Expression of Interest (EOI) Consulting Firms for Constitution of a Panel of Consultants under
Accelerating Infrastructure Delivery through Better Engineering Services Project
Joint EOI
CMS Country of Venture (JV) Submission
Consultant Acronym Position
No.1 Incorporation2 or Sub- Authorized
consultant By
DOLSAR
012791 Engineering Inc. DOLSAR Turkey JV Cem Aker International
Co. Projects
Coordinator
Present the rationale for and benefits of working in association (JV or Sub-consultant) with
others rather than undertaking the assignment independently (as appropriate). Describe the
proposed management and coordination approach of the association and the role of each
firm.
1
If already registered on ADB’s Consultant Management System (CMS). CMS registration under EA-administered selection
is mandatory prior to contract award.
2
The lead consultant must submit a copy of the Certificate of Incorporation of itself and of each JV member and sub-
consultant through VII. EOI Attachments.
1
Accelerating Infrastructure Delivery through Better Engineering Services Project
For this project, WAPCOS Limited associates with DOLSAR Engineering Inc. Co. to enhance the
technical capacity by providing wider expertise, and experience which would benefit the project.
WAPCOS Limited acknowledges the role of local partners that understand the localities of the
project. The localities include but not limited to the provision of local experts, geographical
orientation, as well as communication and coordination with the executing/implementing agency
and local communities. Therefore, WAPCOS Limited associates with PT. Indra Karya (Persero),
PT. Bina Karya (Persero), PT. Multi Phi Beta and PT. Pola Agung.
Founded in 1961 PT Indra Karya (Persero) concentrated its field of business in undertaking
electric power and water resources development projects. Since then PT Indra Karya has
succeeded in completing all the assignments which had been undertaken from feasibility studies,
planning and detailed designing to construction, supervision and project management in various
fields. To enhance the knowledge and skill of its personnel, associations with leading foreign
companies have been carried out, especially in undertaking large scale engineering projects with
latest and advanced technology. PT Indra Karya has been registered in the IBRD, ADB, OECF/
JBIC.
PT. Bina Karya (Persero) was established in 13 November 1962 based on Government regulation
No. 31/1962, in the form of Government-owned Corporation enacted in the republic of Indonesia
National Statute No. 85 year 1962. It was changed into a State-owned liability company by the
Government regulation No. 41 year 1970, and changes in company financial equity from Idr
75,000,000.00 into Idr 10,912,000,000.00 through the shareholders declaration and changes in
charter authorized in 21 May 2003 by notary Abdul Hamid. At its beginning the company only
handled architectural and buildings project, but with the development of the business environment
that is increasingly expanding and the services provided also experiencing growth, today it has
become a company that is capable of handling extensive multi-disciplinary engineering consultancy
and management.
Starting from the establishment of the company in 1979 up until now PT Multi Phi Beta is
entrusted by his Clients to carry out various type of services ranging from study works, field survey
and investigations, up until engineering design and construction supervision of projects located in
all parts of Indonesia. PT MULTI PHI BETA in association with KAMPSAX International A/S carried
out transmigration studies, planning, and design of transmigration settlements financed by the
World Bank in Central Kalimantan for 10 years. Study, planning, and design of Kabupaten roads in
all provinces in Indonesia is carried out in association with Hoff & Overgaard and Carl Bro for more
than 10 years. The project also developed guidelines and methods for planning & design for
Kabupaten roads, which are widely used up until now. Nucleus Estate and Smallholder (NES)
project in Ophir was studied, planned and designed together with DIWI from Germany. The project
was financed by KfW and undertaking also in 10 years. The work consist of planning of oil palm
plantation, network of harvesting, collector, and access road, design of housings, and construction
supervision of all construction works
2
Accelerating Infrastructure Delivery through Better Engineering Services Project
PT. Pola Agung Consulting is an Indonesian private company who provides services in the field of
engineering and management consultancy. The company was founded in 1978 in Jakarta. The
Company was initially involved in the Government program in transmigration and public works
sectors. Within the time span of 25 years, the company has grown. To adjust with new situation the
company’s board of management changed in May 2003. At present, we are supported by a group
of dedicated experienced professionals, to carry out our company’s vision. Our professionals have
experiences in consultation work in the field of Infrastructure: Road, Bridges, Water Supply,
Regional Planning, Waste Water Treatment, Solid Waste, Water Resources, Finance and
Community Empowerment.
WAPCOS is confident that the consortium will form a synergy for the benefit of the Project.
Through the association, WAPCOS identifies there are at least, seven significant benefits, among
others: (i) Wider field/expertise coverage; (ii) More professional human resources available, both
international and national; (iii) Vast experience and know-how; (iv) Extensive lessons-learned and
best practices; (v) Familiarity with local/regional conditions; (vi) Easier management for two project
locations; and (vii) Smooth communication and coordination with the executing agency,
implementing agency, as well as local communities.
I confirm that:
Documentation regarding our corporate structure including beneficial ownership has been
attached.
A written agreement to associate for the purpose of this Expression of Interest has been
signed between the consortium partners and has been attached.
Once a consultant in the Panel is invited to submit Proposal for any call-down assignment, it is not
permissible to transfer the invitation to any other firm, such as Consultant’s parent companies,
subsidiaries and affiliates. The Client will reject a Proposal if the Consultant drops a JV member
without following the procedure prescribed in the REOI/RFP in this regard.
A. Technical Competence
Cross-referencing from your profile projects in Section E, highlight the technical qualifications of
your entity/consortium in undertaking similar assignments. Provide details of past experiences
working with similar project authorities.
Our Consortium has proven a long track record in undertaking water resources assignment,
including projects under the same project authorities in the Ministry of Public Works.
WAPCOS
(a) Highways:
1. Design Review, Pre-Contract Services and Project Management of Civil Works Contract
for: Multinational Nacala Road (Lot-B: Ribaue- Malema road)- (103 kms) (African
Development Bank funded), Mozambique, Duration: March 2011 to Sep 2015; Client:
National Roads Administration(ANE), Republic of Mozambique Country: Mozambique, Scope
of Work: Review of the Engineering design and detailed drawings for the Construction works,
construction supervision.
5. Project Management Consultant (PMC) for Development of Ring Road No. 4, Road
Network System, Water Supply System, Sewerage, Electrical Networks, Storm Water
Drains and Reuse System including Defect Liability for Kamal Vihar, Raipur; Duration:
Jan 2012 to Jan 2014; Client: Raipur Development Authority, Country: India, Scope of Work:
Design review and checking of construction drawings, project management consultancy
services.
6. Design & Engineering Consultancy for the Main Civil, electro-Mechanical & Hydro-
Mechanical works, Infrastructural works including Roads, Bridges and Technical
Assistance during construction for Punatsangchhu-I Hydro Electric Project, PHPA,
Lobesa, Bhutan Duration: January, 2004 to August 2007; Client: Department of Energy
4
Accelerating Infrastructure Delivery through Better Engineering Services Project
(DoE), Royal Govt. of Bhutan, Country: Bhutan, Scope of Work: Detailed engineering
design, EIA studies for all project components including National Highway (Town Wangdue
to Tsirang-Realignment) of length 4.83 km of formation width 10.50m, roads to various
project components & residential colony of length 23.12 km of formation width 6.10 m,
Bailey Bridges class 40R loading at 3 locations, Plate Girder bridges of 33 m span, Internal
colony road of length 5.12 km of formation width 6.10 m permanent pre-stressed concrete
bridge at Powerhouse complex of span 110m of class 70R loading.
7. Design & Engineering Consultancy for the Main Civil, electro-Mechanical & Hydro-
Mechanical works, Infrastructural works including Roads, Bridges and Technical
Assistance during construction for Punatsangchhu-II Hydro Electric Project, PHPA,
Lobesa, Bhutan Duration: Nov 2006 to Nov 2008; Client: Department of Energy (DoE),
Royal Govt. of Bhutan, Country: Bhutan, Scope of Work: Detailed engineering design, EIA
studies.
8. Design & Engineering Consultancy for the Main Civil, electro-Mechanical & Hydro-
Mechanical works, Infrastructural works including Roads, Bridges and technical
Assistance for Tala Hydro Electric Project, Bhutan Duration: 1996 to July 2007; Client:
Royal Govt. of Bhutan, Country: Bhutan, Scope of Work: Detailed engineering design, EIA
studies for all project components including Road to Powerhouse of length 26.5 km,
Roads to various project components & residential colony of length 74.7 km, Steel truss
bridges of 8 Nos of class 70R loading & 6 Nos of 40R loading within the project area,
Rehabilitation of Gedu-Mirching road of length 7 km, Upgradation of Jumja-Tala road of
length 7 km.
10. Preparation of Detailed Project Report for Urban Transport system in Dhanbad under
JNNURM; Duration: May 2008 to August 2009; Client: Dhanbad Municipal Corporation,
Govt. of Jharkhand, Country: India, Scope of Work: Feasibility Studies, Detailed Engineering
Design and Drawing, Detailed Estimates and Technical specifications
11. Detailed Project Report including PPR for State Highways/ Major District Roads in the
National Capital Region of Haryana (Total length - 331.45 km); Duration: June 2006 to
March 2009; Client: PWD, B&R, Haryana, Country: India, Scope of Work: Feasibility
Studies including preparation of a proposal for up-gradation of existing roads on the basis of
traffic census, preparation of Detailed Project Report, Detailed design for SH 20 Murthal –
Sonepat 6.75km, Sonepat –Kharkhoda 14.25 km, KharkhodaSampla Road 18.9 km, SH 22
Rohtak-Kharkhoda-Delhi Border 32.80 km, Bahadurgarh to Jhajjar Road 28 km, SH 15 A
Jhajjar to Farrukh Nagar Gurgaon Road 40.03 km, SH 13 Gurgaon SohnaNuh Road 39.85 km,
SH 20 SamplaJhajjar Road 21.2 km, MDR 132 Hodal - Nuh- Tauru – Pataudi – Patauda
38.67 km, MDR 138 Rai – Nahra – Kundal – Sohti – Bahadurgar 39 km.
12. Detailed Project Reports preparation and supervision and quality control consultancy
services for construction of rural roads under Gram Sampark Sadak Yojana for the
consultancy package no. CS2602 (Rajgarh District), Gujarat India; Duration: April 2011 to
May 2016; Client: M.P. Rural Engineering Service, Rajgarh, India; Country: India Scope of
Work: Feasibility Studies and preparation of Detailed Project Reports (DPRs) of identified rural
5
Accelerating Infrastructure Delivery through Better Engineering Services Project
roads after conducting detailed survey and investigation, testing of field soil and material(s),
construction material survey, supervision and quality control.
13. Preparation of Detailed Project Report for Urban Transport system in Jamshedpur
under JNNURM; Duration: May 2008 to August 2009; Client: Jamshedpur Urban
Agglomeration, Govt. of Jharkhand Govt. of Jharkhand, Country: India, Scope of Work:
Feasibility Studies, Detailed Engineering Design and Drawing, Detailed Estimates and
Technical specifications
14. Detailed Project Reports preparation and supervision and quality control consultancy
services for construction of rural roads under Gram Sampark Sadak Yojana for the
consultancy package no. CS2002 (Dewas District), Gujarat India Duration: April 2011 to
June 2012; Client: M.P. Rural Engineering Service, Dewas, Country: India, Scope of Work:
Feasibility Studies and preparation of Detailed Project Reports of identified rural roads,
supervision and quality control.
15. Preparation of Detailed Project Report for Border Road in the state of Uttaranchal-
Package-III -Sela to Tedang- (22 K.M. Hill Terrain Road) Duration: May 2007 to April 2008;
Client: Central Public Works Department, Country: India, Scope of Work: Feasibility Studies,
detailed engineering design.
16. Preparation of Detailed Project Report for Border Road in the state of Uttaranchal-
Package –II: Niti to Geldung (46 Km Hilly Terrain Road), Uttaranchal, India Duration:
Nov.,2006 to June, 2007; Client: Central Public Works Department, Country: India, Scope of
Work: Feasibility Studies, detailed engineering design.
17. Kerala Sustainable Urban Development Project “Detail Design and Supervision
Consultancy for package 2 (Kochi, Thrissur and Kozhikode) – DSC 2” (Asia
Development Bank Funded), India; Duration: May 2007 to June 2010; Client: Kerala
Sustainable Urban Development Project, Local Self Government Department, Government of
Kerala; Country: India Scope of Work: Detailed design engineering, construction supervision.
18. Detailed Project Reports preparation and supervision and quality control consultancy
services for construction of rural roads under Gram Sampark Sadak Yojana for the
consultancy package no. CS4902 (Alirajpur, Jhabua, Barwani District, M.P., India
Duration: April 2011 to June 2012; Client: M.P. Rural Engineering Service, Alirajpur,
Country: India, Scope of Work: Feasibility Studies and preparation of Detailed Project
Reports of identified rural roads, supervision and quality control.
19. Preparation of Detailed Project Report for Santalpur-Gadhuli Road, Patan and Kachchh
District., Gujarat India (125 km) Duration: April 2011 to March 2013; Client: The Executive
Engineer, Bhuj, Kutch Country: India, Scope of Work: Feasibility Studies, preparation of
Detailed Project Report for selected 125 km of missing link.
20. Preparation of Detailed Project Report of roads from Ambedkar Chowk to Railway
Station for Nagar Palika Parishad Nepanagar Distt. Burhanpur, India Duration: Oct 2012
to Nov 2012; Client: Nagar Palika Parishad Nepanagar Country: India, Scope of Work:
Feasibility studies and preparation of DPR, Detailed designs, estimates, specifications and
other related information.
21. Consultancy Services for Design, drawing and cost estimate & Construction supervision
for Bridge across Rangmati river near Vora Hazira Causeway at Jamnagar, Duration:
Jan 2009 to July 2009; Client: Jamnagar Municipal Corporation Country: India Scope of
Work: Preparation of project report, preparation of detailed design incuding formation level as
per IRC and MORTH guidelines
6
Accelerating Infrastructure Delivery through Better Engineering Services Project
22. Preparation of plan design, cost estimate, leveling and tender document for Fire station,
housing works & other development work, Morbi (Gujarat), India; Duration: Nov 2009 to
April 2010; Client: Morbi Nagar Palika, Gujarat; Country: India Scope of Work: Detailed
design engineering.
DOLSAR
DOLSAR provides engineering and consultancy services for transportation structures and mass
transit systems including the preparation of master plans, feasibility reports, final/detailed designs,
application drawings, technical specifications, tender documents as well as construction
supervision.
DOLSAR Engineering has vast experience in planning, design and construction supervision of
transportation projects. DOLSAR has performed the engineering and consultancy services for
several roads, highways, railways and ports projects and their appurtenant structures including
tunnels and bridges. The total length of roads, highways and railways projects for which
engineering and consultancy services have been performed sums up to more than 1000 km.
7
Accelerating Infrastructure Delivery through Better Engineering Services Project
INDRA KARYA
In term of experience with financing authorities, Indra Karya is experienced in the implementation
of loan financed projects (Word Bank/IBRD, JBIC/OECF, ADB). By 2016, they have involved in
implementation of numerous international financed projects.
Indra Karya has proven a long track record in feasibility study, detailed engineering design,
environmental impact, construction supervision of dams, including projects under the same project
authorities in the Ministry of Public Works and Housing.
1. Road Rehabilitation (Sector) Project Design and Field Team Consultants Under ADB
Loan No. 1798-IND; Duration : November 2003 to January 2004; Client : PT. Jasa Marga
(Persero); Country : Center Java, Indonesia; Scope of Work : Detail engineering design and
master plan
2. Regional Design and Supervision consultants-2 (RDSC-2) for Second Eastern Indonesia
Region Transport Project (EIRTP-2) Under IBRD Loan No. 4744-IND; Duration : November
2006 to October 2010; Client : Directorate General of Highways (Bina Marga), Technical
Guidance Unit for Roads and Bridges; Country : Center Sulawesi, Indonesia; Scope of Work
: Detailed engineering design and supervision
3. Toll Road Technical Planning Cikampek - South Purwakarta - Pleret Segment's;
Duration : October 2003 to September 2004; Client : PT. Jasa Marga (Persero); Country :
West Java, Indonesia; Scope of Work : Planning, desain, and masterplan
4. Design Engineering Design of Road Improvment Exs. Kertas Kraft Aceh, PT Takengon
Cross -North Aceh; Duration : November 2006 to May 2007; Client : Public Planning Works
Unit, Technical Planning and Supply Chain Management BRR NAD – Nias; Country : North
Aceh, Indonesia; Scope of Work : Detail engineering design and master plan
5. Road Engineering Planning North Sulawesi Cross Center; Duration : March 2010 to July
2010; Client : Directorate General of Highways, SNVT Planning and Supervision of Road and
Bridge North Sulawesi; Country : North Sulawesi, Indonesia; Scope of Work : Detail
engineering design, master plan
6. Landslide Monitoring and Analysis System on Strategic Paths in Java and Sumatra;
Duration : June 2007 to November 2007; Client : Ministry of Public Works, Directorate
General of Highways, Technical Road and Bridge Engineering Working Unit; Country :
Indonesia; Scope of Work : Study, LARAP, environmental impact
7. Road Engineering Planning of Kapitu - Tumpaan Kapitu Tumpaan Location, Minahasa
District South Minahasa; Duration : September 2006 to January 2007; Client : South
8
Accelerating Infrastructure Delivery through Better Engineering Services Project
Minahasa District Department of Public Works; Scope of Work : Detail engineering design,
master plan
8. Road Engineering Planning North Sulawesi Cross West (84,54 Km); Duration :
September 2007 to March 2008; Client : SNVT Planning and Supervision of Roads and
Bridges of North Sulawesi; Scope of Work : Detail engineering design, master plan
9. Road Engineering Planning in Kupang City, Kupang District and TTS District - PR 01 –
Package; Duration : August 2010 to January 2011; Client : Directorate General of Highways,
SNVT Planning and Supervision Roads and Bridges NTT; Scope of Work : Detail engineering
design, master plan
10. Road Engineering Planning in Manggarai District and West Manggarai; Duration : March
2006 – June 2007; Client : SNVT P2JJ Prov. NTT; Scope of Work : Planning, engineering,
and design
11. Road Engineering Planning (Package 3); Duration : April 2004 – November 2004; Client :
Road & Bridge Planning & Supervision Project Prop. Central Java; Scope of Work : design,
master plan
12. Road Engineering Planning in Kupang District and TTS (PR-02 Package); Duration :
August 2010 – December 2010; Client : Directorate General of Highways, SNVT Planning and
Supervision of Roads and Bridges of NTT; Scope of Work : planning, design
13. Road Engineering Planning in Flores Island (West Slide) PR 02 – Package; Duration :
March 2013 – December 2013; Client : Ministry of Public Works, Directorate General of
Highways, Sattet NVTPP National Road Prov NTT; Scope of Work : design, planning
14. DED of National Leger Road’s; Duration : June 2005 – January 2006; Client : Directorate
General of Road, Ministry of Public Works; Scope of Work : detail engineering design
15. Bridge Engineering Planning (Package-3); Duration : April 2004 – November 2005; Client :
Project Planning and Supervision of Road and Bridge Prop. Central Java; Scope of Work :
planning, design
16. DED of Kulon Progo Fly Over (2), Kulon Progo District; Duration : October 2004 –
December 2004; Client : Public Works Department Kulon Progo; Scope of Work : detail
engineering design, master plan
17. DED of Road and Bridge – Package 1; Duration : May 2004 – December 2004; Client :
General Directorate of Roads, Public Works Department; Scope of Work : planning, design
18. Package of Road Planning Spreads North Sulawesi; Duration : March 2010 – July 2010;
Client : Directorate General of Highways, SNVT Planning and Supervision of Roads and
Bridges of North Sulawesi; Scope of Work : planning, design
19. Bridge Engineering Planning in Timor Island (PR-03 Package); Duration : November 2007
– December 2007; Client : Satker. NVT Planning and Supervision of Roads and Bridges of
NTT Province; Scope of Work : planning, design
20. Road Engineering Planning in Alor Island (PR-02 Package); Duration : September 2007 –
March 2008; Client : SNVT Planning and Supervision of Roads and Bridges of NTT Province;
Scope of Work : design, master plan
21. Information System in Sekayu and Lubuk Linggau; Duration : July 2005 – September
2005; Client : Directorate General of Road, Ministry of Public Works; Scope of Work : design
22. Feasibility study and Bridge Cross Design; Duration : December 2006 – July 2007; Client
: PT. Kalimantan Prima Persada Contractor & Mining Developer; Scope of Work : study and
design
23. DED of Bridge - Pakckage 7; Duration : January 2005 – June 2005; Client : Directorate
General of Road, Ministry of Public Work; Scope of Work : detail engineering design
24. Road Engineering Planning Package, Kenjeran, Surabaya; Duration : May 2009 – August
2009; Client : SNVT P2JJ Metro Surabaya; Scope of Work : planning, design
25. Road Engineering Planning in Urban Areas (package 01); Duration : March 2004 – May
2004; Client : Project for Planning and Controlling Roads and Urban Bridges of East Java
Province; Scope of Works : design, planning
26. Sangkariang's Bridge Engineering Planning, Suguh River, Kalianyar (Malang District)
and Bedadung River's Bridge Review Design (Jember District); Duration : January 2009
– March 2009; Client : Welfare Core Cooperative (KOPINKAN); Scope of Works : master
plan, design
9
Accelerating Infrastructure Delivery through Better Engineering Services Project
27. Road Engineering Planning in 124 KM's Denpasar - Packages 12 (Bon Dalem/Tembok
Village) – Amlapura; Duration : March 2013 – April 2013; Client : P2JN Bali; Scope of
Works : design, master plan
28. Road and Bridge Enginnering Planning in Lubuk Linggau; Duration : September 2005 –
December 2005; Client : Directorate General of Road, Ministry of Public Works; Duration of
Works : design, master plan
29. Road Engineering Planning at 9,50 Km's, Cekikik Gilimanuk, Pekutatan - Negara-
Tabanan Antasari; Duration : June 2004 – December 2005; Client : Directorate General of
Road, Ministry of Public Works; Scope of Works : planning, design
30. Bridge Engineering Planning Spread in East Java South Cross (Paket-2); Duration : June
2006 – October 2006; Client : Public Works Office of Bina Marga East Java; Scope of Works
: master plan, design
31. DED of Kulonprogo Fly Over (1), Kulonprogo District; Duration : January 2004 – August
2004; Client : Directorate General of Road, Ministry of Public Works; Scope of Works : detail
engineering design
32. DED of Retaining Wall Avalanche in all Road segments in Southeast Sulawesi and South
Sulawesi (Package 5); Duration : January 2004 – May 2004; Clients : Directorate General of
Road, Ministry of Public Works; Scope of Works : detail engineering design
33. Technical Assistance For Second Road Rehabilitation Project, UNDER ADB LOAN NO.
3989 – IND; Duration : April 2003 – January 2004; Clients : PT. Jasa Marga (Persero);
Scope of Works : engineering
34. DED of Gunung Putri Toll Gate's; Duration : August 2002 – October 2002; Clients :
Directorate General of Highways (Bina Marga), Technical Guidance Unit for Roads and
Bridges; Scope of Works : Detail engineering design
BINA KARYA
1. Feasibility Study and Preliminary Design of Papua's Central Cross Road, May 2014 – Nov
2014, Ministry of Public Works of the Directorate General of Highways of the Work Unit of the
Dire. Scope of work : Survey, Investigation, and prepared Preliminary Design
2. Project Consultancy Services Project Management Manual Project Mass Rapid Transit
Jakarta Phase -1, Sept 2012 - Dec 2012, PT. MRT Jakarta. Scope of work : Prepared the
Manual for MRT or Guideline for MRT Consultant
3. Preparation of Feasibility Study and Initial Design of Trans Sumatera Toll Road, 2012 -
2013, Directorate General of Highways, Ministry of Public Works. Scope of work : Survey and
data colection, driling for taking the sample, prepared the Feasibiity study for the toll road and
the impact to the community.
