INDEX
1 Preamble ….......................................................................................... 1
d) Plan showing Final Plot and Original Plot details …......................... 155
f) Plan showing Water Supply, Sewerage & Storm Water Network ..... 157
16 Annexures/Documents......................................................................... 158
17 Photographs …....................................................................................
***************
1
DRAFT TOWN PLANNING SCHEME NO. I AND II AT VILLAGE SAPAD
AND WADEGHAR
PREAMBLE
Whereas, the 1st Town Planning Act enacted by the then Bombay Province
in 1915 called as “The Bombay Town Planning Act, 1915”;
Whereas, the Bombay Town Planning Act, 1915 provided for the
preparation of Town Planning Schemes for the portions of towns in the course of
development;
Whereas, the Act was amended as “The Bombay Town Planning Act, 1954”
which enabled preparation of Development Plans, Town Planning Schemes were
now prepared within the content of citywide Development Plans.
Whereas, the Act was further amended and “The Maharashtra Regional and
Town Planning Act, 1966” introduced yet another level for physical planning viz.
Regional Planning. The provisions for the preparation of Town Planning Schemes
were once again retained;
Whereas, KDMC prepared tentative proposals of the Draft Scheme and explained
in the owners’ meeting on 06/10/2018 under Rule 4(1) of the Maharashtra Town
Planning Scheme Rules, 1974, for eliciting public opinion and suggestions on the
proposals of the Scheme, and:
Whereas, KDMC has submitted the tentative proposal of the Draft Town Planning
Scheme under Section 61(1) of the MR & TP Act 1966 for consultation with the
Director of Town Planning, Maharashtra State, Pune on date 12.12.2018, and;
Whereas, KDMC has received the consultation report of the Director of Town
Planning, Maharashtra State, Pune, under Section 61(1) of the MR & TP Act 1966
vide their letter dated 30.08.2019, and;.
Whereas, The extention to the Town Planning Scheme upto Dt. 01/01/2020 under
Section 61(3) of the MR & TP Act 1966 is granted by the Joint Director of Town
Planning, Konkan Division, Navi Mumbai on date 14.11.2019, and;
Whereas, The sanction for publication of the Draft Town Planning Scheme under
Section 61(1) of the MR & TP Act 1966 is granted by the General Body of Kalyan
Dombivali Municipal Corporation on date 20.12.2019, and;
Whereas, The notice regarding Draft Town Planning Scheme is published in the
Government of Maharashtra Gazette on Dt.23.12.2019 and in News papers on
Dt.24.12.2019 and Dt.25.12.2019 for the suggestion/objections of public for a
period of One month from the date of publication under Section 61(1) of the MR &
TP Act 1966, and;
Therefore, The Draft Town Planning Scheme along with the suggestion/objections
of public is hereby submitted to the Government of Maharashtra for sanction under
Section 68(1) of the MR & TP Act 1966..
***************
3
DRAFT TOWN PLANNING SCHEME NO. I AND II AT VILLAGE SAPAD
AND WADEGHAR
INTRODUCTION:
CONNECTIVITY:
The Corporation has an area of 116.08 sq. km. and Central Railway line
practically bisects the KDMC dividing area into North and South sides of railway
line. Kalyan is an important Railway Junction on Central Railway connecting the
region to all the Metropolitan cities (Kolkata, Chennai, Delhi) and almost all the
other important cities in North, East, West and South India. Both Kalyan and
Dombivli are also very busy suburban railway stations. Due to close proximity to
Mumbai Metropolitan City, connected with excellent rail and road facilities KDMC is
attracting great influx of population depending largely for livelihood in Mumbai and
surrounding areas.
As per the Notification of CRZ published on date 6 th Jan 2011, the CRZ
area in the Town Planning Scheme boundry is approx. 31 Hectare, and this area is
proposed for Riverfront Garden development. The uses may be allowed as per the
Final Plan of the CRZ amended by Central Government time to time.
The area of Town Planning Scheme is subdivided as below.
Sr.No. Use Approx. percent of Area
1 Housing accommodation to the members Upto 10%
of Economically Weaker Section and for
Lower Income Group and for persons
dispossessed in the scheme
2 For Roads, Parks, Playgrounds, Garden Upto 40%
and social infrastructure such as Schools,
Dispensary, Fire Brigade and Public Utility
Places, sale by Planning Authority for
Residential, Commercial use.
3 Final plots for landlord by reconstitution of 50% of the holding as per
Original Plot by alteration of the 7/12 extract
boundaries of the Original Plot.
for the landowners plot in CRZ area, Green Zone area and Residential area
the Final Plot area allotted is 50% of the Original Plot area in developable
zone.
In the Town Planning Scheme maximum FSI 4.00 is proposed on Final plots
(as per the prevailing DC rules amended time to time by the Govt. of
Maharashtra.)
Also the basic FSI for buildable amenities is proposed to be maximum 4.00.
7
In this Town Planning Scheme No.I & II, Reconstitution of Plots and
allotment of Final Plots to the owners and to the Authority as proposed in the Draft
Town Planning Scheme has been shown in the Draft Scheme Plan as prescribed in
the Maharashtra Town Planning Scheme Rules, 1974 and the financial analysis of
8
the Scheme is shown in Redistribution and Valuation Statement Form-I, of the
Scheme and the finance of the Town Planning Scheme is given in Form-II of the
Scheme.
Out of the total cost of the Scheme given in Form-II, cost of works proposed
in the Scheme is estimated to be Rs.1168.40 crore, legal expenses is estimated to
be Rs. 1.0 crore, for other expenses cost of preparation and publication of the
Draft Scheme is estimated to Rs. 1.0 crore and cost of demarcation, salary etc.
the estimate is worked out to be Rs. 5.0 crore.
The total compensation to the plot holders is given in Form-I, which comes
out to be Rs. 505.65 crore.
According to this Form-I the total incremental value is estimated to be
Rs. 1100.63 crore. Proportion of Increment to be contributed by each plot holder
under Section 99 of the Act, is worked out at 50% which gives total incremental
contribution to be Rs. 550.32 crore,
The net demand from (+) or by (-) owner which is the addition of Col 11, 13
& 14 of Form-I, is given in Col. 15 of Form-I, which comes out to be
Rs. 44.65 crore.
Deducting the Incremental Contribution by each holder under Section 99
from the compensation to the plot holders, Net cost of Scheme to KDMC comes to
Rs.1130.73 crore which is proposed to be met by sale of plots allotted to the
Authority in the Scheme.
Total expenditure Rs. 1130.73 crore is proposed to be met by sale of
Authority Plots. (Authority Plots Rs. 1330.41 crore).
For the purpose of working of the finance of the Scheme, value of the
Original Plots in its existing condition, value of Semi Final Plots in undeveloped
condition but considering regular shape of plots, and value of Final Plots in
developed condition assuring that the Scheme has been executed as on the date
of declaration of intention of the Scheme.
Form-I as prescribed under the Maharashtra Town Planning Scheme Rules,
1974, provides for working out contribution (+), compensation (-) under Section
102 of the Act as per Col. 11 of Form-I,
9
and Col. 12 of Form-I, gives the incremental value (section 99 of the Act) i.e.
to accrue due to making of Scheme which is the difference between value of Final
Plots in the developed conditions and value of Final Plots in undeveloped
conditions,
and Col. No.13 of Form-I, gives contribution payable by each owner of plot
which is worked out considering the provision of Section 99 of the Act which is in
the Scheme 50% of the incremental value.
Net demand from (+) or by (-) owner which is the addition of Col 11, 13 & 14
of Form-I, is given in Col. 15 of Form-I.
All these values and calculations are worked out and given in Form-I of the
Draft Town Planning Scheme in respect of each Final Plot included in the Scheme.
The final picture of Form-I with cost of works and services and other cost is given
in Form-II, prescribed under the Rules.
Under the Scheme the works and amenities which are to be provided are of
following categories.
(i) New road making them tar roads, thus opening out the Scheme area for
development which gives great impact to the value of Final Plot.
(ii) Providing Electric Street lights on roads and storm water drains.
(iii) Allotment of sites for public purposes such as plots for educational use, open
space, garden, EWS/Dispossessed Plots, sale of plots, etc.
DEVELOPMENT CONTROL REGULATIONS OF TOWN PLANNING
SCHEME:
For promotion and control of development in the Town Planning Scheme
area, a set of Development Control Regulations have been framed which is
attached with this Scheme. The Draft Town Planning Scheme so prepared by the
Authority will regulate, guide and promote planned and orderly development and
will give impetus to the development activities in the adjoining area.
MEETINGS WITH LANDOWNERS ¼xzkelHkk½:
The salient features of the Town Planning Scheme No. I and II
undertaken by the Kalyan Dombivali Municipal Corporation are as above. Meeting
with the local landowners was conducted on Dt.06.10.2018 and details of the
scheme was explained to them. Considering the consultation report sought from
the Director, Town Planning, Maharashtra State, Pune the scheme is being
published to call Suggestions/Objections from the general public by followimg due
procedure.
***************
10
DRAFT TOWN PLANNING SCHEME NO. I AND II AT VILLAGE SAPAD
AND WADEGHAR
LEGAL FORMALITIES
The KDMC has resolved and decided by the General body Meeting held on
Dt.10/09/2018, Resolution No.63 to prepare and publish the Town Planning
Scheme No.I and II, under sub-section 1 of Section - 60 of the Maharashtra
Regional and Town Planning Act, 1966. The said declaration of Intention to prepare
the Town Planning Scheme was published in the Maharashtra Government
Gazette, Part-II, on Dt.15/09/2018 and the same was also published in the local
newspapers of the city viz. dainik Navakal, Navshakti and the Mid day, on
date 17/09/2018;
The Authority has put notice at the concerned village and also KDMC’s
Notice Board. The copy of the declaration of Intention along with the plan showing
the area and boundary of the Scheme was also submitted to the State Government
on Dt. 25/09/2018. A copy of the Plan submitted to the State Government was also
kept open for the inspection of the general public during office hours on all working
days in the office of the KDMC. Thus the requirements of Section - 60 of the
abovesaid Act have been fulfilled after declaration of the Intention of the Scheme.
3 viz. Dainik Navakal, Navshakti and the Mid Day, under Section 17/09/2018
60(2) of the Maharashtra Regional and Town Planning Act,
1966.
Submission of the proceedings under Section 60(1) & 60(2) of
4 the Maharashtra Regional and Town Planning Act, 1966, to the 25/09/2018
Government of Maharashtra and the Director of Town
Planning, Maharashtra State, Pune.
***************
12
DRAFT TOWN PLANNING SCHEME NO. I AND II AT VILLAGE SAPAD
AND WADEGHAR
Sr.
Particulars Unit Value
No.
1 Total area of the Scheme Hectare *294.80
186/
2 Total number of Original Plots No
(1 to 1751)
Total number of Final Plots
a) Residential Plots (for OP 1 to 1751) 207
b) Garden, Parks, Playground Plots 16
3 c) EWS/LIG Plots 9 No 342
d) Amenity Plots 58
e) Authority Plots 52
4 Total area of Original Plots (as per 7/12 extract) Hectare 294.75
Total area of R- zone Final Plots for land owners
(excluding the area under plots of KDMC, MWSSB,
5 Hectare 122.58
Govt lands and the plots under construction with prior
permission of KDMC)
Deductions from Original Plots while reconstituting
(excluding the area under plots of KDMC, MWSSB,
6 % 50
Govt lands and the plots under construction with prior
permission of KDMC)
7 Total number of Final Plots kept with Authority No. 135
Total area of Final Plots kept with Authority
a) Garden, Parks, Playground Plots 40.15
b) EWS/LIG Plots 15.86
8 Hectare 113.06
c) Amenity Plots 26.85
d) Authority Plots 30.20
According to the provisions of the MRTP Act 1966, for financial analysis of
scheme, the values of the Original Plots is required for the purpose of estimating
the Orignal Plot value.
The area of Town Planning Scheme No. I and II comprises of the
developed area and undeveloped land, as per the Annual Statement of Rates.
Hence the Original Plot value is considered as per Annual Statement of
Rates, as below;
i) Sapad developed area – Rs. 5200 per sq. mtr.
ii) Sapad undeveloped area – Rs. 2150 per sq. mtr.
iii) Wadeghar developed area – Rs. 11200 per sq. mtr.
iv) Wadheghar undeveloped area – Rs. 4500 per sq. Mtr.
** The Rates for the Survey No. 104 and 105 of village Wadeghar are not
mentioned in Annual Statement of Rates for financial year 2018-2019, hence as
these Survey No. 104 and 105 of village Wadeghar falls in the area other than
NDZ area the rate for developed area i.e. Rs. 11200 per sq. mtr. is considered for
calculations.
VALUE ANALYSIS
ORIGINAL PLOT VALUE -- The Original Plot Values are considered as the rates of current ASR rates of
the concerned 7/12 extracts.
SEMIFINAL PLOT VALUE -- The Semi Final Plot Values are based on the appreciation of the reconstituted
plots of reguler shape. For this purpose @ 20% rise in the Original Plot Values
is considered for the Form I calculations.
***************
15
DRAFT TOWN PLANNING SCHEME NO. I AND II AT VILLAGE SAPAD
AND WADEGHAR
COST OF ROADS :
Total road
Sr. Rate of construction Approx. Cost
Road details area
No. (Rs./sq.mtr.) (Crore)
(sq.mtr.)
Entire cross section
With Utility and all
1 570000 7000.00 399.00
structures (Water,
Sewer, Electrical)
2 Culvert etc 8 --- 100.00
TOTAL 499.00
***************
17
***************
18
DRAFT TOWN PLANNING SCHEME NO. I AND II AT VILLAGE SAPAD AND WADEGHAR
***************
PAGES 19 to 123 ARE FORM – I STATEMENT
(FOR SCRUTINY PURPOSE ONLY)
4
3
2
1
1
Serial Number
2
Name of Owner
GARDEN
GARDEN
GARDEN
GARDEN
....
....
....
....
Tenure
3(a)
G4
G3
G2
G1
Plot designation
3 (b)
....
....
....
....
Hissa Number
4(a)
G4
G3
G2
G1
Plot designation
4(b)
5
Area in Sq.Mtr
992.18
864.62
323.38
6479.56
4299.38
ORIGINAL PLOT
----›A Sq.Mtr
Without referance to
0.00
0.00
0.00
0.00
6 (b)
value of strctures
Inclusive of strctures
0.00
0.00
0.00
0.00
6 (c)
VALUE IN RUPEES
F. P. Number
283
135
120
108
8
4299.38
Without referance to
0.00
0.00
0.00
0.00
9 (b)
value of strctures
Un-developed
Inclusive of strctures
0.00
0.00
0.00
0.00
9 (c)
FINAL PLOT
VALUE IN RUPEES
Without referance to
....
....
....
....
10 (b)
value of strctures
Developed
....
....
....
....
Inclusive of strctures
10 (c)
....
....
....
....
....
....
....
....
....
....
....
....
Column 12.
Addition to (+) or Deduction from
14
....
....
....
....
....
....
....
....
....
....
....
....
Remarks
125
Redistribution & Valuation Statement
ORIGINAL PLOT
Plot designation
Plot designation
Area in Sq.Mtr
Inclusive of strctures
Inclusive of strctures
Inclusive of strctures
F. P. Number
Remarks
Tenure
9 (b).
1 2 3(a) 3 (b) 4(a) 4(b) 5 6 (a) 6 (b) 6 (c) 7 8 9 (a) 9 (b) 9 (c) 10 (a) 10 (b) 10 (c) 11 12 13 14 15 16
RIVERFRONT GARDEN
1 .... RFG1 .... RFG1 1864.90 0.00 0.00 0.00 256 1864.90 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
RIVERFRONT GARDEN
2 .... RFG2 .... RFG2 55498.31 0.00 0.00 0.00 257B 55498.31 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
RIVERFRONT GARDEN
3 .... RFG3 .... RFG3 618.96 0.00 0.00 0.00 327 618.96 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
RIVERFRONT GARDEN
4 .... RFG4 .... RFG4 70955.64 0.00 0.00 0.00 329A 70955.64 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
RIVERFRONT GARDEN
5 .... RFG5 .... RFG5 3246.43 0.00 0.00 0.00 329B 3246.43 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
RIVERFRONT GARDEN
6 .... RFG6 .... RFG6 78923.63 0.00 0.00 0.00 329C 78923.63 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
RIVERFRONT GARDEN
7 .... RFG7 .... RFG7 44848.10 0.00 0.00 0.00 329D 44848.10 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
255955.97 ----›B
4
3
2
1
1
1
1
Serial Number Serial Number
2
2
Name of Owner Name of Owner
KDMC (PARK)
PLAYGROUND
PLAYGROUND
PLAYGROUND
PLAYGROUND
....
....
....
....
Tenure Tenure
3(a)
3(a)
PK
Plot designation Plot designation
PG4
PG3
PG2
PG1
3 (b)
3 (b)
....
....
....
....
....
Hissa Number Hissa Number
4(a)
4(a)
PG4
PG3
PG2
PG1
4(b)
4(b)
5
5
3940.27
3373.28
64554.12
43857.70
13382.87
74500.86
74500.86
4,01,490.51
ORIGINAL PLOT
ORIGINAL PLOT
0.00
0.00
0.00
0.00
0.00
6 (a)
6 (a)
----›C
----›D
per Sq.Mtr
Without referance to
Without referance to value of strctures
(A+B+C+D)
0.00
0.00
0.00
0.00
0.00
6 (b)
6 (b)
value of strctures
0.00
0.00
0.00
0.00
0.00
6 (c)
6 (c)
VALUE IN RUPEES
VALUE IN RUPEES
7
7
57
56
F. P. Number F. P. Number
293
186
158B
8
8
3940.27
3373.28
43857.70
13382.87
74500.86
0.00
0.00
0.00
0.00
0.00
9 (a)
9 (a)
Without referance to
0.00 Without referance to value of strctures
0.00
0.00
0.00
0.00
9 (b)
9 (b)
value of strctures
Un-developed
Un-developed
9 (c)
9 (c)
FINAL PLOT
FINAL PLOT
Without referance to
....
....
....
....
....
value of strctures
Developed
Developed
....
....
....
....
....
....
....
....
....
....
