NR CIV SD FORMA 320 Earthworks Drainage
NR CIV SD FORMA 320 Earthworks Drainage
NR CIV SD FORMA 320 Earthworks Drainage
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
Not applicable
Not applicable. The described designsldetails are proposed for standard use
throughout Network Rail's infrastructure.
Existing conditions
Brief general description
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
Network Rail MPBl's Civils Investment Efficiency Strategy and Action Plan identifies
that standardisation of commonly used designsand det& within the hard structures
and earthworks disciplines could achieve significant cost savings through: -
Reducing overall design costs.
Facilitating the streamlining of the technical approvals process.
Reducing contractorlsubcontractor costs associated with detailing uncertainty.
Mitigating maintenance liability.
Providing increased familiarity with the delivered product amongst all parties
leading to increased productivity.
The professional services remit requires the development of a library of standard
designsldetails with accompanying guidance notes on their application. Project
delivery is scheduled in three distinct phases. Tony Gee and partners LLP -
commission is currently limited to phases one and two only.
Phase one, commenced in January 2006 developed previously approved brick and
masonry repair standard designsldetails currently in use at Yerritory level'. Converted
onto a standard drawing template, they have been submitted to Network Rail for
comment. These will be incorporated into the phase two submissions submitted to
Network Rail's Director of Civil Engineering for endorsement.
Phase two extends phase one to develop standard designs and details for a number
of 'non bridge deck' structures for Form B approval stage at the 'national level'. Each
set of standard design and detail shall be submitted under a specific Form A. This
document applies to the standard designs and details for Earthworks Drainage.
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
The third phase has yet to be commissioned and will develop standard bridge
designsldetails.
The library will be maintained and distributed by Network Rail to its stakeholders and
key external suppliers for adoption across the network at a national level.
The standard designsldetails and guidance notes proposed are intended for use on
earthworks.8ramagestructure only.
Not applicable.
Clearance dimensions andlor platform widths will vary at each site proposed for use of
the standard designsldetails. Appropriate specific details are to be included in a
project specific Form AlForm B submission.
5.4 Local road name1 road No./ river namelstation or building name.
Not applicable.
Road and river nameslnumbers will vary at each site proposed for use of the standard
designsldetails. Appropriate specific details are to be included in a project specific
Form AlForm B submission.
Not applicable.
PublidPrivate rights of way will vary at each site proposed for use of the standard
designsldetails. Appropriate specific details are to be included in a project specific
Form AlForm B submission.
5.6 Number and layout of tracks1 whether electrified1 OHLE wire heightlstation
layout.
TMI of Scheme:
Location
Standard Design 8 Detail Efficiency Project - Phase 2
See Appendix A
1
ELR I Mllmae
- I OS add
- ref. I structure NO.
See Appendix A ISee Appendix A ISee AppendixA I
See AppendhA
Document No. NRICIVISDIFORMN320 Revlslon I PI
Not applicable.
Track nature and layout will vary at each site proposed for use of the standard
designddetails. Appropriate specific details are to be included in a project specific
Form NForm B submission.
Not applicable.
Adjacent earthworkslterrain will vary at each site proposed for use of the standard
designddetails. Appropriate specir~cdetails are to be included in a project specific
Form AlFonn B submission.
The defects to be remedied at each site will be associated with inadequate drainage
of existing earthworks such as, but not limited to:-
* Defectivehadequate crest drainage at cuttings where significant positive
catchment is present resulting in surface and shallow groundwater (or land
drainage flows) reaching he cutting crest and possibly washing out or
affecting the stability ofhcutting.
Defectivdnadequate to drainage at embankments where significant positive
catchment is present resulting in surface and shallow groundwater (or land
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
drainage flows) reaching the embankment and possibly seeping through the
formation of the earthwork, or ponding water at the toe.
Defective inleffoutfall structures resulting in localised erosion.
Existing defective, inadequate or life expired slope drains in cuttings leading to
risk of slope face washouts.
Seepages and weVmanhy slopes resulting in slope instability.
Existing cess drain has insufficient capacity to carry discharges from new or
upgraded earthwork drains.
Inadequate conveyance of general catchment flows or watercourses (small
streams or ditches) down to cess drainage.
Not applicable.
ELR I Mllerae
- 1 OS grid
- ref. I Structure No.
See Appendix A See Appendix A I
See AppendixA I See AppendixA 1
Document No. NRICIVISDIFORMN320 ( Revlslon PI
Searches of the Network Rail Hazard Directory, utility company records and site
inspections should be completed to verify the site-associated hazards and the results
included in a project specific Form AlForm B submission.
Proposed works
Brief general descrlptlon giving details of the proposed works.
The standard details will be adopted in accordance with the following scenarios:
Cutting slopes with an adjoining positive catchment will be improved by
construction o&a designed and engineered crest ditchldrain and outfalls. The
crest details is mcorporate a sub-surface cut-off drain low angle catchments
where infiltration may be occurring due to low angle catchments;
Embankment slopes with an adjacent positive catchment will be improved by
construction of a designed and engineered subsurface toe cut-off drain and
outfalls;
Existing defective drainage inlet/outfalls structures will be upgraded with new
chambers and or headwall structures.
Cutting or embankment slopes with seepages will be improved by construction
of slope face drains;
Existing defective or failed slope face stains will be replaced with a suitable
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
alterative details. New slope face drains will be constructed as reauired to
control point discharges at low points in the crest of cuttings.
Track number and layout is to remain as per the existing arrangement. Specific details
are to be included in a project specific Form AlForm B submission.
Not applicable.
The nature of existing structures, earthworks and permanent way will vary at each site
proposed for use of the standard designsldetails. Specific details are to be included
in a project specific Form AlForm B submission.
Not applicable.
Not applicable.
HeadroomlLateral clearances.
Not applicable.
Not applicable.
Materials to be used.
General
Concrete
Concrete Pipes
Plastic Drain Pipes
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
Granular Backfill Material 8 Granular Filter
Aggregates and Fill
Bricl@vorks
Impermeable membranes
Geotextiles and Geocomposites
Culvert
Reinforcement
Steelwork
Blinding
Erosion Matting
PVC waterproofing
Not applicable.
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
Not applicable.
