A. Introduction of visual system
B. System operation for Operator
C. System operation for Engineer
IKK Project 1
Confidential
Not every water treatment plant have the same configuration as in picture above.
a. Some water treatment plant does not have Intake pump (gravity)
b. Some water treatment plant have booster pump
c. For 20 lps water treatment plant there are only three valve for drainage lamella.
d. Some water treatment plant have two compartement clearwell
e. Some water treatment plant does not have distribution pump ( gravity)
Color Pipe
Raw water pipe
Drain pipe/ wash out pipe
Backwash pipe
Blower pipe
Clean water pipe
IKK Project 2
Confidential
Menu
Side Bar
1. INTAKE AREA
OBJEK ID KETERANGAN
Level switch as indicator water level
L is low
Level switch as indicator water level
LL is very low
Intake pump A
P01A
Intake Pump B
P01B
IKK Project 3
Confidential
OBJEK ID KETERANGAN
Turbidity Sensor raw water
PI‐01.NTU
pH sensor raw water
PI‐01.pH
‐ Static Mixer
Flow transmitter A
FIT‐01A
IKK Project 4
Confidential
TK201
IKK Project 5
Confidential
IKK Project 6
Confidential
IKK Project 7
Confidential
Value of pressure
‐
‐ Value of pressure
IKK Project 8
Confidential
3. CHEMICAL TANK
OBJEK ID KETERANGAN
‐ Debit flow
‐ Debit flow
‐ Debit flow
IKK Project 9
Confidential
‐ Debit flow
‐ Debit flow
‐ Debit flow
OBJEK KETERANGAN
As Indicator that system can Run Production, or water level at reservoir is
sufficient to be filled
As Indicator that system can not Run Production, or water level in the
reservoir at maximum
Production active
IKK Project 10
Confidential
STATISTICS
OBJECT ID INFORMATION
A pH of raw water
C pH distribution water
IKK Project 11
Confidential
ENERGY
OBJECT ID INFORMATION
A Total Energy
IKK Project 12
Confidential
SETTINGS
OBJEK ID KETERANGAN
B Year
B Month
B Date
B Hour
B Minute
IKK Project 13
Confidential
B Secon
C Number of User
C Name of User
C Pasword of User
ABOUT
DESCRIPTION
IKK Project 14
Confidential
OBJECT ID INFORMATION
NTU : 0 ‐ 600
pH : 6.0 – 8.0
Notes:
IKK Project 15
Confidential
MESSAGE
OBJECT ID KETERANGAN
Active Message. Message contain
A information warning or alarm.
B I : Information
ID Object
B
B Message Code
B Another informati
IKK Project 16
Confidential
This section is intended for prospective operators to be able to use the system (SCADA) which contains
how to run the system, how to enter and exit the system, how to change language, how to run
production, how to run pumps manually, how to do sludge removal, how to do sludge backwash, how to
run a distribution.
OPERATING SISTEM (SCADA)
This section will explain how to run or activate the system (SCADA):Open Google Chrome
Notes:
IKK Project 17
Confidential
SETTING LANGUAGE
Click IDN for Bahasa Language or ENG for England
IKK Project 18
Confidential
RUN PRODUCTION
1. Click ENABLE Production
Notes:
IKK Project 19
Confidential
4. Dosing pump will run automatically when Flow transmitter sensing water flow.
IKK Project 20
Confidential
1. Click the Intake Pump Icon → The side screen will show the settings for the Intake Pump.
2. Click FLUSH SLUDGE to do sludge removal → sludge removal valve will open
automatically (Valve Color: Green) → Sludge removal process information will appear on
the screen.
Notes:
• Don't forget to do sludge removal on other Flocculator / Lamella!
•
SCADA BOY
IKK Project 22
Confidential
HOW TO DO BACKWASH
1. Click one of the tank Sand Filtration (Example: F101A) The side screen will show display
the Sand Filtration tank settings.
2. Click START BACKWASH to run the Backwash process SET LEVEL in the Backwash
process will appear on the screen The drain and water level reduction valve will open
automatically.
Notes:
SCADA BOY
IKK Project 23
Confidential
3. The next step is AIR BLOWER→ Valve for Air Blower on the Sand Filtration will open and Air
Blower will be activated automatically → The screen will display the AIR BLOWER process
and also when the air blower is active according to the settings.
4. The next step is AIR + WATER BACKWASH → The drain valve, air blower and water
backwash will open automatically → The screen will show display the AIR + BACKWASH
process and also when the air blower is active according to the settings > Backwash water
pump will activate automatically.
Notes:
• AIR BLOWER → aims to break the sand against mud
• AIR + BACKWASH → The air blower and backwash air aim to lift the mud up to
the surface of the water to be discharged through the mud discharge valve
(Gutter)
IKK Project 24
Confidential
5. the next step is BACKWASH 1 or the first drain> The Backwash water valve will remain
open and the Backwash water pump remains active and also the drain valve (Gutter) will
open → The screen will display the BACKWASH 1 process.