Increment (Section 65) column 10(b) minus column Increment (Section 65) column
12
12
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
....
Remarks Remarks
127
Redistribution & Valuation Statement
Plot designation
Plot designation
column 6(c)
Rate of Final plot value
Column 12.
Area in Sq.Mtr
Without referance to
Without referance to
Without referance to
Inclusive of strctures
Inclusive of strctures
Inclusive of strctures
F. P. Number
Remarks
Sections
13, 14
Tenure
value of strctures
value of strctures
value of strctures
value per Sq.Mtr
Sq.Mtr
per Sq.Mtr
1 2 3(a) 3 (b) 4(a) 4(b) 5 6 (a) 6 (b) 6 (c) 7 8 9 (a) 9 (b) 9 (c) 10 (a) 10 (b) 10 (c) 11 12 13 14 15 16
1 EWS/LIG .... E/L1 .... E/L1 5206.74 0.00 0.00 0.00 1 5206.74 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
2 EWS/LIG .... E/L2 .... E/L2 8760.15 0.00 0.00 0.00 6A 8760.15 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
3 EWS/LIG .... E/L3 .... E/L3 12194.33 0.00 0.00 0.00 38 12194.33 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
4 EWS/LIG .... E/L4 .... E/L4 6475.94 0.00 0.00 0.00 75 6475.94 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
5 EWS/LIG .... E/L5 .... E/L5 23939.87 0.00 0.00 0.00 102 23939.87 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
6 EWS/LIG .... E/L6 .... E/L6 14604.24 0.00 0.00 0.00 121 14604.24 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
7 EWS/LIG .... E/L7 .... E/L7 2535.27 0.00 0.00 0.00 161 2535.27 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
8 EWS/LIG .... E/L8 .... E/L8 80061.20 0.00 0.00 0.00 170 80061.20 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
9 EWS/LIG .... E/L9 .... E/L9 4786.09 0.00 0.00 0.00 221 4786.09 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
TOTAL EWS/LIG AREA 158563.83
128
Redistribution & Valuation Statement
ORIGINAL PLOT FINAL PLOT
columns 11 ,13, 14
VALUE IN RUPEES
Un-developed Developed
Name of Owner
Serial Number
other Sections
Plot designation
Plot designation
column 6(c)
Rate of Final plot value
Column 12.
Area in Sq.Mtr
Without referance to
Without referance to
Without referance to
Inclusive of strctures
Inclusive of strctures
Inclusive of strctures
F. P. Number
Remarks
Tenure
value of strctures
value of strctures
value of strctures
value per Sq.Mtr
Sq.Mtr
per Sq.Mtr
1 2 3(a) 3 (b) 4(a) 4(b) 5 6 (a) 6 (b) 6 (c) 7 8 9 (a) 9 (b) 9 (c) 10 (a) 10 (b) 10 (c) 11 12 13 14 15 16
1 MUNICIPALPURPOSE .... MP1 .... MP1 200.00 0.00 0.00 0.00 4 200.00 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
POLICE
2 .... PC1 .... PC1 3060.34 0.00 0.00 0.00 6B 3060.34 0.00 0.00 0.00 .... ....
CHOWKY/GOVT
3 POLICE CHOWKY .... PC2 .... PC2 993.00 0.00 0.00 0.00 7 993.00 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
4 HIGH SCHOOL .... HS1 .... HS1 3193.57 0.00 0.00 0.00 12 3193.57 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
5 HIGH SCHOOL .... HS2 .... HS2 7536.00 0.00 0.00 0.00 22 7536.00 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
6 HIGH SCHOOL .... HS3 .... HS3 6110.00 0.00 0.00 0.00 26 6110.00 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
7 HIGH SCHOOL .... HS4 .... HS4 2795.71 0.00 0.00 0.00 31 2795.71 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
8 MUNICIPALPURPOSE .... MP2 .... MP2 597.78 0.00 0.00 0.00 33 597.78 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
9 FIRE BRIGADE .... FB1 .... FB1 807.26 0.00 0.00 0.00 41 807.26 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
10 FIRE BRIGADE .... FB2 .... FB2 500.00 0.00 0.00 0.00 46 500.00 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
11 FIRE BRIGADE .... FB3 .... FB3 2898.64 0.00 0.00 0.00 61 2898.64 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
12 FIRE BRIGADE .... FB4 .... FB4 2974.68 0.00 0.00 0.00 62 2974.68 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
13 MUNICIPALPURPOSE .... MP3 .... MP3 775.00 0.00 0.00 0.00 66 775.00 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
14 PRIMARY SCHOOL .... PS1 .... PS1 3268.80 0.00 0.00 0.00 67 3268.80 0.00 0.00 0.00 .... ....
15 MUNICIPALPURPOSE .... MP4 .... MP4 194.46 0.00 0.00 0.00 77 194.46 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
16 MUNICIPALPURPOSE .... MP5 .... MP5 99.82 0.00 0.00 0.00 85 99.82 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
17 MUNICIPALPURPOSE .... MP6 .... MP6 179.66 0.00 0.00 0.00 88 179.66 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
18 HOSPITAL .... H1 .... H1 2009.5 0.00 0.00 0.00 93 2009.50 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
19 PRIMARY SCHOOL .... PS2 .... PS2 7590.19 0.00 0.00 0.00 111 7590.19 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
20 PRIMARY SCHOOL .... PS3 .... PS3 6537.94 0.00 0.00 0.00 112 6537.94 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
21 MUNICIPALPURPOSE .... MP7 .... MP7 349.99 0.00 0.00 0.00 117 349.99 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
22 HOSPITAL .... H2 .... H2 24114.64 0.00 0.00 0.00 118 24114.64 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
23 PRIMARY SCHOOL .... PS4 .... PS4 23635.89 0.00 0.00 0.00 124 23635.89 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
24 MUSTER SHED .... MS1 .... MS1 969.24 0.00 0.00 0.00 153 969.24 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
25 MUSTER SHED .... MS2 .... MS2 1394.48 0.00 0.00 0.00 154 1394.48 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
26 HIGH SCHOOL .... HS5 .... HS5 21931.97 0.00 0.00 0.00 156A 21931.97 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
27 PRIMARY SCHOOL .... PS5 .... PS5 26803.52 0.00 0.00 0.00 156B 26803.52 0.00 0.00 0.00 .... ....
129
CULTURAL & WOMEN
28 .... CWWC1 .... CWWC1 4304.77 0.00 0.00 0.00 158A 4304.77 0.00 0.00 0.00
WELFARE CENTRE)
29 MUNICIPALPURPOSE .... MP8 .... MP8 601.06 0.00 0.00 0.00 172 601.06 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
30 MUNICIPALPURPOSE .... MP9 .... MP9 80.41 0.00 0.00 0.00 180 80.41 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
31 HOSPITAL .... H3 .... H3 1695.71 0.00 0.00 0.00 184 1695.71 0.00 0.00 0.00 .... ....
32 FIRE BRIGADE .... FB5 .... FB5 2595.73 0.00 0.00 0.00 188 2595.73 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
33 MUNICIPALPURPOSE .... MP10 .... MP10 582.77 0.00 0.00 0.00 193 582.77 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
34 SC/VM/FM/MM .... SC1 .... SC1 744.22 0.00 0.00 0.00 197A 744.22 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
35 SC/VM/FM/MM .... SC2 .... SC2 596.60 0.00 0.00 0.00 197B 596.60 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
36 SC/VM/FM/MM .... SC3 .... SC3 760.99 0.00 0.00 0.00 197C 760.99 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
37 HIGH SCHOOL .... HS6 .... HS6 9838.50 0.00 0.00 0.00 201A 9838.50 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
38 MUNICIPALPURPOSE .... MP11 .... MP11 174.99 0.00 0.00 0.00 211 174.99 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
39 MUNICIPALPURPOSE .... MP12 .... MP12 215.15 0.00 0.00 0.00 215 215.15 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
40 HIGH SCHOOL .... HS7 .... HS7 7683.72 0.00 0.00 0.00 224 7683.72 0.00 0.00 0.00 .... ....
41 MUNICIPALPURPOSE .... MP13 .... MP13 299.47 0.00 0.00 0.00 231 299.47 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
42 SC/VM/FM/MM .... SC4 .... SC4 296.78 0.00 0.00 0.00 243 296.78 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
43 HIGH SCHOOL .... HS8 .... HS8 6011.67 0.00 0.00 0.00 251 6011.67 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
44 MUNICIPALPURPOSE .... MP14 .... MP14 502.16 0.00 0.00 0.00 252 502.16 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
CREAMATION
45 .... CG .... CG 8814.33 0.00 0.00 0.00 257A 8814.33 0.00 0.00 0.00 .... ....
GROUND
46 FERRY .... F1 .... F1 4000.00 0.00 0.00 0.00 258 4000.00 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
47 PRIMARY SCHOOL .... PS6 .... PS6 1843.84 0.00 0.00 0.00 259 1843.84 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
48 POLICE STATION .... POS1 .... POS1 1746.90 0.00 0.00 0.00 268 1746.90 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
CULTURAL & WOMEN
49 .... CWWC2 .... CWWC2 9144.15 0.00 0.00 0.00 295 9144.15 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
WELFARE CENTRE
50 SC/VM/FM/MM .... SC5 .... SC5 485.01 0.00 0.00 0.00 298 485.01 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
51 SHOPPING CENTRE .... SC6 .... SC6 2447.20 0.00 0.00 0.00 311 2447.20 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
52 SC/VM/FM/MM .... SC7 .... SC7 909.91 0.00 0.00 0.00 312 909.91 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
53 SC/VM/FM/MM .... SC8 .... SC8 4892.31 0.00 0.00 0.00 313 4892.31 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
54 KDMT & PARKING .... PAR1 .... PAR1 22419.22 0.00 0.00 0.00 323 22419.22 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
55 BURIAL GROUND .... BG1 .... BG1 7439.06 0.00 0.00 0.00 324 7439.06 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
56 BURIAL GROUND .... BG2 .... BG2 1563.45 0.00 0.00 0.00 325 1563.45 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
57 FERRY .... F2 .... F2 4000.00 0.00 0.00 0.00 328 4000.00 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
58 HOSPITAL .... H4 .... H4 11114.82 0.00 0.00 0.00 330 11114.82 0.00 0.00 0.00 .... .... .... .... .... .... .... .... ....
TOTAL AMENITY AREA 268532.44
130
Redistribution & Valuation Statement
columns 11 ,13, 14
Rate of Original plot value
VALUE IN RUPEES
Plot designation
Plot designation
column 6(c)
Column 12.
Area in Sq.Mtr
Without referance to
Without referance to
Without referance to
Inclusive of strctures
Inclusive of strctures
Inclusive of strctures
F. P. Number
Remarks
Tenure
per Sq.Mtr
value of strctures
value of strctures
value of strctures
Rate of Final plot
value per Sq.Mtr
DRAFT TOWN PLANNING SCHEME NO. I & II (Village Sapad and Wadeghar)
SUMMARY
Sr. No. Particulars Area (Sq.Mtr.) Area (Ha) (%) to the developed area
1 Area under Landowners Final Plots 1225759.21 122.58 41.85
2 Area under Garden, Playground, Parks 401490.51 40.15 13.71
Area under Economicaly Weaker Section/ Lower
3 158563.83 15.86 5.41
Income Group/Dispossed persons
4 Area under Amenities and Utilities 268532.44 26.85 9.17
5 Area under Authority Plots 302073.27 30.20 10.31
6 Area under proposed Roads 572499.61 57.25 19.55
TOTAL DEVELOPABLE AREA UNDER TPS 2928918.87 292.89 100.00
** The area under STEM (MWSSB) pipeline and maintainence road is included in scheme area for STEM (MWSSB) use, hence neither residential
plots are allotted for this area nor reservation/Authority plot are proposed in this area. Only the maintainence road is widened to 15 mtr.
*** Out of the total area under Town Planning Scheme, some area is owned by Government, KDMC, MWSSB and area of plots on which construction
of building is undertaken as per prior permission of KDMC. Hence the residential plots area allotted after deducting this area from TPS area.
133
AUTHORITY PLOT VALUATION
Rate of
Plot F. P. Rate of Final
SR. Area in Sq. Final Plot Road Valuation of
Name of Owner design Num Valuation of plot FSI plot value
NO. Mtr value per frontage plot
ation ber per Sq.Mtr
Sq. Mtr
1 2 3 4 5 6 7 8 9 10 11
1 AUTHORITY PLOT AU1 2 1398.74 45000 62943300.00 15 MTR 3.80 42750.00 59796135
2 AUTHORITY PLOT AU2 10 5616.99 45000 252764550.00 15 MTR 3.80 42750.00 240126322.5
3 AUTHORITY PLOT AU3 14 1195.00 45000 53775000.00 15 MTR 3.80 42750.00 51086250
4 AUTHORITY PLOT AU4 21 2898.13 45000 130415850.00 15 MTR 3.80 42750.00 123895057.5
5 AUTHORITY PLOT AU5 37 5997.50 45000 269887500.00 12 MTR 3.80 42750.00 256393125
6 AUTHORITY PLOT AU6 47 3444.06 45000 154982700.00 15 MTR 3.80 42750.00 147233565
7 AUTHORITY PLOT AU7 51A 6174.40 45000 277848000.00 15 MTR 3.80 42750.00 263955600
8 AUTHORITY PLOT AU8 51B 12231.49 45000 550417050.00 15 MTR 3.80 42750.00 522896197.5
9 AUTHORITY PLOT AU9 54 3254.34 45000 146445300.00 15 MTR 3.80 42750.00 139123035
10 AUTHORITY PLOT AU10 55 1956.22 45000 88029900.00 15 MTR 3.80 42750.00 83628405
11 AUTHORITY PLOT AU11 63 7619.27 45000 342867150.00 45 MTR 4.00 45000.00 342867150
12 AUTHORITY PLOT AU12 69 3264.51 45000 146902950.00 45 MTR 4.00 45000.00 146902950
13 AUTHORITY PLOT AU13 91 4931.04 45000 221896800.00 30 MTR 4.00 45000.00 221896800
14 AUTHORITY PLOT AU14 101 1564.39 45000 70397550.00 24 MTR 4.00 45000.00 70397550
15 AUTHORITY PLOT AU15 103 10824.59 45000 487106550.00 24 MTR 4.00 45000.00 487106550
16 AUTHORITY PLOT AU16 104 2168.29 45000 97573050.00 18 MTR 4.00 45000.00 97573050
17 AUTHORITY PLOT AU17 107 2256.55 45000 101544750.00 30 MTR 4.00 45000.00 101544750
18 AUTHORITY PLOT AU18 109 3509.98 45000 157949100.00 24 MTR 4.00 45000.00 157949100
19 AUTHORITY PLOT AU19 115 1949.73 45000 87737850.00 24 MTR 4.00 45000.00 87737850
20 AUTHORITY PLOT AU20 122 1249.99 45000 56249550.00 30 MTR 4.00 45000.00 56249550
21 AUTHORITY PLOT AU21 136 2697.56 45000 121390200.00 24 MTR 4.00 45000.00 121390200
22 AUTHORITY PLOT AU22 140 2682.73 45000 120722850.00 24 MTR 4.00 45000.00 120722850
23 AUTHORITY PLOT AU23 141 4614.00 45000 207630000.00 24 MTR 4.00 45000.00 207630000
24 AUTHORITY PLOT AU24 149 3627.04 45000 163216800.00 24 MTR 4.00 45000.00 163216800
25 AUTHORITY PLOT AU25 152 12163.90 45000 547375500.00 24 MTR 4.00 45000.00 547375500
26 AUTHORITY PLOT AU26 155 28004.56 45000 1260205200.00 24 MTR 4.00 45000.00 1260205200
27 AUTHORITY PLOT AU27 157 23469.74 45000 1056138300.00 24 MTR 4.00 45000.00 1056138300
28 AUTHORITY PLOT AU28 159 7900.63 45000 355528350.00 40 MTR 4.00 45000.00 355528350
29 AUTHORITY PLOT AU29 160 7844.13 45000 352985850.00 40 MTR 4.00 45000.00 352985850
30 AUTHORITY PLOT AU30 162 7611.38 45000 342512100.00 24 MTR 4.00 45000.00 342512100
31 AUTHORITY PLOT AU31 164 28019.78 45000 1260890100.00 24 MTR 4.00 45000.00 1260890100
32 AUTHORITY PLOT AU32 165 1255.13 45000 56480850.00 24 MTR 4.00 45000.00 56480850
33 AUTHORITY PLOT AU33 173 7352.63 45000 330868350.00 24 MTR 4.00 45000.00 330868350
34 AUTHORITY PLOT AU34 174 3798.32 45000 170924400.00 40 MTR 4.00 45000.00 170924400
35 AUTHORITY PLOT AU35 175 12997.00 45000 584865000.00 40 MTR 4.00 45000.00 584865000
36 AUTHORITY PLOT AU36 196 3152.75 45000 141873750.00 24 MTR 4.00 45000.00 141873750
37 AUTHORITY PLOT AU37 201B 3026.97 45000 136213650.00 24 MTR 4.00 45000.00 136213650
38 AUTHORITY PLOT AU38 205 1207.17 45000 54322650.00 24 MTR 4.00 45000.00 54322650
39 AUTHORITY PLOT AU39 207 1765.57 45000 79450650.00 18 MTR 4.00 45000.00 79450650
40 AUTHORITY PLOT AU40 230 2449.53 45000 110228850.00 24 MTR 4.00 45000.00 110228850
41 AUTHORITY PLOT AU41 263 1900.00 45000 85500000.00 40 MTR 4.00 45000.00 85500000
42 AUTHORITY PLOT AU42 265 1372.74 45000 61773300.00 40 MTR 4.00 45000.00 61773300
43 AUTHORITY PLOT AU43 269 1649.74 45000 74238300.00 40 MTR 4.00 45000.00 74238300
44 AUTHORITY PLOT AU44 284 4921.82 45000 221481900.00 12 MTR 3.80 42750.00 210407805
45 AUTHORITY PLOT AU45 290 8647.47 45000 389136150.00 30 MTR 4.00 45000.00 389136150
46 AUTHORITY PLOT AU46 296 15367.33 45000 691529850.00 12 MTR 3.80 42750.00 656953357.5
47 AUTHORITY PLOT AU47 301 2275.63 45000 102403350.00 40 MTR 4.00 45000.00 102403350
48 AUTHORITY PLOT AU48 304 3733.28 45000 167997600.00 12 MTR 3.80 42750.00 159597720
49 AUTHORITY PLOT AU49 307 2726.68 45000 122700600.00 12 MTR 3.80 42750.00 116565570
50 AUTHORITY PLOT AU50 309A 4128.06 45000 185762700.00 40 MTR 4.00 45000.00 185762700
51 AUTHORITY PLOT AU51 309B 1704.82 45000 76716900.00 40 MTR 4.00 45000.00 76716900
52 AUTHORITY PLOT AU52 310 4740.97 45000 76716900.00 12 MTR 3.80 42750.00 72881055
13304118600
1330.41
134
DRAFT TOWN PLANNING SCHEME NO. I AND II AT VILLAGE SAPAD AND WADEGHAR
Note: -
The total expenditure of the scheme i.e.Rs. 1130.73 Crore is proposed to be met by sale of Authority Plots.