4. Design and Supervision Construction of Medan - Kualanamu Toll Road, Jan 2016 - Dec
2016, Directorate General of Highways, Ministry of Public Works. Scope of work : Evaluation of
study results and preliminary design, Evaluation of planning criteria and standards
Investigation and field survey, Analysis and Planning of Final Engineering
Prepared the Tender Documents, Schedule and Method of Implementation
5. Detail Engineering Design Crossing, Aug 2015 – Dec 2015, Department of Public Works of
DKI Jakarta Province. Scope of work : Surveys and Topographic Analysis, Design Drill, Sondir,
Utilities, Hydrology, Traffic, Road Network,
6. Detail Engineering Design (DED) Toll Road Development Soreang-Pasir Koja, Aug 2005 –
Feb 2016, PT.Wijaya Karya & PT.Citra Marga Lintas Jabar. Scope of work : Evaluation of study
results and preliminary design, Evaluation of planning criteria and standards
Investigation and field survey, Analysis and Planning of Final Engineering
Prepared the Tender Documents, Schedule and Method of Implementation
10
Accelerating Infrastructure Delivery through Better Engineering Services Project
7. Review Review and Basic Design of Elevated Busway Corridor 15 Pasar Minggu -
Manggarai, July 2014 – Dec 2014, Department of Public Works of DKI Jakarta Province Scope
of work : Survey for the field data, review for the Basic Design
8. Preparation of Technical Document of Road Development Palu - Parigi By Pass, Apr 2014
– Dec 2014, Ministry of Highways Regional Office Central Sulawesi Province. Scope of work :
Secondary and Primary Data Collection, Technical Analysis (Topography, geotechnical,
hydrology and environment), Identification and assessment of alternative routes Initial Design
and ROW PlanEconomic Cost and Feasibility Analysis Financial Feasibility Analysis (FIRR,
Feasibility Sensitivity) The concept of TOR Preparation of DED Preparation of EIA
9. Detail Engineering Design IC design Cibitung - Railway (Sta -0 + 440 s / d Sta 3 + 000) Toll
Road Cibitung - Cilincing, Apr 2013 - Oct 2013, PT. CTP - MTD Malaysia. Scope of work :
DeD Works Cibitung Toll Road Plan Included design of : Interchange Cibitung,
Telaga Asih Main Toll Elevated, Surveys : Surveys and Topographic Analysis, Design Drill,
Sondir, Utilities, Hydrology, Traffic, Road Network, and Design : IC Cibitung, Lanscape
IC Telaga Asih - Mechanical Elevated Toll + 1,400 m - Drainage
- Toll Road - Toll Gate
10. Technical Design and Supervision of Kualanamu Toll Road Construction, Aug 2012 - Aug
2014, Directorate General of Highways, Ministry of Public Works. Scope of work : : Evaluation
of study results and preliminary design, Evaluation of planning criteria and standards
Investigation and field survey, Analysis and Planning of Final Engineering
Prepared the Tender Documents, Schedule and Method of Implementation
11. Consulting Services Re-Computation of Existing Structure in Kebon Jeruk Interchange I,
Mar 2012 - Apr 2012, PT. Marga Lingkar Jakarta, Scope of work : Conducting Structure
Checking on Structures that have been built for IC Kebon Jeruk included with Structure
reinforcement proposal
12. Detail Engineering Design (DED) Alternative Alinyement Sta. 2 + 800 s / d 8 + 000 Toll
Road Cibitung Cilincing, Mar 2012 - July 2012, PT. MTD CTP Expresway, Malaysia. Scope of
work : Conducting a Field Survey consists of a 6 km topographic survey, drilling in 10 points and
12 point sondir and conduct Hydrology and Utilities survey, Doing Technical Analysis (Plan
Profile Structure, Geotechnical and Drainage), Creating Technical Analysis Report, Creating a
DED Image, Create a Specific Document in English Calculate Cost and Plan Working Methods
13. Coastal Road and EIA Planning for East Bolaang Mongondow Distric, Aug 2011 - Dec
2011, East Bolaang Mongondow District Public Works Department. Scope of work : Conduct
primary data survey (topography, soil, hydrology, environment) for the inner ring plan
Bolaang Mongondow East Creating detailed engineering design of the road along 13.3 km
and 2 bridges with road criteria freeway, Prepare Tender & Budgeting Documents Prepare EIA
Documents, doing calculating and solution to minimalize impact from work on field, prepare
reporting and conduct presentations.
14. Technical Planning for Improving Ciawi - Benda Road, Jun 2011 - Nov 2011, Directorate
General of Highways, Ministry of Public Works. Scope of work : Obtain an upgraded road
technical assessment and detailed technical plan for road improvement
Ciawi - A 9 km long object in West Java, This work includes field data surveys (road inventory,
topographic surveys, soils & materials, then Cross, pavement, hydrology and utilities) Followed
by technical planning and quantity calculation and price estimates, methods and
Implementation schedule, and tender documents
15. Bridge Design from Limunjan - Mantaritif Port (5 Units), Jun 2011 - Dec 2011, Public Works
Department of Berau District. Scope of work : Preparing technical work design for 5 bridges
along Limunjan road - Mantaritif Port, from survey, survey analysis, DED, Budgeting, and
Tender Documents for 5 bridges with spans between 25 s / d 80 meters, These DED bridge is a
superstructure of composite steel
16. DED Sambaliung - Mantaritif Road, Apr 2010 - Nov 2010, Public Works Department of Berau
District. Scope of work : Conducting topographic survey, soil investigation, hydrological, and
environmental surveys to perform technical planning of Detail Engineering Design for the road ±
41 km from Sambaliung to Mantaritif, Berau District, East Kalimantan Province with the criteria
of expressway prepare the Tender Document and Budget Plan (RAB) as well as the Plan
Drawings of the route in A3 size
11
Accelerating Infrastructure Delivery through Better Engineering Services Project
17. Final Engineering Design for Government Support Toll Road, Jun 2009 - Dec 2009,
Directorate General of Highways, Ministry of Public Works. Scope of work : Compiled the final
engineering plan document for Cileunyi - Sumedang - Dawuan toll road for ± 60 km
Scope of activities carried out include: evaluate the results of previous studies and preliminary
designs preparation of design criteria conduct Surveys and field investigations, technical
analysis and planning and prepared the Tender Document
18. Technical Assistance Consulting Services Financial Management, Legal, Technical and
Toll Road Concession Management (PMU), Apr 2009 - Dec 2009, Toll Road Regulatory
Agency, Ministry of Public Works. Scope of work : Services related to the development of BPJT
governance, preparing BPJT decision concept on SOP; NSPM and other rules based on results
Has been made by the previous consultant, assist the client in the preparation of the concept of
perfection of laws and regulations on the Toll roads organization (BUJT), BPJT institutions,
construction and operation of toll roads, services directly related to BUJT performance
Early identification of various problems that occur in the implementation of toll roads,
Including the collection of primary and field data related to the work to be performed.
19. Final Engineering Design (FED) Toll Road Development Ciawi - Sukabumi Section 1 + 2
Ciawi - Cibadak (Sta. 0 + 750 - Sta. 26 + 250), Aug 2008 - Jun 2009, PT. Trans Jabar Toll
Road. Scope of work : The length of this toll road is 26 + 250, divided into 2 sections namely
Section 1: Ciawi - Cigombong from Sta. -0 + 750 s / d Sta. 13 + 875 with 3 interchange pieces,
namely IC Ciawi, IC Caringin, and IC Lido; Section 2: Cigombong - Cibadak from Sta. 13 + 875
s / d Sta. 26 + 250 with 1 interchange of IC Cibadak, the main work consists of Survai
(topography, hydrology, land investigation, traffic, road network, and utilities), Analysis and
Planning (main roads, interchange, access, shelter, structures, toll gates, mechanical electrical,
landscape, Utilities, and toll facilities)
20. Final Engineering Design Waru (Aloha) - Wonokromo - Tanjung Perak Toll Road
(Advanced Stage), Jun 2008 - Sep 2009, PT. Margajaya Toll Road. Scope of work :
Conducting a review of previous work of the field conditions as well as costs to the bussiness
Plan, Scope of activities carried out include:- Evaluate the results of previous studies and
preliminary designs, preparation of design criteria, surveys and field investigations technical
analysis and planning and Complete Tender Document
21. Review Design of Outer Ring Toll Road Jakarta W2 North (Kebon Jeruk - Ulujami), Jun
2008 - Dec 2008, PT. Jasa Marga (Persero) Tbk. Scope of work : Conducting a design review
of a project designed in 1996 by PT. Citra Mataram Satria Persada includes:
review of main road plan and profile, interchanges of Ulujami and Kebon Jeruk, overpass and
underpass as built condition, review the needs of Toll Facility, toll gates, utilities and drainage
22. Preparation of Manual of Detailed Engineering Design and Landscape of Toll Road, Apr
2008 - Nov 2008, Directorate General of Highways, Ministry of Public Works. Scope of work :
Preparation of Manual Detail Engineering Design and Landscape Toll Road as the basis /
guidance for further implementation by publishing guidebook manuals for each - Each discipline
23. Detailed Engineering Design of Solo - Ngawi and Ngawi - Kertosono Toll Road, Dec 2007 -
Oct 2008, Directorate General of Highways, Ministry of Public Works. Scope of work : Detailed
Engineering Design of Solo - Ngawi Toll Road and Ruas Ngawi - Kertosono along 68.04 Km
Consists of segments: Solo - Ngawi, Ngawi - Nganjuk and Nganjuk - Kertosono and the
activities are : Evaluate the results of previous studies and preliminary designs, preparation of
criteria design, surveys and field investigations, Technical analysis and planning
and preparation of Tender document
24. Feasibility Study & Detail Engineering Design Flyover Harapan Mulya Bekasi, Aug 2007 -
Jan 2008, PT. Summarecon Agung, Tbk.. Scope of work : A. Making Feasibility Study and
Preliminary Design: Survey work: topography, land investigation, utilities, traffic
Conducting studies: traffic, topography, soil, geometric, structure, cost estimates, and feasibility
of the project, Preparation of the Final Engineering Plan, covering the work:
Stake out design: center line, cross section, Detailed planning: geometric, intersection,
structure, utility, sign and mark, PJU, Cost estimates, working methods
Preparation of Tender and Budgeting Plan Documents and prepare the Tender document
25. Detailed Engineering Design of Cibitung - Cilincing Toll Road Project, Mar 2007 - Apr
2008, PT. MTD CTP Expressway - Malaysia, Scope of work : Planning started from IC Cibitung
12
Accelerating Infrastructure Delivery through Better Engineering Services Project
meeting with Cawang - Cikampek toll road heading east until ended in IC Cilincing meeting with
access road Tanjung Priok through Bekasi and DKI area about ± 34 km
Construction work area Bekasi pile and pile slab with 17 bridges, 9 overpasses, and 4 locations
Ramp on / off with a length of ± 29.8 KmJakarta area with pile slab construction with 2 bridges,
1 overpass, and 1 ramp location on / off with Length ± 4.2 Km.
1. Technical Assistant For Core Team Consultant (CTC) For Regional Roads Development
Project (RRDP) under ADB loan NO.2817-INO, duration: February 2014 – December 2017,
Client: Directorate General of Bina Marga Scope of work: Prepare Final Engineering Design
and bidding documents for all projects and Provide construction supervision of all civil works.
2. Detail Engineering Design Kayu Agung - Palembang - Betung Toll Road Sta.00+000 -
Sta.111+694, Part of Trans Sumatera Toll Road, duration : August 2013 – June 2014, Client
: PT Sriwijaya Markmore Persada, Scope of work: Topographical mapping, Soil Investigations
and field sampling for Final Engineering design of toll road and its structures including
preparation of Bill of Quantities (BoQ) and Compilation of tender document (RFP) for bidding
purpose and conducting traffic analysist for forecast of revenue in financial proposal.
3. Supervision Consultancy Services For The Cikampek - Palimanan Toll Road In West
Java, duration: February 2013 – June 2016, Client: PT Lintas Marga Sedaya, Scope of work:
Reviewed Engineering Design, Assist Client in building and contract negotiation, Construction
supervision of Toll road and all civil works and carried out environment Management and
Monitoring Plan.
4. Road and Bridge Construction Supervision, West Java Road (PW-12/2013, West Java
Province, duration: March 2013 – December 2013, Client: P2JN West Java Province, Scope
of work: Reviewed Engineering Design, Assist Client in building and contract negotiation,
Construction supervision of National Roads and all civil works and carried out Environment
Management and Monitoring Plan.
5. Engineering Supervision for Reconstruction / Road Structure Improvement, Sei Rampah
Road CS (Package 01) North Sumatra Province, duration: March 2013 – December 2013,
Client: P2JN North Sumatera Province, Scope of work: Reviewed Engineering Design, Assist
Client in building and contract negotiation, Construction supervision of National Roads and all
civil works and carried out Environment Management and Monitoring Plan.
6. Detail Engineering Design Of Highway Cross East Aceh-1 (PR-JLJB/11/2012), duration:
June 2012 – December 2012, Client: Directorate General of Bina Marga NAD, Scope of work:
Topographical mapping, Soil Investigations and field sampling for Final Engineering design of
National road and its structures including preparation of Bill of Quantities (BoQ) and
Compilation of tender document (RFP) for bidding purpose.
7. Package 24 - East Line Supervision (MYC) - North Sumatra, duration: June 2012 –
December 2013, Client: Directorate General of Bina Marga North Sumatra, Scope of work:
Reviewed Engineering Design, Assist Client in building and contract negotiation, Construction
supervision of National Roads and all civil works and carried out Environment Management
and Monitoring Plan.
8. Advance DED Bridge Bintan Island - Dompak Island And Review Design, duration:
August 2012 – December 2012, Client: P2JN Kepulauan Riau Province, Scope of work:
13
Accelerating Infrastructure Delivery through Better Engineering Services Project
Topographical mapping, Soil Investigations and field sampling for Final Engineering design and
review of previous design of Bridges including tender document for bidding purpose.
9. Design And Build Work, For Package 4 Sta.6+092 - Sta.8+122 (Main Road), Benoa
Interchange of Nusa Dua-Ngurah Rai-Benoa Toll Road, Port Access Widening Sta.0+000 -
Sta.2+200 And Pesanggrahan Intersection At Ngurah Rai Bypass, duration : February 2012 –
April 2013, Client : PT Jasa Marga Bali Tol, Scope of work: Topographical mapping, Soil
Investigations and field sampling for Final Engineering design of toll road and its structures
including preparation of Bill of Quantities (BoQ) and Compilation of tender document (RFP) and
conducting traffic analysist for forecast traffic volume on each Interchanges, finally Carry out
Environment Management and Monitoring Plan as long as project runs.
10. Design And Build Work, For Nusa Dua - Benoa - Ngurah Rai Toll Road, Package 2,
Sta.2+790 - Sta.5+308 (Main Road) of Nusa Dua-Ngurah Rai-Benoa Toll Road, duration :
February 2012 – April 2013, Client : PT Jasa Marga Bali Tol, Scope of work: Topographical
mapping, Soil Investigations and field sampling for Final Engineering design of toll road and its
structures including preparation of Bill of Quantities (BoQ) and Compilation of tender document
(RFP) and conducting traffic analysist for forecast traffic volume on each Interchanges, finally
Carry out Environment Management and Monitoring Plan as long as project runs.
11. Construction Supervision Services for Construction of Gempol – Pasuruan Toll Road
Section 1, 2 & 3, Part of Trans Java Toll Road, duration : November 2011 – October 2014,
Client: Trans Marga Jatim Pasuruan, Scope of work: Reviewed Engineering Design, Assist
Client in building and contract negotiation, Construction supervision of Toll Roads and all civil
works and carried out Environment Management and Monitoring Plan.
12. Construction Supervision Services for Construction of Gempol – Pandaan Toll Road
Section 1, 2 & 3, Part of Trans Java Toll Road, duration : November 2011 – April 2013,
Client: PT Marga Bumi Adhikaraya, Scope of work: Reviewed Engineering Design, Assist
Client in building and contract negotiation, Construction supervision of Toll Roads and all civil
works and carried out Environment Management and Monitoring Plan.
13. Construction Supervision of Jakarta Outer Ring Road (JORR) Section W2 Segment
Kebon Jeruk – Ulujami Package 1 Sta.8+330 – Sta.10+282, duration : December 2011 –
April 2013, Client: PT Marga Lingkar Jakarta, Scope of work: Reviewed Engineering Design,
Assist Client in building and contract negotiation, Construction supervision of Toll Roads and all
civil works and carried out Environment Management and Monitoring Plan.
14. Consulting Services for Construction Management of Toll Road (At Grade & Fly Over)
and Jakarta Outer Ring Road Section W1 Segment Kebon Jeruk - Penjaringan Package
1 and Package 3 (included Fly Over Rawa Buaya and Fly Over Daan Mogot), duration :
June 2009 - January 2010, Client: PT Jakarta Lingkar Baratsatu (JLB), Scope of work:
Reviewed Engineering Design, Assist Client in building and contract negotiation, Construction
supervision of Toll Roads and all civil works and carried out Environment Management and
Monitoring Plan.
15. Pre Design Of Bakauheni - Terbanggi Besar Toll Road Section 1 (Bakauheni - Babatan)
and Section 3 (Tegineneng - Terbanggi Besar) – Part of Trans Sumatera Toll Road,
duration : May 2009 - November 2009, Client : Directorate General of Bina Marga Lampung
Province, Scope of work: Carry out Topographical mapping, Soil Investigations and field
sampling in numbers of project spots for Pre Engineering Design of toll road including
preparation of Bill of Quantities (BoQ) and Compilation of tender document (RFP) and
conducting traffic analysist for forecast traffic volume on each Interchanges.
