropriate
scale charts: the true direction of the planned route or track should be indicated, as
well as all areas of danger, existing ships' routeing and reporting systems, vessel
traffic services, and any areas where marine environmental protection considerations
apply;
.2 the main elements to ensure safety of life at sea, safety and efficiency of navigation,
and protection of the marine environment during the intended voyage or passage;
such elements should include, but not be limited to:
.1 safe speed, having regard to the proximity of navigational hazards along the
intended route or track, the manoeuvring characteristics of the vessel and its
draught in relation to the available water depth;
.2 necessary speed alterations en route, e.g., where there may be limitations
because of night passage, tidal restrictions, or allowance for the increase of
draught due to squat and heel effect when turning;
.3 minimum clearance required under the keel in critical areas with restricted
water depth;
.5 course alteration points, taking into account the vessel's turning circle at the
planned speed and any expected effect of tidal streams and currents;
.6 the method and frequency of position fixing, including primary and secondary
options, and the indication of areas where accuracy of position fixing is
critical and where maximum reliability must be obtained;
.7 use of ships' routeing and reporting systems and vessel traffic services;
.9 contingency plans for alternative action to place the vessel in deep water or
proceed to a port of refuge or safe anchorage in the event of any emergency
necessitating abandonment of the plan, taking into account existing
shore-based emergency response arrangements and equipment and the nature
of the cargo and of the emergency itself.
3.3 The details of the voyage or passage plan should be clearly marked and recorded, as
appropriate, on charts and in a voyage plan notebook or computer disk.
3.4 Each voyage or passage plan as well as the details of the plan, should be approved by the
ships' master prior to the commencement of the voyage or passage.
4 Execution
4.1 Having finalized the voyage or passage plan, as soon as time of departure and estimated time
of arrival can be determined with reasonable accuracy, the voyage or passage should be executed in
accordance with the plan or any changes made thereto.
4.2 Factors which should be taken into account when executing the plan, or deciding on any
departure therefrom include:
.2 estimated times of arrival at critical points for tide heights and flow;
.4 daytime versus night-time passing of danger points, and any effect this may have on
position fixing accuracy; and
5 Monitoring
5.1 The plan should be available at all times on the bridge to allow officers of the navigational
watch immediate access and reference to the details of the plan.
5.2 The progress of the vessel in accordance with the voyage and passage plan should be closely
and continuously monitored. Any changes made to the plan should be made consistent with these
Guidelines and clearly marked and recorded.
_______
Annex B
1. Under the provisions of the STCW Convention and Code, all officers in charge of
a navigational watch on ships of 500 gross tonnage or more must have a
thorough knowledge and ability to use nautical charts and nautical publications
(refer STCW Code, Table A-II/1);
3. the 2010 Manila Amendments to the STCW Convention and Code have
reinforced ECDIS training requirements and introduced several additional specific
competencies in the use of ECDIS for officers both at management and
operational level serving on ECDIS-fitted ships(refer to STCW Code, Tables A-
II/1 and A-II/2). Training in accordance with the 2010 Manila Amendments
became effective from 1 July 2013;
5. STCW Convention, regulation I/14, paragraph 1.5, as well as section 6.3 of the
International Safety Management (ISM) Code, require companies to ensure
seafarers are provided with familiarization. A ship safety management system
should include familiarization with the ECDIS equipment fitted, including its
backup arrangements, sensors and related peripherals. ECDIS manufacturers
are encouraged to provide training resources including type-specific materials.
These resources may form part of the ECDIS familiarization;