(Authority Plots value Rs. 1330.41 crore).
columns 11 ,13, 14
Rate of Original plot value
VALUE IN RUPEES
Surevy Number in village
column 6(c)
Column 12.
Area in Sq.Mtr
Without referance to
Without referance to
Without referance to
Inclusive of strctures
Inclusive of strctures
Inclusive of strctures
O. P. Number
F. P. Number
Remarks
Tenure
per Sq.Mtr
value of strctures
value of strctures
value of strctures
Rate of Final plot
value per Sq.Mtr
1 2 3 3 (a) 4 4(a) 5 6 (a) 6 (b) 6 (c) 8 9 (a) 9 (b) 9 (c) 10 (a) 10 (b) 10 (c) 11 12 13 14 15 16
1 KDMC 1455 sq mtr 1 4 3 27 1455 5200 7566000 7566000 .... 0 0 0 0 0 0 0 0 0 0 0 0
2 Kharaba G 7 6 62 20 5200 104000 104000 .... 0 0 0 0 0 0 0 0 0 0 0 0
3 K.D.M.C. 1080 sq mtr 1 7 8 65 1080 5200 5616000 5616000 .... 0 0 0 0 0 0 0 0 0 0 0 0
4 Kharaba 1 7 12 69 50 5200 260000 260000 .... 0 0 0 0 0 0 0 0 0 0 0 0
5 KDMC 635 sq. Mtr. 1 8 1 72 635 5200 3302000 3302000 .... 0 0 0 0 0 0 0 0 0 0 0 0
6 K.D.M.C. 470 sq mtr 1 9 5 88 470 5200 2444000 2444000 .... 0 0 0 0 0 0 0 0 0 0 0 0
7 K.D.M.C. 270 sq.mtr. 1 10 1 96 270 5200 1404000 1404000 .... 0 0 0 0 0 0 0 0 0 0 0 0
8 KDMC 1 10 4 99 330 5200 1716000 1716000 .... 0 0 0 0 0 0 0 0 0 0 0 0
9 KDMC 120 sq. Mtr. 1 10 12 108 120 5200 624000 624000 .... 0 0 0 0 0 0 0 0 0 0 0 0
10 K.D.M.C. 1 12 2 119 1110 5200 5772000 5772000 .... 0 0 0 0 0 0 0 0 0 0 0 0
11 K.D.M.C. 2660 sq mtr 1 12 5 123 2660 5200 13832000 13832000 .... 0 0 0 0 0 0 0 0 0 0 0 0
12 K.D.M.C. 1 12 6 124 760 5200 3952000 3952000 .... 0 0 0 0 0 0 0 0 0 0 0 0
13 K.D.M.C. 1 13 1 132 100 5200 520000 520000 .... 0 0 0 0 0 0 0 0 0 0 0 0
14 K.D.M.C. 1 13 2 133 330 5200 1716000 1716000 .... 0 0 0 0 0 0 0 0 0 0 0 0
15 K.D.M.C. 1 13 4 135 1210 5200 6292000 6292000 .... 0 0 0 0 0 0 0 0 0 0 0 0
16 K.D.M.C. 1 13 5 136 680 5200 3536000 3536000 .... 0 0 0 0 0 0 0 0 0 0 0 0
17 KDMC 445 SQ MTR 1 13 7 139 445 5200 2314000 2314000 .... 0 0 0 0 0 0 0 0 0 0 0 0
18 KDMC 815 SQ MTR 1 13 8 141 815 5200 4238000 4238000 .... 0 0 0 0 0 0 0 0 0 0 0 0
19 KDMC 330 SQ MTR 1 13 9 143 330 5200 1716000 1716000 .... 0 0 0 0 0 0 0 0 0 0 0 0
20 KDMC 150 SQ MTR 1 13 10 145 150 5200 780000 780000 .... 0 0 0 0 0 0 0 0 0 0 0 0
21 K.D.M.C. 1 13 11 146 250 5200 1300000 1300000 .... 0 0 0 0 0 0 0 0 0 0 0 0
22 K.D.M.C. 1 13 14 149 450 5200 2340000 2340000 .... 0 0 0 0 0 0 0 0 0 0 0 0
23 Gurucharan G 14 1 151 115400 5200 600080000 600080000 .... 0 0 0 0 0 0 0 0 0 0 0 0
24 Gaothan G 14 2 152 8100 5200 42120000 42120000 .... 0 0 0 0 0 0 0 0 0 0 0 0
25 K.D.M.C. 1 15 4 156 3060 5200 15912000 15912000 .... 0 0 0 0 0 0 0 0 0 0 0 0
26 Gurucharan G 18 && 183 14700 5200 76440000 76440000 .... 0 0 0 0 0 0 0 0 0 0 0 0
27 Kharaba G 21 15 218 80 2150 172000 172000 .... 0 0 0 0 0 0 0 0 0 0 0 0
28 K.D.M.C. 1 26 6 276 560 5200 2912000 2912000 .... 0 0 0 0 0 0 0 0 0 0 0 0
29 K.D.M.C. 2 26 7 277 800 5200 4160000 4160000 .... 0 0 0 0 0 0 0 0 0 0 0 0
136
30 K.D.M.C. 2 26 8 278 250 5200 1300000 1300000 .... 0 0 0 0 0 0 0 0 0 0 0 0
31 K.D.M.C. 1 26 13 283 100 5200 520000 520000 .... 0 0 0 0 0 0 0 0 0 0 0 0
32 Gaothan G 27 1/B 284 8100 5200 42120000 42120000 .... 0 0 0 0 0 0 0 0 0 0 0 0
33 Gurcharan G 27 1/A 287 59520 5200 309504000 309504000 .... 0 0 0 0 0 0 0 0 0 0 0 0
34 Panyacha Khalya G 35 9 361 1400 2150 3010000 3010000 .... 0 0 0 0 0 0 0 0 0 0 0 0
35 Road 1 35 11 363 400 2150 860000 860000 .... 0 0 0 0 0 0 0 0 0 0 0 0
Water Supply & Drainage 20/
36 1 35 375 400 2150 860000 860000 .... 0 0 0 0 0 0 0 0 0 0 0 0
Dept. A/2
37 Jagannath Govind Patil & 1 35 21/A 376 900 2150 1935000 1935000 .... 0 0 0 0 0 0 0 0 0 0 0 0
other 2 and Water Supply
Water Supply & Drainage
38 1 35 21/B 377 100 2150 215000 215000 .... 0 0 0 0 0 0 0 0 0 0 0 0
Dept.
39 Jagannath Govind Patil & 1 35 22/A 378 700 2150 1505000 1505000 .... 0 0 0 0 0 0 0 0 0 0 0 0
other 23 Water Supply
Water Supply & Drainage
40 1 35 22/B 379 100 2150 215000 215000 .... 0 0 0 0 0 0 0 0 0 0 0 0
Dept.
Jagannath Govind Patil &
41 other 10 and Water 1 35 23/A 380 1200 2150 2580000 2580000 .... 0 0 0 0 0 0 0 0 0 0 0 0
Supply
Water Supply & Drainage
42 1 35 23/B 381 100 2150 215000 215000 .... 0 0 0 0 0 0 0 0 0 0 0 0
Dept.
column 6(b)
Area in Sq. Mtr
Column 12.
Hissa Number
11 , 13, 14
O. P. Number
Remarks
Inclusive of structures
Inclusive of structures
Sections
Rate of semi final plot
Without referance to
Without referance to
Tenure
Inclusive of strctures
Without referanceto
Sr. No.
Wadeghar
value of structures
value of structures
value of strctures
value per Sq.Mtr
per Sq.Mtr
1 2 3 3 (a) 4 4(a) 5 6 (a) 6 (b) 6 (c) 7 8 9 (a) 9 (b) 9 (c) 10 (a) 10 (b) 10 (c) 11 12 13 14 15 16
1 Road G 1 4 1264 500 11200 5600000 5600000 .... 0 0 0 0 0 0 0 0 0 0 0 0
2 Road G 2 4 1270 50 11200 560000 560000 .... 0 0 0 0 0 0 0 0 0 0 0 0
3 Road G 2 5 1271 100 11200 1120000 1120000 .... 0 0 0 0 0 0 0 0 0 0 0 0
4 Road 1 2 7 1273 100 11200 1120000 1120000 .... 0 0 0 0 0 0 0 0 0 0 0 0
5 Road 1 2 9 1275 300 11200 3360000 3360000 .... 0 0 0 0 0 0 0 0 0 0 0 0
6 Road G 3 1 1279 560 11200 6272000 6272000 .... 0 0 0 0 0 0 0 0 0 0 0 0
Kalyan Dombivli Mun. Corp. 1050 sq mtr
7 1 4 10 1294 1050 11200 11760000 11760000 .... 0 0 0 0 0 0 0 0 0 0 0 0
8 KDMC 1280 Sq. Mtr. 1 5 .... 1301 1280 11200 14336000 14336000 .... 0 0 0 0 0 0 0 0 0 0 0 0
9 Gurcharan G 9 1 1310 31500 11200 352800000 352800000 .... 0 0 0 0 0 0 0 0 0 0 0 0
10 MWSSB 1 9 2 1311 900 11200 10080000 10080000 .... 0 0 0 0 0 0 0 0 0 0 0 0
11 KDMC 1320 Sq. Mtr. 1 10 1 1313 1320 11200 14784000 14784000 .... 0 0 0 0 0 0 0 0 0 0 0 0
12 Road 1 12 1 1317 7000 11200 78400000 78400000 .... 0 0 0 0 0 0 0 0 0 0 0 0
13 KDMC 2 12 4 1320 2600 11200 29120000 29120000 .... 0 0 0 0 0 0 0 0 0 0 0 0
14 KDMC 1 12 9/C 1327 200 11200 2240000 2240000 .... 0 0 0 0 0 0 0 0 0 0 0 0
15 KDMC 65 sq mtr 1 12 13 1334 65 11200 728000 728000 .... 0 0 0 0 0 0 0 0 0 0 0 0
16 KDMC 1 12 15 1336 1600 11200 17920000 17920000 .... 0 0 0 0 0 0 0 0 0 0 0 0
17 KDMC 8951 sq mtr 1 13 1 1338 8951 11200 100251200 100251200 .... 0 0 0 0 0 0 0 0 0 0 0 0
18 KDMC 1 14 6 1346 890 11200 9968000 9968000 .... 0 0 0 0 0 0 0 0 0 0 0 0
19 Road 1 14 7 1347 530 11200 5936000 5936000 .... 0 0 0 0 0 0 0 0 0 0 0 0
20 KDMC 3128 sq mtr 1 14 8 1349 3128 11200 35033600 35033600 .... 0 0 0 0 0 0 0 0 0 0 0 0
21 Road 1 14 9 1350 150 11200 1680000 1680000 .... 0 0 0 0 0 0 0 0 0 0 0 0
22 Gurcharan G 22 .... 1365 16100 11200 180320000 180320000 .... 0 0 0 0 0 0 0 0 0 0 0 0
23 KDMC 228 sq. Mtr. 1 29 1 1390 228 11200 2553600 2553600 .... 0 0 0 0 0 0 0 0 0 0 0 0
24 KDMC 3269 sq. Mtr. 1 29 2 1392 3269 11200 36612800 36612800 .... 0 0 0 0 0 0 0 0 0 0 0 0
25 KDMC 1 29 3 1393 780 11200 8736000 8736000 .... 0 0 0 0 0 0 0 0 0 0 0 0
26 KDMC 1 29 4 1394 380 11200 4256000 4256000 .... 0 0 0 0 0 0 0 0 0 0 0 0
27 Road 1 29 8 1398 200 11200 2240000 2240000 .... 0 0 0 0 0 0 0 0 0 0 0 0
28 KDMC 1 29 10 1400 200 11200 2240000 2240000 .... 0 0 0 0 0 0 0 0 0 0 0 0
29 KDMC 1 29 14 1404 2120 11200 23744000 23744000 .... 0 0 0 0 0 0 0 0 0 0 0 0
30 Road 1 30 5 1413 430 11200 4816000 4816000 .... 0 0 0 0 0 0 0 0 0 0 0 0
31 KDMC 1 30 7 1415 400 11200 4480000 4480000 .... 0 0 0 0 0 0 0 0 0 0 0 0
32 KDMC 6500 Sq. Mtr. 1 31 .... 1419 6500 11200 72800000 72800000 .... 0 0 0 0 0 0 0 0 0 0 0 0
33 MWSSB G 33 1/B 1430 200 4500 900000 900000 .... 0 0 0 0 0 0 0 0 0 0 0 0
140
34 MWSSB G 33 2/B 1432 1020 4500 4590000 4590000 .... 0 0 0 0 0 0 0 0 0 0 0 0
35 MWSSB G 33 5/B 1436 250 4500 1125000 1125000 .... 0 0 0 0 0 0 0 0 0 0 0 0
36 MWSSB G 33 6/A/2 1438 120 4500 540000 540000 .... 0 0 0 0 0 0 0 0 0 0 0 0
37 MWSSB G 33 6/B/2 1440 300 4500 1350000 1350000 .... 0 0 0 0 0 0 0 0 0 0 0 0
38 MWSSB G 33 10/B 1445 950 4500 4275000 4275000 .... 0 0 0 0 0 0 0 0 0 0 0 0
39 MWSSB 1 33 11/B 1447 250 4500 1125000 1125000 .... 0 0 0 0 0 0 0 0 0 0 0 0
40 MWSSB G 36 2/B 1465 800 11200 8960000 8960000 .... 0 0 0 0 0 0 0 0 0 0 0 0
41 Road G 37 2 1467 600 11200 6720000 6720000 .... 0 0 0 0 0 0 0 0 0 0 0 0
42 Raod G 37 9 1476 6700 11200 75040000 75040000 .... 0 0 0 0 0 0 0 0 0 0 0 0
43 MWSSB 1 37 10/B 1478 50 11200 560000 560000 .... 0 0 0 0 0 0 0 0 0 0 0 0
44 MWSSB 1 37 12/B 1481 770 11200 8624000 8624000 .... 0 0 0 0 0 0 0 0 0 0 0 0
45 MWSSB G 37 14/B 1484 1000 11200 11200000 11200000 .... 0 0 0 0 0 0 0 0 0 0 0 0
46 Road G 37 24 1496 800 11200 8960000 8960000 .... 0 0 0 0 0 0 0 0 0 0 0 0
47 MWSSB G 37 29/B 1502 1120 11200 12544000 12544000 .... 0 0 0 0 0 0 0 0 0 0 0 0
48 KDMC 1560 sq. Mtr. 1 39 1/1 1519 1560 11200 17472000 17472000 .... 0 0 0 0 0 0 0 0 0 0 0 0
49 MWSSB G 39 1/3 1521 1920 11200 21504000 21504000 .... 0 0 0 0 0 0 0 0 0 0 0 0
50 KDMC 1970 sq. Mtr. 1 39 1/4 1523 1970 11200 22064000 22064000 .... 0 0 0 0 0 0 0 0 0 0 0 0
51 KDMC 1 44 5 1553 130 11200 1456000 1456000 .... 0 0 0 0 0 0 0 0 0 0 0 0
52 KDMC 2 44 6 1554 450 11200 5040000 5040000 .... 0 0 0 0 0 0 0 0 0 0 0 0
53 KDMC 700 sq. Mtr. 1 44 7 1556 700 11200 7840000 7840000 .... 0 0 0 0 0 0 0 0 0 0 0 0
54 KDMC 2 46 6 1566 2800 11200 31360000 31360000 .... 0 0 0 0 0 0 0 0 0 0 0 0
55 MWSSB G 67 1/A/1 1574 1250 11200 14000000 14000000 .... 0 0 0 0 0 0 0 0 0 0 0 0
56 MWSSB G 67 1/B/1 1576 250 11200 2800000 2800000 .... 0 0 0 0 0 0 0 0 0 0 0 0
57 MWSSB G 67 1/C/1 1578 220 11200 2464000 2464000 .... 0 0 0 0 0 0 0 0 0 0 0 0
58 Road G 68 2 1586 960 11200 10752000 10752000 .... 0 0 0 0 0 0 0 0 0 0 0 0
59 MWSSB 1 68 3/B 1588 220 11200 2464000 2464000 .... 0 0 0 0 0 0 0 0 0 0 0 0
60 Road G 91 3 1598 380 11200 4256000 4256000 .... 0 0 0 0 0 0 0 0 0 0 0 0
61 Road G 91 5 1600 330 11200 3696000 3696000 .... 0 0 0 0 0 0 0 0 0 0 0 0
62 Road G 91 7 1602 330 11200 3696000 3696000 .... 0 0 0 0 0 0 0 0 0 0 0 0
63 Road G 93 1 1612 4200 11200 47040000 47040000 .... 0 0 0 0 0 0 0 0 0 0 0 0
64 KDMC 2 94 1 1628 760 11200 8512000 8512000 .... 0 0 0 0 0 0 0 0 0 0 0 0
65 KDMC 2 94 2 1629 200 11200 2240000 2240000 .... 0 0 0 0 0 0 0 0 0 0 0 0
66 KDMC 1620 sq. Mtr. 1 95 1 1631 1620 11200 18144000 18144000 .... 0 0 0 0 0 0 0 0 0 0 0 0
67 Road G 95 9 1641 940 11200 10528000 10528000 .... 0 0 0 0 0 0 0 0 0 0 0 0
68 Road 1 98 6 1664 100 11200 1120000 1120000 .... 0 0 0 0 0 0 0 0 0 0 0 0
69 Road G 98 18 1676 200 11200 2240000 2240000 .... 0 0 0 0 0 0 0 0 0 0 0 0
70 Road G 99 7 1685 900 11200 10080000 10080000 .... 0 0 0 0 0 0 0 0 0 0 0 0
71 Govt of Maharashtra 1 101 1/B 1703 700 11200 7840000 7840000 .... 0 0 0 0 0 0 0 0 0 0 0 0
72 Road G 102 5 1710 300 11200 3360000 3360000 .... 0 0 0 0 0 0 0 0 0 0 0 0
73 Road G 103 2 1713 80 11200 896000 896000 .... 0 0 0 0 0 0 0 0 0 0 0 0
74 Road G 103 4 1715 900 11200 10080000 10080000 .... 0 0 0 0 0 0 0 0 0 0 0 0
75 KDMC 2 103 6 1725 1,782.50 11200 19964000 19964000 .... 0 0 0 0 0 0 0 0 0 0 0 0
76 Road G 103 10 1729 100.00 11200 1120000 1120000 .... 0 0 0 0 0 0 0 0 0 0 0 0
77 Govt of Maharashtra 1 103 11/A 1730 5109 11200 57220800 57220800 .... 0 0 0 0 0 0 0 0 0 0 0 0
78 Road G 103 12 1732 530 11200 5936000 5936000 .... 0 0 0 0 0 0 0 0 0 0 0 0
79 KDMC 3213 sq. Mtr. 1 104 .... 1740 3213 11200 35985600 35985600 .... 0 0 0 0 0 0 0 0 0 0 0 0
141
DRAFT TOWN PLANNING SCHEME NO. I AND II AT VILLAGE SAPAD
AND WADEGHAR
NOTES
01. All the rights of mortgagors and mortgagees, if any, existing in the Original
Plots will be transferred to their corresponding Final Plots.