16. Consulting Services For The Final Engineering Design (Fed) Toll Road Ciawi -
Sukabumi, Section 3 And 4 : Cibadak - Sukabumi Sta.26+250 - Sta.53+600 (27,35 Km),
14
Accelerating Infrastructure Delivery through Better Engineering Services Project
duration : October 2008 - June 2010, Client : PT Semesta Marga Raya, Scope of work:
Topographical mapping, Soil Investigations and field sampling for Final Engineering design of
toll road and its structures including preparation of Bill of Quantities (BoQ) and Compilation of
tender document (RFP) and conducting traffic analysist for forecast traffic volume on each
Interchanges.
17. Construction Supervision Sevices of Kanci-Pejagan Toll Road Sta.233+000-Sta.268+000,
duration : June 2008 - December 2010, Client: PT Semesta Marga Raya, Scope of work:
Reviewed Engineering Design, Assist Client in building and contract negotiation, Construction
supervision of Toll Roads and all civil works and carried out Environment Management and
Monitoring Plan.
18. Construction Supervision Services Of Bogor Ring Road Section I Sentul Selatan -
Kedung Halang (Sta.0+000 - Sta.3+850), duration : March 2008 - November 2008, Client:
Indonesia Highway Corporation, Scope of work: Reviewed Engineering Design, Assist Client in
building and contract negotiation, Construction supervision of Toll Roads and all civil works and
carried out Environment Management and Monitoring Plan.
19. Consulting Services For The Row Plan Preparation And Detailed Engineering Design of
Semarang - Solo Toll Road Phase II Link : Salatiga-Boyolali (Sta.40+200-Sta.63+100),
Part of Semarang-Solo Toll Road, duration : March 2008 - October 2008, Client : Indonesian
Highway Corporation, Scope of work: Topographical mapping, Soil Investigations and field
sampling for Final Engineering design of toll road and its structures including preparation of Bill
of Quantities (BoQ) and Compilation of tender document (RFP) for bidding purpose and
conducting traffic analysist to determined Traffic Loads of each vehicles across Arterial roads.
20. Construction Supervision Services Of Toll Prof. DR.IR Sedyatmo Toll Road Package 4
Link : Penjaringan – Kapuk Lane B (Sta. 7+456 – Sta. 11+337), duration : June 2008 -
December 2008, Client: Indonesia Highway Corporation, Scope of work: Reviewed
Engineering Design, Assist Client in building and contract negotiation, Construction supervision
of Toll Roads and all civil works.
21. Consulting Services For Construction Supervision For Technical National Road Project,
Package BRR-PW JN 01, duration : August 2007 - December 2007, Client: BRR Aceh-Nias,
Scope of work: Reviewed Engineering Design, Assist Client in building and contract
negotiation, Construction supervision of Toll Roads and all civil works.
22. Consulting Services for The Detailed Engineering Design and Construction Supervision
of Tanjung Priok Access Road Construction Project Phase I Under JBIC Loan, duration :
September 2007 - February 2011, Client : Directorate General of Highway, Scope of work:
Topographical mapping, Soil Investigations and field sampling for Final Engineering design of
toll road and its structures including tender document for bidding purpose.
23. Basic Design and FED Penjaringan – Kebon Jeruk Toll Road Project Under Jakarta
Outer Ring Road (JORR) Section W-1, duration : May 2006 - December 2006, Client : PT
Jakarta Lingkar Baratsatu (JLB), Scope of work: Topographical mapping, Soil Investigations
and field sampling for Final Engineering design of toll road and its structures including
preparation of Bill of Quantities (BoQ) and Compilation of tender document (RFP) for bidding
purpose, Beside engineering works, The Company has also carried out The Review of
Environmental Study for the project in form of Environmental Impact Assessment.
24. Detailed Engineering Design of Depok - Antasari Toll Road, duration : August 2006 - July
2007, Client PT Citra Waspphutowa, Scope of work: Topographical mapping, Soil
Investigations and field sampling for Final Engineering design of toll road and its structures
including preparation of Bill of Quantities (BoQ) and Compilation of tender document (RFP)for
bidding purpose.
15
Accelerating Infrastructure Delivery through Better Engineering Services Project
25. Consulting Services for Regional Design and Supervision Consultant (RDSC) Team I
Second Eastern Indonesia Region Transportation Project (EIRTP-2), duration : January
2007 - June 2009, Client : Directorate General of Highway, Scope of work: Prepare Final
Engineering Design and bidding documents for all projects to be implemented in Annual Work
Programmed and Provide construction supervision of all civil works implemented under Annual
Work Programmed, including establishing and operating testing laboratories at specified
locations, provide general support in overall project management to all implementing agencies
at all level of government.
26. Technical Supervision Works for Kabupaten Roads Package PW-03C BRR Aceh, duration
: August 2006 - January 2007, Client : BRR Aceh & Nias, Scope of work: carry out the review
design and construction supervision including assistance to the project officer for tendering and
contracting of the successful implementation of technique supervision of road construction.
27. Technical Advisory Services Road Rehabilitation (Sector) Project – Core Team
Consultant Under ADB Loan No. 1798-INO, duration : November 2002 - July 2006, Client :
KIMPRASWIL (DGRI), Scope of work: Monitoring the progress of the Action Plan and
reformulating and implementing road sector policies and strategies, Quality and quantity control
to support and enforce the law on vehicle overloading, road safety and road planning and
programming, Monitoring progress evaluated the proposal AWP each year by using latest
IIRMS 2000 program and Certification of monthly payment review engineering design, cost
estimates, pre qualification document and bidding documents for first batch (AWP).
28. Consultancy Services for The Road Rehabilitation (Sector) Project (RRSP) under ADB
Loan No.1798-INO (Design and Field Team), duration : November 2003 - January 2006,
Client : Ditjen Bina Marga, Scope of work: carry out the review design and construction
supervision including assistance to the project officer for tendering and contracting of the
successful implementation of technique supervision of road construction.
PT. Pola Agung has proven a long track record in feasibility study, detailed engineering design,
environmental impact, construction supervision of dams, including projects under the same project
authorities in the Ministry of Public Works and Housing.
2. Feasibility Study And Basic Desain For Toll Road Trans Sumatera Province Link
Medan - Aceh. Package F3. Duration : April 2012 - July 2013 Client :Direktorat General
Of Highways Ministry Of Public Work Indonesian PT. Pola Agung Scope of Work :
Feasibility Study
3. Guide Line for Design Of Specsification Bridge Project (Package A-7) Duration
: July 08, 2015 - December 2015 Client : Direktorat General Of Highways Ministry Of
Public Work, Working Group on Coaching Activities of Directorate of Bridge Indonesian,
Scope of Work : Feasibility Study
16
Accelerating Infrastructure Delivery through Better Engineering Services Project
5. Pra Feasibility Development Of Road at jayapura sentani City and Keerom City Of
Papua Province Duration : November 12, 2007 - May 2008 Client : DPU
Jayapura Indonesian , Scope of Work : Feasibility Study
7. Detail Engineering Desain Bridge Of West Nusa Tenggara Province 01 (Package 10)
Duration : April 01, 2015 - September 2015 Client : Direktorat General Of
Highways Ministry Of Public Work, nationalWest Nusa Tenggara Province
Indonesian , Scope of Work : Design
9. Detail Engineering Design Road, Fly Over and Bridge East Java Province, Duration
: July 28, 2005 - December 18, 2005 Client : Direktorat General Of Highways Ministry
Of Public Work, Temporary Work Unit of East Java P2JJ Indonesian , Scope of Work :
Design
10. Detail Engineering Design Last Toll Road Semarang - Bawen City Duration : July,
28 2005 - January 18, 2006 Client : PT Jasa Marga (Persero) Indonesian ,
Scope of Work : Design
12. Management Consulting For Direktorat Bina Marga East Regional, Duration :
February 25, 2010 - December 2010 Client : Direktorat General Of Highways Ministry
Of Public Work, Satker of East Road and Bridge Directorate Indonesian Scope of
Work : EIA
13. Management Consulting For Direktorat Bina Marga East Regional , Duration :
January 14, 2008 - December 2009 Direktorat General Of Highways Ministry Of Public
Work, Unit Dir. Eastern Roads and Bridges Indonesian Scope of Work : EIA
15. Consulting Services For Construction Supervision of The Tanjung Priok Access
Road Construction Project, Phase Duration : 2 November 23, 2010 - July 03,
2015 Client : Direktorat General Of Highways Ministry Of Public Work Akses Tanjung
17
Accelerating Infrastructure Delivery through Better Engineering Services Project
16. Management Consulting Construction Toll Outer Ring Road Jakarta Seksi W1
Segment Kebon Jeruk - Penjaringan Duration : October 04, 2007 - June 2009 Client :
PT. Jakarta Lingkar Barat Satu Indonesian Scope of Work : Supervision
17. Construction Supervision For Bridge to Satker Road And Bridge National Region II
(Package 04) Duration : April 01, 2015 - December 2015 Client : Direktorat
General Of Highways Ministry Of Public Work, National Road Planning and Monitoring Unit
of West Nusa Tenggara Province Indonesian Scope of Work : Supervision
B. Geographical Experience
Cross-referencing from your profile projects in Section E, present experiences in similar geographic
areas (Indonesia or the Asian and the Pacific).
Since its inception in 1969, WAPCOS has been actively providing consultancy services in more
than 50 countries all over the world. WAPCOS has till date provided consultancy for more than
2000 projects in India as well abroad. WAPCOS has undertaken numerous projects in Asia Pacific
region as well. For carrying-out various project activities, WAPCOS has established its offices at
different project locations in the region. The countries of operation in Asia and Pacific region have
been Indonesia, Lao PDR, Philippines, Malaysia, Singapore, Cambodia, Myanmar,Vietnam,
Mangolia, India, Bhutan, Bangladesh, Afghanistan, Sri Lanka, Nepal etc.
DOLSAR’s experience covers projects in several other countries such as Azerbaijan, Bosnia-
Herzegovina, Cyprus, India, Iraq, Libya, Pakistan, Georgia, Saudi Arabia, Turkmenistan and
Uzbekistan.
PT. Indra Karya (Persero) is seemly the most experienced Indonesian Consulting Company in
Road and Bridge Projects. The company has been actively providing consultancy services in Detail
Design and of almost all major road and bridge engineering planning and study in Indonesia, such
as Road Rehabilitation (Sector) Project Design Under ADB, Second Eastern Indonesia Region
Transport Project (EIRTP-2) Under IBRD, Landslide Monitoring and Analysis System, and
Feasibility Study and Bridge Cross Design. The company also has been actively providing
consultancy services in Study, Detail Design, LARAP, and EIA project of almost all major Irrigation,
River improvement, and bulk water in Indonesia, such as Ciliwung – Cisadane river, Brantas river,
Cimanuk-Cisanggarung river, Bili-Bili, Pengga, and Batutegi.
WAPCOS
WAPCOS has been engaged in a number of water sector and infrastructure projects in Asia and
the Pacific as follows :
18
Accelerating Infrastructure Delivery through Better Engineering Services Project
Lao PDR
1. Development of Six Lift Irrigation Schemes in Champassack Province (under Line of
Credit, Government of India); Duration: May, 2009 to Sept. 2015; Client: Department of
Irrigation, Ministry of Agricultural and Forestry, Government of Lao PDR; Location: Lao PDR
2. Project Management Consultancy for Nam Song Hydropower Project (3x2 MW) (Under
Line of Credit of Govt. of India); Duration: Oct 2008 to Ongoing; Client: Electricite Du LAOS
(EDL); Location: LAOS PDR
3. Construction of Nam song Hydropower project & 115 Kv Transmission line project and
purchase of equipment for rural electrification Phase-2; Duration: 2008; Client: Electricile
du Laos; Location: Lao PDR
4. Engineering Procurement and construction for development of 6 large Irrigation
Schemes in Champassak province Lao PDR; Duration: 2015; Client: Department of
Irrigation, Ministry of Agricultural and Forestry, Government of Lao PDR; Location: Lao PDR
Cambodia
1. Project Implementation Consultant for Construction of 230kV DC Transmission Line from
Stung Treng to Kratie and associated 230/22 KV Substation at Kratie, Kingdom of
Cambodia.; Duration: January 2012 to January 2014; Client: Electricite Du Cambodia (EDC);
Location: Cambodia
2. Siem Reap River Basin-Development of Master Plan, Cambodia, Kingdom of Cambodia.;
Duration: December, 2014 to Nov, 2016; Client: Ministry of External Affairs, Government of
India; Location: Cambodia
3. Rehabilitation of West Baray Irrigation Project – Project Management, Kingdom of
Cambodia.; Duration: April, 2005 to June, 2009; Client: Ministry of Water Resources and
Meteorology, Royal Government of Cambodia; Location: Cambodia
4. Engineering Procurement and Construction of Stung Tasal Dam Project, Kingdom of
Cambodia; Duration: Dec,2007 to September, 2015; Client: Ministry of Water Resources and
Meteorology, Royal Government of Cambodia; Location: Cambodia
Bhutan
1. Punatsagchhu-I Hydro Electric Project (1200 MW, 343m Design head) Investigations,
Engineering Consultancy for Main Civil Works and Infrastructure Development, Wangdue
Phodrang, Western Bhutan; Duration: Jan 2004 to August, 2010; Client: PHPA Royal
Government of Bhutan; Location: Bhutan
2. Punatsagchhu-II Hydro Electric Project Investigations, Engineering Consultancy for Main
Civil Works and Infrastructure Development (6x170 MW), 256 m Gross Head, Wangdue
Phodrang, Western Bhutan; Duration: November, 2006 to Ongoing; Client: PHPA Royal
Government of Bhutan; Location: Bhutan
3. Detailed design engineering for Tala Hydro Electric Project (1020 MW, 860 m Gross
Head), Tala, Western Bhutan; Duration: December, 1997 to July, 2007; Client: Royal
Government of Bhutan; Location: Bhutan
4. Technical services on Design & construction of 400 kV Transmission lines for
Mangdechhu Hydro electric Project, Bhutan; Duration: September 2011 to Ongoing; Client:
Bhutan Power Corporation, Bhutan; Location: Bhutan
5. EIA study for additional generation of power from chukha H.E. Project; Duration: May,
1976 to August, 1988; Client: Royal Government of Bhutan; Location: Bhutan
6. Development of Financial Information System For Tala Hydro Elect. Project; Duration:
December, 1997 to July, 2007; Client: Royal Government of Bhutan; Location: Bhutan
Bangladesh
1. Sustainable Rural Infrastructure Improvement Project (Asian Development Bank – TA
7371-BAN), Dhaka, Bangladesh; Duration: April, 2010 to August, 2010; Client: Asian
Development Bank; Location: Bangladesh
19
Accelerating Infrastructure Delivery through Better Engineering Services Project
Nepal
1. Draft Feasibility Study Report of Arun-III H.E. Project; Duration: August 2008 to ongoing;
Client: Satluj Jal Vidyut Nigam Ltd.(SJVNL), Shimla; Location: Nepal
2. Preparation of DPR for Irrigation Studies of Command area lying in Indian Territory under
Sapta Kosi High Dam Multi-Purpose Project and Sun Kosi Storage-cum-Diversion
Scheme; Duration: March 2009 to Feb 2014; Client: Sapta Kosi Sun Kosi Investigation (JPO-
SKSKI), Nepal
DOLSAR
DOLSAR has been involved in and successfully delivered services, ranging from feasibility studies
to construction supervision in various Asian countries. This experience includes some notable
projects
HAVELIAN-THAKOT Motorway: Located in Pakistan, 130 km motorway. Services provided
are design review and construction supervision.
KARAKORAM Highway: Located in Pakistan 62 km highway. Services provided are detailed
design and construction supervision.
Consultant’s Services including Design and Construction Supervision of Water Supply
and Sewerage Projects for 10 PROVINCES IN AZERBAIJAN: Preparation of detailed
design, tender documents and provision of construction supervision services for Shirvan,
Salyan, Neftchala, Khacmaz, Yevlakh, Barda, Khizi, Quzar, Gobustan and Naftalan Provinces.
Client: AZERSU Joint Stock Company, Azarbaijan
Dasu Dam and Hydroelectric Power Plant: Located in Pakistan, Dasu Dam and HEPP is a
roller compacted concrete dam with a height of 240 m and an installed capacity of 4320 MW.
Services provided are review of the feasibility study, preparation of detailed design, bill of
quantities, cost estimate, environmental impact assessment report, social impact assessment
report, RAP, preparation of bidding documents, tendering and contracting, construction design,
contract management and construction supervision services.
Pakal Dul Dam and Hydroelectric Power Plant: Located in India, Pakal Dul Dam and HEPP
is a concrete faced rockfill dam with a height of 167 m and an installed capacity of 1000 MW.
Services provided are tender design and tender drawings.
Lata Tapovan Dam and Hydroelectric Power Plant: Located in India, Lata Tapovan Dam
and HEPP is a concrete dam with a height of 20 m and an installed capacity of 171 MW.
Services provided are tender design and tender drawings.
Kishanganga Dam and Hydroelectric Power Plant: Located in India, Kishanganga Dam and
HEPP is a concrete faced rockfill dam with a height of 37 m and an installed capacity of 330
MW. Services provided are tender design and tender drawings.
Ramman Stage III Dam and Hydroelectric Power Plant: Located in India, Ramman Stage III
Dam and HEPP is a concrete faced rockfill dam with a height of 32 m and an installed capacity
of 120 MW. Services provided are tender design and tender drawings.
20
Accelerating Infrastructure Delivery through Better Engineering Services Project
INDRA KARYA
Relevant to this project, INDRA KARYA has engaged in the preparation of a number of projects in
the region, as follows:
I. CENTRAL JAVA
1. Road Rehabilitation (Sector) Project Design and Field Team Consultants Under ADB
Loan No. 1798-IND; Duration : November 2003 to January 2004; Client : PT. Jasa
Marga (Persero); Country : Central Java, Indonesia; Scope of Work : Detail engineering
design and master plan
2. Road Engineering Planning (Package 3); Duration : April 2004 – November 2004;
Client : Road & Bridge Planning & Supervision Project Prop. Central Java; Scope of Work
: design, master plan
4. DED of Road and Bridge – Package 1; Duration : May 2004 – December 2004; Client :
General Directorate of Roads, Public Works Department; Scope of Work : planning,
design
5. Road Engineering Planning in Urban Areas (package 01); Duration : March 2004 –
May 2004; Client : Project for Planning and Controlling Roads and Urban Bridges of East
Java Province; Scope of Works : design, planning
2. Landslide Monitoring and Analysis System on Strategic Paths in Java and Sumatra;
Duration : June 2007 to November 2007; Client : Ministry of Public Works, Directorate
General of Highways, Technical Road and Bridge Engineering Working Unit; Country :
Indonesia; Scope of Work : Study, LARAP, environmental impact
3. Technical Assistance For Second Road Rehabilitation Project, UNDER ADB LOAN
NO. 3989 – IND; Duration : April 2003 – January 2004; Clients : PT. Jasa Marga
(Persero); Scope of Works : engineering
4. DED of Gunung Putri Toll Gate's; Duration : August 2002 – October 2002; Clients :
Directorate General of Highways (Bina Marga), Technical Guidance Unit for Roads and
Bridges; Scope of Works : detail engineering design
1. Road Engineering Planning North Sulawesi Cross Center; Duration : March 2010 to
July 2010; Client : Directorate General of Highways, SNVT Planning and Supervision of
Road and Bridge North Sulawesi; Country : North Sulawesi, Indonesia; Scope of Work :
Detail engineering design, master plan
21
Accelerating Infrastructure Delivery through Better Engineering Services Project
3. Road Engineering Planning North Sulawesi Cross West (84,54 Km); Duration :
September 2007 to March 2008; Client : SNVT Planning and Supervision of Roads and
Bridges of North Sulawesi; Scope of Work : Detail engineering design, master plan
4. Package of Road Planning Spreads North Sulawesi; Duration : March 2010 – July
2010; Client : Directorate General of Highways, SNVT Planning and Supervision of
Roads and Bridges of North Sulawesi; Scope of Work : planning, design
1. Feasibility study and Bridge Cross Design; Duration : December 2006 – July 2007;
Client : PT. Kalimantan Prima Persada Contractor & Mining Developer; Scope of Work :
study and design
1. Road Engineering Planning in Kupang City, Kupang District and TTS District - PR 01
– Package; Duration : August 2010 to January 2011; Client : Directorate General of
Highways, SNVT Planning and Supervision Roads and Bridges NTT; Scope of Work :
Detail engineering design, master plan
3. Road Engineering Planning in Kupang District and TTS (PR-02 Package); Duration :
August 2010 – December 2010; Client : Directorate General of Highways, SNVT Planning
and Supervision of Roads and Bridges of NTT; Scope of Work : planning, design
1. DED of National Leger Road’s; Duration : June 2005 – January 2006; Client :
Directorate General of Road, Ministry of Public Works; Scope of Work : detail
engineering design
2. Information System in Sekayu and Lubuk Linggau; Duration : July 2005 – September
2005; Client : Directorate General of Road, Ministry of Public Works; Scope of Work :
design
22
Accelerating Infrastructure Delivery through Better Engineering Services Project
3. DED of Bridge - Pakckage 7; Duration : January 2005 – June 2005; Client : Directorate
General of Road, Ministry of Public Work; Scope of Work : detail engineering design
4. Road and Bridge Enginnering Planning in Lubuk Linggau; Duration : September 2005
– December 2005; Client : Directorate General of Road, Ministry of Public Works;
Duration of Works : design, master plan
VIII. ACEH
IX. YOGYAKARTA
1. DED of Kulon Progo Fly Over (2), Kulon Progo District; Duration : October 2004 –
December 2004; Client : Public Works Department Kulon Progo; Scope of Work : detail
engineering design, master plan
2. DED of Kulonprogo Fly Over (1), Kulonprogo District; Duration : January 2004 –
August 2004; Client : Directorate General of Road, Ministry of Public Works; Scope of
Works : detail engineering design
X. EAST JAVA
3. Bridge Engineering Planning Spread in East Java South Cross (Paket-2); Duration :
June 2006 – October 2006; Client : Public Works Office of Bina Marga East Java; Scope
of Works : master plan, design
XI. BALI
23
Accelerating Infrastructure Delivery through Better Engineering Services Project
1. DED of Retaining Wall Avalanche in all Road segments in Southeast Sulawesi and
South Sulawesi (Package 5); Duration : January 2004 – May 2004; Clients :
Directorate General of Road, Ministry of Public Works; Scope of Works : detail
engineering design
BINA KARYA
PT. Bina Karya (Persero) have Branch Offices in all Regions. Relevant to this project, BIKA has
engaged in projects in the region, as follows:
A. SUMATERA
1. Preparation of Feasibility Study and Initial Design of Trans Sumatera Toll Road, 2012 -
2013, Directorate General of Highways, Ministry of Public Works. Scope of work : Survey and
data colection, driling for taking the sample, prepared the Feasibiity study for the toll road and
the impact to the community.