A safe method of construction shall be derived for the particular site which will include
the considerations listed below. The methodology is likely to be as follows:
Drainage improvement works will be scoped by visual examination of each site
by Geotechnical and/or Drainage Engineer. A linear level survey will be
undertaken as required at each site requiring linear drain runs, to enable
design of adequate pipe sizes, gradients and invert levels. Intrusive ground
investigation is to undertaken as required using small plant (window or
windowless sampling) or hand dug trial pits.
Wherever practicable, new cutting crest drains will be constructed by hand or
with mini-excavation plant, to faciliate work within the Network Rail boundary;
New slope face drains will be constructed using appropriate road-rail plant
andlor from the crest where access permits.
Embankment toe drains will be constructed using suitable excavation plant,
subject to temporary access agreement with the adjacent landowner.
The works will be designed and wnstructed so as not to reduce the existing
stability of adjacent Network Rail structures or earthworks. Temporary support
to drain trenches will be used as directed by a Geotechnical Engineer if poor
ground conditions are encountered.
Any disruption details are to be included where appropriate in a project specific Form
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
AlForm 6 submission.
Generic environmental constraints are detailed in the Safety, Health and Environment
Risk assessment on drawing (NR/CIV/SD/320) An environmental assessment
identifying the risks should be included in a project specific Form NForm B
submission.
The drainage works will be designed and constructed to minimise damage to existing
line side vegetation, where practicable to do so.
For each site, various drainage options based on the attached standard detail
drawings will be considered in consultation with Network Rails, who will approve the
scope of works at each site. Items to be considered in setting the scope include but
are not limited to:-
* The findings of preliminary GI (if applicable)
Design effectiveness
Buildability
Cost (construction and whole life)
Environmental constraints
Third party issues (land take, temporary access, consents, planning)
Not applicable
Not applicable.
Not applicable.
Not applicable.
Not applicable.
Not applicable
Not applicable
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
Design criteria (Earthwork)
The maximum total external load on the pipeline must not exceed the minimum value
of the pipe strength multiplied by the appropriate value of the bedding factor and
divided by a suitable design factor of safety. All culverts shall be sized based on the
recommendations in the ClRlA Culvert Design Guide (Report No. 168)
Wind loading
Not applicable.
Not applicable.
Not applicable
Not applicable.
Not applicable.
Other criteria
Not applicable.
Not applicable.
Design life
New sub-surface drains with geotextile components will have a minimum design life of
50 years1 Lined ditch drains will have a minimum design life of 25 years. The design
life of unlined earth ditches is to be a minimum of 10 years. Temporary bagged
headwall will have a minimum 10-year design life for pipe sizes not exceeding 600
mm diameter.
See Appendix A for full list of standards. The primary standards are as follows:-
NFUSPlTRK/9006 Design, Installation & Maintenance of Lineside Drainage
NWSPlCIVl044 Design & Construction of Undertrack Crossings
See Appendix A
20.3 Eurostandards
See Appendix A for full list of standards. The primary standards are as follows:
BS EN 752 Drain and sewer systems outside buildings (Part 1 issue date 1996
and Part 4 issue date 1998)
BS EN 1610 Construction and testing of drains and sewers (issue date 1998)
20.5 Other
See Appendix A
Not applicable.
21.2 Headroom
Not applicable.
21.3 Clearances
Not applicable.
21.4 Other
--`,,`,,`,``,,`,,`
Chambers constructed in the cess are to extend above the cess level to cess rail
height. This is a departure from NRISPKRW006 Section 7.1.4 and has been
instructed bv Network Rail. All chambers for crest and cess drainage are to be
rectangulari n construction as instructed by Network Rail.
-
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
Not applicable.
Geotechnical conslderations
Differential settlement to be allowed for in design
Not applicable.
Not applicable.
Not applicable.
Drains will be designed and constructed so as not to affect the existing stability of
adjacent Network Rail structures and earthworks. Temporary support to drain
trenches will be used as directed by a Geotechnical Engineer if poor ground
conditions are encountered.
Deslan statement
Method of analysis to be used, including identification of any computerised
methods to be used.
Run-off to new drains will be calculated by a drainage engineer on the basis of local
catchment size and characteristics to allow the size of pipes and their required falls to
be determined.
Where the entire drainage system to outfall is being constructed, new drains and
outfalls will be designed on the basis of a 1 in 20 year return period rainfall event. For
sub-surface drains incorporating porous or perforated pipe, the pipe will be sized such
that the drain trench may become surcharged during events more severe than a 1 in 2
year return period without causing surface flooding.
Not applicable.
Not applicable.
Not applicable. The described designsldetails are proposed for standard use
throughout Network Rail's infrastructure.
How compliance with the AIP and all applicable standards will be achieved.
Tony Gee and Partners have a Quality Management System that complies with IS0
9001. This system is reviewed regularly to ensure it remains effective. Compliance
with the Approval in Principle will be achieved through adherence to the core and
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
design procedures set out as part of this system. These include, but are not limited
to, procedures for design review, preparations of calculations, preparation of
drawings, design change control, preparation of specifications and design checking.
Not applicable. Scheme costs will vary for each site proposed for use of the
described standard designsldetails. These details are to be included in the project
specific Form AlForm B submission.
Not applicable.
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
I confirm that the criteria specified in Network Rail Company Specification RTICEIS1003
have been considered, and the Design is submitted for Approval in Principle on behalf of
Tony Gee and Partners.
Signed
Vame (Print)
-/~eoff -Rowan bitla Engineer
l ~ a t e 2%.
05.06
To be signed by the Designer responsible for the Design to AIP stage or other person
authorised to sign on behalf of the organisation responsible for the Design
I have considered the submission for the above Scheme and confirm that the information
specified in Network Rail Com~anv
. - S~ecification
. RTlCUSl003 is included in the submission.
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
hjly comments on the submission are as shown below.
Item Description
No.
1 Read RTlCE/S/003 as "NRISPlCIVl003 (formerly RTlCElSlOO3)"
2 Location 1 ELR IMileage IOS Grid Ref. IStructure No. - Delete "see Appendix A and
read as various locations across Network Rail Infrastructure"
3 Section 6.1 2 - catch pit cover options (as detailed in Professional Services Remit) to
be detailed in generic Form B submission.
4 Section 6.14 - 'Environment Agency' to be read as 'Environment Agency (or Scottish
Environment Protection Agency)'
5 Sections 6.1 5 & 20.1 - the outline construction method shall be detailed in the generic
Form B submission drawing taking full account of the requirements of Network Rail
company procedure NRIPRClMPIlC10024 Control and Use of Metal Pins and Spikes
on Network Rail lnfrastructure and NRIPRClMPllC10026 Process for Locating Buried
Services Prior to Ground Penetration.
