Foundation
Foundation
Foundation
Ø
DRB MATTING BARS SPACED @ 0.50CM. ON
1.00 1.00 CENTER BOTH WAYS. 1.00
F1C1
F1C1 WF-1 F1C1
WF-1
1.00 1.00
2"X4"X1.50MM. THK. REC TUBE SPACED
ON CENTER EQUALLY
RAFTER
WF-1
RAFTER
WF-1
WF-1
RAFTER
1.00
1.00
RAFTER
F1C1 WF-1 F1C1
F1C1
RAFTER
1.00
WF-1
RAFTER
F1C1 F1C1
1.00
RAFTER
WF-1
RAFTER
WF-1
WF-1
0.20 MTRS. ELEVATED RAFTER
1.00 SLAB ON FILL
RAFTER
F1C1 WF-1
1.00
1.00 RAFTER
1.00 1.00
WF-1
STEP UP F1C1 F1C1
1.00 1.00 1.00
SIGN AND SEALED APPROVED BY : PROJECT TITLE SHEET CONTENT SHEET NO.
ENGR. ADOLFO D. TANCO III S 1
AS SHOWN
6 11
CIVIL ENGINEER OWNER LOCATION :