2. Design and Supervision Construction of Medan - Kualanamu Toll Road, Jan 2016 - Dec
2016, Directorate General of Highways, Ministry of Public Works. Scope of work : Evaluation
of study results and preliminary design, Evaluation of planning criteria and standards
Investigation and field survey, Analysis and Planning of Final Engineering
Prepared the Tender Documents, Schedule and Method of Implementation
3. Technical Design and Supervision of Kualanamu Toll Road Construction, Aug 2012 -
Aug 2014, Directorate General of Highways, Ministry of Public Works. Scope of work :
Evaluation of study results and preliminary design, Evaluation of planning criteria and
standards Investigation and field survey, Analysis and Planning of Final Engineering
Prepared the Tender Documents, Schedule and Method of Implementation
B. JAVA
1. Project Consultancy Services Project Management Manual Project Mass Rapid Transit
Jakarta Phase -1, Sept 2012 - Dec 2012, PT. MRT Jakarta. Scope of work : Prepared the
Manual for MRT or Guideline for MRT Consultant
2. Detail Engineering Design Crossing, Aug 2015 – Dec 2015, Department of Public Works of
DKI Jakarta Province. Scope of work : Surveys and Topographic Analysis, Design Drill,
Sondir, Utilities, Hydrology, Traffic, Road Network,
3. Detail Engineering Design (DED) Toll Road Development Soreang-Pasir Koja, Aug 2005
– Feb 2016, PT.Wijaya Karya & PT.Citra Marga Lintas Jabar. Scope of work : Evaluation of
study results and preliminary design, Evaluation of planning criteria and standards
Investigation and field survey, Analysis and Planning of Final Engineering
Prepared the Tender Documents, Schedule and Method of Implementation
4. Review Review and Basic Design of Elevated Busway Corridor 15 Pasar Minggu -
Manggarai, July 2014 – Dec 2014, Department of Public Works of DKI Jakarta Province
Scope of work : Survey for the field data, review for the Basic Design
5. Detail Engineering Design IC design Cibitung - Railway (Sta -0 + 440 s / d Sta 3 + 000)
Toll Road Cibitung - Cilincing, Apr 2013 - Oct 2013, PT. CTP - MTD Malaysia. Scope of
work : DeD Works Cibitung Toll Road Plan Included design of : Interchange Cibitung,
Telaga Asih Main Toll Elevated, Surveys : Surveys and Topographic Analysis, Design Drill,
Sondir, Utilities, Hydrology, Traffic, Road Network, and Design : IC Cibitung, Lanscape
IC Telaga Asih - Mechanical Elevated Toll + 1,400 m - Drainage
- Toll Road - Toll Gate
24
Accelerating Infrastructure Delivery through Better Engineering Services Project
25
Accelerating Infrastructure Delivery through Better Engineering Services Project
14. Preparation of Manual of Detailed Engineering Design and Landscape of Toll Road, Apr
2008 - Nov 2008, Directorate General of Highways, Ministry of Public Works. Scope of work :
Preparation of Manual Detail Engineering Design and Landscape Toll Road as the basis /
guidance for further implementation by publishing guidebook manuals for each - Each
discipline
15. Detailed Engineering Design of Solo - Ngawi and Ngawi - Kertosono Toll Road, Dec
2007 - Oct 2008, Directorate General of Highways, Ministry of Public Works. Scope of work :
Detailed Engineering Design of Solo - Ngawi Toll Road and Ruas Ngawi - Kertosono along
68.04 Km
Consists of segments: Solo - Ngawi, Ngawi - Nganjuk and Nganjuk - Kertosono and the
activities are : Evaluate the results of previous studies and preliminary designs, preparation of
criteria design, surveys and field investigations, Technical analysis and planning
and preparation of Tender document
16. Feasibility Study & Detail Engineering Design Flyover Harapan Mulya Bekasi, Aug 2007 -
Jan 2008, PT. Summarecon Agung, Tbk.. Scope of work : A. Making Feasibility Study and
Preliminary Design: Survey work: topography, land investigation, utilities, traffic
Conducting studies: traffic, topography, soil, geometric, structure, cost estimates, and
feasibility of the project, Preparation of the Final Engineering Plan, covering the work:
Stake out design: center line, cross section, Detailed planning: geometric, intersection,
structure, utility, sign and mark, PJU, Cost estimates, working methods
Preparation of Tender and Budgeting Plan Documents and prepare the Tender document
17. Detailed Engineering Design of Cibitung - Cilincing Toll Road Project, Mar 2007 - Apr
2008, PT. MTD CTP Expressway - Malaysia, Scope of work : Planning started from IC
Cibitung meeting with Cawang - Cikampek toll road heading east until ended in IC Cilincing
meeting with access road Tanjung Priok through Bekasi and DKI area about ± 34 km
Construction work area Bekasi pile and pile slab with 17 bridges, 9 overpasses, and 4
locations
Ramp on / off with a length of ± 29.8 KmJakarta area with pile slab construction with 2 bridges,
1 overpass, and 1 ramp location on / off with Length ± 4.2 Km...
C. SULAWESI
1. Preparation of Technical Document of Road Development Palu - Parigi By Pass, Apr
2014 – Dec 2014, Ministry of Highways Regional Office Central Sulawesi Province. Scope of
work : Secondary and Primary Data Collection, Technical Analysis (Topography, geotechnical,
hydrology and environment), Identification and assessment of alternative routes Initial Design
and ROW PlanEconomic Cost and Feasibility Analysis Financial Feasibility Analysis (FIRR,
Feasibility Sensitivity) The concept of TOR Preparation of DED Preparation of EIA
2. Coastal Road and EIA Planning for East Bolaang Mongondow Distric, Aug 2011 - Dec
2011, East Bolaang Mongondow District Public Works Department. Scope of work : Conduct
primary data survey (topography, soil, hydrology, environment) for the inner ring plan
Bolaang Mongondow East Creating detailed engineering design of the road along 13.3 km
and 2 bridges with road criteria freeway, Prepare Tender & Budgeting Documents Prepare EIA
Documents, doing calculating and solution to minimalize impact from work on field, prepare
reporting and conduct presentations.
D. KALIMANTAN
a. Bridge Design from Limunjan - Mantaritif Port (5 Units), Jun 2011 - Dec 2011, Public
Works Department of Berau District. Scope of work : Preparing technical work design for 5
bridges along Limunjan road - Mantaritif Port, from survey, survey analysis, DED, Budgeting,
and Tender Documents for 5 bridges with spans between 25 s / d 80 meters, These DED
bridge is a superstructure of composite steel
b. DED Sambaliung - Mantaritif Road, Apr 2010 - Nov 2010, Public Works Department of
Berau District. Scope of work : Conducting topographic survey, soil investigation, hydrological,
and environmental surveys to perform technical planning of Detail Engineering Design for the
road ± 41 km from Sambaliung to Mantaritif, Berau District, East Kalimantan Province with the
criteria of expressway prepare the Tender Document and Budget Plan (RAB) as well as the
26
Accelerating Infrastructure Delivery through Better Engineering Services Project
E. PAPUA
1. Feasibility Study and Preliminary Design of Papua's Central Cross Road, May 2014 –
Nov 2014, Ministry of Public Works of the Directorate General of Highways of the Work Unit of
the Dire. Scope of work : Survey, Investigation, and prepared Preliminary Design
PT POLA AGUNG
Relevant to this project, PT. POLA AGUNG has engaged in the preparation of a number of projects
in the region, as follows:
III. SUMATERA
1. Technical Assistence for Traffic Environment Impact (ANDALALIN) Segment
Padang - Pekanbaru, Sumatera Province , Duration : July 06, 2017 -
September 03, 2017 Client : PT. Hutama Karya (Persero) Toll road development
division Indonesian , Scope of Work : Feasibility Study
2. Feasibility Study And Basic Desain For Toll Road Trans Sumatera Province
Link Medan - Aceh. Package F3. Duration : April 2012 - July 2013 Client
:Direktorat General Of Highways Ministry Of Public Work Indonesian PT. Pola
Agung Scope of Work : Feasibility Study
3. Guide Line for Design Of Specsification Bridge Project (Package A-7)
Duration : July 08, 2015 - December 2015 Client : Direktorat General Of
Highways Ministry Of Public Work, Working Group on Coaching Activities of
Directorate of Bridge Indonesian, Scope of Work : Feasibility Study
4. Consulting Services For Construction Supervision Consultant (CSC) for
Reconstruction of Calang - Meulaboh National Road Duration : January 9,
2012 - December 31, 2012 Client : Direktorat General Of Highways Ministry
Of Public Work, Satker of Central Implementation of National Road I Activities
Implementation Indonesian , Scope of Work : EIA
IV. KALIMANTAN
1) Technical Guideline / Managemen for Bridge Rehabilitation (Package B-
4/2014) , Duration : May 02, 2014 - December 2014 Client :Direktorat General
Of Highways Ministry Of Public WorkWork Unit of Directorate of Technical
Engineering of Bridge Engineering Development Indonesian ,Scope of Work :
Feasibility Study
III. PAPUA
1) Pra Feasibility Development Of Road at jayapura sentani City and Keerom
City Of Papua Province , Duration : November 12, 2007 - May 2008 Client :
DPU Jayapura Indonesian , Scope of Work : Feasibility Study
IV. WEST NUSA TENGGARA
1) Package 20 : Detail Engineering Desain Bridge Of West Nusa Tenggara
Province 02 Duration : January 08, 2016 - December 2016 Client : Direktorat
General Of Highways Ministry Of Public Work National West Nusa Tenggara
Province Indonesian , Scope of Work : Design
2) Detail Engineering Desain Bridge Of West Nusa Tenggara Province 01
(Package 10) Duration : April 01, 2015 - September 2015 Client : Direktorat
General Of Highways Ministry Of Public Work, nationalWest Nusa Tenggara
Province Indonesian , Scope of Work : Design
27
Accelerating Infrastructure Delivery through Better Engineering Services Project
28
Accelerating Infrastructure Delivery through Better Engineering Services Project
The consulting team works in close co-ordination with client to establish rapport within the
project implementation units and identify optimal frameworks to achieve project objectives.
Effective management of resources is the priority and key professionals identified for the job
are highly experienced working in team contexts towards establishing efficient synergies in
applying their knowledge to implement best solutions. We lay emphasis on continuous
interaction with our clients, timely submission of reports, continuous monitoring of project
activities, and timely completion of project activities & completion of milestones as per
envisaged work schedule to promote quality output.
2. How will your firm/consortium handle complaints concerning the performance of experts or
quality of the reports submitted for this assignment? What internal controls are in place to
address and resolve complaints?
To avoid any complain is our first priority. We will assign our permanent and experienced
engineers to the Team, and try to avoid any possible complain through close interaction and
coordination with all parties concerned, especially the client and the Bank. Our strategies are:
1) to ensure our quality and professionalism at all time via good Team management; 2) to
resolve minor complains without delay before it got serious; 3) always seek for improvement
within our Team, including innovation and creativity. With regard to complaints on the quality
of the reports submitted, we will make sure all outputs will be reviewed by senior professionals
and checked for accuracy and completeness before submission. In addition, thorough analysis
of client’s requests will be made to ensure that the services exactly match with the
requirements of the clients, so that Client satisfaction is ascertained during and after
completion of the projects.
3. How will you ensure the quality of your firm’s/consortium’s performance over the life of this
assignment?
Our Team will perform all tasks based on the relevant standard operating procedures, i.e. ISO
29
Accelerating Infrastructure Delivery through Better Engineering Services Project
and OHSAS. Following these procedures, we are sure that the quality of our deliverables and
all activities will meet the requirements stipulated in the TOR. To better ensure our
performance quality, the management home suppport team from each company will act as
strong backup support for the Team, including all the required assistance in relation to
technical, project administration, legal, procurement, and financial aspects. In addition, if the
need arises, we are in a position to form a special, case by case, Task Unit to support the
Team. Through extensive teamwork, the Task Unit(s) and fellow experts will offer
comprehensive solutions and technical recommendations to overcome any urgent outreach
support requested by the Client or consultant Team. We measure our performance using the
Critical Success Criteria related to the project by means of key performance indicators based
on Time, Cost and Scope of the project. We exercise constant vigil and alertness in
forecasting, preventing and mitigating project risks in time and ensuring communication
between the client and the consultant’s team. We follow systematic procedures for quality
control with no compromise to quality and standards and strict adherence to work schedule
and completion of proposed services within stipulated time and budget. In-depth knowledge of
financial and management information systems are maintained at all times by keeping a
record system of all activities, and all services are executed in accordance with professional
standards by effective use of applicable reports, standards, maps/drawings, specifications and
other information. Regular briefings to the client/ authorities are undertaken to discuss on the
progress, performance variance, risk assessment and any problems of the project with
measures to be taken.
4. Describe standard policies, procedures and practices that your firm has put in place to avoid
changes/replacements of personnel and to ensure the continuity of professional services once
contracted.
5. Describe what social protection practices you have in place to safeguard the well-being of your
proposed experts? Specifically describe arrangements you have in place for medical, accident,
and life insurance coverage during the assignment.
WAPCOS Limited provides social benefits like Earned Leave, Leave Travel Concession, and
contribution to Provident Fund, life and medical insurances to all its permanent staff and
experts It also provides medical, accidental insurance to all its permanent/ contract as well as
resource personnel. During the course of assignment, experts would be given medical and
accidental insurance cover. Each of the Indonesian companies provide social protection such
as BPJS Ketenaga-kerjaan and BPJS Kesehatan, which cover medical, accident and life
insurance during the assignment for the project.
DOLSAR has a clean HSSE history and all related protection measures are being taken for all
projects with different requirements. All medical and social insurances of DOLSAR are covered
as per the requirement of the Turkish Government under the Act of Labor. Therefore, all
personnel employed by DOLSAR have medical, accident and life insurance policies defined
and acquired.
30
Accelerating Infrastructure Delivery through Better Engineering Services Project
WAPCOS was set up in 1969 to promote though consultancy services, the sharing of expertise
built up in the country through massive water resources development over the years. Being a
Government of India Undertaking, it has the unique facility to draw upon the vast reserve of experts
from specialised Government Departments, Semi Government Agencies, Autonomous Bodies and
Academic/Research and Development Institutions working at Union and State levels which are its
constituents and associates. Besides, it has its own contingent of specialists in multifarious
disciplines. WAPCOS is registered with funding agencies like World Bank, Asian Development
Bank, African Development Bank, besides other international agencies and possesses the requisite
competence to deliver the goods to the entire satisfaction of the client and is reckoned as one of
the top international consultancy organisations of repute the world over in the water resources
sector. WAPCOS possesses state-of-the-art expertise in the various areas of its operation and has
successfully completed a large number of assignments in Asia and the Pacific namely, India,
Bangladesh, Bhutan, Afghanistan, Myanmar, Sri Lanka, Nepal, Cambodia, Philippines, Singapore,
Malaysia, Lao PDR ; African countries namely Ghana, Burkina Faso, Benin, Senegal, Sierra
Leone, Central African Republic, Chad, DR Congo, Ethiopia, Kenya, Mali, Mozambique, Nigeria,
Rwanda, Tanzania, Uganda, Zimbabwe, Swaziland, Malawi, Madagascar, Mauritius, Niger, Togo,
Guinea Conakry, Burundi, South Sudan, & Middle East countries namely Iraq, Iran, Republic of
Yemen, Syria, Oman etc in various disciplines of water resources, power and infrastructure
development.
INDRA KARYA
Founded in 1961 as PN Indra Karya and in 1972 became PT Indra Karya (Persero) was at the
beginning, engaged in general contracting activities. In the year 1978 the company was
reorganized and changed its line of business to engineering and management consulting services.
As its preliminary step which become the basis fundament for further development, PT Indra Karya
concentrated its field of business in undertaking electric power and water resources development
projects. Since then PT Indra Karya has been succeeded in completing all the assignments which
had been undertaken from feasibility studies, detailed design to construction, supervision and
project management. To enhance the knowledge and skill of its personnel, associations with
leading foreign companies have been carried out, especially in undertaking large scale engineering
projects with high technology. PT Indra Karya has been registered in the IBRD, ADB, OECF/ JBIC.
BINA KARYA
PT. Bina Karya (Persero) is a State Owned Enterprise consultant based in Jakarta founded in
1962. More than fifty years since our establishment, BIKA has successfully and completed many
projects for goverment dan private sector client and also for national and international funding
agencies, as well as for private sector clients. Major International agencies with which BIKA is
registered as a consultant include the World Bank (WB), the Asian Development Bank (ADB),
Japan Bank International Corporation (JBIC) and Islamic Development Bank (IDB). BIKA is also
registered as Indonesian Consultant Association member. For Quality Since 2012 the firm has
been certified with ISO 9001:2008 and OHSAS 18001:2007.
31
Accelerating Infrastructure Delivery through Better Engineering Services Project
E. Project References
Please select ALL relevant projects to demonstrate the firm’s technical qualifications and
geographical experience.