6 Section 6.15 (cont'd) - method of construction for culverts is not specifically covered.
This shall be detailed in the generic Form B submission.
7 Section 16.1 - include design assumptions for catch pit stability
.8 Section 20.1 - within appropriate notes in generic Form B submission include
requirement for the Contractor to comply with: (a) NRIGNICIVl002 Application and
Reapplication of Protective Treatment to Railtrack Infrastructure, (c) NRISPICIV1039
Specification RT98 - Protective Treatments for Railtrack lnfrastructure (in particular
galvanising of steelwork).
9 Section 20.3 - Railway Safety Principles and Guidance - Part 1 and Part 2A
Guidance on the lnfrastructure are deemed to apply.
10 Section 21.4 - chamber cover levels to comply with NRISPlTRW9006. Standard
design 1detail for catch pits to include option to use round plastic 1 rectangular or
circular concrete.
11 Section 22.2 - soil parameters used to design headwalls to be stated in generic Form
B submission
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
Design Life)'
Drawing NRICIVISD/326rev. P l
Section CC: lifting handle presents a trip hazard and is to be re-detailed. Section B-
8: see drawing 325 comments about orientation of side wall slabs. Section D-D: state
nominal spacing between vertical bars. State nominal openings on grated cover.
Note 5 -include option to use round plastic catch pits.
Tltle of Scheme:
Location
Standard Design 8 Detail Efficiency Project - Phase 2
See Appendix A
I
ELR I Mileage I OS grid ref. I Structure No.
See Appendix A I
See Appendix A I
see Appendix A ( See Appendix A
Document No. NWCIVISDIFORMN320 I Revirlon PI
I have considered the submission for Approval in Principle of the above Scheme in order to
be satisfied that the Designer has adequately addressed the a ~ ~ l i c a bcriteria
le s~ecifiedin
Network Rail Company specification ~ ~ l ~ E k 1 0and
0 3 confirm'that:
,
My comments on the submission are as shown below. Provided these comments are
adequately addressed, I hereby give Approval in Principle to the Scheme.
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
ame (Print) y
.a /Date
be signed by other responsible non-technical person (U applicable)
I have considered the submission for the above Scheme and confirm that the information
specified in Network Rail Company Specification RTICEIS1003 is included in the submission.
My comments on the submission are as shown below.
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
-
Po be signed by the Asset Engineer
I have considered the submission for Approval in Principle of the above Scheme as reauired
by Network Rail Company ~pecificationRTICEIS~~~~ in order to be satisfied that the .
a ~ ~ l i c a bcriteria
le . ..
smcified in Network Rail Com~anvSmcfication RTICEIS1003 have been
a'd'equately addressed by the Designer, and my comments on the submission are as shown
below.
Provided these comments are adequately addressed I hereby endorse the Approval in
Principle submission that has been signed by the Civil Engineer in Part 5 of this Form A.
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
Apr. '04
.'
Applicable.
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
Management of Inquiries and Investigations 8 Oct. '04
and their recommendations by Network Rail
Number
BS EN 752
Title
1
BS EN 752 k i n and sawf systems outside buildings Part 4
4
BS EN 1610 Construction and testing of drains and sewers 4
20.6 OTHERS
Number Title iswe Date
No
SRA Train and Station Sewices for Disabled
Passengers: A Coda of Practice
Hiihwaya Agency Speciiication for Highway
works.
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
2%$%%$% ‘7 A1S3 (3.02 kg/I@ kmlY. HEALTH AND ENW?ONMENT RISK ASSESSME~ 1 24. ~ ~ KcuREwa m fs@/cw/Lm
IE
K’+’-&
XfLbSE9f (SfEf40S126 &27) 70 A1S3 (3.02 kq/r@
SEcnm 150. ,
““)]
/
‘“
//. m~-, Sli?LfESfi (SEE~lE 26&27) 25. BRfCXWM TOm UXSTWXOlf4CiXSB
g+ szLEcTEo MKmL EWKERNG BRfCKSCIASS INORTAQTO~Y i.
mmRfM ~g SILECTEO MxFs_L mTHBs3s21
mm 1.
I 26. N.LW?~TO BE@4KdX?M#X
mRKswscRfEmof451TE
WTFHBS44492EQ5
m
. iTfSASSLMOIMTAOM fETWT~fS AWAQECf TNE RISKSASSOCIATED i.
cwAJlhQ of? KAKsrvEflLL 8 ~w x,//< cowmEfE7Eumfwr MxxK WflismaAcowsmcm N MMTTESLNcERTIKD4 NITMN THE WMAY I 27. UFAS4ffC RENFrXCEWJT TO BE NkXMW4CE
Mc401L (w M3TEs 18A19) - k’” GMMMJfc41a4iEsMfu ~[, BOTTCU wTTT4Bs446.3m
s v (SEE NOTE 21-23) ;.
M40TLL (SEI NoTEs 16A19) OF Emc4i
. . mm MEAsuR5 2a w.msmmftfms nwnsasmsm BEN
rr+y-:-- ‘, ~~?+ 7F “1 AcQmLMm MTtf Bs EN loom. r,
,. . .\,, , .. E
?
I-+7.--.-:.-L- . .-
~-f 23. MLaJNLW4cmm N~fwTH
\ \ I q -? Wf/GN/cw/LKA7 SEC7KN es. f.
4“L~\ &oR’H)l=-l -1 A
33. ERC5KW4PRUTECTkX fAA~TOC0UFWSI 1.
L4mcowisEwlf?TnE.
TIEHCHEKNTEO MWM4TELY PRfCRTO
L.-J
200 B4cmG4fMAmE .AITEf?+fR sL47AoLEGRAsssIEo
NolE o WLWRTSIJILNGNSXT c MafoREo w4AxaaMfa wTTTiuAJAFKT13RE#s
R
WnI-n WNoNG GRamccmm+4s REsws4cw4
1) m tfMxA31NoTsuTMLEFm NS7RMW6. A.LEXFQSID SOfLS TOBE
Tm2iscREEw a? Ff#vMvs mcu FLooo RE4( fW-sEEom M FIWJTICTEO m EsfossN u4Tnf4G 0.
ATTCHMWT 1.011 wLFmGcffiEwf c ML ERo?mf4PtmTEcTfm4 u4mf4GTo BEsmxIifo
3“
l-w’.