6. The next step is BACKWASH 2 → The Backwash water valve will remain open and the
Backwash water pump remains active and also the drain valve (Gutter) will open the same
as in the BACKWASH 1 .
Notes:
IKK Project 25
Confidential
7. The next step is BACKWASH 3 or the third drain Back The Backwash water valve will remain
open and the Backwash water pump remains active and also the drain valve (Gutter) will
open the same as in the BACKWASH steps 1 and 2.
8. The next step is SETTLE, aims to calm the water in the Sand Filtration for the time set in
the settings → All Valves in the Sand Filtration will be closed.
IKK Project 26
Confidential
9. The next step is NESTING, aims to precipitate water in the Sand Filtration during the time
or height level that has been set in the settings >The drain valve and water level reduction
will open automatically
10. The final step in the drainage process is FLUSHING, aims to rinse the water in the Gutter in
the Sand Filtration > The Sand Filtration Valve Inlet will open and the drain Valve (Gutter)
will open automatically.
Notes:
IKK Project 27
Confidential
2. The Distribution Pump will activate and the Distribution ENABLE button will turn green.
Water discharge meter (Flow Meter), Pressure pipe distribution sensor (Pressure Sensor),
chlorine residual sensor and distribution water pH sensor will be green.
Notes:
IKK Project 28
Confidential
This section is intended for prospective Engineers to be able to understand more about the
system (SCADA) such as Pump Group Operational Mode Settings (Intake, Backwash and
Distribution Pumps), Alarm and Warning Settings for each sensor, Sludge trigger settings or
Backwash, Backwash step, Level Control on sand filtration, etc.
MAINTENANCE USER
This section explains how to register a user or new user system.
1. Log in as Engineer
IKK Project 29
Confidential
3. Input User Name or system user name → PIN Code Input → Click on the rightmost column
to change the system user authorization level.
4. Input User / User Name → PIN Code Input → Select User Level
Notes:
IKK Project 30
Confidential
2. Click of of the pump icon (Example: Intake Pump A) → Side display will showing
pump setting → Select PUMP GROUP
IKK Project 31
Confidential
And if Choose Fixed Frequency, Input Value for the frequency at the Fixed Frequency
Low Alarm
Deviation Alarm
Setting Alarm using Deviation Percentage
Positive Alarm
Positive Warning
Negative Warning
Negative Alarm
IKK Project 32
Confidential
Example:
System will show warning if Turbidity or Raw water NTU reach 5 NTU
1. Click Turbidity or Raw Water NTU Senso icon → Select Alarm → At Limit Alarm,
Checklist High Warning → Input NTU Value (Example: 5 NTU)
If Turbidity or Raw Water NTU reach 5 NTU, System will Showing orange colour at the sensor
icon.
Sensor List that usually get setting for Alarm and Warning:
✓ Raw Water NTU Sensor
✓ Raw Water pH Sensor
✓ Chemical Tank level Sensor
✓ Distribution Water NTU Sensor
✓ Distribution Water Chlorine Sensor
✓ Distribution Water pH Sensor
Notes:
IKK Project 33
Confidential
IKK Project 34
Confidential
IKK Project 35
Confidential
Control Mode for Backwash Pump can be use between Pump Frequency or backwash water debit
STEP:
1. SET LEVEL
2. AIR BLOWING
3. AIR + BACKWASH
4. BACKWASH 1
5. BACKWASH 2
6. BACKWASH 3
7. SETTLE
8. NESTING
9. FLUSHING
Time Level
Frequency Time
IKK Project 36
Confidential
Inlet Enable
Inlet Sand Filter Valve will close if water level reach 90 cm from the sand
Inlet Disable
Inlet Sand Filter Valve will open if water level reach 85 cm from the sand
Outlet Enable
Outlet Sand Filter Valve will open if water level reach 15 cm from the sand
Outlet Disable
Outlet Sand Filter Valve will close if water level reach 10 cm from the sand
Notes:
The water level control setting in the sand filter is made for maintain the water level in order to keep
The water not getting to low (Keep the sand always submerged in water) and not getting to high
IKK Project 37
Confidential
Demand On
Indication of production needs will be active when the water level in the reservoir reaches 20
cm from the floor
Demand Off
Indication of production needs will be inactive when the water level in the reservoir reaches
275 cm from the floor
Supply On
Indication of supply will be active when the water level in reservoir reaches 50 cm from the
floor
Supply Off
Indication of supply will be inactive when the water level in reservoir reaches 20 cm from the
floor
IKK Project 38
Confidential
2. Input Proportional Dose for Alum Sulphate with Turbidity below 5 NTU and pH 8.0