Detailed Project Reports April 2011 to M.P. Rural Engineering India WAPCOS
preparation and May 2016 Service, Rajgarh Lim
supervision and quality
control consultancy
services for construction
1 of rural roads under Gram
Sampark Sadak Yojana
for the consultancy
package no. CS2602
(Rajgarh District), Gujarat
India
Preparation of Detailed WAPCOS
Dhanbad Municipal
Project Report for Urban May 2008 to Lim
2 Corporation, Govt. of India
Transport system in August 2009
Jharkhand
Dhanbad under JNNURM
Detailed Project Reports April 2011 to M.P. Rural Engineering India WAPCOS
preparation and June 2012 Service, Dewas Lim
supervision and quality
control consultancy
services for construction
5
of rural roads under Gram
Sampark Sadak Yojana
for the consultancy
package no. CS2002
(Dewas District), Gujarat
32
Accelerating Infrastructure Delivery through Better Engineering Services Project
Detailed Project Reports April 2011 to M.P. Rural Engineering India WAPCOS
preparation and June 2012 Service, Alirajpur Lim
supervision and quality
control consultancy
services for construction
of rural roads under Gram
8 Sampark Sadak Yojana
for the consultancy
package no. CS4902
(Alirajpur, Jhabua,
Barwani District, M.P.,
India
13 Feasibility Study and May 2014 – Ministry of Public Works Indonesia BIKA
Preliminary Design of Nov 2014 of the Directorate
Papua’s Central Cross General of Highways of
Road the Work Unit of the
Directorate of Planning
34
Accelerating Infrastructure Delivery through Better Engineering Services Project
35
Accelerating Infrastructure Delivery through Better Engineering Services Project
36
Accelerating Infrastructure Delivery through Better Engineering Services Project
Construction Supervision
Services of Adapazarı
City Center - New December, Republic of Turkey DOLSAR
9 Settlement Areas and 2006 to July, Greater Municipality of Turkey
Karaman and Camili 2009 Adapazarı
Regions Connection
Roads
WAPDA
Karakoram Highway (as a September, Kashmir Road, Sunny DOLSAR
10 part of the Dasu Dam and 2011 to View Estate, Lahore, Pakistan
HEPP Contract) August, 2014
Pakistan
General Directorate of
Balıkesir Northern Ring June, 2015 to Highways
11 Road Survey and Design Turkey
May, 2017 Karayolları Genel DOLSAR
Consultancy Services
Müdürlüğü Ankara
Road Engineering
Planning of Kapitu -
South Minahasa District
Tumpaan Kapitu 1 Sept 2006 -
26 Department of Public Indonesia IKA
Tumpaan Location, 12 Jan 2007
Minahasa District South Works
Minahasa
SNVT Planning and
Road Engineering 26 Sept 2007 -
Supervision of Roads
27 Planning North Sulawesi 26 March Indonesia IKA
and Bridges of North
Cross West (84,54 Km) 2008 Sulawesi
Road Engineering Directorate General of
Highways, SNVT
Planning in Kupang City, 31 Augst 2010
28 Planning and Indonesia IKA
Kupang District and TTS - 12 Jan 2011
District - PR 01 - Package Supervision Roads and
Bridges NTT
Road Engineering
Planning in Manggarai 12 Mart 2006
29 SNVT P2JJ Prov. NTT Indonesia IKA
District and West – 12 Jun 2007
Manggarai
Road & Bridge Planning
30 Road Engineering 23 Apr 2004 – & Supervision Project Indonesia IKA
Planning (Package 3) 15 Nov 2004
Prop. Central Java
Directorate General of
Road Engineering
Highways, SNVT
Planning in Kupang 31 Augst 2010
31 Planning and Indonesia IKA
District and TTS (PR-02 - 31 Dec 2010 Supervision of Roads
Package)
and Bridges of NTT
Ministry of Public Works,
Road Engineering 06 March
Directorate General of
Planning in Flores Island 2013 – 05
32 (West Side) PR-02 December Highways, Sattet Indonesia IKA
NVTPP National Road
Package 2013
Prov NTT
Directorate General of
DED of National Leger 01 June 2005
33 Road, Ministry of Public Indonesia IKA
Road's – 12 Jan 2006
Works
Project Planning and
Bridge Engineering 23 April 2004 - Supervision of Road and
34 Indonesia IKA
Planning (Package - 3) 15 Nov 2005 Bridge Prop. Central
Java
DED of Kulonprogo Fly Public Works
09 Oct 2004 -
35 Over (2), Kulonprogo Department Kulon Indonesia IKA
District 17 Dec 2004 Progo
07 May 2004 General Directorate of
DED of Road And Bridge - 17
36 Roads, Public Works Indonesia IKA
- Package 01 December
Department
2004
Directorate General of
Package of Road 17 March Highways, SNVT
37 Planning Spreads North 2010 – 16 July Planning and Indonesia IKA
Sulawesi 2010 Supervision of Roads
and Bridges of North
Sulawesi
38 Bridge Engineering 02 Nov 2007 - Satker. NVT Planning Indonesia IKA
39
Accelerating Infrastructure Delivery through Better Engineering Services Project
40
Accelerating Infrastructure Delivery through Better Engineering Services Project
Detail Engineering Design Aug 2005 – PT.Wijaya Karya & Indonesia BIKA
(DED) Toll Road Feb 2016 PT.Citra Marga Lintas
55
Development Soreang- Jabar
Pasir Koja
Review Review and July 2014 – Department of Public Indonesia BIKA
Basic Design of Elevated Dec 2014 Works of DKI Jakarta
56 Busway Corridor 15 Province
Pasar Minggu -
Manggarai
Detail Engineering Design Apr 2013 - Oct PT. CTP - MTD Mala Indonesia BIKA
IC design Cibitung - 2013
58 Railway (Sta -0 + 440 s /
d Sta 3 + 000) Toll Road
Cibitung - Cilincing
Technical Desig and Aug 2012 - Directorate General of Indonesia BIKA
Supervision of Aug 2014 Highways, Ministry of
59 Kualanamu Toll Road Public Works
Construction
Consulting Services Re- Mar 2012 - PT. Marga Lingkar Indonesia BIKA
Computation of Existing Apr 2012 Jakarta
60
Structure in Kebon Jeruk
Interchange
Detail Engineering Mar 2012 - PT. MTD CTP Indonesia BIKA
Design (DED) Alternative July 2012 Expresway, Malaysia
61 Alinyement Sta. 2 + 800
s / d 8 + 000 Toll Road
Cibitung Cilincing
Coastal Road and UKL / Aug 2011 - East Bolaang Indonesia BIKA
UPL Planning for East Dec 2011 Mongondow District
62 Bolaang Mongondow Public Works
Distric Department
41
Accelerating Infrastructure Delivery through Better Engineering Services Project
Review Design of Outer Jun 2008 - PT. Jasa Marga Indonesia BIKA
Ring Toll Road Jakarta Dec 2008 (Persero) Tbk
70
W2 North (Kebon Jeruk -
Ulujami)
Preparation of Manual of Apr 2008 - Directorate General of Indonesia BIKA
Detailed Engineering Nov 2008 Highways, Ministry of
71
Design and Landscape of Public Works
Toll Road
Detailed Engineering Dec 2007 - Directorate General of Indonesia BIKA
Design of Solo - Ngawi Oct 200 Highways, Ministry of
72
and Ngawi - Kertosono Public Works
Toll Road
Feasibility Study & Detail Aug 2007 - PT. Summarecon Indonesia BIKA
Engineering Design Jan 2008 Agung, Tbk.
73
Flyover Harapan Mulya
Bekasi
Detailed Engineering Mar 2007 - PT. MTD CTP Indonesia BIKA
Design of Cibitung - Apr 2008 Expressway - Malaysia
74
Cilincing Toll Road
Project
Technical Assistant For February 2014 Directorate General of Indonesia MPB
Core Team Consultant – December Bina Marga
75 (CTC) For Regional 2017
Roads Development
Project (RRDP) under
42
Accelerating Infrastructure Delivery through Better Engineering Services Project
45
Accelerating Infrastructure Delivery through Better Engineering Services Project
46
Accelerating Infrastructure Delivery through Better Engineering Services Project
48
Accelerating Infrastructure Delivery through Better Engineering Services Project
LARP
Design & Engineering
Consultancy for the Main
Civil, electro-Mechanical
& Hydro-Mechanical 1996 to July WAPCOS
1 works, Infrastructural Royal Govt. of Bhutan Bhutan
2007 Lim
works including Roads,
Bridges and technical
Assistance for Tala Hydro
Electric Project, Bhutan
Reconstruction /
Rehabilitation and
completion of Salma dam Nov 2004 to WAPCOS
2 Govt. of Afghanistan Afghanistan Lim
project, Govt. of Nov 2011
Afghanistan (including
infrastructure works)
49
Accelerating Infrastructure Delivery through Better Engineering Services Project
52
Accelerating Infrastructure Delivery through Better Engineering Services Project
53
Accelerating Infrastructure Delivery through Better Engineering Services Project
EIA Study for proposed Sept. 2012 to Water Resources Dept., WAPCOS
4 India Lim
Mahuar Irrigation Project Dec 2013 Govt. of M.P.
EIA Study for Ganeshpura Oct 2012 to Water Resources Dept., WAPCOS
5 India Lim
Irrigation Project Jan 2014 Govt. of M.P.
EIA Study for proposed WAPCOS
Sept. 2012 to Water Resources Dept.,
6 Chetikheda Irrigation India Lim
Dec 2013 Govt. of M.P.
Project
EIA Study for proposed NWDA, Min. of Water WAPCOS
Aug 2013 to
7 Lower Orr Major Dam Resources, Govt. of India Lim
April 2016
Project India
LARP
Preparation of Estimate, WAPCOS
Feasibility Report, DPR Lim
Superintending
for the Linking of
Feb, 2006 to Engineer,I&CAD
1 Pranahitha River to India
Mar, 2012 Department,SripadaRao
SripadaSagar Project for
Project Circle, A.P, India
utilization of 160 TMC of
Pranahitha
Design Engineering and WAPCOS
preparation of Feasibility Lim
and DPR for Pumping Superintending
Scheme with Link Canal Jul., 2006 to Engineer,
2 India
for Diversion of About 165 Mar 2011 Dummugudem Project
TMC of Water from Circle, A.P, India
Dummugudem Project to
Nagarjuna Sagar Project
Office of Chief Engineer, WAPCOS
Consultancy for
Project Planning and Lim
Preparation of DPR for
June 2008 to Formulation
3 Upper Vansadhara India
April 2012 Sechasadan,
Irrigation Project with EIA
Kharvelnagar,
and EMP and R&R Plan
Bhubaneswar, Orissa
EIA Study for proposed WAPCOS
Sept 2012 to Water Resources Dept.,
4 Datuni Major Irrigation India Lim
Dec. 2013 Govt. of M.P.
Project.
Environmental Impact WAPCOS
Assessment of Upper Narmada Valley Lim
5 Narmada Irrigation Project 2004-2009 Development Authority, India
in Dindori and Annupur Govt. of M.P.
Districts
54
Accelerating Infrastructure Delivery through Better Engineering Services Project
55
Accelerating Infrastructure Delivery through Better Engineering Services Project
Water Supply
EIA
Consultancy services for WAPCOS
The Municipal
formulation of detailed Lim
Commissioner
project report of water
Jamnagar Municipal
supply master plan of Feb 2009 to
1 Corporation India
Jamnagar city of ward no. October 2009
Jubilee Gardens, Lal
18 & 19 for posing to
Banglow, Jamnagar,
national agencies for
India
financial assistance.
Environmental Impact IKA
June 2010 to
Assessment Study of
2 December BBWS NTT 1 Indonesia
Tanju and Mila Dam for
2010
Rababaka Complex
Feasibility Study and IKA
April 2007 to
3 Environmental Baseline of BWS Kalimantan II Indonesia
October 2007
Muara Juloi Dam
Environmental Impact IKA
Assessment Study and May 2008 to
4 Hydraulic Model of Lolak December BWS Sulawesi I Indonesia
Dam in Bolaang 2008
Mongondow District
DED Bulk Water Rural IKA
May 2007 to Serayu Opak Regional
5 Networks on 20 Locations Indonesia
January 2008 Hall
WS Serayu Bogowonto
LARP
Consultancy Services for WAPCOS
Detail Design Review for Lim
Water and Sanitation
Gerbi Dam Reservoir,
July, 2012 Development &
Transmission and
1 to Rehabilitation Project Ethiopia
Treatment Plant Study,
June, 2014 Office, Addis Ababa,
Design and Tender
Ethiopia
Document Preparation
Project, Ethiopia
Environmental and Social WAPCOS
Assessment (ESIA) and Lim
Development of
Resettlement Policy
Nile Basin Initiative/ Nile
Framework (RPF) for
November Equatorial Lakes
Proposed Borenga and Kenya &
2 2011 to July Subsidiary Action
Norera Small Dams, Tanzania
2012 Program (NELSAP)
Irrigation, Hydropower
and Water Supply
Infrastructure in Mara
River Basin, Kenya and
Tanzania
Consultancy Services for WAPCOS
the Detailed Design and Lim
Lake Victoria South
Supervision of Bondo & Oct 2011 to
3 Water Services Board, Kenya
Siaya Water supply and Oct 2014
Kisumu, Kenya
Sanitation Projects,
Bondo & Siaya, Kenya –
56
Accelerating Infrastructure Delivery through Better Engineering Services Project
SKNVT Performance
Assistance In Handling September Development of
Techniques Combined 2007 to Environmental IKA
2
(3R) in Mataram October 2007 Sanitation Management
NTB Indonesia
Assistance In Handling
Techniques Combined SKNVT Performance
(3R) in Kupang IKA
April 2007 to Development of
3 October 2007 Environmental Indonesia
Sanitation Management
NTT
57
Accelerating Infrastructure Delivery through Better Engineering Services Project
Hydro-power
EIA
Comprehensive
Environment Impact WAPCOS
Assesment Studies of L&T Power Lim
1 Mar-15 India
Sach-Khas (267 MW) Development Limited
Hydro Power project,
Himachal Pradesh
For each of the projects listed above, provide a Project Summary using the following template to be
annexed to EOI Attachments.
58
Accelerating Infrastructure Delivery through Better Engineering Services Project
V. Key Considerations in approaching this assignment (no more than 9,000 characters
summarizing approach and methodology)
Not Applicable for Empanelment.
3
Refers to experts who (i) are employees of the consulting firm, or (ii) have fixed-term consultant contract with the
consulting firm covering the term of the Indefinite Delivery Contract.
59
Accelerating Infrastructure Delivery through Better Engineering Services Project
Table 1: List of Experts with Experience relevant to the Assignment at Call-down Stage
1. Motilal Team WAPCOS B.Sc. Engg. 44 Worked in Mozambique as Team Leader cum International Full time
Choudhary Leader (Civil), R.I.T Resident Engineer for the Project : Design Review,
Jamshedpur,I Pre-Contract Services and Project Management of
Indian ndia, 1967 Civil Works Contract for : Multinational Nacala Road
M. Tech. (Lot-B: Ribaue- Malema road)- (103 kms),
iwrm@wapcos. (Design Eng) Mozambique (African Development Bank funded),
co.in
I.I.T Delhi, Year: 2011-2015, Client: National Roads
India, 1970 Administration(ANE), Republic of Mozambique
Worked in Yemen as a Team Leader for the project,
:Construction Supervision for Rehabilitation and
Reconstruction of Regional Roads in Hadramout
Governorate, Yemen (World Bank Funded) Year:
2010-2013, Client: Ministry of Public works and
Highway, Republic of Yemen
Construction of Sahebganj-Dumka Road,
Jharkhand, Govt of Bihar, India, Two lane
highway 13 km length, hilly terrains of
hazardous and inhospitable areas, consisting of
one major bridge and two RCC & more than ten
H.P. culverts.
Repair & maintenance of State highways at
Jharkhand, Govt of Bihar, India, Two lane 335 km
existing highways consisting of 7 major, more
than 20 minor bridges and more than 150
culverts
Widening, repair & maintenance of state highways
at Bihar, India for Four lane and two lane
highways of Patna, capital of Bihar in Governor’s
60
Accelerating Infrastructure Delivery through Better Engineering Services Project
2. Serdar Team DOLSAR B.Sc. Civil 3 Mr.Erler has more than 30 years of experience in the International Full Time
Erler Leader Engineering supervision of motorway and highway projects
Middle East including bridges, viaducts, cut&cover structures,
Turkish Technical culverts, retaining structures. He has many years of
University experience on site, as a site engineer, resident civil
Email : engineer, chief resident engineer and project
serdar.erler manager. He also has extent knowledge on computer
@ software related to above subjects and computer
dolsar.com. aided design. His experience also includes, various
tr supervision services of motorways including, Gebze –
Orhangazi – İzmir Motorway (428 km, Turkey), Al
Koufra-Abouzareg Motorway (470 km, Libya) and
Karakoram Highway (62 km, Pakistan). In all projects
he has been involved in he has reviewed detailed
engineering design documents for the road section,
including design drawings, specifications, sectional
plans, bill of quantities, cost estimates and
construction plans. He has more than 20 years of
experience working as a Team Leader in Motorway
and Highway Projects. He also has knowledge and
experience on operation and maintenance of
motorways and highways.
3. G. Venkata Pavement WAPCOS B.Tech. 14 Road Construction Supervision for Rehabilitation International Full time
Ramana Engineer (Civil) and Reconstruction of Regional Roads in
Indian M.Tech. Hydramout Governorate, Yemen.
(Transportati Engineering and Design Consultancy for Main
iwrm@wapcos. on Civil Work & Electromechanical Works and
co.in
Engineering) Infrastructure including the works on items like
Bridges, Culverts and roads for Punatsangchhu-I
Hydro Electric Project (PHEP-I) (6x200 MW),
Bhutan
Consultancy services for Kerala sustainable urban
Development project “Design and Supervision
Consultancy for package 2 (Kochi, Thrissur and
Kozhikode) – DSC 2”(ADB Funded)
Surveying, investigation and preparation of Detailed
Project Report for Roads and Bridges for Mandi
District in Himachal Pradesh, India
Engineering and Design Consultancy for Main Civil
Work & Electromechanical Works and Infrastructure
including the works on items like Bridges, Culverts
and roads for TALA Hydro Electric Project
(THEP)(6x170 MW) Bhutan
Detailed Project Report including PPR for Murthal
to Sonepat road at NCR Haryana.
62
Accelerating Infrastructure Delivery through Better Engineering Services Project
4. Nilüfer Senior DOLSAR B.Sc. Civil 20 Mrs. Yaşar has more than 20 years of experience as a International Full Time
Yaşar Pavement Engineering design engineer and a senior pavement design
Design Middle East specialist. He has held this position for various
Turkish Engineer Technical national and international projects, including -Anamur
University 3. District. State Road Survey and Project Engineering
nyasar@ Services and - Balıkesir North Ring Road State
dolsar.com. Highway Survey and Project Engineering Services.
tr
5. Ali Onur Senior DOLSAR B.Sc. Civil 20 Mr. Ali Onur Kuyucak has more than 20 years of International Full-time
Kuyucak Bridge / Engineering experience in the bridge design of motorway and
Structure Middle East highway projects. He also has extent knowledge on
Turkish Engineer Technical computer software related to above subjects including
University MS Windows and MS Office applications, Computer
aokuyucak Aided Design Softwares (Microstation, AutoCAD),
@ M.Sc. Civil Numerical Map Aided Roadway Design Softwares,
dosar.com. Engineering (Inroads, Inrail for hıghway and railway design) and 3-
tr Middle East D Building Structural Design and Analysis Software
Technical (Probina). In all projects he has been involved in he
University has prepared detailed engineering design documents
for the bridge section, including design drawings,
specifications, sectional plans, bill of quantities, cost
estimates, permanent supports and construction
plans.
6. Manish Traffic WAPCOS B .E. (Civil 10 Construction Supervision for Rehabilitation and International Full time
Kumar Engineer Engg.), from Reconstruction of the Regional Road (FPERP-
Nagpur RR3,RR4) in Hadramout Governorate, Yemen
Indian University Construction Supervision of Reconstruction of
(2002). Hanad Weir and Hanad Left Main Canal (HLMC)
iwrm@wapcos. M.Tech (Soil and Associated Works in Wadi Ahwar, Yemen.
co.in
63
Accelerating Infrastructure Delivery through Better Engineering Services Project
Mechanics
and
Foundation)
from NIT
Kurukshetra
(2007).
7. Shambhu Hydrology WAPCOS M.Tech 27 Construction Supervision for Rehabilitation and International Full time
Azad Engineer( (Water Reconstruction of Regional Roads in Hadramout
1) Resource Governorate, Yemen (Contract No. FPERP-RR3 &
Indian Engineering), RR4) (World Bank Funded)
I.I.T Delhi Consultancy services for Kerala sustainable urban
iwrm@wapcos. B.Tech (Civil Development project “Design and Supervision
co.in
Engineering), Consultancy for package 2 (Kochi, Thrissur and
I.I.T Kanpur Kozhikode) – DSC 2”(ADB Funded)
Consultancy Service for Detail Design, Tender
Document Preparation and Construction
Supervision and Project management services of
Bondo&Siaya Water Supply and Sanitation Projects,
Kenya (African Development Bank Funded)
Kurnool-Cuddapah Canal Modernization Project,
Andhra Pradesh, India (Japan International
Coorporation Agency Funded)
Construction Supervision and Quality Control of
Rural Roads for APMGSY for PIU-Rewa, Madhya
Pradesh, India
Tala Hydro Electric Project – Infrastructrual works
including Roads, Bridges and Technical Assistance
during Construction, Bhutan
Rohtang Pass, Manali Highway Roads and
64
Accelerating Infrastructure Delivery through Better Engineering Services Project
8. Ali Osman Senior DOLSAR M.Sc. in 40 Mr. Erdem has 41 years of experience on planning International Full-time
Erdem Hydrologi Meterology/Hy and designing the development of transportation and
st drology water resources projects. He has vast experience in
Turkish Engineering water resources and flood hydrology especially
Istanbul hydrometrics, hydrometeorology, snow and ice
aoerdem@ Technical hydrology and climate. He has provided services for
dolsar.com. University many master plan, feasibility reports, detailed designs
tr in regards to hydrology, engineering hydrology studies
of roads, highways and motorways.
9. Abhijit Geodetic WAPCOS B.E. Civil 16 Design and Fabrication drawings for Foot Over National Full time
Patki Engineer Colleg Bridges for Pune Municipal Corporation.
e of Design and Fabrication drawings for Foot Over
Indian Engineering, Bridges for Kolhapur Municipal Corporation.
Pune 1997 Approach Road for various Wind Farm sites in
iwrm@wapcos. M.Tech. Satara Dist., Maharashtra.
co.in
(Structures), Approach Road for Wind Farm at Sakri, Dist. Dhule
65
Accelerating Infrastructure Delivery through Better Engineering Services Project
Visvesvaraya – Maharashtra.
Regional Approach Road for Wind Farm at Kas Lake, Dist.
College of Satara – Maharashtra.
Engineering, Topographical / Contour Survey, Cadastral Survey,
Nagpur 2000 Approach & Internal Roads and micrositing survey
for Wind Farm site at various Districts in Karnataka
State – 16 Nos.