WEw.S !N WXMCYKE Wfi w4ffF#cTuRER’s WSRMWMS
1 1 I i J
2) BuxEo f4xMALwoTsLAlMLE , ~ us 10/04 MTDSWAY c ~
I 1 FOR PfPEWMTERS GEA~TN#N6C0. I (wET51JPP0M sLuFKEs. Rfs4f PR07ECTM EWIFWNT IS USSO.
1 ~ 1.
oFmKsofsEmE l.E. FaLulIo CONoucT AI@3114TE WATER OuMm
WATER Ml LMo40w4/vws4.E TEsnf4s.
2. U.L K4NTS B3JWEH CONCRETF M40/OR BRICKS 1[
WATER 0mTf4) E McRMEo.
FNLURE OF TEMmRMW fmRKs o/c
3. ‘EUPCRMY SAXEO HEMWWU ASWUEO 10 YEAR
ESitN WE FC+7 PIPE SfZES HOT ~CEEOlf4C 602
* KA
<,+ 6+ iEE TM-H
. ...4
Y
ZmcREIE
4. ill 04CRETE TO COMPLY MTH SS EN 206-l:2@3
I REOUfRED. RECAST C0tA3WE Sf+4Ll NM A UINMJU 28-tx
30 OR 0+600 MN WE Ccwmssrm STRENcm c+ 20MPh
J
1 30 Oil O+6@3 MN
-1
ENsuRE cmfim7 PERw4M
PROTECTNE EWIFWENT !S USED
XST-IN-S4TU C?3NCRETE TO BE NM S72 ~
IONIN4L SLUMP w 504fkl UNIESS OTHERMSE
A
..-.
xATrn
SECTION B-B 5. D4CREIE TO SE CLASS Cl 6/20
SECTION C-C 6. :OfWRETE SUBGP.M)E is TO BE FREE OF PONOED
U40/O+f RUNNl~ WATER. FRESH CONCRETE IS TO I
1 R07ECTE0 FRC4f EROSK3N W RUNNlffi WATER,
SC4LE 1:25
*TEMPORARY 6AGM ‘&JTLETHEADWALL w
TEMPORARY BAGGED INLET HEADiYALL 7. ‘RACK Ol?AfWE M%REGATES MO FILL TO COMFtY
WTN TME 1S3/2 FFvM NR/U4/CN/OOS/lB5
-. :UJJSE 165.010.
8. X?4ERM EXCAVA~ MO EMTW#XW TO CCMPLY
WTH NR/Gf4/Cf@30B SECTION 52, CM 52.(F31
“OR CF@NffWf flLTERS M40 52.wz FOR FILL
m
m
UTERLUS.
19, lLTER UATIFfWl SPECfflEO IN ACCCffOM4CE WITH
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
fEFEREf4tES TO HKXWAYS MEfWY S$’EClFiCATk3N
“OR HfGtWAYS WORKS SECTION 505 CIAUSE 3 TAB
d i/5.
SECURf 1 LONG PLATI FO
10. ILL MATERL4L CUSS SW2UL0 BE REFERENCE MTF
PIKMXK
— ME HP3NWAYS AXt4CY SPECIFICAT!C41 OF lflGhWAYS
VORKS.
, H SIOE
>
?1,
w
fAILOSTEELSUfz Y
,-1
WILINE IX E4TCH PROFfLE J TOP M40 N)TTOhf MoslIELBMs \
CFciflLLBm
‘h ‘“if- )2.
+
F )3.
r 1 . SECTION D - D
1 s+
L-–––––——
-I---––-I–1–--------J-
TOE I
L--t
t
—————— .
lYPICAL CONFIGURATION FOR UPSTREAM TRASH
S0M0M41 17iK. FRECMT PAWNC
SUS TO FftMNT LCGL ERtISON 1 SCREEN (IF REQUIRED)
6EOLE0 ON S74 BUN04NC TO W1
I
NR/EN/CN/009 SECTH3N 85 lWIL TRASH SCREENS TO BE M37TOSCUE
WUY LXSICNEO BY ENCINEER.
a
L
La
1=
P1
““’:~?‘:NvGuMT’ON
FRONT ELEVATION reisim
Rev Dab
I Oawipfion of ]Omign’dl C’k
Network Rail
BRICK HEADWALL ~d~
1
‘T ? =
“L —
3Z
5X0 C4mET
lEOl INLET
ERos40HPRuT’m-w fAATTv4G
I
I
WRsolwcss
I
I
L LONG PIATE
40Melfm Sfmef
LOndG+l ml 2EE
Tet 020-7 W7-S4)I
.411111E
II , II mm c4wAfFERs
StLECTEO BACKflLL (SEE NOTE 3W3 ;)
II II [MATERM
(
\ —
;–––––
–;
I I I I I BOTTOM f E LONC FINE NOLEFMW4GEFIN
OF OITCH $,?
‘1’1’
WIN C4+4WESS FOR HINGE PLATE
- - . ..’ i;*5;\5~ 40 LoHc FtATE
1 /. .. LCt4C Fi_AII
L– --–– --l
.r, . ‘ < #. ~
~TOGRfLLSUfS OderapyWl@+d~hddLy Nhork Rrail
* -“- ‘“ ‘x A ML EWNEERff4C STM40PRD EfES#M
A3 ‘- ~.: I
MIOSTEEL WIE FOR PPMOCK M4i SW
INOUTM mfmiafm D cc+mfMfT NEIW17KRM200B
J?lAN (SEE W3TE 5,26&27)
~i–j
(SWS OMRTED FOR CbWIY) 1 ~INE w cm+ Pst4m.s fl % Wko%A
‘ I EARTHWORKS DRAINAGE
OF LXK.LSU?S
mcwFwssMWwsmENGTN OF 2#PA 11
cAsT-lN5nu COWREIE TO WUlXST2WlHA
Noulw-s4.uuP oF54n4uuMEsso~
5TATE0 12
—P8EcAsT m6a7ETEc-144wL Ill-t b MTli FE4BLE SEAMAl (EG. IAMIW) AS REWl~
(SEE NOTE26) TO PF6EWNFLEA2W2E.