02. All the rights of passages either to any existing over any land included in the
Scheme are hereby extinguished, except where otherwise specified in the
Remarks Column of Form-I.
03. All the rights of the lessors and lessees, if any, in the Original Plots are hereby
transferred to their corresponding Final Plots respectively of change in area except
where otherwise specified in Remarks Column of Form-I
04. Agreements in respect of Original Plot between the owner on one part and the
Appropriate Authority or Government on the other part are hereby transferred to
the corresponding Final Plots subject to minor modification in area unless
otherwise provided in the agreement.
05. The tenure of all Original Plots are hereby transferred to the corresponding
Final Plots.
06. The owners of the Original Plots whose Final Plots are not identical with the
Original Plots are allowed, unless otherwise specified and no compensation is
allowed in the Scheme to remove trees and material, if any, of their wire fencing,
hedges, sheds, huts, etc. existing on their Original Plot and not included within the
boundary of their Final Plots allotted to them within one month from the date on
which the draft Scheme comes into force, provided that they shall fill up at their
own cost any hollows created during the action of removal of the aforesaid
material.
07. The Appropriate Authority shall keep all sites allotted for the public purpose in
sanitary conditions and shall utilize for the specified purpose mentioned in the
Scheme.
142
08. No excavation shall be made anywhere within the scheme area without the
permission of the KDMC having been first obtained except within the plots finally
allotted to the owners.
09. In case of plots held on new tenure or restricted tenure under the Agricultural
Lands and Tenancy Act or under any other mode, the rights of the Collector, Thane
for Government of Maharashtra to receive share of compensation as per prevailing
Government rules and policy out of the total compensation that may be decided
under the Final Scheme are hereby transferred or continued on Final Plots as
shown in the Form- I of the Scheme.
10. In case of Final Plots allotted in common ownership or joint ownership, the
shares of persons are as per their shares in the respective Original Plots.
11. The rights of other right holder in Original Plot are transferred to the
corresponding Final Plot.
13. Agreements in respect of Original Plot between the owner on one part and any
other person on the other part are hereby transferred to the corresponding Final
Plots subject to minor modification in area unless otherwise provided in the
agreement.
14. For the land under litigation, the ownership of such land shall be as per the
judgment of the Hon’ble Court or Competent Authority.
***************
143
DRAFT TOWN PLANNING SCHEME NO. I AND II AT VILLAGE SAPAD
AND WADEGHAR
*** As per the video conferencing meeting with the Director, Town
Planning, Maharashtra State, Pune following FSI is proposed in the Draft
Town Planning Scheme.
2) Base FSI on buildable reservation plots, EWS/LIG and Authority plots, etc.
shall be = maximum 4.00.
3) The development on the KDMC sale plot adjecent to Water Front
Development (as shown on Draft Plan) shall be restricted to Stilt + Two upper
floors and for residential purpose only.
4) Provision of Amenity space mentioned in sanctioned DCPR's shall not be
made applicable for final plots, upto 4000.00 sq.mtr. area.
5) There shall be no height restrictions for building on a Final Plot but no
relaxation in front marginal spaces will be granted.
6) Minimum marginal Space Requirement:
Sr. No. Type of building Front margin
1 Residential 3.00 mtr
2 Mixed use & Commercial 4.50 mtr
7) The ramps may be permitted in side marginal open space, provided that
marginal space on one side shall be available and No ramp shall be provided in
this marginal space.
8) No plot will be allowed direct access from 40 mtr wide road.
9) The reservations for High School and Primary School may be allowed to be
developed for other Educational Purposes like Medical Colleges, Engineering
Colleges and other similar purposes with th Special Permission of Municipal
Commissioner.
10) The development charges and other building permission charges will be
applicable as per prevailing Government resolution and other charges as
decided by the Municipal Commissioner.
11) For the plots fronting scheme road, no cantilever projection will be allowed
in front 3.0 mtr. setbacks.
145
12) Four wheeler parking spaces may be provided in the Automated Mechanical
Vertical Car Parking system of required height within the building line. This
parking system may be provided at a site away from main building but not in
required compulsary marginal spaces and away from compound wall.
13) As per the Notification of CRZ published on date 6 th Jan 2011, the CRZ
area in the Town Planning Scheme boundry is approx. 31 Hectare, and this
area is proposed for Riverfront Garden development. The uses may be allowed
as per the Final Plan of the CRZ amended by the Central Government from
time to time.
*************
146
DRAFT TOWN PLANNING SCHEME NO. I AND II AT VILLAGE SAPAD
AND WADEGHAR
*************
148
COMBINED DETAILS OF THE RESERVATIONS IN SANCTIONED DEVELOPMENT PLAN AND THE REQUIRED RESERVATIONS AS PER THE
BALANCE AREA OF TPS
SANCTIONED D.P. RESERVATION DETAILS RESERVATION DETAILS FOR BALANCE TPS AREA
D. P. RES TOTAL TOTAL TOTAL
SR NO. D.P. RES SANCTIONED D.P. REQUIRED FINAL FINAL PLOT
AREA AREA REQUIRED AREA PROPOSED
NO. RESERVATION NAME AREA (Ha) PLOT NO. AREA (Ha)
(Ha) (Ha) (Ha) (V+VI) AREA (Ha)
I II III IV V VI VII VIII IX X
1 1 FERRY 0.40 0.4 NIL 0.4 0.40 328 4000
2 48 FERRY 0.40 0.4 NIL 0.4 0.40 258 4000
3 4 HIGH SCHOOL 0.60
4 17 HIGH SCHOOL 0.60 12,22, 26,
31, 156A,
1.9 4.58 6.48 6.51 65123.86
201A,
5 62 HIGH SCHOOL 0.70
224, 251
158B,
18 12 PLAYGROUND 1.80 1.8 9.15 10.95 13.91 139054.94
293
19 20 HOSPITAL 1.20
93, 118,
20 52 HOSPITAL 1.42 3.44 0.37 3.81 3.89 38934.67
184, 330
21 13 VETERNARY HOSPITAL 0.82
149
22 7 MUSTER SHED 0.15 0.15 NIL 0.15 0.24 153, 154 2363.72
ADDITIONAL RESERVATIONS KEPT AS MUNICIPAL PURPOSE FOR REQUIRMENT OF VARIOUS PUBLIC ACTIVITIES
SANCTIONED D.P. RESERVATION DETAILS RESERVATION DETAILS FOR BALANCE TPS AREA
D. P. RES TOTAL TOTAL TOTAL
SR NO. D.P. RES REQUIRED FINAL FINAL PLOT
RESERVATION NAME AREA AREA REQUIRED AREA PROPOSED
NO. AREA (Ha) PLOT NO. AREA (Ha)
(Ha) (Ha) (Ha) (I+II) AREA (Ha)
41 MP1 MUNICIPAL PURPOSE ... ... ... ... 200.00 4 200.00
42 MP2 MUNICIPAL PURPOSE ... ... ... ... 597.95 33 597.95
43 MP3 MUNICIPAL PURPOSE ... ... ... ... 775.00 66 775.00
44 MP4 MUNICIPAL PURPOSE ... ... ... ... 194.91 77 194.91
45 MP5 MUNICIPAL PURPOSE ... ... ... ... 99.82 85 99.82
46 MP6 MUNICIPAL PURPOSE ... ... ... ... 179.66 88 179.66
47 MP7 MUNICIPAL PURPOSE ... ... ... ... 349.99 117 349.99
48 MP8 MUNICIPAL PURPOSE ... ... ... ... 601.06 172 601.06
49 MP9 MUNICIPAL PURPOSE ... ... ... ... 80.41 180 80.41
50 MP10 MUNICIPAL PURPOSE ... ... ... ... 582.77 193 582.77
51 MP11 MUNICIPAL PURPOSE ... ... ... ... 174.99 211 174.99
52 MP12 MUNICIPAL PURPOSE ... ... ... ... 122.54 215 122.54
53 MP13 MUNICIPAL PURPOSE ... ... ... ... 299.47 231 299.47
54 MP14 MUNICIPAL PURPOSE ... ... ... ... 502.16 252 502.16
TOTAL 4760.73
RESERVATIONS KEPT FOR EWS/LIG PURPOSE
SANCTIONED D.P. RESERVATION DETAILS RESERVATION DETAILS FOR BALANCE TPS AREA
D. P. RES TOTAL TOTAL TOTAL
SR NO. D.P. RES REQUIRED FINAL FINAL PLOT
RESERVATION NAME AREA AREA REQUIRED AREA PROPOSED
NO. AREA (Ha) PLOT NO. AREA (Ha)
(Ha) (Ha) (Ha) (I+II) AREA (Ha)
55 E/L1 EWS/LIG ... ... ... ... 5206.74 1 5206.74
56 E/L2 EWS/LIG ... ... ... ... 8760.15 6A 8760.15
57 E/L3 EWS/LIG ... ... ... ... 12194.33 38 12194.33
58 E/L4 EWS/LIG ... ... ... ... 6475.94 75 6475.94
59 E/L5 EWS/LIG ... ... ... ... 23939.87 102 23939.87
60 E/L6 EWS/LIG ... ... ... ... 14604.24 121 14604.24
61 E/L7 EWS/LIG ... ... ... ... 2535.27 161 2535.27
62 E/L8 EWS/LIG ... ... ... ... 80061.2 170 80061.2
63 E/L9 EWS/LIG ... ... ... ... 4786.09 221 4786.09
151
TOWN PLANNING SCHEME No. I & II (VILLAGE SAPAD AND WADEGHAR) {See rules (v) and 21(1)}
FINAL PLOTS KEPT AGAINEST GOVERNMENT LAND IN VILLAGE SAPAD AND WADEGHAR
columns 11 ,13, 14
Un-developed Developed
Name of Owner
Serial Number
column 6(c)
Area in Sq.Mtr
Column 12.
Rate of semi final plot
Hissa Number
Without referance to
Without referance to
Without referance to
Inclusive of strctures
Inclusive of strctures
Inclusive of strctures
O. P. Number
F. P. Number
Remarks
Tenure
per Sq.Mtr
value of strctures
value of strctures
value of strctures
1 2 3 3 (a) 4 4(a) 5 6 (a) 6 (b) 6 (c) 7 8 9 (a) 9 (b) 9 (c) 10 (a) 10 (b) 10 (c) 11 12 13 14 15 16
1 Gurucharan G 14 1 151 115400 5200 600080000 600080000 0 0 0 0 0 0 0 0 0 0 0
2 Gaothan G 14 2 152 8100 5200 42120000 42120000 0 0 0 0 0 0 0 0 0 0 0
3 Gurucharan G 18 && 183 14700 5200 76440000 76440000 0 0 0 0 0 0 0 0 0 0 0
4 Gaothan G 27 1/B 284 8100 5200 42120000 42120000 0 0 0 0 0 0 0 0 0 0 0
5 Gurcharan G 27 1/A 287 59520 5200 309504000 309504000 0 0 0 0 0 0 0 0 0 0 0
170 80061.20
6 Gurcharan G 134 && 1251 32800 5200 170560000 170560000 0 0 0 0 0 0 0 0 0 0 0
7 Gurcharan G 135 && 1252 15600 5200 81120000 81120000 0 0 0 0 0 0 0 0 0 0 0
`
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò----EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, MÉÖ¯û´ÉÉ®ú iÉä ¤ÉÖvÉ´ÉÉ®ú, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 1
RNI No. MAHBIL/2009/35529
|ÉÉÊvÉEÞòiÉ |ÉEòɶÉxÉ
¶ÉɺÉEòÒªÉ +ÊvɺÉÚSÉxÉÉ, xÉä¨ÉhÉÖEòÉ <iªÉÉnùÒ
+ÊvɺÉÚSÉxÉÉ
+. ºÉÉä. ´ÉÉPɴɺÉä,
+ʱɤÉÉMÉ, |ɨÉÖJÉ ÊVɱ½þÉ xªÉɪÉÉvÉÒ¶É,
ÊnùxÉÉÆEò 4 xÉÉä´½åþ¤É®úú 2019. ®úɪÉMÉb÷--+ʱɤÉÉMÉ.
+ÉÊhÉ VªÉÉ+lÉÔ, +ɴɶªÉEò iÉÒ SÉÉèEò¶ÉÒ Eäò±ªÉÉxÉÆiÉ®ú ´É ºÉÆSÉɱÉEò, xÉMÉ®ú ®úSÉxÉÉ, ¨É½þÉ®úɹ]Åõ ®úÉVªÉ, {ÉÖhÉä ªÉÉÆSÉÉ ºÉ±±ÉÉ PÉäiɱªÉÉxÉÆiÉ®ú |ɺiÉÉÊ´ÉiÉ ¡äò®ú¤Énù±É
¨ÉÆVÉÚ®ú Eò®úhÉä +ɴɶªÉEò +ɽäþ, +ºÉä ¶ÉɺÉxÉÉSÉä ¨ÉiÉ ZÉɱÉä +ɽäþ ;
iªÉÉ+lÉÔ, +ÉiÉÉ =CiÉ +ÊvÉÊxɪɨÉÉSªÉÉ Eò±É¨É 37 SÉä {ÉÉä]õ-Eò±É¨É (2) +x´ÉªÉä ´É iªÉÉ +xÉÖ¹ÉÆMÉÉxÉä ¶ÉɺÉxÉÉºÉ |ÉÉ{iÉ +ºÉ±É䱪ÉÉ <iÉ®ú +ÊvÉEòÉ®úÉÆSÉÉ
´ÉÉ{É®ú Eò°üxÉ ¶ÉɺÉxÉ =CiÉ Ê´ÉEòÉºÉ ªÉÉäVÉxÉäiÉÒ±É |ɺiÉÉÊ´ÉiÉ ¡äò®ú¤Énù±É |ɺiÉÉ´É ¨ÉÆVÉÚ®ú Eò®úÒiÉ +ɽäþ +ÉÊhÉ iªÉɺÉÉ`öÒ =CiÉ Ê´ÉEòÉºÉ ªÉÉäVÉxÉÉ ¨ÉÆVÉÖ®úÒSªÉÉ +ÊvɺÉÖSÉxÉäiÉÒ±É
¡äò®ú¤Énù±ÉÉSªÉÉ +xÉÖºÉÚSÉÒ¨ÉvªÉä ¶Éä´É]õSªÉÉ xÉÉånùÒxÉÆiÉ®ú {ÉÖføÒ±É xÉ´ÉÒxÉ xÉÉånù ºÉ¨ÉÉʴɹ]õ Eò®úhªÉÉiÉ ªÉäiÉ +ɽäþ ;
xÉÉånù
“ Ê´ÉEòɺÉ
ªÉÉäVÉxÉÉ ¦ÉÉMÉ xÉEòɶÉÉ´É®ú nù¶ÉÇʴɱªÉÉ|ɨÉÉhÉä +É.Gò.243-{ÉÊ®ú´É½þxÉ ºÉä´ÉÉ (UMC Bus Stop) ½äþ +É®úIÉhÉ ´ÉMɳÚýxÉ iªÉÉJÉɱÉÒ±É IÉäjÉ
+É.Gò.244-nù¡òxɦÉÚ¨ÉÒ ªÉÉ +É®úIÉhÉÉiÉ ºÉ¨ÉÉʴɹ]õ Eò®úhªÉÉiÉ ªÉäiÉ +ɽäþ ’’.
2. ºÉnù®úSÉÉ ¨ÉÆVÉÚ®ú ¡äò®ú¤Énù±É ½þÒ +ÊvɺÉÚSÉxÉÉ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉÉiÉ |ÉʺÉrù ZÉɱªÉÉSªÉÉ ÊnùxÉÉEòÉÆ{ÉɺÉÚxÉ +ƨɱÉÉiÉ ªÉä<DZÉ.