10. R N Gupta Geotech WAPCO Ph.D. (Rock 31 Over 3 decades experience in the field of geotechnical International Full Time
nical S Mechanics) investigation in a number of projects pertaining to
Indian, Engineer University of various sectors.
New Castle
Email : Upon Tyne.
iwrm@wap England –
cos.co.in 1982.
M. Tech (Mine
Planning and
System
Design) -
Indian School
of Mines India
– 1975.
BE (Mining
Engg.) -
Indian School
of Mines India
– 1964.
11. Kağan Senior DOLSAR B. Sc. in Civil 27 Mr. Solmaz has more than 15 years of experience in International Full-time
Solmaz Geotechni Engineering the tender design, detailed design and construction
66
Accelerating Infrastructure Delivery through Better Engineering Services Project
13. A.K.M. Cost and WAPCOS B.E. (Civil), 30 Road Construction Supervision for Abdulla Gharib International Full time
Govil Quantity from Birla Road Section (FPERP-RR5) of Rayyan Bin Aifan
67
Accelerating Infrastructure Delivery through Better Engineering Services Project
15. Sanjay Procurem WAPCOS MTech-IIT 19 Consultancy Services for Design Engineering and International Full time
Sharma ent Delhi 1998, Construction Supervision for Stung Tasal Dam
Specialist BTech. Project, Cambodia (Under Line of Credit of Govt. of
Civil- REC India and Govt. of Cambodia – Procurement Expert
Hamirpur- – (Client: Ministry of Water Resources and
1996 Meteorology, Royal Government of Cambodia) –
(2012-2014)
Project Management Consultancy Services for
increasing height of existing weir constructed at
69
Accelerating Infrastructure Delivery through Better Engineering Services Project
16. Pushpendra Contract WAPCOS M. Tech. 25 Supervision for Rehabilitation and Reconstruction of International Freelancer
Srivastava document (Civil), from Regional Roads (FPERP-RR3/RR4) in Hadramout
specialist Manav Governorate, Yemen
Indian Bharti Construction of Various new and up gradation of
University, existing roads Project funded by World Bank
iwrm@wapcos. Solan, 2013 Construction Supervision of Four Laning of National
co.in
B.E. (Civil), Highway No. 2 from km 317+100 to km 65+000
from M.S. GTRIP/5, Package IV-A, National Highways
University of Authority of India, World Bank Funded
Baroda, Project Engineering Services for Ahmedabad
Gujarat, Mehsana Toll Road Project, Length-51.6 Km. (4
1992 laning), Cost of Project: 150 crores, Ahmedabad
Mehsana Toll Road Company Limited (An SPV of
Govt. of Gujarat and IL & FS)
Four Laning of SAMAKHIYALI TO Bhachau, Section
of National Highways - 8A. (Ch. 306.00 – Ch.
324.00)
17. Som Dutta Institution WAPCOS LLB/Civil 49 Preparation of Detailed Project Reports for International Full time
Gupta al and Engineering Integrated Municipal Solid Waste Management in
legal 18 ULB’s of Bihar Under NGRBA through SPUR-
Indian specialist Group 2 towns.
Preparation of DPR and Construction Supervision
iwrm@wapcos. of Water supply, Drainage, Sewerage, Solid Waste
co.in
Management, Roads & slum improvement for 8
ULB’s in the state of Karnataka
70
Accelerating Infrastructure Delivery through Better Engineering Services Project
71
Accelerating Infrastructure Delivery through Better Engineering Services Project
18. K.K. Gaur Social WAPCOS Ph.D., 14 Survey for block contouring, planning, design & International Full time
safeguard Sociology, preparation of plans estimates of distributary down
Indian s Agra to 8 ha. sub chak and drainage of chak for the
specialist University, command area under various canals of Sardar
iwrm@wapcos. 1990-91 Sarovar Project.
co.in
M.A., Kurnool-Cuddapah Canal Modernization Project,
Sociology, Andhra Pradesh
Institute of Detailed Project Report of Godavari Lift Irrigation
Advanced Schemes Preparation of DPR and Construction
Studies, Supervision of Water supply, Drainage, Sewerage,
Meerut Solid Waste Management, Roads & slum
University, improvement for 8 ULB’s in the state of Karnataka
1975 (World Bank Funded)
B.A., Meerut Consultancy Services for Project Monitoring ,
University, Construction Supervision & Quality Control for
1973 Sewerage Project of Jabalpur city (JNNURM
Funded, GoI)
Consultancy Services for Survey, Investigation,
Planning, Preparation of DPR, carrying out EIA and
Implementation/ Commissioning Support for
Renewal and Rejuvenations of Water Supply and
Sewerage capacities for Shimla city (JNNURM
Funded, GoI)
Preparation of Detailed Project Report for Providing
Water Supply, Sewerage, Sewerage Treatment
Plant for Ludhiana town (JNNURM Funded, GoI)
Support Agency for Project Gram Panchayats- “Jal
72
Accelerating Infrastructure Delivery through Better Engineering Services Project
Nirman Project”
19. A. Stephen Environm WAPCOS M.Sc. 24 Construction of Salma Dam Project (3X14MW); International Full time
Leo ental (Environment (Under Line of Credit of Govt. of India) (107 m ;
expert al Sciences) earth and rock fill dam)- Detailed Design and
Indian Bharthidasan Construction supervision
University, Gerbi Dam Reservoir, Transmission and Treatment
iwrm@wapcos. Tiruchirapalli, Plant Study, Design And Tender Document
co.in
Tamil Nadu, Preparation Project, Ethiopia ( 22m High Rock Fill
India (1987, Dam) - Detailed Design and Construction
First Class) supervision
Nam Song Hydropower Project (3x2 MW)- Detailed
Design and Construction supervision(Gravity Dam
with 70 Height) )
Preparation of Detailed Project Report for
Punatsangchhu-I Hydro Electric Project (Under
Line of Credit of Govt. of India) (A concrete gravity
type about 137 m in height)- Detailed Design and
Construction supervision
EIA Study for Tala Hydro Electric Project
(1020MW) (92m high concrete gravity dam)-
Detailed Design and Construction supervision
EIA Study for Teesta-III H.E Project, Sikkim
(1200MW) (rock fill dam at 60 m height)- Detailed
Design and Construction supervision
Detailed Project Report, Detailed Design
Engineering Services, Construction Supervision,
Testing and Commission of Purulia Pumped
Storage Project (4 X 225 MW) West Bengal (72 m
high rockfill dam)- Detailed Design and
73
Accelerating Infrastructure Delivery through Better Engineering Services Project
Construction Supervision
Kurichhu H.E. Project (Straight gravity concrete
Dam, 55 m height, 4 X 15 MW)- Project
Management and Construction Supervision
20. Sevgi Senior DOLSAR B. Sc. in 29 Ms. Arslan has experience in the preparation of International Full-time
Arslan Environm Environmental Environmental Impact Assessment (EIA),
ental Engineering Environmental and Social Impact Assessment (ESIA),
Turkish Specialist Environmental and Social Due Diligence (ESDD)
Middle East Reports, environmental consultancy and monitoring
sarslan@ Technical issues according to Turkish regulation and/or
dolsar.com. University according to International requirements. She has over
tr 29 years of experience in preparation of
Environmental Impact Assessment Reports (EIA) as
well as in infrastructure projects including
transportation projects.
In her most recent experience she is working as the
Environmental Expert for Gebze – Orhangazi – İzmir
Motorway, a 428 km Motorway which is being built
under an EPC Basis.
21. Prasetijo Highway Indra Master of 30 Has vast experince in the field of planning, design, National Full Time
Adi Engineer Karya Highway execution of road and bridge projects. Worked as a
Engineering team leader for following projects:
System, 1991, Supervision Consultancy Service on The
ITB Bandung, Construction of Light Rail Transit (LRT) in South
Indonesia Sumatera Province, 31 Oct 2016 - 14 Juli 2017
Review Study of Toll Road Develompent Medan-
Kualanamu-Tebing Tinggi Segments, 7 Jan 2015
- 19 Aug 2015
74
Accelerating Infrastructure Delivery through Better Engineering Services Project
75
Accelerating Infrastructure Delivery through Better Engineering Services Project
22. Apriyanto Pavement Indra Master of 10 Has vast experince in the field of planning, design, National Full Time
Engineer Karya Transportation execution of road and bridge projects. Worked as a
Engineering, pavement engineer for following projects:
ITB, 2007, Study and Analysis Traffic at Ciawi - Sukabumi
Bandung, Toll Road, Client: Trans Jabar Tol, Sep 2015 - Juli
Indonesia 2016
Road Engineering Planning, Bintuni - Wondama,
Client: Laksana Desain Daya Cipta, Mei 2013 -
Sept 2013
Road Engineering Planning Leger Data's for
National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
Road Engineering Planning in Kupang District and
TTS (PR-02 Package), Client : Directorate General
of Highways, SNVT Planning and Supervision of
Roads and Bridges of NTT, August 2010 -
December 2010
Road Engineering Planning Package, Kenjeran,
Surabaya, Client : SNVT P2JJ Metro Surabaya,
May 2009 - August 2009
23. Magdalena Bridge Indra Bachelor of 23 Has vast experince in the field of planning, design, National Full Time
Idrus Engineer Karya Civil execution of road and bridge projects. Worked as a
Engineering, bridge engineer for following projects:
Palembang Review Study of Toll Road Development Medan-
76
Accelerating Infrastructure Delivery through Better Engineering Services Project
24. Luthfy Aziz Traffic Indra Master of 25 Has vast experince in the field of planning, design, National Full Time
Lubis Engineer Karya Transportation execution of road and bridge projects. Worked as a
Engineering, road engineer for following projects:
University of Review Study of Toll Road Development Medan-
Indonesia, Kualanamu-Tebing Tinggi Segments, 7 Jan 2015 -
2008 19 Aug 2015,Client: PT. Cipta Strada
FS of Bridge at Sambas Besar River - Kalimantan,
Client: PT. Wiraguna Tani West Kalimantan
Branch, Oct 2014 - Des 2014
Road Engineering Palnning Bofuer-Bomberay,
Client: PT. Laksana Desain Daya Cipta, Jul 2014 -
Oct 2014
Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, March 2014 - Juni 2014
Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sep 2013 - Des 2013
Road Engineering Planning, Bintuni - Wondama,
Client: Laksana Desain Daya Cipta, Mei 2013 -
Sept 2013
FS Access Road North Kalibaru Port (Tanjung
Priok New Port), Client: Cipta Strada, Maret 2013 -
Mei 2013
Traffic Survey for Indi II Sumatera and Java
Project, Client: Dacrea Konsultan, Jan 2013 - Maret
2013
78
Accelerating Infrastructure Delivery through Better Engineering Services Project
79
Accelerating Infrastructure Delivery through Better Engineering Services Project
25. Fatchi Hydrology Indra Bachelor of 19 Has vast experience in the field of planning, design, National Full Time
Handoyo Engineer Karya Civil execution of road and bridge projects. Worked as a
Engineering, hydrology engineer for following projects:
Malang
Muhammadiya Review Study of Toll Road Development Medan-
h University, Kualanamu-Tebing Tinggi Segments, 7 Jan 2015 -
1998 19 Aug 2015
Technical Assistance Sub Directorate of Highways
and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client:
Bina Marga, Juli 2013 - Des 2013
Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sept 2011 - Des 2011
Regional Design and Supervision consultants-2
(RDSC-2) for Second Eastern Indonesia Region
Transport Project (EIRTP-2) Under IBRD Loan No.
4744-IND, Client : Directorate General of Highways
(Bina Marga), Technical Guidance Unit for Roads
and Bridges, November 2006 - October 2010
Road and Bridge Engineering Planning in Lubuk
Linggau, Client : Directorate General of Road,
Ministry of Public Works, September 2005 -
December 2005
Road Rehabilitation (Sector) Project Design and
Field Team Consultants Under ADB LOAN
NO.1798-IND, Client : PT Jasa Marga (Persero),
November 2003 - January 2004
Road Planning at West Java Province, Cirebon -
Kuningan Segment, Jul 2001 - Des 2001
80
Accelerating Infrastructure Delivery through Better Engineering Services Project
26. Lubab Transport Indra Master of Civil 26 Has vast experince in the field of planning, design, National Full Time
Planner Karya Engineering, execution of road and bridge projects. Worked as a
Surakarta transport planner for following projects:
Muhammadiya Consultancy Service of Financing Scheme of
h University, Semarang-Batang Toll Road, Pandaan-Malang,
2009 Balikpapan-Samarinda, and Manado-Bitung, Client:
Mandiri Sekuritas, Aug 2016 - April 2017
Study and Analysis Traffic at Ciawi - Sukabumi Toll
Road, Client: Trans Jabar Tol, Sep 2015 - Juli 2016
Review Traffic Study Kanci - Pejagan - East
Brebes, Client: Multhiphibeta - Waskita Toll Road,
Jan - March 2015
Study Bali Mandara Toll Road Networking, Client:
Jasa Marga Bali Tol, Oct 2014 - Desember 2014
Technical Assistance Sub Directorate of Highways
and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client:
Bina Marga, Juli 2013 - Des 2013
Traffic Study and Basic Design Toll Road Bogor
Ring Road Sekci II B, Client: Marga Sarana Jabar -
Multhiphibeta, Jan 2013 - Juli 2013
Traffic Study of Road Engineering Planning, Nusa
Dua-Ngurah Rai-Benoa Toll Road (Paket-04),
Client: Waskita Karya, Jul 2012 - Des 2012
Preparation of Masterplan of Marine
Transportation of Kepulauan Riau Province
Riau Islands Province, Client: Bappeda Riau
Island Province, Jul 2011 - Des 2011
Engineering Consulting Service For Jakarta Mass
Rapid Transit System Project Jakarta, Client:
81
Accelerating Infrastructure Delivery through Better Engineering Services Project
27. Eko Geodetic Indra Bachelor of 25 Has vast experince in the field of planning, design, National Full Time
Prihriyadi Engineer Karya Geodetic execution of road and bridge projects. Worked as a
Subagyo Engineer, geodetic engineer for following projects:
Gadjah Mada Technical Planning of Bojonegoro Regional Road,
University, Client : Bina Marga and Irrigation Bandung, March
1992 2015 - September 2015
Road Engineering Planning in 124 KM's Denpasar
- Packages 12 (Bon Dalem/Tembok Village) -
82
Accelerating Infrastructure Delivery through Better Engineering Services Project
28. Eko Cost and Indra Bachelor of Has vast experience in the field of planning, design, National Full Time
Suliyanto Quantity Karya Civil 20 execution of road and bridge projects. Worked as a
Engineer Engineering, cost and quantity engineer for following projects:
Udayana
83
Accelerating Infrastructure Delivery through Better Engineering Services Project
84
Accelerating Infrastructure Delivery through Better Engineering Services Project
29. Wisnu Geotech Indra Master of 30 Has vast experience in the field of planning, design, National Full Time
Wibowo nical Karya Geology execution of road and bridge projects. Worked as a
Engineer Engineering, geotechnical engineer for following projects:
University of
New South Technical Planning of Bojonegoro Regional Road,
Wales, 1987 Client : Bina Marga and Irrigation Bandung, March
2015 - September 2015
Periodical Road and Bridge Technical Planning in
Timika, Client : SKNVT Road Planning and
Supervision Province Papua, April 2014 -
September 2014
Bridge Technical Preparation, Client : SKNVT
Road Planning and Supervision, July 2013 -
November 2013
Road Engineering Planning Segment Maruni -
Warmare - Prafi, Client : SKNVT Road Supervision
and Planning West Papua, August 2012 -
December 2012
Detail Engineering Design Cross Island I (Package
23/2011), Client : SNVT Road Supervision and
Planning Province Aceh, April 2011 - September
2011
Bridge Engineering Planning Tirasai River, Client :
SKNVT Road Supervision and Planning West
Papua, August 2010 - December 2010
Road and Bridge Geitechnical Planning, Client :
Publics Works Service, June 2009 - October 2009
Bridge Engineering Planning Fly Over Jomin,
Client : DPU Bina Marga, September 2007 -
December 2007
85
Accelerating Infrastructure Delivery through Better Engineering Services Project
30. Dedi Contract Indra Bachelor of 11 Has vast experience in the field of planning, design, National Full Time
Tarmedi Documen Karya Civil execution of road and bridge projects. Worked as a
t Engineering, contract document specialist for following projects:
Specialist Surabaya Review Study of Toll Road Develompent Medan-
Sunan Giri Kualanamu-Tebing Tinggi Segments, 7 Jan 2015 -
University, 19 Aug 2015
2006 Technical Assistance Sub Directorate of Highways
and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client:
Bina Marga, Juli 2013 - Des 2013
Engineering Consulting Service For Jakarta Mass
Rapid Transit System Project Jakarta, Client:
JMEC-Wiratman, March 2010 - Jan 2011
86
Accelerating Infrastructure Delivery through Better Engineering Services Project
31. Tri Wanto Road Indra Bachelor of 14 Has vast experience in the field of planning, design, National Full Time
Ardi Safety Karya Civil execution of road and bridge projects. Worked as a
Wibawa Specialist Engineering, road safety specialist for following projects:
Semarang 17 Review Traffic Study Kanci - Pejagan - East
August 1945 Brebes, Client: Multhiphibeta - Waskita Toll Road,
University, Jan - March 2015
2003 Road Engineering Planning Leger Data's for
National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
FS Access Road North Kalibaru Port (Tanjung
Priok New Port), Client: Cipta Strada, Maret 2013 -
Mei 2013
Special Handling of Road Avalanches in Nabire -
Bedudipa Segment , Client: Kogas Driyap
Konsultan, April 2011 - Aug 2011
Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
Final Engineering Design Ciawi - Sukabumi Toll
Road, Mei 2008 - Des 2008, Client: Semesta
Marga Raya, Mei 2008 - Des 2008
Road Engineering Planning of Kapitu - Tumpaan
Kapitu Tumpaan Location, Minahasa District South
87
Accelerating Infrastructure Delivery through Better Engineering Services Project
32. Maryoni Economi Indra Master of 31 Has vast experience in the field of planning, design, National Full Time
c and Karya Economic, execution of road and bridge projects. Worked as a
Financial Jakarta economic and financial analysis expert for following
Analysis Nusantara projects:
Expert Economic
Sciences Review Traffic Study Kanci - Pejagan - East
University, Brebes, Client: Multhiphibeta - Waskita Toll
2004 Road, Jan - March 2015
Road Engineering Planning, Bintuni - Wondama,
Client: Laksana Desain Daya Cipta, Mei 2013 -
Sept 2013
Traffic Study of Road Engineering Planning,
Nusa Dua-Ngurah Rai-Benoa Toll Road (Paket-
04), Client: Waskita Karya, Jul 2012 - Des 2012
Engineering Consulting Service For Jakarta
Mass Rapid Transit System Project Jakarta,
Client: JMEC-Wiratman, March 2010 - Jan 2011
Review Study of Toll Road Kunciran - Serpong -
Bandar Soekarno Hatta, Client: Cipta Strada,
Jan - March 2010
Road Engineering Planning in Alor Island (PR-02
Package); Client : SNVT Planning and
Supervision of Roads and Bridges of NTT
88
Accelerating Infrastructure Delivery through Better Engineering Services Project
33. Sugih Jaya Procurem Indra Bachelor of 28 Has vast experience in the field of planning, design, National Full Time
ent Karya Management execution of road and bridge projects. Worked as a
Specialist Economic, procurement specialist for following projects:
Jakarta
Krisnadwipayana Review Study of Toll Road Development Medan-
University, 1989 Kualanamu-Tebing Tinggi Segments, 7 Jan 2015
- 19 Aug 2015,Client: PT. Cipta Strada
Technical Assistance Sub Directorate of
Highways and Urban Roads, Dit. Bina Teknik,
Ditjen. Bina Marga, Ministry of Public Works
Jakarta, Client: Bina Marga, Juli 2013 - Des 2013
Traffic Study of Road Engineering Planning,
Nusa Dua-Ngurah Rai-Benoa Toll Road (Paket-
04), Client: Waskita Karya, Jul 2012 - Des 2012
Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
Final Engineering Design Ciawi - Sukabumi Toll
Road, Mei 2008 - Des 2008, Client: Semesta
Marga Raya, Mei 2008 - Des 2008
Road Engineering Planning of Kapitu - Tumpaan
89
Accelerating Infrastructure Delivery through Better Engineering Services Project
34. Utari Institution Indra Bachelor of Civil 29 Has vast experience in the field of planning, design, National Full Time
Dewi al and Karya Law, Jakarta execution of road and bridge projects. Worked as a
Legal Pancasila institutional and legal specialist for following projects:
Specialist University, 1988
Review Traffic Study Kanci - Pejagan - East
Brebes, Client: Multhiphibeta - Waskita Toll Road,
Jan - March 2015
Road Engineering Planning Leger Data's for
National Road of Serui, Client: Kogas Driyap
90
Accelerating Infrastructure Delivery through Better Engineering Services Project
35. Syakti Social Indra Bachelor of 34 Has vast experience in the field of planning, design, National Full Time
Kirana Eka Safeguar Karya Social and execution of road and bridge projects. Worked as a
Sidharta ds Politic, Jember social safeguards specialist for following projects:
Specialist University, 1983 Review Study of Toll Road Development Medan-
Kualanamu-Tebing Tinggi Segments, 7 Jan 2015
- 19 Aug 2015
Traffic Study and Basic Design Toll Road Bogor
Ring Road Sekci II B, Client: Marga Sarana Jabar
- Multhiphibeta, Jan 2013 - Juli 2013
91
Accelerating Infrastructure Delivery through Better Engineering Services Project
36. Achmad Environm Indra Master of 26 Has vast experince in the field of planning, design, National Full Time
Widarto ental Karya Environmental execution of road and bridge projects. Worked as a
Expert Engineering, environmental expert for following projects:
Surabaya Review Traffic Study Kanci - Pejagan - East
Sepuluh Brebes, Client: Multhiphibeta - Waskita Toll Road,
November Jan - March 2015
Technology Road Engineering Planning in 124 KM's Denpasar
University, 2011 - Packages 12 (Bon Dalem/Tembok Village) -
Amlapura, Client : P2JN Bali, March 2013 - April
2013
Road Engineering Planning, National Road on
Jayapura 1 Region, Client: Kogas Driyap
93
Accelerating Infrastructure Delivery through Better Engineering Services Project
37. Graduate in
Civil
Engineering,
Ir. Team Univ. He has experience in, planning, design,programming,
PT. Bina
Muhammad Leader/Hi Hasanuddin, managing, monitoring, and supervising construction of National
Karya 28 Full Time
Ridwan, ghway 1984 roads, flyovers and bridges Expert
(Persero)
MSc Engineer Master of
Engineering
Civil, Ins.
