This document is a checklist for instrument installation at a water utility project in Jubail and Yanbu, Saudi Arabia. It lists specifications for equipment like tag numbers, manufacturers, and ranges. It then has a table to check that instrument stands, installations, impulse tubing, cabling, and signals were properly fabricated, mounted, tested, and meet specifications. The checklist is to be filled out and signed off by test performers and quality control engineers to verify acceptable installation.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
776 views1 page
Instrument Installation Checklist
This document is a checklist for instrument installation at a water utility project in Jubail and Yanbu, Saudi Arabia. It lists specifications for equipment like tag numbers, manufacturers, and ranges. It then has a table to check that instrument stands, installations, impulse tubing, cabling, and signals were properly fabricated, mounted, tested, and meet specifications. The checklist is to be filled out and signed off by test performers and quality control engineers to verify acceptable installation.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
POWER & WATER UTILITY COMPANY FOR JUBAIL & YANBU
PROJECT CODE: GMD-MFQ-JUB-101
REPLACEMENT OF SEVEN DRUM SCREENS IN SWC-1 & LCP's IN SWP-2, JUBAIL INSTRUMENT INSTALLATION CHECK LIST SPECIFICATION EQUIPMENT INSTRUMENT TYPE RANGE TAG NO. SERIAL NO. MANUFACTURER ACCURACY INPUT OUTPUT S. NO. DESCRIPTION PASS FAIL N/A REMARKS 1 Instrument Stand / Supports 1.1 Fabrication of Stand as per drawing 1.2 Deburred, Primed and Painted 1.3 Instrument location as per IFC drawing 1.4 Access is unobstructed and clear for maintenance 1.5 Stand Grounded 1.6 Stand and Support Secure 2 Instrument Installation 2.1 Instrument Calibrated prior to installation and documentation checked 2.2 Instrument mounted in accordance with hook-up drawing 2.3 Check instrument is correct in accordance with ISS / P&ID 2.4 Instrument securely installed on stand 2.5 Elevation correct relative to process tapping 2.6 Sunshade installed 2.7 Stand and Support Secure 3 Impulse Tubing 3.1 Material used according to specification 3.2 Isolation and equalization valves / manifolds installed 3.3 Vent and drain installed 3.4 Tubing slope checked 3.5 Verify tubing connection to HP & LP sides 3.6 Leak Test done 3.7 Pressure Test of Impulse tubing 4 Cabling / Signal / Conduit 4.1 Check electrical installation with respect to conduits, glands are correct 4.2 Core and cable tagging are correct 4.3 All cores are meggered and continuity checked 4.4 Check connection terminations with instrument for tightness 4.5 Check display
TEST RESULTS: ACCEPTABLE NOT ACCEPTABLE
TEST PERFORMED BY : ____________________ SIGNATURE: _____________________