3. =CiÉ ¨ÉÆVÉÚ®ú ¡äò®ú¤Énù±É nù¶ÉÇÊ´ÉhÉÉ®úÉ ¦ÉÉMÉ xÉEòɶÉÉ xÉÉMÉÊ®úEòÉÆSªÉÉ +´É±ÉÉäEòxÉÉlÉÇ EòɪÉÉDZɪÉÒxÉ ´Éä³ýä ¨ÉvªÉä EòɨÉEòÉVÉÉSªÉÉ Ênù´É¶ÉÒ JÉɱÉÒ xɨÉÚnù EòɪÉÉDZɪÉɨÉvªÉä
BEò ¨ÉʽþxªÉÉSªÉÉ EòɱÉÉ´ÉvÉÒEò®úÒúiÉÉ ={ɱɤvÉ ®úɽþÒ±É.
(1) +ɪÉÖCiÉ, =±½þɺÉxÉMÉ®ú ¨É½þÉxÉMÉ®ú{ÉÉʱÉEòÉ, =±½þɺÉxÉMÉ®ú.
(2) ºÉ½þºÉÆSÉɱÉEò, xÉMÉ®ú ®úSÉxÉÉ, EòÉäEòhÉ Ê´É¦ÉÉMÉ, EòÉäEòhÉ ¦É´ÉxÉ, xÉ´ÉÒ ¨ÉÖ¤Æ É<Ç.
(3) ºÉ½þɪªÉEò ºÉÆSÉɱÉEò, xÉMÉ®ú ®úSÉxÉÉ, `öÉhÉä ¶ÉÉJÉÉ, ÊVÉ. `öÉhÉä.
4. ºÉnù®ú ¡äò®ú¤Énù±ÉÉSÉÒ +ÊvɺÉÚSÉxÉÉ ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉÉSªÉÉ www.maharashtra.gov.in ºÉÆEòä iɺlɳýÉ´É®ú |ÉʺÉrùù Eò®úhªÉÉiÉ +ɱÉÒ
+ɽäþ.
¨É½þÉ®úɹ]ÅõÉSÉä ®úÉVªÉ{ÉÉ±É ªÉÉÆSªÉÉ +Énäù¶ÉÉxÉÖºÉÉ®ú ´É xÉÉ´ÉÉxÉä,
+¶ÉÉäEò EòÉ. JÉÉÆbä÷Eò®ú,
EòɪÉÉǺÉxÉ +ÊvÉEòÉ®úÒ.
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò----EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, MÉÖ¯û´ÉÉ®ú iÉä ¤ÉÖvÉ´ÉÉ®ú, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 3
URBAN DEVELOPMENT DEPARTMENT
4th Floor, Main Building, Mantralaya
Mumbai 400 032, dated 7th November 2019
NOTIFICATION
MAHARASHTRA REGIONAL AND TOWN PLANNING ACT, 1966.
No. TPS. 1218/4358/C.R.113/19/UD-12.—Whereas, the Revised Development Plan of the City of
Ulhasnagar (hereinafter referred to as “the said Development Plan”) has been sanctioned partly by the Government
in the Urban Development Department, under section 31(1) of the Maharashtra Regional and Town Planning Act,
1966 (hereinafter referred to as “the said Act”) vide Notification No.TPS-1214/1423/CR-19/ 17/SM/UD-12, dated
21st April 2017 (hereinafter referred to as “the said Notification”) and has come into force with effect from 20th
May 2017 and the Excluded Part of the said Development Plan has been sanctioned by the Government in Urban
Development Department under section 31(1) of the said Act, vide Notifications dated 20th April 2018 and dated 1st
March 2019 ;
And whereas, in the said Development Plan, an area admeasuring 3115.00 sq. mt. of land bearing Sheet No.61pt.,
70pt. of Ulhasnagar (hereinafter referred to as “the said land”) is reserved for Public Purpose (UMC Bus Stop) as
Site No.243 (hereinafter referred to as “the said reservation”) ;
And whereas, Ulhasnagar Municipal Corporation (hereinafter referred to as “the said Municipal Corporation”),
after following the legal procedure under sub-section (1) of Section 37 of the said Act, has submitted a proposal for
modification in the said Development Plan so as to delete the said land from the said reservation and to include the
same in adjoining Site No.244-Burial Ground vide letter dated 24th September 2018 (hereinafter referred to as “the
Proposed Modification”) ;
And whereas, after making necessary enquiries and after consulting the Director of Town Planning, Maharashtra
State, Pune, the Government is of the opinion that it is necessary to sanction the Proposed Modification ;
Now therefore, in exercise of the powers conferred under sub-section (2) of Section 37 of the said Act and all
other powers enabling it in that behalf, the State Government hereby sanctions the Proposed Modification as described
below:-
“In the Schedule of modifications appended with the said Notification, after the last entry, the following new
entry shall be inserted viz :—
ENTRY
“Site No.243-Public Purpose (UMC Bus Stop) is deleted and the land so deleted is included in Site No.244-
Burial Ground as shown on the part plan of the Deveopment Plan.”
2. The date of publication of this Notification in the Maharashtra Government Gazette is fixed as the date
of coming into force of this sanctioned modification.
3. The Part Plan of aforesaid sanctioned modification shall be made available for inspection by the general
public during office hours on all working days at the following offices for a period of one month :—
(i) The Commissioner, Ulhasnagar Municipal Corporation, Ulhasnagar.
(ii) The Joint Director of Town Planning, Konkan Division, Konkan Bhavan, Navi Mumbai.
(iii) The Assistant Director of Town Planning, Thane Branch, Thane.
4. This notification shall also be published on the Government Website at www.maharashtra.gov.in
ASHOK K. KHANDEKAR,
Section Officer.
ºÉÉä¨ÉxÉÉlÉ PÉÉMÉæ,
{ÉÉä±ÉÒºÉ ={É +ɪÉÖCiÉ,
±É. Ê´É.---4, ¨É®úÉä³ý, ¨ÉÖƤÉ<Ç,
+ÊiÉÊ®úCiÉ EòɪÉǦÉÉ®ú,
{ÉÉä±ÉÒºÉ ={É +ɪÉÖCiÉ (¶É½þ®äú), ´ÉɽþiÉÚEò, ¨ÉÖƤÉ<Ç.
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò----EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, MÉÖ¯û´ÉÉ®ú iÉä ¤ÉÖvÉ´ÉÉ®ú, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 5
BY THE DY. COMMISSIONER OF POLICE (CITY), TRAFFIC, MUMBAI
Order
No. 3485/DCP/City/Tr./2019.—Whereas, it is considered necessary to ensure smooth flow of
vehicular traffic and safety of pedestrians, during marathon competition of "WNS Navy Half
2019" passing through Surji Vallabhadas Road Tiger gate-left diversion Valchand Hirachand Road-
Green gate-Valchand Hirachand Road to Shahid Bhagatsingh Road and P. D’mello Road junction-
right diversion–by P. D’mello Road straight ahead Vadibundar junction take U turn-by P. D’mello
road Shahid Bhagat Singh Road-right diversion-by Sir Firojshah Mehta Road by Kavasbi Road
left diversion straight ahead Veer Nariman Road- left diversion straignt ahead-round to Nirmal
Circle–left diversion ahead Mumbai Samachar Road-St. Thomas Cathedral Church-left diversion-
Homi Modi St.-Bombay House right diversion-Veer Nariman Road to Flora Fountain Road left
diversion- Veer Nariman Road- B.S.N.L.-Karmveer Bhaurao Patil Marg left diversion-straight U-
turn on Karmaveer Bhaurao Patil Marg–by A D’mello road right diversion- Mahatma Gandhi
Road- left diversion- Kala Ghoda Statue–Chhattrapati Museum- left diversion- to Shahid
Bhagatsingh Marg-Lion gate left diversion- K. Dubhash Marg- straight to Copper Chimni
Restaurant- K. Dubhash U-turn- straight K. Dubhash Marg- left diversion-Shahid Bhagatsingh
Road-to Surji Vallabhdas Road by same road closed on Surji Vallabhdas Road.
I, Somnath Gharge, Dy. Commissioner of Police (City), Traffic, Brihan Mumbai, in exercise of
the powers conferred upon me under section 115 of M. V. Act, 1988 (Act No. 59 of 1988) read with
Government Notification No. MVA 0589/CR-1061/TRA-2, dated 19th May 1990 do hereby order
as under :—
No. 231 /DCP/CITY/TRAFFIC/Temp./2019
In Pydhonie Traffic Division following roads will be closed for vehicular movement from 17th
November 2019 on 04-00 hrs. to 17th November 2019 till 11-00 hrs.
1. Carnac Bundar to Vadibundar both bonds.
2. Chakala to Carnac Bundar both bonds.
3. Chakala Junction to Sabusiddiqui, to Carnac bundar left diversion.
4. Y. M. Road between Masjid Bundar Station to P. D’mello Road.
DIVERSIONS
(a) By reason closed P. D’mello Road vehicular traffic from Chakala to Carnac Bundar and
Sabusiddiqui will take diversion on Chakala to Mohammadali Road towards Bhendibazar take
right turn to S.V.P. Road and by S.V.P. Road will go straight to Vadibundar Junction and will go to
Eastern Freeway or P. D’mello Road North bond.
(b) Vehicular traffic of Eastern Free way South bond will get down at Malet bundar and will
go by P. D’mello Road Raghunath Kaklij Chowk to Dockyard Road or will go by beside Easter
Free way bridge South bond by take left diversion will go to S.V.P. Road.
(c) Vehicular traffic from Wadala Port Road South bond will also take right diversion on P.
D’mello Road Raghunath Kaklij Chowk and go to Dockyard Road.
People are requested to comply with the instructions given by Traffic Policemen deployed at
strategic points. Necessary direction and informative boards will be put up at important Jn. to
guide the motorists.
Issued under my seal and signature on this 14th day of November 2019.
SOMNATH GHARGE,
Dy. Commissioner of Police,
LA - IV, Marol, Mumbai.
I/c. Dy. Commissioner of Police (City),
Traffic, Mumbai.
6 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò----EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, MÉÖ¯û´ÉÉ®ú iÉä ¤ÉÖvÉ´ÉÉ®ú, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941
{ÉÉä±ÉÒºÉ +ɪÉÖCiÉ, `öÉhÉä ¶É½þ®ú ªÉÉÆVÉEòbÚ÷xÉ
¨ÉxÉÉ<Ç +Énäù¶É
Gò¨ÉÉÆEò ʴɶÉÉ/OÉÉ{ÉÆÊxÉ/ÊxÉ´Éb÷hÉÖEò/¨ÉxÉÉ<Ç +Énäù¶É/20/2019.-------VªÉÉ+lÉÔ ={ÉÉänÂùPÉÉiÉÉiÉÒ±É +.Gò. 1 ¨ÉvÉÒ±É +ÊvɺÉÚSÉxÉäxÉÖºÉÉ®ú ¨É½þÉ®úɹ]Åõ ®úÉVªÉ
ÊxÉ´Éb÷hÉÚEò +ɪÉÉäMÉÉxÉä, ÊnùxÉÉÆEò 14 Êb÷ºÉå¤É®ú 2019 iÉä 31 ¨ÉÉSÉÇ 2020 ªÉÉ EòɱÉÉ´ÉvÉÒ¨ÉvªÉä ¨ÉÖnùiÉ ºÉÆ{ÉhÉɪÉÉ ´É xÉ´ªÉÉxÉä ºlÉÉÊ{ÉiÉ ½þÉähÉɪÉÉ ºÉÖ¨ÉÉ®äú 113
OÉɨÉ{ÉÆSÉɪÉiÉÓSªÉÉ ºÉÉ´ÉÇÊjÉEò ÊxÉ´Éb÷hÉÖEòÒEò®úÒiÉÉ iɺÉäSÉ lÉä]õ ÊxÉ´Éb÷hÉÖEòÒuùÉ®äú ¦É®úhªÉÉiÉ ªÉɴɪÉÉSªÉÉ Ê®úCiÉ ºÉ®ú{ÉÆSÉ {Énùɺɽþ Ê®úCiÉ ºÉnùºªÉ {ÉnùÉÆSªÉÉ
{ÉÉä]õ-ÊxÉ´Éb÷hÉÖEòÉÆEò®úÒiÉÉ ºÉÆMÉhÉEòÒEÞòiÉ {ÉrùiÉÒxÉä ®úɤÉÊ´ÉhªÉÉiÉ ªÉɴɪÉÉSªÉÉ |ÉiªÉIÉ ÊxÉ´Éb÷hÉÖEòÒSÉÉ EòɪÉÇGò¨É VÉɽþÒ®ú Eäò±Éä±ÉÉ +ɽäþ. `öÉhÉä {ÉÉä±ÉÒºÉ +ɪÉÖCiÉɱɪÉÉiÉÒ±É
{ÉÉä±ÉÒºÉ ={É +ɪÉÖCiÉ, {ÉÊ®ú¨ÉÆb÷³ý-1 `öÉhÉä +ÆiÉMÉÇiÉ b÷ɪÉPÉ®ú {ÉÉä.º]äõ. ½þqùÒiÉÒ±É xÉÉ®úҴɱÉÒ, nùʽþºÉ®ú, Ë{É{É®úÒ, ´ÉÉEò³ýhÉ, xÉÉMÉÉ´É, {ÉÉä±ÉÒºÉ ={É +ɪÉÖCiÉ,
{ÉÊ®ú¨ÉÆb÷³ý-2 ʦɴÉÆb÷Ò +ÆiÉMÉÇiÉ xÉÉ®ú{ÉÉä±ÉÒ {ÉÉä.º]äõ. ½þqùÒiÉÒ±É Ênù´Éä +ÆVÉÚ®ú |ɦÉÉMÉ Gò¨ÉÉÆEò. 2 ¤É, 3 Eò ´É 4 b÷ +ɱÉÒ¨ÉPÉ®ú |ɦÉÉMÉ Gò¨ÉÉÆEò. 1+, nùÉ{ÉÉäbä÷ |ɦÉÉMÉ
Gò¨ÉÉÆEò. 2¤É ªÉÉ OÉɨÉ{ÉÆSÉɪÉiÉÓEò®úÒiÉÉ ºÉÉ´ÉÇÊjÉEò/{ÉÉä] õÊxÉ´Éb÷hÉÚEòÉ ½þÉähÉÉ®ú +ɽäþiÉ. +Énù¶ÉÇ +ÉSÉÉ®úºÉÆʽþiÉÉ ÊnùxÉÉÆEò 4 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ {ÉɺÉÚxÉ ±ÉÉMÉÚ
ZÉɱÉä±ÉÒ +ɽäþ. ÊnùxÉÉÆEò 16 xÉÉä´½åþ¤É®ú 2019 iÉä ÊnùxÉÉÆEò 21 xÉÉä´½åþ¤É®ú 2019 nù®ú¨ªÉÉxÉ xÉɨÉÊxÉnæù¶ÉxÉ Îº´ÉEòÉ®úhÉä, iɺÉäSÉ ÊnùxÉÉÆEò 22 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ
xÉɨÉÊxÉnæù¶ÉxÉ {ÉjÉÉSÉÒ UôÉxÉxÉÒ ½þÉä>ðxÉ ÊnùxÉÉÆEò 25 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ =¨Éänù´ÉÉ®úÒ ¨ÉÉMÉä PÉähªÉÉSÉÒ +ÆÊiÉ¨É iÉÉ®úÒJÉ, ÊxÉ´Éb÷hÉÚEò ÊSÉx½þ ´ÉÉ]õ{É, =¨Éänù´ÉÉ®úÉÆSÉÒ ªÉÉnùÒ
|ÉʺÉvnù Eò®úhÉä <. EòɨÉEòÉVÉ ½þÉähÉÉ®ú +ɽäþ. ÊnùxÉÉÆEò 8 Êb÷ºÉå¤É®ú 2019 ®úÉäVÉÒ ¨ÉiÉnùÉxÉ ½þÉähÉÉ®ú +ºÉÖxÉ ÊnùxÉÉÆEò 9 Êb÷ºÉå¤É®ú 2019 ®úÉäVÉÒ ¨ÉiɨÉÉäVÉhÉÒSÉÒ |ÉÊGòªÉÉ
{ÉÚhÉÇ ½þÉähÉÉ®ú +ɽäþ.