HALF ROUND CHANNEL 2000 DEEP .. 13 7HE5u850L EA7wwlLET FYPE5W4.L8E
elo,._mME
-.-w
- . .. ..— ---
WIF PERFC4WE0 FwE MO w 75 (IAN.) 10/20/ 250um MIN. I IIKam.m w EX64NECTE0TO TWWTWFCWWRUSW M
l—=f--/
THICKNESS WI MN. W (SEE NOTE 25)
EQ2 Mm. 5URFKE WA&4OEWt As
600 TYUCN
(5EE KITE 17)
8EEW4G MGREGRA7E(SEE NOTES 21 & 24) TYPE F
CREST DITCH
MIN. LAP. (S2E NOI 25)
5URF~E FLW
14
15
— Fnllw
1}
51JRFMXFLow
;0 O::O..:O;O WERE SwE PEFMTs.
m SEE8ELOW F08CUUECTC46W m .. O.O.OOOOOOO
00 .0 .0 ~
17. ~SNOU10BEAT=XQWEFfTl+k4 ~
12001YP (m As5Num4c+4 OOO.OOOOOO
xcc4APANnNGC6w#4cs)
0.O.O.OOOOO lWmuEM.E NEN8RANEm SLWE !8. F$%=~N~.Vkb$$k-~
00 00 ~o ~
OOO.O.OOOO SloE ANo EASE WY, 2wN klut 7W~CRCU TWS4WEC+ l14ECUTTlffi.
(VARIESSEE No7E 3) Oooooooeoo
0..”.00 14N. UP. (5SS 19. t.w.sscOtwcmo mms7v4cms7 w
1-
0:0. ICKHESS WM.
.: NOTE 25) (Swn7msam),ww mmxmcnwn.s m
I-L_.. 225tAnMwoLWEml
TWf B FILTER NATER141(EC. /
::”
:0.c)
.“:
W41UUIAGRADIENTOF NEW CRE5T LWIN PIPES
*8ESFWWS
44hm 51NUE-51ZE0 4XREGATE).~- I .: i
—----— EosTNGwvAYEmNEwTf (w Nu7E 28)
s 2 5=:::*N
a-lil(,669WlN 600
SUiwm FUN w116Tt?7TFi ffPIPETO L?EVAMEOTOSU17
FILTRAFIC44G20TEXME YXl MN. / YPERFWEOFIPE.3W W4.W
1=-”-
WJTNSEENOTE2
Mow
EMTli SIW TO 8S ONiTTEOWNERE UINIUUhf
TYPE D OFFSEFS FFiWTATW AJ4t)W3PECR
ESTUN NOT 8S
WJN-FNWEIm 5PACEAVAALMIE.
HALF ROUND CHANNEL 1200 DEEP HALF ROUND CHANNEL 1200 ~ ProtectionIF RZWIREO
& m
—
mum
I
GMVMSEOS7m
b Fw4GE ?wFmT
AT2WOCENTRES
-SEE
(5ss
E Ems/wAEE
/’ NUTES 26-28) 3
EAmNMc143u
wFlEPM4tKLct’TKN5 3
8WOlu WTTHucNILY CCNAPACTEO BK%FHlnTTH lcHTLYmwmEo TREwH
TREt4tH EXCAVA7DN
MtlW&S c4wA770t4 M51NCS\ SUl?Ffi mm 1. GRP/GRcCwFQsnE m 1 1 n
I
\ awn rlw 2. CMVANISEOSTIn. SWEI
TYPE Y 1- Pdinl
I’Es
O!MmJG
m
1, LLc4MEN90Ns NwuETRmuNLEss KuTEo
16. AALELsC4W TO*!41AUORDWI MTN
NR/a4/ct@06 sEc71Lm 65. fuw4cm~mm it4ccwrc7Tmwmi
RAWTNG NR/C?V/SO/J22.324,325,326.
19. Au E4s KMXUWNTTOBEIN K3XIWXE c4alAnc44cf ALL SWCTWKSTO~
uTm Es44492mt3 wPfTINT N4TlJRA GRUJ0fflmG#EEmo
:
m-l- Uwn3JTmLE uATEau m EE DCAVATEO
tO1mLMXo wTTNt21wRAPmmfo
OwwTEO GmAIAl? U4TIIW CR CAS-INSIN
4. mmRcamTsHowN!s8m4c AT TlJf,#U
mmmcEKm~mFu. LYLXsn4Eo13Y
N9RWKNS. Ml~SfXS TOBE tKSNESR NkXOKWCE WITNBSS400PNTT 4
RE-sEEoEo AJ’mmUTEcTEo MTT4ERc610N 5. UPvAlwoETAIL slaTAmEaA.Ym BRKX
1 ) Mm ~.
( )
6. ~54w-~~PiPEToBE
axcREIEmPolwTf~ ;f
;>’ “
EALEO WTTN FIIIBLE SEMU41
EOURSO TO FWEvfNT LEMXS.
~*
(EG.IAASTW) AS
m
7, LLF?ffS TO COMPLY WTNTl+f RELEVM4T
RMS4i STANTMROS SET CUT IN TAE41 165/1
1 I I
Rw NR/cN/clv/m CulAsE 185.005. ‘
I I 8. Umsmcfwm ssmccwrfwmi .9s
%2ZU03.
O+NIO MN
9. upwA240wf/~mm7smm
SECTION C-C
10,
is wl:m
1- Z.hl W.
-- ~1- -IT
EXENl OF C49-IN-SMJ /“
Cct4XmE Cu ORESSEO / ~111 \ 14,
~E AJ7TOt4. / \
\, 111[
Lm
M W06 I, FOR41 A APPROVAL 17W IARL
BRICK HEADWALL 1 E
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
w bta 00wipti
d rehii Oesign’d C’kd
w
scu 1:20 &WorkRafl
ExnTlffi
GROUND LEkIL
1403 (r@ ERUSCN PRU7ECTTON IF
REoulmo. (SEE NoTE 21.)
mAsHEo Eoa Er WTNGWN.IS 40MtOn
street TeL om-7557-8oa
TO M4TCH AAIAXNT W4K OOWLE HN4CE LOldUl W1 2EE
(EU4K CREST)
, t
l\
II -——— 1 ——
W?m?z?2
JF3CK HEAOWAU (SEE NOTE 6)
IT o
SUBSOIL LWN
k124
SURFKE C@lN OUTLET
-m) ‘*
CRA7TNt ~ TO BE
lNsmlLEo WHERE Pin I
uc4?T#@mcRaE AlwJ40 SELEcmo ~
IS45000R GREATER bdOrcoFY wih0@d8i#IJrea heMby N8twork R~il H
I suesfXoRAiWcuTLEF WERVA TO a lal-m
mLmUHEmmGsTm EEscN
ExmltAc STREAM
OunET VAWS
BEElm
U4ATUN ~ FAU
m TO OVTLETFROM~
WWWRT
1- EARTHWORKS DRAINAGE
nsEPNOLE IWmONEO AT lIwcfwf emms PIPE IWfRT
WCFSUBSOLEWN coUmETE c4TmEEssEosmNE
APRON. (SEE NOTES 10 & 11). EITHEII CWRSEOANOMJRTNIEO~ SRiCX
BF.0MNGLW4EOMTN*PW cwPwTEocUssef2FAL oTt EmEssEo ANo MoRTmEosTw H
PIPE. SJwRUJE 153 (MN). (SEE No7s 13 & 15). OR PRECAST REINF’3RCE0 CONCiWE UNllS
km NOTE 17).