Teknologi
94
Accelerating Infrastructure Delivery through Better Engineering Services Project
Bandung, 1988
38. Graduate in
Civil
PT. Bina He has responsible for carrying out all types of
Ir. Sukris Pavement Engineering, National
Karya 32 structural design especially fly over, bridge and Full Time
Santoso Engineer Univ. Expert
(Persero) highway design related to road works
Brawijaya,
1984
39. Graduate in He has experience in the design, construction and National Full Time
Civil supervision of highways, fly over and bridges Expert
Ir. Ganda PT. Bina
Bridge Engineering,
Sumekarjay Karya 22
Engineer Institut
a (Persero)
Teknologi
Nasional, 1994
40. Graduate in He has experience in the design, construction and National Full Time
Civil supervision of highways, fly over and bridges Expert
Ir. Ganda PT. Bina
Bridge Engineering,
Sumekarjay Karya 22
Engineer Institut
a (Persero)
Teknologi
Nasional, 1994
41. Graduate in
Civil
PT. Bina He has Experience for carrying out all types of traffic
Traffic Engineering, National
Ir. Bunedi Karya 18 analysis especially fly over, bridge and highway Full Time
Engineer Univ. Expert
(Persero) design related to road works
Borobudur,
1998
42. PT. Bina Graduate in
Ir. Hendra Hydrology National
Karya Civil 20 He has experience for carrying out all types Full Time
Ananda, ME Engineer Expert
(Persero) Engineering, ofhidrology and drainage works especially for fly over,
95
Accelerating Infrastructure Delivery through Better Engineering Services Project
45.
Graduate in
He has experiences in estimation of roads, flyovers
Elon Cost and PT. Bina Civil
and bridges projects with qualification in civil National
Ahmadi Quantity Karya Engineering, 12 Full Time
engineering and relevant project Expert
Wiranta Engineer (Persero) STT - YPKP,
experience in Indonesia.
2005
96
Accelerating Infrastructure Delivery through Better Engineering Services Project
46. Graduate in
Geotechni PT. Bina Geotechnical He has experiences in undertaking geotechnical
Ir. Herold National
cal Karya Engineering, 28 surveys and investigations for road projects Full Time
Hutagalung Expert
Engineer (Persero) Universitas that comply with the DGH requirements
Indonesi, 1988
47. Contract PT. Bina Graduate in He has experience in contract procurement
Widiyagung, National
Document Karya Bachelor , 30 philosophy and procedures currently used for civil Full Time
SH Expert
Specialist (Persero) 1986 works in Indonesia
48. Graduate in
Civil
Eko Broto Road PT. Bina Engineering, He has experience in roadsafety issues in Indonesia
National
Budiarto, Safety Karya Univ 12 and must have project experience with a wide range Full Time
Expert
ST Specialist (Persero) Krisnadwipaya ofsafety-related projects of government agencies
na, Jakarta,
2004
49. Graduate in He has many experiences as economist and/or
Economic
Economic financial analyst in developing infrastructure projects.
and PT. Bina
Ateng Faculty He also has experience and understanding of National
Financial Karya 30 Full Time
Sunarya Pancasila economic and financial analyses of infrastructure Expert
Analysis (Persero)
University, projects per government requirement and ADB
Expert
Jakarta, 1986 standards.
50. Graduate from
Economic
Faculty of He has experiences in procurement of goods, works
Procurem PT. Bina
Kusuma and services as well as contract management of National
Maryana ent Karya 20 Full Time
Negara infrastructure projects in accordance with Indonesian Expert
Specialist (Persero)
Institute of public procurement regulations.
Economic
Science, 1996
97
Accelerating Infrastructure Delivery through Better Engineering Services Project
98
Accelerating Infrastructure Delivery through Better Engineering Services Project
57.
Agus Budi Resident/
PT Multi
Satriawan, Highway S1 20 Ahli Teknik Jalan - Utama National freelance
Phi Beta
Ir, Indonesia Engineer
58. Abdurahma
Team PT Multi
n, Ir, S1 20 Ahli Teknik Jalan - Utama National freelance
Leader Phi Beta
Indonesia
59. Resident/
Sabaruddin, PT Multi
Highway S1 20 Ahli Teknik Jalan - Madya National freelance
Ir, Indonesia Phi Beta
Engineer
60.
Resident/
Asiano, Ir, PT Multi
Highway S1 25 Ahli Teknik Jalan-Utama National freelance
Indonesia Phi Beta
Engineer
61.
Houdman
Tambunan, Resident PT Multi
S2 21 Ahli Madya Pengawas National freelance
Ir, MT, Engineer Phi Beta
Indonesia
62.
Edi
Susanto,Ir, Resident PT Multi Ahli Teknik Jalan - Utama, Ahli Teknik Jembatan -
S2 19 National full-time
MT, Engineer Phi Beta Madya
Indonesia
63. M. Daud
Nasution, Resident PT Multi
S1 15 Ahli Teknik Jalan - Madya National freelance
ST, Engineer Phi Beta
Indonesia
99
Accelerating Infrastructure Delivery through Better Engineering Services Project
64. Bontor
Resident PT Multi
Rumahorbo, S1 20 Ahli Teknik Jalan - Madya National freelance
Engineer Phi Beta
Ir, Indonesia
65. Quality /
Limin, Ir, Pavement PT Multi
S1 22 Ahli Teknik Jalan - Madya National full-time
Indonesia & Mat. Phi Beta
Eng
66. Quality /
Yandri
Pavement PT Multi
Yalmi, Ir, S1 19 Ahli Madya Pengawas National freelance
& Mat. Phi Beta
Indonesia
Eng
67.
Abdul
Structure PT Multi
Mutholib, Ir, S1 16 Ahli Teknik Jembatan - Madya National freelance
Engineer Phi Beta
Indonesia
68.
AS.
Structure PT Multi
Sulistyo, Ir, S1 20 Ahli Teknik Jembatan - Madya National freelance
Engineer Phi Beta
Indonesia
69.
M. Yazied, Structure PT Multi
S1 20 Ahli Teknik Jembatan - Madya National freelance
Ir, Indonesia Engineer Phi Beta
70.
Haryanto, Ir,
Drainage PT Multi
MT, S2 19 Ahli Teknik Irigasi - Muda National freelance
Engineer Phi Beta
Indonesia
100
Accelerating Infrastructure Delivery through Better Engineering Services Project
71.
Rachman
HIghwaY PT Multi
Syarief, Ir, S1 18 Ahli Teknik Jalan-Madya National freelance
Engineer Phi Beta
Indonesia
72.
Mardijati, Ir, Architect PT Multi
S1 20 Arsitek - muda National freelance
Indonesia Engineer Phi Beta
73.
Irwin Bahar
Quantity
Rasyid, Ir, PT Multi
Engineer/ S2 19 Ahli Teknik Jalan - Utama National full-time
MT, Phi Beta
K3
Indonesia
74.
Bambang
Quantity PT Multi
Gustiarso, S1 20 Ahli Teknik Jalan - Madya National freelance
Engineer Phi Beta
Ir, Indonesia
75. Quality /
Jafar
Pavement PT Multi
Rasyid, Ir, S1 19 Ahli Teknik Jalan - Madya National freelance
& Mat. Phi Beta
Indonesia
Eng
76. Quality /
Sugeng
Pavement PT Multi
Bintoro, ST, S1 16 Ahli Teknik Jalan - Madya National freelance
& Mat. Phi Beta
Indonesia
Eng
77. Gentur J,
Chief PT Multi
ST, S1 18 Ahli Teknik Jalan - Madya National freelance
Inspector Phi Beta
Indonesia
101
Accelerating Infrastructure Delivery through Better Engineering Services Project
102
Accelerating Infrastructure Delivery through Better Engineering Services Project
85. Utilitas/
Zaidadin Mechanic
PT Multi
Razmel, Ir, al & S1 31 Ahli Teknik Mekanikal - Madya National
Phi Beta
Indonesia Elektrikal
Engineer freelance
86. Ir.
Yohannes
Haryanto Highway PT. Pola S1 / 1988 Civil
26 Feasibility Study / DED National Full time
Indonesia Engineer Agung Engineering
polajkt@hot
mail.com
87. S2 / 1995 /
Ir.
Civil
Sumarsono,
Engineering - Feasibility Study / DED National Associate
MBA Highway PT. Pola
S1 / 19
Indonesia Engineer Agung
1988 / Master
polajkt@hot
Of Business
mail.com
Administration
88. Ir.
Yohannes
Haryanto Highway PT. Pola S1 / 1988 Civil
26 Feasibility Study / DED National Full time
Indonesia, Engineer Agung Engineering
polajkt@hot
mail.com
89. Ir. S2 / 1995 / Civil
Sumarsono, Engineering -
MBA Highway PT. Pola S1 / 1988 /
19 Feasibility Study / DED National Assosiate
Indonesia, Engineer Agung Master Of
polajkt@hot Business
mail.com Administration
103
Accelerating Infrastructure Delivery through Better Engineering Services Project
104
Accelerating Infrastructure Delivery through Better Engineering Services Project
105
Accelerating Infrastructure Delivery through Better Engineering Services Project
mail.com
106
Accelerating Infrastructure Delivery through Better Engineering Services Project
111. Pasrah
Pamuji, ST S1 / 2007 /
PT. Pola
Indonesia, Surveyor Civil 7 Environment National Full time
Agung
polajkt@hot Engineering
mail.com
112. Sylvia
Yuniar, ST S1 / 2009 /
PT. Pola
Indonesia, Surveyor Civil 5 Feasibility Study National Full time
Agung
polajkt@hot Engineering
mail.com
113. Rima
Ekawati,ST
Traffic PT. Pola S1 / 2016 /
Indonesia, 1 Feasibility Study National Full time
Engineer Agung Civil Engineer
polajkt@hot
mail.com
108
Accelerating Infrastructure Delivery through Better Engineering Services Project
1. Prasetijo Adi 30 Has vast experince in the field of planning, design, execution of road and bridge projects. Worked as
a team leader for following projects:
Supervision Consultancy Service on The Construction of Light Rail Transit (LRT) in South
Sumatera Province, 31 Oct 2016 - 14 Juli 2017
Review Study of Toll Road Develompent Medan-Kualanamu-Tebing Tinggi Segments, 7 Jan
2015 - 19 Aug 2015
KPML's Road Infrastructure Development Technical Supervision Package 1 (stage 1), 16 Dec
2013 - 19 Sept 2014
Traffic Analysis of Nusa Dua-Ngurah Rai-Benoa Highway Planning (Package-04), Jul 2012 - Des
2012
Study of Traffic Engineering Planning Simpang Cikande, Tangerang-Merak Toll Road, Feb 2011
- Juni 2011
Sea Transportation Planning Riau Island Province, Maret 2010 - Oct 2010
Basid Design of Toll Road Bakauheni - Terbanggi Besar, Aug 2009 - Feb 2010
Evaluation Traffic Study of JORR Toll Road, W1, Maret 2009 - Juli 2009
Final Engineering Design Ciawi - Sukabumi Toll Road, Mei 2008 - Des 2008
Toll Road Engineering Planning Kertosono - Mojokerto, Feb 2007 - Nov 2007
DED of Serang Ring Road, Sept 2006 - Des 2006
DED of Toll Road Gempol - Pasuruan 34 Km's, Feb 2005 - Aug 2005
Final Engineering Desain Rest Area and On/Off Toll Road Jakarta – Cikampek – Sadang, Sept
2003 - Aug 2004
Engineering Planning of Fly Over KiaraCondong and Soekarno Hatta, Bandung, Juni 2002 - Oct
2002
Road Planning at West Java Province, Cirebon - Kuningan Segment, Jul 2001 - Des 2001
Design and Construction Supervision of The Sumatra East Coast Highways Project, Feb 1999 -
March 2000
109
Accelerating Infrastructure Delivery through Better Engineering Services Project
2. Apriyanto 10 Has vast experince in the field of planning, design, execution of road and bridge projects. Worked as
a pavement engineer for following projects:
Study and Analysis Traffic at Ciawi - Sukabumi Toll Road, Client: Trans Jabar Tol, Sep 2015 - Juli
2016
Road Engineering Planning, Bintuni - Wondama, Client: Laksana Desain Daya Cipta, Mei 2013 -
Sept 2013
Road Engineering Planning Leger Data's for National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
Road Engineering Planning in Kupang District and TTS (PR-02 Package), Client : Directorate
General of Highways, SNVT Planning and Supervision of Roads and Bridges of NTT, August 2010
- December 2010
Road Engineering Planning Package, Kenjeran, Surabaya, Client : SNVT P2JJ Metro Surabaya,
May 2009 - August 2009
3. Magdalena Idrus 23 Has vast experince in the field of planning, design, execution of road and bridge projects. Worked as
a bridge engineer for following projects:
Review Study of Toll Road Development Medan-Kualanamu-Tebing Tinggi Segments, 7 Jan 2015
- 19 Aug 2015
Technical Assistance Sub Directorate of Highways and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client: Bina Marga, Juli 2013 - Des 2013
Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sept 2011 - Des 2011
Sangkariang's Bridge Engineering Planning, Suguh River, Kalianyar (Malang District) and
Bedadung River's Bridge Review Design (Jember District), Client : Welfare Core Cooperative
(KOPINKAN), January 2009 - March 2009
Bridge Engineering Planning Spread in East Java South Cross (Paket-2), Client : Public Works
Office of Bina Marga East Java, June 2006 - October 2006
Road and Bridge Engineering Planning Sayati - Palasari, Client : Bina Marga Bandung, June 2004
- October 2004
110
Accelerating Infrastructure Delivery through Better Engineering Services Project
Road Planning at West Java Province, Cirebon - Kuningan Segment, Jul 2001 - Des 2001
Planning Access Road Ramp Ciawi, Jagorawi Toll Road, Client : PT. Jasa Marga (Persero),
August 2000 - October 2000
Feasibility Study and EIA Jatiasih Toll Road - Cileungsi and Spur Spur Jagorawi, Client : PT. Jasa
Marga (Persero), December 1997 - April 1999
Supervision of Road and Bridge in Inderalaya Segment - Kayu Agung, Client : P3TNAS South
Sumatera, August 1995 - May 1996
4. Luthfy Aziz Lubis 25 Has vast experince in the field of planning, design, execution of road and bridge projects. Worked as
a road engineer for following projects:
Review Study of Toll Road Development Medan-Kualanamu-Tebing Tinggi Segments, 7 Jan 2015
- 19 Aug 2015,Client: PT. Cipta Strada
FS of Bridge at Sambas Besar River - Kalimantan, Client: PT. Wiraguna Tani West Kalimantan
Branch, Oct 2014 - Des 2014
Road Engineering Palnning Bofuer-Bomberay, Client: PT. Laksana Desain Daya Cipta, Jul 2014 -
Oct 2014
Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, March 2014 - Juni 2014
Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sep 2013 - Des 2013
Road Engineering Planning, Bintuni - Wondama, Client: Laksana Desain Daya Cipta, Mei 2013 -
Sept 2013
FS Access Road North Kalibaru Port (Tanjung Priok New Port), Client: Cipta Strada, Maret 2013 -
Mei 2013
Traffic Survey for Indi II Sumatera and Java Project, Client: Dacrea Konsultan, Jan 2013 - Maret
2013
Road Engineering Planning National Road on Jayapura 1 Region, Abepura-Arso-Waris Segments,
Client: Kogas Driyap Konsultan, Aug 2014 - Des 2014
Road Engineering Planning Leger Data's for National Road of Gatentiri - Tanah Merah, Client:
Pillar Pusaka Inti, Apr - Aug 2014
111
Accelerating Infrastructure Delivery through Better Engineering Services Project
Road Engineering Planning Leger Data's for National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sept 2011 - Des 2011
Special Handling of Road Avalanches in Nabire - Bedudipa Segment , Client: Kogas Driyap
Konsultan, April 2011 - Aug 2011
Special Handling of Road Avalanches in Nabire - Bedudipa Segment , Client: Kogas Driyap
Konsultan, Jan 2011 - Apr 2011
Road Engineering Planning Leger Data's for National Road of Jayapura, Client: Kogas Driyap
Konsultan, Aug 2010 - Des 2010
Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
Review Study of Toll Road Kunciran - Serpong - Bandar Soekarno Hatta, Client: Cipta Strada, Jan
- March 2010
5. Fatchi Handoyo 19 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked as
a hydrology engineer for following projects:
Review Study of Toll Road Development Medan-Kualanamu-Tebing Tinggi Segments, 7 Jan 2015
- 19 Aug 2015
Technical Assistance Sub Directorate of Highways and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client: Bina Marga, Juli 2013 - Des 2013
Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sept 2011 - Des 2011
Regional Design and Supervision consultants-2 (RDSC-2) for Second Eastern Indonesia Region
Transport Project (EIRTP-2) Under IBRD Loan No. 4744-IND, Client : Directorate General of
Highways (Bina Marga), Technical Guidance Unit for Roads and Bridges, November 2006 -
October 2010
Road and Bridge Engineering Planning in Lubuk Linggau, Client : Directorate General of Road,
112
Accelerating Infrastructure Delivery through Better Engineering Services Project
6. Lubab 26 Has vast experince in the field of planning, design, execution of road and bridge projects. Worked as
a transport planner for following projects:
Consultancy Service of Financing Scheme of Semarang-Batang Toll Road, Pandaan-Malang,
Balikpapan-Samarinda, and Manado-Bitung, Client: Mandiri Sekuritas, Aug 2016 - April 2017
Study and Analysis Traffic at Ciawi - Sukabumi Toll Road, Client: Trans Jabar Tol, Sep 2015 - Juli
2016
Review Traffic Study Kanci - Pejagan - East Brebes, Client: Multhiphibeta - Waskita Toll Road, Jan
- March 2015
Study Bali Mandara Toll Road Networking, Client: Jasa Marga Bali Tol, Oct 2014 - Desember 2014
Technical Assistance Sub Directorate of Highways and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client: Bina Marga, Juli 2013 - Des 2013
Traffic Study and Basic Design Toll Road Bogor Ring Road Sekci II B, Client: Marga Sarana Jabar
- Multhiphibeta, Jan 2013 - Juli 2013
Traffic Study of Road Engineering Planning, Nusa Dua-Ngurah Rai-Benoa Toll Road (Paket-04),
Client: Waskita Karya, Jul 2012 - Des 2012
Preparation of Masterplan of Marine Transportation of Kepulauan Riau Province
Riau Islands Province, Client: Bappeda Riau Island Province, Jul 2011 - Des 2011
Engineering Consulting Service For Jakarta Mass Rapid Transit System Project Jakarta, Client:
JMEC-Wiratman, March 2010 - Jan 2011
Basic Design Toll Road Bakauheni - Terbanggi Besar, Client: PU Bina Marga, Sept 2009 - Feb
2010
Final Engineering Design Ciawi - Sukabumi Toll Road, Mei 2008 - Des 2008, Client: Semesta
Marga Raya, Mei 2008 - Des 2008
Intercodal Transportation Planning Study and Pedestrian System of Banda Aceh City, Client:
113
Accelerating Infrastructure Delivery through Better Engineering Services Project
114
Accelerating Infrastructure Delivery through Better Engineering Services Project
Review Traffic Study Kanci - Pejagan - East Brebes, Client: Multhiphibeta - Waskita Toll Road,
Jan - March 2015
Traffic Study and Basic Design Toll Road Bogor Ring Road Sekci II B, Client: Marga Sarana
Jabar - Multhiphibeta, Jan 2013 - Juli 2013
Road Engineering Planning Leger Data's for National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Sept 2011 - Des 2011
Intercodal Transportation Planning Study and Pedestrian System of Banda Aceh City, Client:
Qorina-BRR NAD Nias, Sep 2007 - Des 2007
Detail Engineering Design Special Bridge Busung and Kangboi, Client : Bina Marga Riau, July
2005 - February 2006
Toll Road Technical Planning Cikampek - South Purwakarta - Pleret Segment's, Client : PT Jasa
Marga (Persero), October 2003 - September 2004
Road Planning at West Java Province, Cirebon - Kuningan Segment, Jul 2001 - Des 2001
Planning Access Road Ramp Ciawi, Jagorawi Toll Road, Client : PT. Jasa Marga (Persero),
August 2000 - October 2000
9. Wisnu Wibowo 30 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked
as a geotechnical engineer for following projects:
Technical Planning of Bojonegoro Regional Road, Client : Bina Marga and Irrigation Bandung,
March 2015 - September 2015
Periodical Road and Bridge Technical Planning in Timika, Client : SKNVT Road Planning and
Supervision Province Papua, April 2014 - September 2014
Bridge Technical Preparation, Client : SKNVT Road Planning and Supervision, July 2013 -
November 2013
115
Accelerating Infrastructure Delivery through Better Engineering Services Project
Road Engineering Planning Segment Maruni - Warmare - Prafi, Client : SKNVT Road Supervision
and Planning West Papua, August 2012 - December 2012
Detail Engineering Design Cross Island I (Package 23/2011), Client : SNVT Road Supervision