+¶ÉÉ´Éä³ýÒ `öÉhÉä {ÉÉä±ÉÒºÉ +ɪÉÖCiÉÉ±ÉªÉ ½qùÒiÉ OÉɨÉ{ÉÆSÉɪÉiÉ ÊxÉ´Éb÷hÉÖEòÒEò®úÒiÉÉ VÉɨÉÊxÉnæù¶ÉxÉ {ÉjÉä κ´ÉEòÉ®úhªÉÉSªÉÉ Ê`öEòÉhÉÒ ÊxÉ´Éb÷hÉÚEò ºÉƤÉÆvÉÉxÉä ®úÉVÉEòÒªÉ
{ÉIÉ +É{É+É{ɱÉä ¶ÉCiÉÒ |Énù¶ÉÇxÉ Eò®úhªÉɺÉÉ`öÒ, xÉɨÉÊxÉnæù¶ÉxÉ {ÉjÉ nùÉJÉ±É Eò®úiÉä ´Éä³äýºÉ ¨ÉÉä`ö¬É |ɨÉÉhÉÉ´É®ú BEòjÉ ªÉähªÉÉSÉÒ ¶ÉCªÉiÉÉ +ɽäþ. ºÉnù®ú Ê`öEòÉhÉÉÆSªÉÉ
|ÉÉÆMÉhÉÉiÉ EòÉìxÉÇ®ú ʨÉ]õÓMÉ, ºÉ¦ÉÉ, {ÉjÉEòÉ®ú {ÉÊ®ú¹Énù, <iªÉÉnùÒºÉÉ®úJÉä EòɪÉÇGò¨É ÊxÉ´Éb÷hÉÚEò ºÉƤÉÆvÉÉxÉä PÉähªÉÉSÉÒ ¶ÉCªÉiÉÉ xÉÉEòÉ®úiÉÉ ªÉäiÉ xÉɽþÒ. iªÉɨÉÖ³äý ÊxÉ´Éb÷hÉÚEò
|ÉÊGòªÉä¨ÉvªÉä +b÷lɳýÉ ªÉä´ÉÚxÉ ºÉnù®ú Ê`öEòÉhÉSÉÒ ¶ÉÉÆiÉiÉÉ ¦ÉÆMÉ ½þÉähªÉÉSÉÒ nùÉ]õ ¶ÉCªÉiÉÉ +ɽäþ, +¶ÉÒ ¨ÉÉZÉÒ JÉÉjÉÒ ZÉɱÉÒ +ɽäþ.
iªÉÉ+lÉÔ ¨ÉÒ, Ê´É´ÉäEò ¡òhɺɳýEò®ú, {ÉÉä±ÉÒºÉ +ɪÉÖCiÉ, `öÉhÉä ¶É½þ®ú ¨É±ÉÉ ¡òÉèVÉnùÉ®úÒ |ÉÊGòªÉÉ ºÉÆʽþiÉÉ Eò±É¨É 144(2) +x´ÉªÉä |ÉÉ{iÉ +ÊvÉEòÉ®úÉxÉÖºÉÉ®ú
OÉɨÉ{ÉÆSÉɪÉiÉ ÊxÉ´Éb÷÷hÉÖEòÒEò®úÒiÉÉ xÉɨÉÊxÉnæù¶ÉxÉ nùÉJÉ±É Eò®úhªÉÉiÉ ªÉähÉɪÉÉ EòɪÉÉDZɪÉÉSªÉÉ 100 ¨ÉÒ]õ®ú SɽÖþ¤ÉÉVÉÖEòb÷Ò±É {ÉÊ®úºÉ®úÉiÉ =¨Éänù´ÉÉ®úÉÆSÉä ºÉ¨ÉlÉÇEò,
EòÉähÉiªÉɽþÒ {ÉIÉÉSÉä {ÉnùÉÊvÉEòÉ®úÒ/ºÉÆPÉ]õxÉäSÉä {ÉnùÉÊvÉEòÉ®úÒ/EòɪÉÇEòiÉæ +ÉÊhÉ |ÉÊiÉÊxÉvÉÒ ªÉÉÆxÉÉ ÊxÉ´Éb÷hÉÚEò ºÉƤÉÆvÉÉxÉä ºÉ¦ÉÉ/¤Éè`öEò/{ÉjÉEòÉ®ú {ÉÊ®ú¹Énù +ÉnùÒ EòɪÉÇGò¨É
PÉähªÉÉºÉ |ÉÊiɤÉÆvÉ Eò®úÒiÉ +ɽäþ. iªÉÉSÉ|ɨÉÉhÉä xÉɨÉÊxÉnæù¶ÉxÉ +VÉÇ nùÉJÉ±É Eò®úhÉɪÉÉ =¨Éänù´ÉÉ®úÉxÉä =¨Éänù´ÉÉ®úÒ +VÉÇ nùÉJÉ±É Eò®úiÉÉxÉÉ =¨Éänù´ÉÉ®ú ´É iªÉÉSªÉÉ ºÉÉä¤ÉiÉ
4 ´ªÉCiÉÒ ªÉÉÆxÉÉSÉ ÊxÉ´Éb÷hÉÚEò ÊxÉhÉÇªÉ +ÊvÉEòÉ®úÒ ªÉÉÆSªÉÉ EòIÉɨÉvªÉä |É´Éä¶É näùhªÉÉiÉ ªÉä<DZÉ. iªÉÉSÉ|ɨÉÉhÉä =¨Éänù´ÉÉ®úÒ =¨Éänù´ÉÉ®úÒ +VÉÇ nùÉJÉ±É Eò®úhªÉÉºÉ ªÉähÉɪÉÉ
=¨Éänù´ÉÉ®úÉºÉ xɨÉÖnù Ê`öEòÉhÉSªÉÉ EòɪÉÉDZɪÉÉSªÉÉ 100 ¨ÉÒ]õ®ú SɽÖþ¤ÉÉVÉÖEòb÷Ò±É {ÉÊ®úºÉ®úɨÉvªÉä ¡òCiÉ iÉÒxÉ ´ÉɽþxÉä +ÉhÉhªÉÉSÉÒ {É®ú´ÉÉxÉMÉÒ näùhªÉÉiÉ ªÉäiÉ +ºÉÚxÉ iÉÒxÉ
{ÉäIÉÉ +ÊvÉEò ´ÉɽþxÉä ºÉnù®ú EòɪÉÉDZɪÉÉSªÉÉ 100 ¨ÉÒ]õ®ú {ÉÊ®úºÉ®úÉiÉ +ÉhÉhªÉÉºÉ |ÉÊiɤÉÆvÉ PÉɱÉhªÉÉiÉ ªÉäiÉ +ɽäþ.
´É®úÒ±É +Énäù¶ÉÉSÉä EòÉähÉÒ½þÒ ´ªÉCiÉÒxÉä =±±ÉÆPÉxÉ Eäò±ªÉɺÉ, +¶ÉÉ ´ªÉCiÉÒÊ´É°üvnù ¦ÉÉ®úiÉÒªÉ nÆùb÷ Ê´ÉvÉÉxÉ ºÉÆʽþiÉÉ Eò±É¨É 188 +x´ÉªÉä EòɪÉnäù¶ÉÒ®ú EòÉ®ú´ÉÉ<Ç
Eò®úhªÉÉiÉ ªÉä<DZÉ.
ºÉnù®ú +Énäù¶É ÊnùxÉÉÆEò 16 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ 00-01 {ÉɺÉÚxÉ ÊnùxÉÉÆEò 25 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ 24-00 ´ÉÉ. {ɪÉÈiÉ +ƨɱÉÉiÉ ®úɽþÒ±É.
ºÉnù®ú +Énäù¶É ¶ÉɺÉEòÒªÉ EòiÉÇ´ªÉÉ´É®úÒ±É {ÉÉä±ÉÒºÉ +ÊvÉEòÉ®úÒ ´É Eò¨ÉÇSÉÉ®úÒ ªÉÉÆxÉÉ iɺÉäSÉ ¶ÉɺÉEòÒªÉ/ÊxɨɶÉɺÉEòÒªÉ, ÊxÉ´Éb÷hÉÚEò EòɨÉɶÉÒ ºÉƤÉÆÊvÉiÉ
¶ÉɺÉEòÒªÉ/ÊxɨɶÉɺÉEòÒªÉ +ÊvÉEòÉ®úÒ/Eò¨ÉÇSÉÉ®úÒ ªÉÉÆxÉÉ ±ÉÉMÉÚ ½þÉähÉÉ®ú xÉɽþÒ.
ºÉnù®úSÉÉ +Énäù¶É ¨ÉÉZªÉÉ ºÉ½þÒ ´É ʶÉCªÉÉÊxɶÉÒ +ÉVÉ ÊnùxÉÉÆEò 14 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ `öÉhÉä ªÉälÉä VÉÉ®úÒ Eò®úhªÉÉiÉ +ɱÉÉ +ɽäþ.
Ê´É´ÉäEò ¡òhɺɳýEò®ú,
{ÉÉä±ÉÒºÉ +ɪÉÖCiÉ, `öÉhÉä ¶É½þ®ú.
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò----EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, MÉÖ¯û´ÉÉ®ú iÉä ¤ÉÖvÉ´ÉÉ®ú, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 7
{ÉÉä±ÉÒºÉ +ɪÉÖCiÉ, `öÉhÉä ¶É½þ®ú ªÉÉÆVÉEòbÚ÷xÉ
¨ÉxÉÉ<Ç +Énäù¶É
Gò¨ÉÉÆEò ʴɶÉÉ/OÉÉ{ÉÆÊxÉ/ÊxÉ´Éb÷hÉÚEò/¨ÉxÉÉ<Ç +Énäù¶É/21/2019.-------VªÉÉ+lÉÔ ={ÉÉänÂùPÉÉiÉÉiÉÒ±É +.Gò. 1 ¨ÉvÉÒ±É +ÊvɺÉÚSÉxÉäxÉÖºÉÉ®ú ¨É½þÉ®úɹ]Åõ ®úÉVªÉ
ÊxÉ´Éb÷hÉÚEò +ɪÉÉäMÉÉxÉä, ÊnùxÉÉÆEò 14 Êb÷ºÉå¤É®ú 2019 iÉä 31 ¨ÉÉSÉÇ 2020 ªÉÉ EòɱÉÉ´ÉvÉÒ¨ÉvªÉä ¨ÉÖnùiÉ ºÉÆ{ÉhÉɪÉÉ ´É xÉ´ªÉÉxÉä ºlÉÉÊ{ÉiÉ ½þÉähÉɪÉÉ ºÉÖ¨ÉÉ®äú 113
OÉɨÉ{ÉÆSÉɪÉiÉÓSªÉÉ ºÉÉ´ÉÇÊjÉEò ÊxÉ´Éb÷hÉÖEòÒEò®úÒiÉÉ iɺÉäSÉ lÉä]õ ÊxÉ´Éb÷hÉÖEòÒuùÉ®äú ¦É®úhªÉÉiÉ ªÉɴɪÉÉSªÉÉ Ê®úCiÉ ºÉ®ú{ÉÆSÉ {Énùɺɽþ Ê®úCiÉ ºÉnùºªÉ {ÉnùÉÆSªÉÉ
{ÉÉä]õ-ÊxÉ´Éb÷hÉÖEòÉÆEò®úÒiÉÉ ºÉÆMÉhÉEòÒEÞòiÉ {ÉrùùiÉÒxÉä ®úɤÉÊ´ÉhªÉÉiÉ ªÉɴɪÉÉSªÉÉ |ÉiªÉIÉ ÊxÉ´Éb÷hÉÖEòÒSÉÉ EòɪÉÇGò¨É VÉɽþÒ®ú Eäò±Éä±ÉÉ +ɽäþ. +Énù¶ÉÇ +ÉSÉÉ®úºÉÆʽþiÉÉ
ÊnùxÉÉÆEò 4 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ {ÉɺÉÚxÉ ±ÉÉMÉÚ ZÉɱÉä±ÉÒ +ɽäþ. ÊnùxÉÉÆEò 16 xÉÉä´½åþ¤É®ú 2019 iÉä ÊnùxÉÉÆEò 21 xÉÉä´½åþ¤É®ú 2019 nù®ú¨ªÉÉxÉ xÉɨÉÊxÉnæù¶ÉxÉ Îº´ÉEòÉ®úhÉä,
iɺÉäSÉ ÊnùxÉÉÆEò 22 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ xÉɨÉÊxÉnæù¶ÉxÉ {ÉjÉÉSÉÒ UôÉxÉxÉÒ ½þÉä>ðxÉ ÊnùxÉÉÆEò 25 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ =¨Éänù´ÉÉ®úÒ ¨ÉÉMÉä PÉähªÉÉSÉÒ +ÆÊiÉ¨É iÉÉ®úÒJÉ,
ÊxÉ´Éb÷hÉÚEò ÊSÉx½þ ´ÉÉ]õ{É, =¨Éänù´ÉÉ®úÉÆSÉÒ ªÉÉnùÒ |ÉʺÉvnù Eò®úhÉä <. EòɨÉEòÉVÉ ½þÉähÉÉ®ú +ɽäþ. ÊnùxÉÉÆEò 8 Êb÷ºÉå¤É®ú 2019 ®úÉäVÉÒ ¨ÉiÉnùÉxÉ ½þÉähÉÉ®ú +ºÉÚxÉ ÊnùxÉÉÆEò
9 Êb÷ºÉå¤É®ú 2019 ®úÉäVÉÒ ¨ÉiɨÉÉäVÉhÉÒSÉÒ |ÉÊGòªÉÉ {ÉÚhÉÇ ½þÉähÉÉ®ú +ɽäþ.
+ÉÊhÉ VªÉÉ+lÉÔ, `öÉhÉä {ÉÉä±ÉÒºÉ +ɪÉÖCiÉɱɪÉÉiÉ ªÉÉ{ÉÚ´ÉÔ ´ÉäMÉ´ÉäMɲªÉÉ {ÉIÉÉƨÉvªÉä ®úÉVÉEòÒªÉ º{ÉvÉæ{ÉÉä]õÒ ´ÉÉnùÊ´É´ÉÉnù ½þÉä>ðxÉ ´ÉäMÉ´ÉäMɳýªÉÉ ÊxÉ´Éb÷hÉÖEòÒSªÉÉ
ºÉƤÉÆvÉÉiÉ nùJɱÉ{ÉÉjÉ ´É +nùJɱÉ{ÉÉjÉ MÉÖx½äþ nùÉJÉ±É ZÉɱÉä±Éä +ɽäþ. OÉɨÉ{ÉÆSÉɪÉiÉ ÊxÉ´Éb÷hÉÖEòÒSªÉÉ ÊxÉʨÉkÉÉxÉä ºlÉÉÊxÉEò EòɪÉÇEòiªÉÉƨÉvªÉä +É{ɺÉÉiÉ ¦ÉÉÆb÷hÉiÉÆ]äõ
½þÉä>ðxÉ ½þÉiÉPÉÉ<Ç´É®ú ªÉähªÉÉSÉÒ ¶ÉCªÉiÉÉ xÉÉEòÉ®úiÉÉ ªÉäiÉ xÉɽþÒ, +¶ÉÉ |ɺÉÆMÉÒ BJÉÉtÉ MÉ]õÉEòbÚ÷xÉ/´ªÉCiÉÒEòbÚ÷xÉ ½þiªÉÉ®úÉSÉÉ nÖù°ü{ɪÉÉäMÉ ½þÉä>ðxÉ MÉƦÉÒ®ú {ÉÊ®úκlÉiÉÒ
ÊxɨÉÉÇhÉ ½þÉähªÉÉSÉÒ ¶ÉCªÉiÉÉ xÉÉEòÉ®úiÉÉ ªÉäiÉ xÉɽþÒ. iªÉÉEòÊ®úiÉÉ ºÉÆ{ÉÚhÉÇ OÉɨÉ{ÉÆSÉɪÉiÉ ÊxÉ´Éb÷hÉÚEò EòɪÉÇIÉäjÉÉiÉ ¶ÉºjÉ {É®ú´ÉÉxÉÉvÉÉ®úEò ªÉÉÆxÉÒ ¶ÉºjÉÉÆSÉÒ xÉä-+ÉhÉ
Eò®úhªÉÉºÉ |ÉÊiɤÉÆvÉÉi¨ÉEò +Énäù¶É ±ÉÉMÉÚ Eò®úhÉä Gò¨É|ÉÉ{iÉ ´ÉÉ]õiÉä.
iªÉÉ+lÉÔ, ¨ÉÒ, ={É®úÉäCiÉ {ÉÊ®úκlÉiÉÒiÉ Ê´É´ÉäEò ¡òhɺɳýEò®ú, {ÉÉä±ÉÒºÉ +ɪÉÖCiÉ, `öÉhÉä ¶É½þ®ú ¨É±ÉÉ ¡òÉèVÉnùÉ®úÒ nÆùb÷ |ÉÊGòªÉÉ ºÉÆʽþiÉÉ 1973 SÉä Eò±É¨É
144(1) +x´ÉªÉä |ÉnùÉxÉ Eò®úhªÉÉiÉ +ɱÉ䱪ÉÉ +ÊvÉEòÉ®úÉÆSÉÉ ´ÉÉ{É®ú Eò°üxÉ `öÉhÉä {ÉÉä±ÉÒºÉ +ɪÉÖCiÉɱɪÉÉiÉÒ±É {ÉÉä±ÉÒºÉ ={É +ɪÉÖCiÉ, {ÉÊ®ú¨ÉÆb÷³ý-1 `öÉhÉä
+ÆiÉMÉÇiÉ b÷ɪÉPÉ®ú {ÉÉä. º]äõ. ½þqùÒiÉ xÉÉ®úҴɱÉÒ, nùʽþºÉ®ú, Ë{É{É®úÒ, ´ÉÉEò³ýhÉ, xÉÉMÉÉ´É (ºÉÉ´ÉÇÊjÉEò ÊxÉ´Éb÷hÉÚEò), {ÉÉä±ÉÒºÉ ={É +ɪÉÖCiÉ, {ÉÊ®ú¨ÉÆb÷³ý-2, ʦɴÉÆb÷Ò
+ÆiÉMÉÇiÉ xÉÉ®ú{ÉÉä±ÉÒ {ÉÉä. º]äõ. ½þqùÒiÉÒ±É Ênù´Éä +ÆVÉÚ®ú |ɦÉÉMÉ Gò. 2 ¤É , 3Eò ´É 4b÷ +ɱÉÒ¨ÉPÉ®ú |ɦÉÉMÉ Gò. 1-+, nùÉ{ÉÉäbä÷ |ɦÉÉMÉ Gò. 2 ¤É ({ÉÉä]õ-ÊxÉ´Éb÷hÉÚEò)
ªÉÉ OÉɨÉ{ÉÆSÉɪÉiÉ ÊxÉ´Éb÷hÉÚEò +ºÉ±É䱪ÉÉ EòɪÉÇIÉäjÉÉiÉ ¶ÉºjÉ {É®ú´ÉÉxÉvÉÉ®úEò ªÉÉÆxÉÉ ¶ÉºjÉ iÉɤªÉÉiÉ `äö´ÉhªÉÉºÉ ´É ¤ÉɳýMÉhªÉÉºÉ ¨ÉxÉÉ<Ç Eò®úÒiÉ +ɽäþ. iÉlÉÉ{ÉÒ UôÉxÉxÉÒ
ºÉʨÉiÉÒxÉä VªÉÉÆxÉÉ ºÉÖ]õ Ênù±Éä±ÉÒ +ɽäþ, iªÉÉ ¶ÉºjÉ {É®ú´ÉÉxÉvÉÉ®úEòÉÆxÉÉ ½þÉ ¨ÉxÉÉ<Ç +Énäù¶É ±ÉÉMÉÚ ½þÉähÉÉ®ú xÉɽþÒ.