CREST DRAIN OUTFALL
SECTION A-A ‘-- ““-”-““’ lYPICAL FIAP VALVE DETAIL STANDARD D~AILS
w l:m w l:m
(SEE NOTE 5)
SHTIOF~
bin I
1
!
L---- 4/ -
-- ---- J
r
I
%-
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
-n
/l
! I
r
A“
.----4
I
I
I
Copyright Network Rail
Provided by IHS under license with Network Rail Licensee=Colas Rail Limited/1121223091, User=jones, nigel
No reproduction or networking permitted without license from IHS Not for Resale, 02/28/2014 12:05:20 MST
LWWlt4C t40. NR/E3@D/323
-q
~
~TocoMmYwTli TEs
NF4/GN/C7@a sEc170N 113. Gaiiw
!. ILL C4UENX44SIN WSlJ14ETRES
UNIISS NOTED
~ FIX? smuaumsToBf~
NAnn?AGPaBa aE?aamomL z B42AMNtTO SE FfE10W4C0NJUt4tTW wlTH
LWWXWTABLEU4TERMT0 SE EXCAVATED C+?AMWC NR/Cf@O/322.323,324,326.
lPPFmfo IXUPACTED 3. FoFfMm44m ML mwTuREs To OEwmPEFEm
=IA%!u!l!t% c4sT-Nsilu mNmEII. N4Twul GRc4JNoC4?mxEEREo FuL
IJNWXPTMLE MTERLu- TO SE EXC4VATE0N
EFm40NF%0mTwxuA 7Tw43ToCOwRlsz RtPlxxo wm4ElFHERAPF%aQ COwMxo
slooE~JJIE mfRsmMtECmss SIEo CRM41nA MTEFal@?C#sT—w45m~
MC15WEDN~WllT5M4W~’S REIHFCmnAEHl sNfmT41s!4W4Mm ML
Nm6xmNs. ML E4PosIo50u ToBE K REw4FmCEuENTsNuLao BE FuLLYmsia4Eo EY
EM%4EERIN MZWCWWE WITHSS54WPMSF 4.
w::””~”m 5. SLm PRwd_Es SNuwN wC4xr#aY.
~wml 6. DEPFHCI SUMP TO=225UIN CRTOUATCJ4 PIPE
10t/U4/CF@OU CMJSE [email protected]. ou44ETm (wlucHEvERlsim&R).
NONE
m
m-F!PEsm COIAFIY nlni THE RELEWM MTls44
I
I ““ 5TfflDMOS SS7 CAJF IN TMU 165/1 FRW
HF4/GN/cu/oos C4AJsE ls5Jm5.
WIE 1:20 12. ML PLASTCORUN PlPESTOIX41FtY~ ES
.
496z2fAm
I .,
1:40 MN ml Iolsml ST4 CwGiEIE ScAIE 1:20 13. #lLCONCREFE FIPESTOCOWLYWTINSS
wnEr TocLscMEAs ..__–––. –––––-–––– J—J< !3911:PMT 101 (REINFCfiWD EM UNRBtWORCED),
S4iWiWNWllC+lE-E< . l\ mll:PAw 103 (FmsmEmm )N40ss
. I ElmK41 FuoTEcncu (mm 9ms) p~~~
~w witonfmnffi A
/ r+ 591~ 114 (PC4fCUSWllH WE OR REB4TE0
...’ * - RCOm& gwml& CiA5s 66 n4muM 12s-225
or A.~ ~MDFtWIEOWllN GEOMill.E Ml, (SEENOTES10,# 26 & WNFS).
t wxmwafso mfomssctmsrmcwu 14. ML PlPEM40FlPE/WM3LE&4HTSTO~SEMED
I MEW- (= NOTES19, 21 & 25), MO U&X XCURE. lNLET/OUTLET14CtESIN PIASTIC
L lo/mSE2CNG bXmAIF
I (SEE~ 19 & 21). 1
~ TO BE PR-FORUEO.
e 15.
SECTION F-F w
1
SW-E 120
E
PIPE
1&
mmm%
LS TO BE FREE OF FOtWO MO/C61 RUNNING
SIF
wAm FREs44coNcREFElsmsEmam7Eo
.lHsnucot’wEm 1 FRC4AEiWlC44 67 RUNNlffi WATER.
EwOiw m MTC41 BEosoomL mT5M. csT-N-sw 17. CDMXETE 244WLDLElN~MTN
wLFRwNo PmFILE CoNmTE. (slENuTEs 15&17). Nf@/CW/0D9 C4AUSE181.Xil.
l++
IL
F
IA STANDARD DETAl L FOR CASCADE DRAIN TYPFfi IIRA N OUTFALL O CASCADE TYPE ‘C’
18. 7T5XK C4vAw NXF5EGATES MO FILL m COUPLY
MIH T#Bl_E 1S3/2 FRC41NR/GN/CN/Ea36/l 65
CuusE 1s5.010.
19. GENERALE4CAVATP3N MO WmM3RKS TO COUPLY
OWLETTO
scu tm QL!lL2 WTH NR/GN/C$@3E SECTON52, fJAUSE 52,001
ScME 1:20 FIX GP.M4ULMFILTERSM40 52.002 FCff HI-L
N4TERLU.S.
I II II I II I 11111 \ 20. FTLIIR UATERUl SPECIFIEDIN MCC4MMCE WTH
I II II I
‘1&#l
kWWLILE KIL6?JNE FF03N5USS01LEMJIN REMRENCESTO Hk74WAYS AGENCYSPEClFlCA7iUH
m 300w. WrrH
INpmwml.s FIX HICNWAYS WOftKSSECTKN 5M CIAUSE 3
TIBLI 5/5.
