B2B Case Analysis (Buying Behaviour)

This document analyzes a case study of an organization's buying behaviour for new automation equipment and facility upgrades. It outlines the various stages of the buying process, including problem recognition of needing improved productivity, determining product characteristics and specifications, searching for and evaluating suppliers, selecting suppliers, specifying quantities needed, and reviewing supplier and product performance. The organization is making a new buy of equipment including a conveyor belt, labeling machine, bar cutting machine, software, and a duplex vacuum plodder to automate operations. It also plans to upgrade the facility ambience with new LED lights, HVAC, ducting, switches, and wiring.

Uploaded by

Ronnie Philips
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views10 pages

B2B Case Analysis (Buying Behaviour)

This document analyzes a case study of an organization's buying behaviour for new automation equipment and facility upgrades. It outlines the various stages of the buying process, including problem recognition of needing improved productivity, determining product characteristics and specifications, searching for and evaluating suppliers, selecting suppliers, specifying quantities needed, and reviewing supplier and product performance. The organization is making a new buy of equipment including a conveyor belt, labeling machine, bar cutting machine, software, and a duplex vacuum plodder to automate operations. It also plans to upgrade the facility ambience with new LED lights, HVAC, ducting, switches, and wiring.

Uploaded by

Ronnie Philips
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

A

Case Analysis
On
Organization Buying Behaviour

Course: B2B Marketing (2021-23)

Submitted To: Submitted By:(Group -


4)

Dr. Shailesh Pandey Manisha


Mazumdar
Priyal Shrivastava
Richa Yadav
Riddhi Singh
Ronnie Philips

Case-1: Organizational Buying Grid

Straight
Buying Stages New Buy Modified Re-buy
Re-buy

Problem Recognition
- Improve the Improve Plant Productivity
efficiency

Automation Machine

● Conveyer Belt
● Automatic shampoo
filling and labeling
machine
● Duplex Vacuum
plodder
Determine Product ● IT Software Support
Characteristics ● Automatic Circular
Bar Cutting Machine

Ambience:

● Tube Lights
● Air Conditioner
● Roof Replacement

Automation Machine:

● Conveyer Belt-up to
2000 mm in width
with an installed
capacity of 9,00,000
meters per annum.
Determine Product ● Automatic shampoo
Specification filling and labeling
machine - Production
Capacity: 200ltr
● Machine Material:
Mild Steel
● Loading Capacity:
200ltr
● Duplex Vacuum
plodder - Duplex
Vacuum Plodder,
Production Capacity:
200 Kg Per Hour. ₹
14.5 Lakh
● IT Software Support-
camera, laptop,
software for handling
operation activities,
● Automatic Circular
Bar Cutting Machine
- Fully Automatic Bar
Cutting Circular Saw
Machine, For
Industrial, Capacity:
10 To 80mm -₹ 18.50
Lakh

Ambience:

● Tube Lights-LED
Tube lights 30 Watt
● Air Conditioner-
Centralised AC -
Industrial Split AC
₹ 2.3 Lakh/ Number
Voltage: 230 V - 400
V
Capacity: 2.8 kW -
10.6 kW Dimensions:
850 x 325 x 590 mm
Frequency: 501 Hz
Weight: 63 Kg approx
Brand: Vertiv
● Roof Replacement

Search for Suppliers Ambience:

● Smart LED Lights -


Philips
● HVAC - Vertiv
● AC Duct - Hindalco
(Rs. 95 per sq ft.)
● Switches - Havells
● Wires - Polycab

Automation Machine:
● Conveyer Belt -
Hong’s Belt
● Labelling Machine -
● Automatic Circular
Bar cutting Machine
● Software Support
● Duplex Vaccum
Plodder

Evaluate Proposals

Ambience:

● Smart LED Lights -


Philips
● HVAC - Vertiv
● AC Duct - Hindalco
(Rs. 95 per sq ft.)
● Switches - Havells
● Wires - Polycab

Automation Machine:
Select Suppliers
● Conveyer Belt -
Hong’s Belt
● Labelling Machine -
● Automatic Circular
Bar cutting Machine
- Zeal tech
Automation
● Software Support -
IBM
● Duplex Vaccum
Plodder - Spectech
Industries

Automation Machine:

● Conveyer Belt-up to
2000 mm in width
with an installed
Specify Quantity capacity of 9,00,000
needed meters per annum.
● Automatic shampoo
filling and labeling
machine - Production
Capacity: 200ltr
● Machine Material:
Mild Steel
● Loading Capacity:
200ltr
● Duplex Vacuum
plodder - Duplex
Vacuum Plodder,
Production Capacity:
200 Kg Per Hour. ₹
14.5 Lakh
● IT Software Support-
camera, laptop,
software for handling
operation activities,
● Automatic Circular
Bar Cutting Machine
- Fully Automatic Bar
Cutting Circular Saw
Machine, For
Industrial, Capacity:
10 To 80mm -₹ 18.50
Lakh