ªÉÉ{ÉÖfäø +ºÉä½þÒ +Énäù¶É näùhªÉÉiÉ ªÉäiÉ +ɽäþ EòÒ, VªÉÉ ¶ÉºjÉ {É®ú´ÉÉxÉvÉÉ®úEòÉÆxÉÉ ªÉÉ +Énäù¶ÉÉx´ÉªÉä UôÉxÉxÉÒ ºÉʨÉiÉÒxÉä ºÉÖ]õ Ênù±Éä±ÉÒ +ɽäþ, iªÉÉ ¶ÉºjÉ
{É®ú´ÉÉxÉvÉÉ®úEòÉÆxÉÒ +É{ɱÉÒ ¶ÉºjÉä ÊxÉ´Éb÷hÉÖEòÒSªÉÉ EòÉähÉiªÉɽþÒ EòɪÉÇGò¨ÉÉnù®ú¨ªÉÉxÉ =nùÉ. |ÉSÉÉ®ú, ºÉ¦ÉÉ, ®ìú±ÉÒ <. |ɺÉÆMÉÒ Vɴɳý ¤ÉɳýMÉÚ xɪÉä.
|ÉiªÉäEò ¶ÉºjÉ {É®ú´ÉÉxÉvÉÉ®úEòÉºÉ +Énäù¶ÉÉ{ÉÚ´ÉÔ xÉÉä]õÒºÉ ¤ÉVÉÉ´ÉhÉä ¶ÉCªÉ xɺɱªÉÉxÉä Eò±É¨É 144(2) ¡òÉèVÉnùÉ®úÒ nÆùb÷ |ÉÊGòªÉÉ ºÉÆʽþiÉÉ 1973 +x´ÉªÉä |ÉÉ{iÉ
+ÊvÉEòÉ®úÉxÉÖºÉÉ®ú ºÉnù®úSÉÉ +Énäù¶É BEòiÉ¡òÔ EòÉføhªÉÉiÉ +ɱÉÉ +ɽäþ.
ºÉnù®úSÉÉ +Énäù¶É `öÉhÉä {ÉÉä±ÉÒºÉ +ɪÉÖCiÉɱɪÉÉiÉÒ±É {ÉÊ®ú¨ÉÆb÷³ý-1 `öÉhÉä +ÆiÉMÉÇiÉ b÷ɪÉPÉ®ú {ÉÉä.º]äõ. ½þqùÒiÉÒ±É xÉÉ®úҴɱÉÒ, nùʽþºÉ®ú, Ë{É{É®úÒ, ´ÉÉEò³ýhÉ, xÉÉMÉÉ´É,
{ÉÊ®ú¨ÉÆb÷³ý-2 ˦ɴÉb÷Ò +ÆiÉMÉÇiÉ xÉÉ®ú{ÉÉä±ÉÒ {ÉÉä. º]äõ. ½þqùÒiÉÒ±É Ênù´Éä +ÆVÉÚ®ú |ɦÉÉMÉ Gò. 2¤É, 3Eò ´É 4b÷ +ɱÉÒ¨ÉPÉ®ú |ɦÉÉMÉ Gò. 1-+, nùÉ{ÉÉäbä÷ |ɦÉÉMÉ Gò. 2¤É,
ªÉÉ OÉɨÉ{ÉÆSÉɪÉiÉ ÊxÉ´Éb÷hÉÚEò +ºÉ±É䱪ÉÉ EòɪÉÇIÉäjÉÉiÉ ÊnùxÉÉÆEò 14 xÉÉä´½åþ¤É®ú 2019 00-01 ´ÉÉ. {ÉɺÉÚxÉ iÉä ÊnùxÉÉÆEò 9 Êb÷ºÉå¤É®ú 2019 ®úÉäVÉÒSÉä 24-00 ´ÉÉ.
{ɪÉÈiÉ +ƨɱÉÉiÉ ®úɽþÒ±É.
={É®úÉäCiÉ ¨ÉxÉÉ<Ç +Énäù¶ÉÉSÉä =±±ÉÆPÉxÉ Eò®úhÉɪÉÉ ¶ÉºjÉ {É®ú´ÉÉxÉvÉ®úEòÉÆ´É®ú ¦ÉÉ®úiÉÒªÉ nÆùb÷ ºÉÆʽþiÉäSÉä Eò±É¨É 188 xÉÖºÉÉ®ú EòɪÉnäùʶɮú EòÉ®ú´ÉÉ<Ç Eäò±ÉÒ VÉÉ<DZÉ.
ºÉnù®úSÉÉ +Énäù¶É ÊnùxÉÉÆEò 14 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ ¨ÉÉZÉä ºÉ½þÒ ´É ʶÉCCªÉÉÆxÉä Ênù±ÉÉ +ɽäþ.
Ê´É´ÉäEò ¡òhɺɳýEò®ú,
{ÉÉä±ÉÒºÉ +ɪÉÖCiÉ, `öÉhÉä ¶É½þ®ú.
8 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò----EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, MÉÖ¯û´ÉÉ®ú iÉä ¤ÉÖvÉ´ÉÉ®ú, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941
{ÉÉä±ÉÒºÉ +ɪÉÖCiÉ, `öÉhÉä ¶É½þ®ú ªÉÉÆVÉEòbÚ÷xÉ
¨ÉxÉÉ<Ç +Énäù¶É
Gò¨ÉÉÆEò ʴɶÉÉ/OÉÉ{ÉÆÊxÉ/ÊxÉ´Éb÷hÉÚEò/¨ÉxÉÉ<Ç +Énäù¶É/22/2019.-------VªÉÉ+lÉÔ ={ÉÉänÂùPÉÉiÉÉiÉÒ±É +.Gò. 1 ¨ÉvÉÒ±É +ÊvɺÉÚSÉxÉäxÉÖºÉÉ®ú ¨É½þÉ®úɹ]Åõ ®úÉVªÉ
ÊxÉ´Éb÷hÉÚEò +ɪÉÉäMÉÉxÉä, ÊnùxÉÉÆEò 14 Êb÷ºÉå¤É®ú 2019 iÉä 31 ¨ÉÉSÉÇ 2020 ªÉÉ EòɱÉÉ´ÉvÉÒ¨ÉvªÉä ¨ÉÖnùiÉ ºÉÆ{ÉhÉɪÉÉ ´É xÉ´ªÉÉxÉä ºlÉÉÊ{ÉiÉ ºÉÖ¨ÉÉ®äú 113
OÉɨÉ{ÉÆSÉɪÉiÉÓSªÉÉ ºÉÉ´ÉÇÊjÉEò ÊxÉ´Éb÷hÉÖEòÒEòÊ®úiÉÉ iɺÉäSÉ lÉä]õ ÊxÉ´Éb÷hÉÖEòÒuùÉ®äú ¦É®úhªÉÉiÉ ªÉɴɪÉÉSªÉÉ Ê®úCiÉ ºÉ®ú{ÉÆSÉ {Énùɺɽþ Ê®úCiÉ ºÉnùºªÉ {ÉnùÉÆSªÉÉ {ÉÉä]õ
ÊxÉ´Éb÷hÉÖEòÉÆEòÊ®úiÉÉ ºÉÆMÉhÉEòÒEÞòiÉ {ÉrùùiÉÒxÉä ®úɤÉÊ´ÉhªÉÉiÉ ªÉɴɪÉÉSªÉÉ |ÉiªÉIÉ ÊxÉ´Éb÷hÉÖEòÒSÉÉ EòɪÉÇGò¨É VÉɽþÒ®ú Eäò±Éä±ÉÉ +ɽäþ. +Énù¶ÉÇ +ÉSÉÉ®úºÉÆʽþiÉÉ ÊnùxÉÉÆEò
4 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ {ÉɺÉÚxÉ ±ÉÉMÉÚ ZÉɱÉä±ÉÒ +ɽäþ. ÊnùxÉÉÆEò 16 xÉÉä´½åþ¤É®ú 2019 iÉä ÊnùxÉÉÆEò 21 xÉÉä´½åþ¤É®ú 2019 nù®ú¨ªÉÉxÉ xÉɨÉÊxÉnæù¶ÉxÉ Îº´ÉEòÉ®úhÉä, iɺÉäSÉ
ÊnùxÉÉÆEò 22 xÉÉä´½åþ¤É®ú 2019 ®úÉVä ÉÒ xÉɨÉÊxÉnæù¶ÉxÉ {ÉjÉÉSÉÒ UôÉxÉxÉÒ ½þÉä´ÉÚxÉ ÊnùxÉÉÆEò 25 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ =¨Éänù´ÉÉ®úÒ ¨ÉÉMÉä PÉähªÉÉSÉÒ +ÆÊiÉ¨É iÉÉ®úÒJÉ, ÊxÉ´Éb÷hÉÚEò
ÊSÉx½þ ´ÉÉ]õ{É, =¨Éänù´ÉÉ®úÉÆSÉÒ ªÉÉnùÒ |ÉʺÉrù Eò®úhÉä <. EòɨÉEòÉVÉ ½þÉähÉÉ®ú +ɽäþ. ÊnùxÉÉÆEò 8 Êb÷ºÉå¤É®ú 2019 ®úÉäVÉÒ ¨ÉiÉnùÉxÉ ½þÉähÉÉ®ú +ºÉÚxÉ ÊnùxÉÉÆEò 9 Êb÷ºÉå¤É®ú
2019 ®úÉäVÉÒ ¨ÉiɨÉÉäVÉhÉÒSÉÒ |ÉÊGòªÉÉ {ÉÚhÉÇ ½þÉähÉÉ®ú +ɽäþ.
iªÉÉ +xÉÖ¹ÉÆMÉÉxÉä =¨Éänù´ÉÉ®ú iɺÉäSÉ Ê´ÉÊ´ÉvÉ ®úÉVÉEòÒªÉ {ÉIÉ |ÉSÉÉ®úɺÉÉ`öÒ ZÉåbä÷ =¦ÉÉ®úhÉä, ¤ÉìxɺÉÇ, EòÉ{Éb÷Ò ¡ò±ÉEò, {ÉÉäº]õºÉÇ ±ÉÉ´ÉhÉä, xÉÉä]õÒºÉÉ ÊSÉEò]õÊ´ÉhÉä, PÉÉä¹ÉhÉÉ
ʱɽþÒhÉä, Eò¨ÉÉxÉ, {ÉiÉÉEòÉ, Eò]õ +É=]õ ±ÉÉ´ÉhÉä ËEò´ÉÉ ÊSÉx½äþ ´ÉÉ{É®úiÉÉiÉ, iªÉɨÉÖ³äý +xÉäEò ´Éä³ýÉ nùÉäªÉÉ, EòÉ`ö¬É ´É iÉiºÉ¨É ¦ÉÉMÉ ®úºiªÉÉ´É®ú +Éb÷´ÉÉ ªÉä>ðxÉ
®ú½þnùÉ®úÒºÉ +b÷lɳýÉ ½þÉäiÉÉä. VªÉÉ+lÉÔ, |ÉSÉÉ®úÉSÉä EòɱÉÉ´ÉvÉÒiÉ +¶ÉÉ ÊEò®úEòÉä³ý EòÉ®úhÉÉ´É°üxÉ ´ÉÉnù ÊxɨÉÉÇhÉ ½þÉä>ðxÉ {ÉIÉ EòɪÉÇEòiªÉÉǨÉvªÉä +ºÉÆiÉÉä¹ÉÉSÉä
´ÉÉiÉÉ´É®úhÉ iɪÉÉ®ú ½þÉäiÉä, iªÉɨÉÖ³äý EòɪÉnùÉ ´É ºÉÖ´ªÉ´ÉºlÉäSÉÉ |ɶxÉ ÊxɨÉÉÇhÉ ½þÉä´ÉÚxÉ ºÉÉ´ÉÇVÉÊxÉEò ¶ÉÉÆiÉiÉäSÉÉ ¦ÉÆMÉ ½þÉä>ð ¶ÉEòiÉÉä.
iªÉÉ+lÉÔ, ={É®úÉäCiÉ {ÉÊ®úκlÉiÉÒiÉ ¨ÉÒ, Ê´É´ÉäEò ¡òhɺɳýEò®ú, {ÉÉä±ÉÒºÉ +ɪÉÖCiÉ, `öÉhÉä ¶É½þ®ú, ºÉxÉ 1951 SÉÉ ¨É½þÉ®úɹ]Åõ {ÉÉä±ÉÒºÉ +ÊvÉÊxɪɨÉ, Eò±É¨É
33(1) ({É) +x´ÉªÉä ¨É±ÉÉ |ÉnùÉxÉ Eò®úhªÉÉiÉ +ɱÉ䱪ÉÉ +ÊvÉEòÉ®úÉSÉÉ ´ÉÉ{É®ú Eò°üxÉ `öÉhÉä {ÉÉä±ÉÒºÉ +ɪÉÖCiÉÉ±ÉªÉ +ÆiÉMÉÇiÉ {ÉÉä±ÉÒºÉ ={É +ɪÉÖCiÉ, {ÉÊ®ú¨ÉÆb÷³ý-
1 `öÉhÉä +ÆiÉMÉÇiÉ b÷ɪÉPÉ®ú {ÉÉä.º]äõ. ½þqùÒiÉÒ±É xÉÉ®úҴɱÉÒ, nùʽþºÉ®ú, Ë{É{É®úÒ, ´ÉÉEò³ýhÉ, xÉÉMÉÉ´É (ºÉÉ´ÉÇÊjÉEò ÊxÉ´Éb÷hÉÚEò), {ÉÉä±ÉÒºÉ ={É +ɪÉÖCiÉ, {ÉÊ®ú¨ÉÆb÷³ý-2,
ʦɴÉÆb÷Ò +ÆiÉMÉÇiÉ xÉÉ®ú{ÉÉä±ÉÒ {ÉÉä. º]äõ. ½þqùÒiÉÒ±É Ênù´Éä +ÆVÉÚ® |ɦÉÉMÉ Gò¨ÉÉÆEò 2 ¤É, 3 Eò ´É 4 b÷ +ɱÉÒ¨ÉPÉ®ú |ɦÉÉMÉ Gò. 1 +, nùÉ{ÉÉäbä÷ |ɦÉÉMÉ Gò. 2 ¤É ({ÉÉä]õ
ÊxÉ´Éb÷hÉÚEò) ªÉÉ OÉɨÉ{ÉÆSÉɪÉiÉ EòɪÉÇIÉäjÉÉiÉ ÊxÉ´Éb÷hÉÖEòÒSªÉÉ +xÉÖ¹ÉÆMÉÉxÉä VÉxÉVÉÒ´ÉxÉ ºÉÖ®ú³ýÒiÉ ®úɽþhªÉɺÉÉ`öÒ, ºÉÉ´ÉÇVÉÊxÉEò ¶ÉÉÆiÉiÉÉ ´É ºÉÖ´ªÉ´ÉºlÉÉ VÉÉä{ÉɺÉhªÉɺÉÉ`öÒ
iɺÉäSÉ EòÉähÉiÉɽþÒ EòɪÉnùÉ ´É ºÉÖ´ªÉ´ÉºlÉäSÉÉ |ɶxÉ ÊxɨÉÉÇhÉ ½þÉä´ÉÚxÉ ºÉɨÉÉÊVÉEò iÉäfø ÊxɨÉÉÇhÉ ½þÉä´ÉÚ xɪÉä ¨½þhÉÚxÉ ®ú½þnùÉ®úÒºÉ +b÷lɳýÉ ½þÉä<Ç±É ËEò´ÉÉ =VÉäb÷ ´É ½þ´ÉÉ
ÊxÉ´ÉævÉ{ÉhÉä ªÉähªÉÉºÉ |ÉÊiɤÉÆvÉ ½þÉä<Ç±É +¶ÉÉ Ê®úiÉÒxÉä EòÉähÉiªÉɽþÒ ºÉÉ´ÉÇVÉÊxÉEò ®úºiÉÉ ´É ºÉÉ´ÉÇVÉÊxÉEò VÉÉMÉä´É®ú ¤ÉìxɺÉÇ ±ÉÉ´ÉhÉä, ¡ò±ÉEò ±ÉÉ´ÉhÉä, JÉÉƤÉÉ´É®ú ZÉåbä÷
±ÉÉ´ÉhÉä ªÉÉÆºÉ |ÉÊiɤÉÆvÉ Eò®úÒiÉ +ɽäþ.
ºÉnù®ú OÉɨÉ{ÉÆSÉɪÉiÉ ÊxÉ´Éb÷hÉÖEòÒSÉä EòɳýÉiÉ EòÉähÉiªÉɽþÒ =¨Éänù´ÉÉ®úÉxÉä JÉÉVÉMÉÒ <¨ÉÉ®úiÉ +lÉ´ÉÉ +É´ÉÉ®úÉiÉ {ÉÉäº]õºÉÇ, ZÉåbä,÷ ¤ÉìxɺÉÇ, EòÉ{Éb÷Ò ¡ò±ÉEò ±ÉÉ´ÉhÉä
xÉÉä]õÒºÉÉ ÊSÉ]õEòÊ´ÉhÉä, PÉÉä¹ÉhÉÉ Ê±ÉʽþhÉä <iªÉÉnùÒSÉÉ ´ÉÉ{É®ú Eò®úɴɪÉÉSÉÉ +ºÉ±ªÉÉºÉ iªÉÉÆxÉÒ |ÉlÉ¨É VÉÉMÉÉ ¨ÉɱÉEòÉSÉÒ ±ÉäJÉÒ {É®ú´ÉÉxÉMÉÒ PÉähÉä ¤ÉÆvÉxÉEòÉ®úEò +ɽäþ.
+¶ÉÒ ±ÉäJÉÒ {É®ú´ÉÉxÉMÉÒ ºÉƤÉÆÊvÉiÉ {ÉÉä±ÉÒºÉ º]äõ¶ÉxɱÉÉ nùÉJÉ´ÉÚxÉ {ÉÉä±ÉÒºÉÉÆSÉÉ xÉÉ-½þ®úEòiÉ nùÉJɱÉÉ PÉähÉänäùJÉÒ±É ¤ÉÆvÉxÉEòÉ®úEò ®úɽþÒ±É. +¶ÉÉ Ê®úiÉÒxÉä JÉÉVÉMÉÒ VÉÉMÉä´É®ú
±ÉɴɱÉä±Éä ¤ÉìxɺÉÇ, {ÉÉäº]õºÉÇ <iªÉÉnùÒ¨ÉÖ³äý ®ú½þnùÉ®úÒºÉ +b÷lɳýÉ ½þÉähÉÉ®ú xÉɽþÒ ´É =VÉäb÷ ½þ´ÉÉ +b÷´É±ÉÒ VÉÉhÉÉ®ú xÉɽþÒ ½äþ {ÉɽþhÉä iªÉÉ =¨Éänù´ÉÉ®úɱÉÉ ¤ÉÆvÉxÉEòÉ®úEò
®úɽþÒ±É.
