lssue eon 8 capes wo rece wae ekg tal eeray mal panel [However odes orth poe! supe were rsd orang “TECHNICAL GUERY [secs —SauorARaCo [Pet Warinn et Prot [ne 077 feces na: 385 Tees 1 [eerie Somos ToA [mien Jour on [es [ROW AREA. jst MSEIO ENERGY METER SUPPORT AND DRAWING DETAILS FOR REVSSOW foncsna ean ae |—« te Energy metering panel shall be mounted on a site fabricated rack as suitable, nergy metering panel (SAP # 538003-DCPR-47-002-REV.A) to be installed. fer to altached typical one ine diagram for Rev. 8 Model fs metering panel is under procurement cycte and not avaliable in SA stock, Contractor to cor he OHPL sysiem without the energy metering pane that o connect the transformer secon Peas rie feast for ovo &. arora eget Peau Neste eae pa? ji [rN Sin iN Siar TR war od Struct ry side lupon TQ RESPONSE 26 OCT 2022 seotemieecries TQ RESPONSE 28: 0CT 222 eee.