Ambience:

● Tube Lights-LED
Tube lights 30 Watt
● Air Conditioner-
Centralised AC -
Industrial Split AC
₹ 2.3 Lakh/ Number
Voltage: 230 V - 400
V
Capacity: 2.8 kW -
10.6 kW Dimensions:
850 x 325 x 590 mm
Frequency: 501 Hz
Weight: 63 Kg approx

All equipments are power


Review the efficient and can reduce
supplier/product energy consumption upto 30%
performance and increase the productivity
upto 57%.

B2B Customer -> Commercial Buying -> User

In this case we take decision based on New Buy


Step 1: Problem or Need Recognition - Improve the plants productivity by improving working conditions
and internal structure of the plant.

Step 2: Product Characteristics

Organizational Buying Grid (Case 2)


Vahan Motors Limited is planning to grow for which they will require more material, some of
the material will be a straight re-buy while some will fall under the cateogory of modified re-
buy.
The suppliers are mostly same but for both the cases we can consider new suppliers as well as
the demand now has increased.

*Each year 25% more components will be required*

Buying Stages New Buy Modified Re-buy Straight Re-buy

Requirement of
Problem/Need Timely availability of
material due to
Recognition - components
expansion

● Steel ● Tyre
● Plastic ● Fuel Tank
Determine Product ● Aluminium ● High Tensil
Characteristics ● Rubber Fastener
● Stainless Steel ● Lamp
● Battery

Tyre
● Light weight ● Directional
steel ● Symmetrical
● Corrosion ● Asymmetrical
Determine Product resistant metal Battery
Specification ● Recyclable ● Lead Acid
and energy Battery
efficient ● VRLA
aluminimum
batteries
● Solid State
Battery
● Exisiting
Suppliers ● Exisiting
● Referrals Suppliers
● Internet ● Referrals
● Competitors
Suppliers
Search for Suppliers
Suppliers
● Exide Battery
● Tata Steel ● MRF Tyre
● HJ Steel ● Ocean Power
● Apex ● Moglix
● Plastemart

● Timely
delivery
● Low cost and
Evaluate Proposals
more benefits
● Good quality
● Customization

● Quality
certification
Select Suppliers
● Credibility
● Credit cycle

Specify Quantity
needed

● Supplier
scorecard
● Review of
Review the
material from
supplier/product
department
performance
heads
● Effeciency of
the parts

B2B Customer -> Commercial Buying -> OEM

Organizational Buying Grid (Case 3)


Buying Stages New Buy Modified Rebuy Straight Rebuy

To improve the
efficiency and
Problem Recognition
productivity on larger
scale.

Create a new campus


● Buying Land
● Outsource
Architects.
Procurement Activities Accounts Department
● Furniture Purchase
Determine Product
● Audio Visual ● Photocopying
Characteristics
Equipments Machine
● Plain paper ● Vegetables
copier
● Air conditions

Determine Product New Campus: Land


Specification ● Rural or Urban
Area
● 7acre-10acre
Outsource Architect
● Timely
delivery of
services
● Best prices
Furniture
● Customized
Table, desk,
lecture desk,
almirahs,
sofas.
Audio Visual
Equipment
● Good sound
and visibility
● Best Price and
Quality
● Customization
● Services and
Maintainance
Air Condition
● Best Price and
Quality
● Customization
● Services and
Maintainance

New Campus
● Achitects from
Metropolitans
(Delhi,
Kolkata).
● Quotations
Search for Suppliers
from
Institutional
Lands
Procurement Activities
● Existing
Suppliers

New Campus: Land


● Feasibility
Study
● Frontage and
Accessibility
● Suitaibility for
Construction
Evaluate Proposals
● Legalities and
documentation
s
● Timely
availability
and efficient
Architects

● Consistent
Quality
● Fair Price
● Delivery
Select Suppliers ● Routine order
products
● supplier
reputations

Land and architects


including all the 1 Photocopying
Specify Quantity
expenses worth of 200 machine of worth Rs
needed
Millions 10 Lakh

Review the
supplier/product
performance

Institution Based Case

*There are 2 Buying Situations: New Buy and Straight Buy

*Materials such as furniture, audiovisual equipment, paper copiers, and air conditioning units have been
put into a new buy situation as the quantity may differ with the new campus formation.