STANDARD DETAIL FOR INTERMEDIATE OUTLET FROM CREST MEUSF@J4E
OH S10EY@EOFMM4tWE
EKCAVATK44 21. mLwERL41CLmssNalo KREmRENcEo WllH
TTiE HittWIAm #&EtWY SPECifitAllC44Cf HKNWAYS
DRAIN lYPE A TO CASCADE DRAIN TYPE ~ ~& C WmKs.
w 1:54 -- STANDARD DUAIL FOR INTFRMEDIATE 0UTL13 FROM
CREST DRAIN lYPE B-E TO CASCADE DRAIN CRESTDITCH
VMES TO SUIT WE TOKGRWHY
UIN 2S00
CREsTMTCH
ScuE 1:50
P1 l/?13/Ml FORMAW’PRWM lnYm 1AM
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
\:m--rJ\,,LL.=RT=
UQFilMo CEAIPkmo CRMUMR 40Uellal
street Tek 02U-7557-SOLI
\ .,. MCKmL (EC, TYFf A mnx Ldan Hwl 2EE
RECC4APAC7ED
TREW3 MIS4NCSTO SE @PR#fD ‘%=k
SY CEOTECtW.XEtWINEER
CONCREE5uREWMI SEE
I
WS50LOIWN WFLITV)RIES
(1200-2000 SW.)
I 1!
I I
baterqy with@id s@!alumkldby t4elwak Rail H
ML EWINEEQN4CSTIJOP$ EXS4tt4
8 D CWWUGNTNETWF5KRM2W6
3 t VA ~ ‘ A--
L
KIRFMEO ENCINEERW 6RCK OR EARTHWORKS DRAINAGE
oRE5.xO NO NORTM5E0STONE(SEE
-i NOTES28 k 29).
s
f “ NC44-PERFC47ATED
PIPEAT t42MlMl FNL Fhl IM4DLE. Fit OR NORTMEO5TC41E(MN. 1Y3)
(w NOTES11-14). OuMEFERAs SPECWEO(2254 IA4K). ‘1- (SEE NOTE25). CREST DRAIN OUTFALL
mII-K,
““w /7:Fi:. ‘“”” “ \ CCMPX7ELIktLL GIWCCD
STANDARD DETAILS
‘#J ID OR 2E6nm SH4GIE-S4ZE0SEEUNNS- f SECTION A–A GRbM.NM ML TO CL 181.C07
#xREGATE (SEE NOTES19 & 21) w OR 1W24 (As SPECIFIED) Sht 3 OF ~
mw4-wML m PIPE mm STANDARD D UAIL FOR OUTLET FROM CREST DRAIN
SECTION E-E wIlsomsss icuk AS S44WNOA1
lYPE H TO CASCADE DRAIN
SCM 1:25 hawing
Sw.2 1:20
Copyright Network Rail lumber NR/CiV/SD/325 I A
h
Provided by IHS under license with Network Rail Licensee=Colas Rail Limited/1121223091, User=jones, nigel
No reproduction or networking permitted without license from IHS Not for Resale, 02/28/2014 12:05:20 MST
, .,..
. ..,.. . ... . . . . ,.,...
.,,
..,....
m
GQ&EM
17. t. ~ ~ IN UNJ.IMEMES IM4LESS mmo
onKwlsE
2. WAMSNGTOX REAOIHCONWWKNMTH
18. ~ NR/W/SO/322.323.324,325.
WITH NR/GN/W/COB SECTION 52. C4.AUSE 52.C?31 3. c14uAKRcumsTOcw~WRESm
FW GWNMJR FiLIERS ~ 52.002 FOR ML MIHA GbLVNWSEEISTE
ELGFWED CENTRE
-..—.
U4TTRL4S. SECTKN Am PRECAST cot4cRmE ENo SECTK443
19, flLlIRlA4TERlM SPECIFEON4NDXEWKE MTN (TO MTNSTU40 1.5 KN L13A0 APPLIED OH A 754AlA
REFERENCES m tNG4iWAm lGEwY wcNwAnoN Ln4 CIRCLE WrrK3uT PEmw4ENl cfFl_Ecm (y+
FORtNGHWAYSWRK SSWTt4450SClAl J5E3 OU#GE). N.L CONCEFE CNJMBER SECTKW4S TO B
TABLE 5/5. SEN.Eo.
20. FTUIAATktWI CIKSSKWOB EREFEREWEO M7H 4. EPTN W SUMP TO BE 225ANN OR TO MATCH PIP
IT4E MGIWAYS MXWf’ SPfCklWllDt4 W HWIWAYS
WxlKs 5.
~
21. WMHW4ESTOCWPLY WITH
t4R/Gt4/w/oLM sEcTlow 113,
9.
K44E
DEEMSTRW
SEE 0ffAM?4G NR/CN/StI/320 TM-E 1
.. .
2W lAiN.
L %%i%w?%q’j &@).+t
‘-1 urn.
1-‘2ca I 40x40mm STEELMW_E< <
10.
WCS
ML PIPES m COMPLY WFFHTHE RELEWM BRITIW
STM4WROS W CUT IN TAELE 165/1 FRWI
SECTION B-B .. NR/GN/W/D139 CWJSE 165,0+35.
SW.E1:25 11, ML. PLMCDRJAN
49622X6.
WESTOCCWLYWH m
.,,
12. uc&cm7sptpEsmmymm
5011:PMT 103 (mwoF6xo OR UNFIINFORCUI),
1= 16MM4 STEEL B#7
5r?!nl:P#RT 103 (PmlREsm
II
.
OWN TYPE ‘A’
. —––––11––– CASCJM CWN TWE ‘B’.
13,
%% “4 ‘- “’’” ‘%:’””
AIL PiEMAD FIPE/lAANHOLE JLW4TSTO Of SEAK[
11 SECTION D-D (GRIL L MOUNTING) MAD I#Cf SECURE, lNLET/WTLET NWES IN W
1’ [
w 1:5 UAWDLE TO BE PRE-FC4WED.
I
I 14, ALL CCWFWE m CC4APLYWITN m 5328. FREC,&J
I CONWRETE SWIL K4W A MINl~ clJm
IL
B I
I
E X/l CWNWShf STIWWOt OF201APACAs71N~
CONCRETE TO BE MIX S72 WIN A t40Mlt4u_ SLUMP
Cf 5DtAkl UNLESS OTHERWSt STASED.