and Planning Province Aceh, April 2011 - September 2011
Bridge Engineering Planning Tirasai River, Client : SKNVT Road Supervision and Planning West
Papua, August 2010 - December 2010
Road and Bridge Geitechnical Planning, Client : Publics Works Service, June 2009 - October
2009
Bridge Engineering Planning Fly Over Jomin, Client : DPU Bina Marga, September 2007 -
December 2007
Detail Engineering Design Special Bridge Busung and Kangboi, Client : Bina Marga Riau, July
2005 - February 2006
Road and Bridge Engineering Planning Sayati - Palasari, Client : Bina Marga Bandung, June
2004 - October 2004
Road Planning in East Kalimantan Province Package - 11 Road Sections Mensalong - Tau
Lumbis and Tau Lumbis - Long Bawan, Client : Directorate General of Regional Infrastructure of
the Department of Settlements and Regional Infrastructure, April 2003 - December 2003
Road and Bridge Engineering Planning in Segment Jatibarang - Palimanan Stage I, Client :
Department of Settlement and Regional Infrastructure, January 2001 - November 2001
10. Dedi Tarmedi 11 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked
as a contract document specialist for following projects:
Review Study of Toll Road Develompent Medan-Kualanamu-Tebing Tinggi Segments, 7 Jan 2015 -
19 Aug 2015
Technical Assistance Sub Directorate of Highways and Urban Roads, Dit. Bina Teknik, Ditjen. Bina
Marga, Ministry of Public Works Jakarta, Client: Bina Marga, Juli 2013 - Des 2013
Engineering Consulting Service For Jakarta Mass Rapid Transit System Project Jakarta, Client:
JMEC-Wiratman, March 2010 - Jan 2011
Road and Bridge Geotechnical Planning, Client : Publics Works Service, June 2009 - October 2009
116
Accelerating Infrastructure Delivery through Better Engineering Services Project
Road Engineering Planning in Alor Island (PR-02 Package); Client : SNVT Planning and Supervision
of Roads and Bridges of NTT Province, September 2007 - March 2008
11. Tri Wanto Ardi 14 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked
Wibawa as a road safety specialist for following projects:
Review Traffic Study Kanci - Pejagan - East Brebes, Client: Multhiphibeta - Waskita Toll Road, Jan
- March 2015
Road Engineering Planning Leger Data's for National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
FS Access Road North Kalibaru Port (Tanjung Priok New Port), Client: Cipta Strada, Maret 2013 -
Mei 2013
Special Handling of Road Avalanches in Nabire - Bedudipa Segment , Client: Kogas Driyap
Konsultan, April 2011 - Aug 2011
Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
Final Engineering Design Ciawi - Sukabumi Toll Road, Mei 2008 - Des 2008, Client: Semesta
Marga Raya, Mei 2008 - Des 2008
Road Engineering Planning of Kapitu - Tumpaan Kapitu Tumpaan Location, Minahasa District
South Minahasa, Client : South Minahasa District Department of Public Works, September 2006 -
January 2007
DED of Bridge - Pakckage 7, Client : Directorate General of Road, Ministry of Public Works,
January 2005 - June 2005
12. Maryoni 31 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked
as a economic and financial analysis expert for following projects:
Review Traffic Study Kanci - Pejagan - East Brebes, Client: Multhiphibeta - Waskita Toll Road,
Jan - March 2015
Road Engineering Planning, Bintuni - Wondama, Client: Laksana Desain Daya Cipta, Mei 2013 -
Sept 2013
Traffic Study of Road Engineering Planning, Nusa Dua-Ngurah Rai-Benoa Toll Road (Paket-04),
117
Accelerating Infrastructure Delivery through Better Engineering Services Project
118
Accelerating Infrastructure Delivery through Better Engineering Services Project
Design and Construction Supervision of The Sumatra East Coast Highways Project, Feb 1999 -
March 2000
Engineering Design of Bridge Package 1, Semarang, Binkot-Directorate General of Highways,
Aug 1995 - Mar 1996
Engineering Design of Road and Bridge, P3TNas-Directorate General of Highways, Lampung,
May 1993- Feb 1994
Engineering Design of Bridge Package XI, West Kalimantan, P3TNas Kalbar - Directorate
General of Highways, Jul 1991- Nov 1991
14. Utari Dewi 29 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked
as a institutional and legal specialist for following projects:
Review Traffic Study Kanci - Pejagan - East Brebes, Client: Multhiphibeta - Waskita Toll Road,
Jan - March 2015
Road Engineering Planning Leger Data's for National Road of Serui, Client: Kogas Driyap
Konsultan, Feb 2012 - Apr 2012
Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
Detail Engineering Design Special Bridge Busung and Kangboi, Client : Bina Marga Riau, July
2005 - February 2006
Toll Road Technical Planning Cikampek - South Purwakarta - Pleret Segment's, Client : PT Jasa
Marga (Persero), October 2003 - September 2004
Planning Access Road Ramp Ciawi, Jagorawi Toll Road, Client : PT. Jasa Marga (Persero),
August 2000 - October 2000
Engineering Preparation Design of Road at the Location of Landslide and Preparation of Tender
Document Package 1, Jambi, Bintek - Directorate General of Highways, May 1998 - Mar 1999
Engineering Design of Urban Bridge, Kupang and Manado, Binkot - Directorate General of
Highways, Sept 1996 - Mar 1997
15. Syakti Kirana Eka 34 Has vast experience in the field of planning, design, execution of road and bridge projects. Worked
119
Accelerating Infrastructure Delivery through Better Engineering Services Project
120
Accelerating Infrastructure Delivery through Better Engineering Services Project
Engineering Design of Bridge Package XI, West Kalimantan, P3TNas Kalbar - Directorate
General of Highways, Jul 1991- Nov 1991
ADB 7 Supervision Project Link Dompu - Sila and Talabiu - Parado, in Dompu West Nusa
Tenggara, Directorate General of Highways, Apr 1990- Feb 1991
16. Achmad Widarto 26 Has vast experince in the field of planning, design, execution of road and bridge projects. Worked as
a environmental expert for following projects:
Review Traffic Study Kanci - Pejagan - East Brebes, Client: Multhiphibeta - Waskita Toll Road,
Jan - March 2015
Road Engineering Planning in 124 KM's Denpasar - Packages 12 (Bon Dalem/Tembok Village) -
Amlapura, Client : P2JN Bali, March 2013 - April 2013
Road Engineering Planning, National Road on Jayapura 1 Region, Client: Kogas Driyap
Konsultan, Apr 2010 - Aug 2010
Road Engineering Planning in Alor Island (PR-02 Package); Client : SNVT Planning and
Supervision of Roads and Bridges of NTT Province, September 2007 - March 2008
Bridge Engineering Planning Spread in East Java South Cross (Paket-2), Client : Public Works
Office of Bina Marga East Java, June 2006 - October 2006
DED of Bridge - Pakckage 7, Client : Directorate General of Road, Ministry of Public Works,
January 2005 - June 2005
Technical Assistance For Second Road Rehabilitation Project, UNDER ADB LOAN NO. 3989 -
IND, Client : PT. Jasa Marga (Persero), April 2003 - January 2004
Design and Construction Supervision of The Sumatra East Coast Highways Project, Feb 1999 -
March 2000
17. He has experience in, planning, design, programming, managing, monitoring, and supervising
construction of roads, flyovers and bridges (The Project is Detail Engineering Design (DED) Bali
Ir. Muhammad Proyek Jalan Tol Benoa-Kuta-Nusa Dua, Project DED Jalan Tol Seksi 1 (Ruas Bakauhuni –
28 Babatan) dan Seksi 3 (Ruas Tegineneng-Terbanggi Besar) pada Kegiatan Perencanaan
Ridwan, MSc
Pembangunan Jalan dan Jembatan, Dinas Pekerjaan Umum Propinsi Lampung Tahun
Anggaran 2009,etc)
121
Accelerating Infrastructure Delivery through Better Engineering Services Project
18. He has responsible for carrying out all types of structural design especially fly over, bridge and
highway design related to road works (The Project is Improvement in Metropolitan and Large Cities
Ir. Sukris Santoso 32 Project (under JBIC Loan IP : 488) Package 2 : Suprapto Flyover and Pramuka Pemuda Flyover,
Project DED Perempatan Jalan Cibarusah Raya dan Jalan M.H. Thamrin Lippo Cikarang, etc)
19. He has experience in the design, construction and supervision of highways, fly over and bridges (The
Ir. Ganda Project is Rencana Perencanaan Jalan Lingkar Pantai dan UKL/UPL, Pekerjaan Detail Engineering
22
Sumekarjaya Design Jalan Sambaliung – Mataritif Kabupaten Berau Kaltim, etc)
20. He has Experience for carrying out all types of traffic analysis especially fly over, bridge and highway
Ir. Ganda design related to road works (The Project is Penyusunan Studi Kelayakan dan Desain Awal Jalan Tol
22 Trans Sumatera Ruas Medan – Banda Aceh, Rencana Perencanaan Jalan Lingkar Pantai dan
Sumekarjaya
UKL/UPL, etc)
21. He has experience for carrying out all types ofhidrology and drainage works especially for fly over,
bridge and highway designrelated to road works (The Project is Proyek Penyusunan Dokumen teknis
Ir. Bunedi 18 Pembangunan lalan palu - p.arigi by pass, Penyusunan Studi Kelayakan dan Desain Awal Jalan Tol
Trans Sumatera Ruas Medan – Banda, etc)
22. He has experience for carrying out all types of transport planning element especially related with fly
Ir. Hendra Ananda, over, bridge and highway works (The Project is Review Kajian dan Basic Design Busway Layang
20 Koridor 15 Pasar Minggu - Manggarai, Penyusunan Studi Kelayakan dan Desain Awal Jalan Tol
ME
Trans Sumatera Ruas Medan – Banda, etc)
23. He has experience in the planning, design and implementation of road, flyover and bridge projects
Ir. Kharis Subarkah 12 (The Project is FS Jalan Nasional Lintas Tengah Pegunungan Papua, Detai Desain Ruas Toll Ciawi
Sukabumi Tahap 2, etc)
122
Accelerating Infrastructure Delivery through Better Engineering Services Project
24. He has experiences in estimation of roads, flyovers and bridges projects with qualification in civil
engineering and relevant project experience in Indonesia (The Project is Pekerjaan Lanjutan
Pembangunan Gerbang Tol Tangerang 2 dan Gardu Satelit Meruya 1 Tahap II (Pelebaran Jalan dan
Ir. Yahmanto 31 PO Khusus di Km 19 + 000 B-GT, Tangerang Km 05 + 870 – 05 + 960 A pada Ruas Jalan Tol
Jakarta - Tangerang, Proyek Pekerjaan Scrapping dan Filling Aspal, Expansion Joint dan Marka
Jalan di Jalan Tol Ir. Wiyoto Wiyono, MSc. Ruas Cawang Interchange s/d Rawamangun, etc)
25. He has experinces in undertaking geotechnical surveys and investigations for road projectsthat
Elon Ahmadi comply with the DGH requirements ((The Project is Penyusunan Studi Kelayakan dan Desain Awal
12
Wiranta Jalan Tol Trans Sumatera Ruas Medan – Banda Aceh,etc)
26. He has experience in contract procurement philosophy and procedures currently used for civil works
Ir. Herold in Indonesia (The Project is Penyusunan Studi Kelayakan dan Desain Awal Jalan Tol Trans
28
Hutagalung Sumatera Ruas Medan – Banda Aceh,etc)
27. He has experience in road safety issues in Indonesia and must have project experience with a wide
range of safety-related projects of government agencies (The Project is Review Design Jalan Tol
Widiyagung, SH 30 Lingkar Luar Jakarta Ruas W2 Utara (Kebon Jeruk-Ulujami), Rencana Teknik Akhir Pembangunan
Jalan Tol Semarang Seksi A (Krapyak – Jatingaleh), etc)
28. He has many experiences as economist and/or financial analyst in developing infrastructure projects.
He also has experience and understanding of economic and financial analyses of infrastructure
Eko Broto Budiarto, projects per government requirement and ADB standards (The Project is Project Jasa Konsultasi
12 Bantuan Teknik Pengadaan Tanah Ruas Jalan Tol Kunciran – Serpong Banten, Regional Project
ST
Management Consultant (RPMC) Region II South Sumatera. Rural Infrastruktur ndiri (RIS-PNPM)
ADB Loan 2249-INO (SF), etc)
123
Accelerating Infrastructure Delivery through Better Engineering Services Project
29. He has experiences in procurement of goods, works and services as well as contract management of
infrastructure projects in accordance with Indonesian public procurement regulations (The Project is
Ateng Sunarya 30 Penyusunan Studi Kelayakan dan Desain Awal Jalan Tol Trans Sumatera Ruas Medan – Banda
Aceh, etc)
30. He has more than 10 years of experiences in drafting contract agreements and in resolving legal
Maryana 20 issues in public procurements in Indonesia.
31.
He has 7 years working experience on project related social safeguards. He’s has experience on the
Irmani Indroyono 28 project social impacts consistent with the country’s (The Project is Penyusunan Studi Kelayakan dan
Desain Awal Jalan Tol Trans Sumatera Ruas Medan – Banda Aceh,etc)
32. She has many experiences in environmental science, engineering, and related field with experience
in overseeing environmental management plans of infrastructure projects, including Indonesia’s
Ir. Andi Yulianto 27 regulatory framework (The Project is Project DED Jalan Tol Dukungan Pemerintah, Final Engineering
Design CibitungCilincing Toll Road Project, etc)
33. He has responsible for carrying out all types of structural design especially fly over, bridge and
highway design related to road works (The Project is Improvement in Metropolitan and Large Cities
Ir. Muhwinardini 19 Project (under JBIC Loan IP : 488) Package 2 : Suprapto Flyover and Pramuka Pemuda Flyover,
Project DED Perempatan Jalan Cibarusah Raya dan Jalan M.H. Thamrin Lippo Cikarang, etc)
124
Accelerating Infrastructure Delivery through Better Engineering Services Project
36. Houdman
Tambunan, Ir, MT, 19 Ahli Teknik Jalan - Utama
Indonesia
37. Agus Budi
Satriawan, Ir, 20 Ahli Teknik Jalan - Utama
Indonesia
38.
Abdurahman, Ir,
20 Ahli Teknik Jalan - Utama
Indonesia
46.
Yandri Yalmi, Ir,
19 Ahli Madya Pengawas
Indonesia
125
Accelerating Infrastructure Delivery through Better Engineering Services Project
126
Accelerating Infrastructure Delivery through Better Engineering Services Project
57.
Gentur J, ST,
18 Ahli Teknik Jalan - Madya
Indonesia
58.
Tjarli, Ir, Indonesia 20 Ahli Teknik Jalan - Madya
127
Accelerating Infrastructure Delivery through Better Engineering Services Project
69.
Ir. Sumarsono, MBA
Indonesia, 19 Feasibility Study / DED
[email protected]
70.
Ir. Berton Siahaan
Indonesia, 27 Feasibility Study / DED
[email protected]
71. Ir. Drs. Sukarni
Ginting
27 Feasibility Study / DED
Indonesia,
[email protected]
128
Accelerating Infrastructure Delivery through Better Engineering Services Project
129
Accelerating Infrastructure Delivery through Better Engineering Services Project
87.
Ir. Agus Satimo
Indonesia, 18 Feasibility Study / Environment
[email protected]
88. Ir. Djayadi
Indonesia, 22 Feasibility Study
[email protected]
89. Ali Imron, ST
Indonesia, 18 Feasibility Study
[email protected]
90. Abdul Wachid, ST
Indonesia, 7 Feasibility Study
[email protected]
91. Pasrah Pamuji, ST
Indonesia, 7 Environment
[email protected]
92.
Sylvia Yuniar, ST
Indonesia, 5 Feasibility Study
[email protected]
93. Rima Ekawati,ST
Indonesia, 1 Feasibility Study
[email protected]
131
Accelerating Infrastructure Delivery through Better Engineering Services Project
SN Description
1 Certificate of Incorporation of the lead member
2 Certificate of Incorporation of the JV member (for each member) – 2a to 2e
3 JV Agreement, Power of Attorneys of JV Firms
4 Details of at least 5 Clients listed in B(iv) of Part VI
5 Lead firm’s audited financial statements for the last three (3) years showing positive net worth
and no qualified opinion by an independent auditor (If not required by the law of the lead firm’s
country, other financial statements acceptable to the IA)
6 ISO 9000 family of Quality Management certification of the lead firm and other JV firms – 6a to
6f
7 Information regarding experts/personnel available with the firm, joint venture partners and sub-
consultants (including access of pool of experts) highlighting the key qualifications and details
of similar experience of each expert (tabular form in the Tables prescribed in EOI template) –
Table 1
8 List of experts having experience in Indonesia – Table-2
9 Certificate that the key experts to be nominated for a call-down assignment shall be from the
list of experts provided at the empanelment stage – 9a to 9l
10 Details of experience of the firms (project summary) – 10a,10b,10c,10d,10e, 10f
We, the undersigned, certify to the best of our knowledge and belief:
We have read the advertisement, including the terms of reference (TOR), for this assignment.
Neither the consulting firm nor its JV member or sub-consultant or any of its experts prepared the
TOR for this activity.
We confirm that the project references submitted as part of this EOI accurately reflect the
experience of the specified firm/consortium.
We further confirm that, if any of our experts is engaged to prepare the TOR for any ensuing
assignment resulting from our work product under this assignment, our firm, JV member or sub-
consultant, and the expert(s) will be disqualified from short-listing and participation in the
assignment.
4 There are no prescribed forms or formal requirements for the certifications mentioned in this section, as well as for
association documents or agreements among firms and association members. The firms may use the legal/formal
requirements applicable in the country/place of execution. It should be noted, however, that the association
agreements are not yet required during the EOI submission and evaluation. If the consortium is selected to be
included in the panel, the IA will require submission of these agreements along with other relevant documents, prior to
signing or amendment of the IDC.
5
Eligibility refers to ADB’s Guidelines on the Use of Consultants by Asian Development Bank and its Borrowers,
Clause 1.13 together with Clauses 1.10-1.11 and 1.23-1.25 on integrity and anti-corruption policies.
132
Accelerating Infrastructure Delivery through Better Engineering Services Project
All consulting entities and experts proposed in this EOI are eligible to participate in ADB-funded, -
supported and –administered activities.
The lead entity and JV member or sub-consultant are NOT currently sanctioned by ADB or other
MDBs. Neither the consulting firm nor the JV member or sub-consultant has ever been convicted
of an integrity-related offense or crime related to theft, corruption, fraud, collusion or coercion.
We understand that it is our obligation to notify ADB should any member of the consortium
become ineligible to work with ADB or other MDBs or be convicted of an integrity-related offense
or crime as described above.
JV member or sub-consultant, including all proposed experts named in this EOI, confirmed their
interest in this activity in writing.
JV member or sub-consultant, including all proposed experts named in this EOI, authorized us in
writing to represent them in expressing interest in this activity.
None of the proposed consortiums are subsidiaries of and/or dependent on the Executing Agency
or the Implementing Agency or individuals related to them.
Rohit Mishra
Representative of the Consortium
133