15, COKRETE OR EA?ESSWGSTC44E WRC44 SUBGRAE
I 1
S m BE FREE W FW4DED M4D/Ci? RIJNNlffi
I 1 WATER, FRESH COWIETE IS m BE PF637ECTED
FROM EROS40N BY RUNNING WAIER,
I 16 CONCRETE S+PWlll B! IN AXOFWMCE WITH
\ \ NR/GN/Ch@36 CIAUSE 181.s01
CUT S4AB S REWNWO TO CLI?
WEAS REOUIREDTO
AW40 FWUffi COWR AWIO FWLN42 COWR
wPRoxMAII E(FENTOF
CWPACTED CFW4UAR BWKFILL
MIN. 2W THICKNESS.
1 ~
Lo cc4APm
NW63XIUATE E3-mT w
GIWWWf BACKFILL
MIN. 2fJI llWKNESS.
1
~
Lu cc4APb2TEo CIAss 6$2 flu Em
WST-IN-SITU CWtREFE
NALW4CHN4CAS REWMfO TO
STANDARD DETAIL FOR CASCADF STANDARD DETAIL FOR CASCADE suPPaT DEBR6 TRAP sm.
(SEE NOTES 14, 16 & S@.
TYPE A TOE OUTFALL lYPE B TOE OUTFALL
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
/’+
SCM 1:25 SCkE 1:25 EaT
wleAsEsu8m4Tswl
mu ~
TH
(EG. WSTK)
JL WMooXw PRECASJ
CWCRETESLAB
SECTION C-C 11
= 1:25 !v
RWNO GWANBED STEEL
IL
F
AF
—
EARTHWORKS DRAINAGE
b KXMI
“y-i3* &
m-C4FAm4cw/cw/so/3m TM1.E 1
?lefs
9. U.LPIPES TO~YMIH TNERELEVANTWdTlS4i
ST#MVROS SETtXTt4TMLE 165/l FRW
500X500X50
Thk.PRE-CAST w/Glk/cw/009 CuusE 165.035.
PAw4GslMm PuMwT 10. U2. PIASTIC CfUJNPIPES TO IXMPLY~RS
$962201H.
11. UL C04AXTE PIPES TO CC4APLY WSTN 0SJ91MVR
XWOX30thk PFifCAST
PAW!K WE TO PRMt41 102 (Rm4mcEo C4i uNREINFomEo), Bs ~PART
103 (PREsTREmEo ) w 8s 5911:PMT 114
pxws.micmwfsdim).
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
12. ~~*~-m~-
1:50
\3N0PER SIAB. mmomt4G
SFEEl Pm.
WIE
INCLINED DRAIN scul:m
kNOkMESECIJRE.
WW1-E
tUT/OUiLEF NOLESINPMSTC
TO BE PRE-FC4ME0. WE EAAMETER LS
wl:m 5oo(TYP)c4t KsPEcYmo! 44AccowAt4nffi
)SAHCS.
13. =ORATEO PIPE TO OE &3 EA4 U?A.DS SPECIFIEO
14.
NU CONNECTONTO CREST DRAN IMLES
oTwmYsf SPECIFIEO
CREST OWN LOCATION
(IF ~) 15.
TO SE FREE OF F04BE0 ANO/C# RVNNINC WATER.
/ / -COMXEFE15TOSE FfUTECTEOFROkl
EROSk3N EY RUNNlffi WATER.
m I-lP. 16, XMXETESHCW1.O SflNICCOF@MEMTH
IN WI MIN. W@4/CN/OOS C4JUSE 181 sUM
91 HEM OEPOi AS EARECTIO BY OESIGNER 17. ITMK Ci?M4KE hXRECAES ANO FILL TO COMPLY
oNsiTEoEPfNEwc oHExFusEo kTfN 1~ 165/2 FRtM NR/GN/CiV/008/165
MowIEo CIASS w CRouw CcNEmm&. NolAlwl OEPTN CLAUSE 165.010.
MATERW 125-225 S42S. As SPECIFIEO OH wmMPM4Yit40 18. SENEFM EXCAVATMH INO EMTNWXKS TO COMPLY
g (w NOTES 16-21). ORAWTHCS.
19.
;%
I \A 5/5.
FILTRATW
“o~’ \Y.‘(SEE
PERFolwEo FIPE
NOTES 10-14)
A
20. ML MATER!U Cw SluYno 02 REFEREtwxo WITH
M HICHWAYS MENtY S?EC!i7tAl10N C+ HKHWAYS
Wmxs.
FfRFoRATEoPiFf ouTLET
c. ‘-; EXM4MESREWNEOT0
1996 MO MSO iR/bt4/Ci/0ti3 CLAUSE 165.009
U40 1s5.018.
UNYIOKEY~OLEW~
(!ASIH
SmuREO FMERtLOm M+o FfimmILwt4 cwuLwwTTo
‘W), (SEE NOTES 10-14). TOE
FIA 9ZE (
\ STANDARD D17AIL FOR SLOPE DRAIN lYPE B —
CEss
\Afi (DEEP RUBBLE DRAIN)
>1
—
w 150 Iv
I
Network Rail
LLl\l ~dy
40I&itm street Tel! 020-7557-600
LOndcm Nwl 2EE
-’”NW%;“1
*
b8seJc0py wiolcf@nd 8igrdurcs tKMby N3h01il kill
mLENwEmHcs7m Exsm4
.3 cwmchlt4EM4tK m12006
125-225
..- . \_ ...—~.w EARTHWORKS DRAINAGE
*
M SECTION D-D
--””’--’-w-w’” .-—
-F 1:~
““
?!!& ‘STANDARD DETAIL FOR SLOPE DRAIN lYPE A SLOPE DRAINAGE DETAILS
(sHALLOw RuBBLE DRAIN~
SECTION C-C ScuEl:YJ
scM l:W
I swle I Aswmn
--`,,`,,`,``,,`,,`,`,,,,`,`,`,``-`-`,,`,,`,`,,`---
Copyright Network Rail
Provided by IHS under license with Network Rail Licensee=Colas Rail Limited/1121223091, User=jones, nigel
No reproduction or networking permitted without license from IHS Not for Resale, 02/28/2014 12:05:20 MST