¨ÉÒ, ºÉÖSÉxÉÉ näùiÉÉä EòÒ, ºÉnù®ú½Úþ +Énäù¶ÉÉSªÉÉ |ÉiÉÒ ÊxÉ´Éb÷hÉÚEò EòɪÉÇIÉäjÉÉiÉ ºÉ½þVÉ ÊnùºÉhÉɪÉÉ ºÉÉ´ÉÇVÉÊxÉEò Ê`öEòÉhÉÒ ÊSÉ]õEò´ÉÚxÉ v´ÉxÉÒIÉä{ÉEòÉuùÉ®äú ºÉnù®ú +Énäù¶É
|ɺÉÉÊ®úiÉ Eò®úÉ´ÉÉ ´É iɶÉÉ xÉÉånùÒ PÉähªÉÉiÉ ªÉÉ´ªÉÉiÉ.
ºÉnù®ú ¨ÉxÉÉ<Ç +Énäù¶É ÊnùxÉÉÆEò 14 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ 00-01 ´ÉÉ. {ÉɺÉÚxÉ iÉä ÊnùxÉÉÆEò 9 Êb÷ºÉå¤É®ú 2019 ®úÉäVÉÒ 24-00 ´ÉÉ. {ÉÉ´ÉäiÉÉä ±ÉÉMÉÚ ®úɽþÒ±É. ºÉnù®ú
¨ÉxÉÉ<Ç +Énäù¶ÉÉSÉÉ ¦ÉÆMÉ Eò®úhÉɪÉÉ Ê´É°ürù ¨É½þÉ®úɹ]Åõ {ÉÉä±ÉÒºÉ +ÊvÉÊxɪɨÉ, 1951 SÉä Eò±É¨É 131 |ɨÉÉhÉä EòÉ®ú´ÉÉ<Ç Eò®úhªÉÉiÉ ªÉä<DZÉ.
ºÉnù®ú +Énäù¶É +ÉVÉ ÊnùxÉÉÆEò 14 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ ¨ÉÉZÉä ºÉ½þÒ Ê¶ÉCCªÉÉÊxɶÉÒ VÉÉ®úÒ Eäò±Éä±ÉÉ +ɽäþ.
ºÉnù®ú +Énäù¶É ¨ÉÉZªÉÉ ºÉ½þÒ Ê¶ÉCªÉÉÊxɶÉÒ ÊnùxÉÉÆEò 14 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒ ÊxÉMÉÇʨÉiÉ Eò®úhªÉÉiÉ ªÉäiÉ +ɽäþ.
ºÉÉä¨ÉxÉÉlÉ PÉÉMÉæ,
{ÉÉä±ÉÒºÉ ={É +ɪÉÖCiÉ (¶É½þ®äú),
´ÉɽþiÉÚEò, ¨ÉÖƤÉ<Ç.
(+ÊiÉÊ®úCiÉ EòɪÉǦÉÉ®ú).
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò----EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, MÉÖ¯û´ÉÉ®ú iÉä ¤ÉÖvÉ´ÉÉ®ú, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 11
BY THE DEPUTY COMMISSIONER OF POLICE (CITY), MUMBAI
Temporary Notification/Order
No. 3469/DCP/Traffic (City)/2019.—On Sunday, 17th November 2019, WNS Navy has organized
Half Marathon 2019. This event will have participants from Mumbai and different cities of India. To
prevent danger, obstruction and inconvenience to the public, so to direct, I, Somnath Gharge, I.P.S, Dy.
Commissioner of Police (City), Traffic, Brihan Mumbai (Addl. Charge) in exercise of the powers
conferred upon me under section 115 of Motor Vehicles Act, 1988 (Act No. 59 of 1988) read with Government
Notification No. MVA 0589/CR 1061/TRA-2, dated 19th May 1990 do hereby order as under.
No. 230 /DCP/TEMP/TR./2019
1. During 21 Km, 10 Km. and 05 Km. half Marathon carriage ways of following roads will be
closed as required for regular vehicular traffic from 04-00 hrs. to 12-oo hrs. There shall be free access to
Ambulances carrying patients, Fire Brigade vehicles, vehicles of essential services carrying milk, gas,
vegetables on below mentioned roads. Vehicular access in case of other emergencies shall also be provided.
Start on Shoorji Vallabhdas Road outside Tiger Gate - First turn Left on to Valchand Hirachand
Marg (Green Gate) - Continue straight on Valchand Hirachand Marg joining Shahid Bhagat Singh
Road and P D' Mello Road - Take Right on P D' Mello Road continue straight - U turn on P D' Mello
Road - U Turn near the start of the Eastern Free way (Wadi Bander signal) - Continue straight on P D'
Mello Road-Continue onto Shahid Bhagat Singh Marg - turn Right on Sir Phiroz Shah Mehta Road -
Continue on Sir Phiroz Shah Mehta Road - turn left on Cawsji Patel Street - continue straight on Cawasji
Patel Street - turn left on Veer Nariman Road- Take round on Hornimal Circle - turn left on Bombay
Samachar Marg (S Thomas Cathedral) - Turn left on Homi Modi Street (Bombay House) - turn left Right
on Veer Nariman road towards Flora Fountain - Turn left on Veer Nariman Road BSNL - Turn left on
Karmaveer Bhaurao Patil Marg - continue straight on Karmveer Bhaurao Patil Marg U Turn Karmveer
Bhaurao Patil Marg - Turn right on A D' Mello Road - Turn right on Mahatma Gandhi Road Kala Ghoda
Statue Continue straight towards Chhatrapatti Shivaji Maharaj Vastu Sangrahalaya-Turn left towards
Shahid Bhagat Singh Road (Lion gate)- Turn left on K dubhash Marg- continue straight till Cooper
Chinmay Restaurant U Turn on K Dubhash Marg- continue straight on K Dubhash Marg then turn left
on Shahid Bhagat Singh Road till Shoorji Vallabhdas Road - Continue the same route to take 2nd loop -
Finish on Shoorji Vallabhdas Road out side Mumbai Port Trust Building End Race.
The below mentioned roads are partially closed to regular vehicular traffic on 17th November 2019
from 04-00 hrs to 12-00 hrs. Provision has been made for emergent traffic to reach the closed junction by
using earmarked lane all along the route and from there onwards emergency vehicular traffic can use
roads on which diversion has been given.
1 Shahid Bhagat singh Roads- Old Custom House Road - Belard Pier Rd - P. D' mello Road- Wadi
Bunder Road Both Bonds.
Parking of all types of motor vehicles shall be prohibited on both sides of the below mentioned roads
on 17th November 2019 from 04-00 to 12-00hrs.
PARKING RESTRICTIONS
Parking of all types of motor vehicles shall be prohibited on both sides of the below mentioned roads
on 17th November 2019 from 04-00 to 12-00 hrs.
SOMNATH GHARGE,
Dy. Commissioner of Police,
Traffic (City), Mumbai
(Addl. Charge).
¦ÉÉMÉ BEò (EòÉä.Ê´É.{ÉÖ.)-----2+
199
12 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò----EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, MÉÖ¯û´ÉÉ®ú iÉä ¤ÉÖvÉ´ÉÉ®ú, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941
xÉMÉ®ú®úSÉxÉÉ +ÉÊhÉ ¨ÉÚ±ªÉÊxÉvÉÉÇ®úhÉ Ê´É¦ÉÉMÉ, EòÉäEòhÉ Ê´É¦ÉÉMÉ, xÉ´ÉÒ ¨ÉÖ¤Æ É<Ç ªÉÉÆVÉEòbÚ÷xÉ
+Énäù¶É
Gò¨ÉÉÆEò |ÉÉ.xÉ.®ú.ªÉÉä.Gò. 1 ´É 2/Eòb÷Éå¨ÉxÉ{ÉÉ/Eò±É¨É 61(3)/¨ÉÖnùiÉ´ÉÉfø/ºÉ½þºÉÆEòÉäÊ´É/2045.------- VªÉÉ+lÉÔ, Eò±ªÉÉhÉ-b÷ÉåʤɴɱÉÒ ¨É½þÉxÉMÉ®ú{ÉÉʱÉEäòxÉä
(ªÉÉ{ÉÖfäø ‘‘ ÊxɪÉÉäVÉxÉ |ÉÉÊvÉEò®úhÉ ’’ +ºÉä ºÉƤÉÉäÊvɱÉä±Éä) xÉMÉ®ú®úSÉxÉÉ {ÉÊ®úªÉÉäVÉxÉÉ Gò. 1 ´É 2 iɪÉÉ®ú Eò®úhÉäSÉÉ <®úÉnùÉ Gò. 63, ÊnùxÉÉÆEò 10 ºÉ{]åõ¤É®ú 2018 SªÉÉ
`ö®úÉ´ÉÉuùÉ®äú Eäò±ÉÉ +ºÉÚxÉ iªÉɤÉɤÉiÉSÉÒ ºÉÚSÉxÉÉ ¨É½þÉ®úɹ]Åõ |ÉÉnäùʶÉEò ´É xÉMÉ®ú®úSÉxÉÉ +ÊvÉÊxɪɨÉ, 1966 (ªÉÉ{ÉÖfäø ‘‘ =CiÉ +ÊvÉÊxÉªÉ¨É ’’ +ºÉä =±±ÉäÊJɱÉä±Éää) SÉä
Eò±É¨É 60 (2) +x´ÉªÉä ÊnùxÉÉÆEò 15 ºÉ{]åõ¤É®ú 2018 ®úÉäVÉÒSªÉÉ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉÉiÉ |ÉʺÉrù Eäò±ÉÒ +ɽäþ (ªÉÉ{ÉÖfäø ‘‘ =CiÉ xÉMÉ®ú®úSÉxÉÉ ªÉÉäVÉxÉÉ ’’ +ºÉä
=±±ÉäÊJɱÉä±ÉÒ) ;
+ÉÊhÉ VªÉÉ+lÉÔ, =CiÉ +ÊvÉÊxɪɨÉÉiÉÒ±É Eò±É¨É 61 {ÉÉä]õ-Eò±É¨Éä (1) ´É (3) SªÉÉ iÉ®úiÉÖnùÒxÉÖºÉÉ®ú, =CiÉ |Éɯû{É xÉMÉ®ú®úSÉxÉÉ ªÉÉäVÉxÉÉ <®úÉnùÉ VÉɽþÒ®ú
ZÉɱªÉÉSªÉÉ ÊnùxÉÉÆEòÉ{ÉɺÉÚxÉ xÉ>ð ¨ÉʽþxªÉÉSÉä +ÉiÉ ËEò´ÉÉ iªÉÉ{ÉÖfäø ¶ÉɺÉxÉÉxÉä ´ÉÉfø´ÉÚxÉ Ênù±É䱪ÉÉ ¨ÉÖnùiÉÒSªÉÉ +ÉiÉ {ÉhÉ EòÉähÉiªÉɽþÒ {ÉÊ®úκlÉiÉÒiÉ +¶ÉÒ ´ÉÉføÒ´É
¨ÉÖnùiÉ iÉÒxÉ ¨ÉʽþxªÉÉÆ{ÉäIÉÉ VÉɺiÉ xÉɽþÒ, +¶ÉÉ ´ÉÉføÒ´É ¨ÉÖnùiÉÒiÉ |Éɯû{É xÉMÉ®ú®úSÉxÉÉ ªÉÉäVÉxÉäSÉÉ ¨ÉºÉÖnùÉ iɪÉÉ®ú Eò°üxÉ |ÉʺÉrù Eò®úhÉä +ɴɶªÉEò +ɽäþ ;
+ÉÊhÉ VªÉÉ+lÉÔ, ºÉxÉ 2014 SªÉÉ =CiÉ +ÊvÉÊxÉªÉ¨É Gò¨ÉÉÆEò 38 ¨ÉvÉÒ±É Eò±É¨É 148-+ä SªÉÉ iÉ®úiÉÖnùÒxÉÖºÉÉ®ú =CiÉ +ÊvÉÊxɪɨÉÉiÉÒ±É |ÉEò®úhÉÒ Gò.
II, III, IV ´É V ¨ÉvÉÒ±É EòÉähÉiªÉɽþÒ Ê´ÉEòÉºÉ ªÉÉäVÉxÉÉ, |ÉÉnäùʶÉEò ªÉÉäVÉxÉÉ ËEò´ÉÉ ªÉÉäVÉxÉäSÉÉ EòɱÉÉ´ÉvÉÒ ¨ÉÉäVÉiÉÉxÉÉ Eåòpù ¶ÉɺÉxÉ ËEò´ÉÉ ®úÉVªÉ ¶ÉɺÉxÉ
ªÉÉÆSÉäEòbÚ÷xÉ BJÉÉtÉ ÊxÉ´Éb÷hÉÖEòÒEòÊ®úiÉÉ PÉÉäʹÉiÉ Eäò±É䱪ÉÉ +ÉSÉÉ®úºÉÆʽþiÉäSÉÉ EòɱÉÉ´ÉvÉÒ ¨ÉÉäVÉhªÉÉiÉ ªÉäiÉ xÉɽþÒ ;
+ÉÊhÉ VªÉÉ+lÉÔ, =CiÉ ÊxɪÉÉäVÉxÉ |ÉÉÊvÉEò®úhÉÉxÉä iªÉÉÆSÉä ÊnùxÉÉÆEò 22 +ÉìMɺ]õ 2019 ´É ÊnùxÉÉÆEò 28 +ÉìMɺ]õ 2019 +x´ÉªÉä =CiÉ |Éɯû{É xÉMÉ®ú®úSÉxÉÉ
ªÉÉäVÉxÉäSÉÉ ¨ÉºÉÖnùÉ iɪÉÉ®ú Eò°üxÉ |ÉʺÉrù Eò®úhªÉɺÉÉ`öÒ iÉÒxÉ ¨ÉʽþxªÉÉÆSÉÒ ¨ÉÖnùiÉ´ÉÉfø ¨ÉÆVÉÖ®úÒ¤ÉɤÉiÉ Ê´ÉxÉÆiÉÒ Eäò±ÉÒ +ɽäþ ;
+ÉÊhÉ VªÉÉ+lÉÔ, ¶ÉɺÉxÉÉxÉä xÉMÉ®úÊ´ÉEòÉºÉ Ê´É¦ÉÉMÉÉEòb÷Ò±É +ÊvɺÉÚSÉxÉÉ Gò¨ÉÉÆEò ]õÒ{ÉÒBºÉ. 1813/3211/|É.Gò. 508/xÉÊ´É-13, ÊnùxÉÉÆEò 1 Êb÷ºÉå¤É®ú
2016 +x´ÉªÉä, =CiÉ +ÊvÉÊxɪɨÉÉSªÉÉ Eò±É¨É 61(3) +x´ÉªÉä ¨ÉÖnùiÉ´ÉÉfø näùhªÉÉSÉä +ÊvÉEòÉ®ú ºÉƤÉÆÊvÉiÉ Ê´É¦ÉÉMÉÒªÉ ºÉ½þºÉÆSÉɱÉEò, xÉMÉ®ú ®úSÉxÉÉ ªÉÉÆxÉÉ |ÉiªÉÉÌ{ÉiÉ
Eäò±Éä±Éä +ɽäþiÉ ;
+ÉÊhÉ VªÉÉ+lÉÔ, =CiÉ ÊxɪÉÉäVÉxÉ |ÉÉÊvÉEò®úhÉÉxÉä xɨÉÚnù Eäò±Éä±ÉÒ EòÉ®úhÉä Ê´ÉSÉÉ®úÉiÉ PÉä>ðxÉ iªÉÉÆxÉÒ ¨ÉÉÊMÉiɱÉä±ÉÒ 3 ¨ÉʽþxªÉÉÆSÉÒ ¨ÉÖnùiÉ´ÉÉfø, ÊnùxÉÉÆEò 1
VÉÉxÉä´ÉÉ®úÒ 2020 {ɪÉÈiÉ ¨ÉÆVÉÚ®ú Eò®úhÉä +ɴɶªÉEò +ºÉ±ªÉɤÉɤÉiÉ ºÉ½þºÉÆSÉɱÉEò, xÉMÉ®ú®úSÉxÉÉ, EòÉäEòhÉ Ê´É¦ÉÉMÉ, xÉ´ÉÒ ¨ÉÖƤÉ<Ç ªÉÉÆSÉÒ JÉÉjÉÒ {É]õ±ÉÒ +ɽäþ ;
iªÉÉ+lÉÔ, ¶ÉɺÉxÉ +ÊvɺÉÚSÉxÉÉ xÉMÉ®úÊ´ÉEòÉºÉ Ê´É¦ÉÉMÉ Gò¨ÉÉÆEò ]õÒ{ÉÒBºÉ. 1813/3211/|É.Gò. 508/xÉÊ´É-12, ÊnùxÉÉÆEò 1 Êb÷ºÉå¤É®ú 2016 +x´ÉªÉä
|ÉnùkÉ Eäò±É䱪ÉÉ ¶ÉCiÉÒSÉÉ ´ÉÉ{É®ú Eò°üxÉ ºÉ½þºÉÆSÉɱÉEò, xÉMÉ®ú®úSÉxÉÉ, EòÉäEòhÉ Ê´É¦ÉÉMÉ, xÉ´ÉÒ ¨ÉÖƤÉ<Ç ½äþ =CiÉ +ÊvÉÊxɪɨÉÉSªÉÉ Eò±É¨É 61 {ÉÉä]õ-Eò±É¨É (3) xÉÖºÉÉ®ú
=CiÉ |Éɯû{É xÉMÉ®ú®úSÉxÉÉ ªÉÉäVÉxÉäSÉÉ ¨ÉºÉÖnùÉ iɪÉÉ®ú Eò°üxÉ |ÉʺÉrù Eò®úhªÉÉEòÊ®úiÉÉSÉÒ ¨ÉÖnùiÉ ÊnùxÉÉÆEò 1 VÉÉxÉä´ÉÉ®úÒ 2020 ½þÉ Ênù´ÉºÉ vÉ°üxÉ iªÉÉ Ênù´ÉºÉÉ{ɪÉÈiÉ
´ÉÉføÊ´ÉiÉ +ɽäþiÉ.
Order
No. TPS No. 1 and 2/KDMC/Sect 61(3)/ Time-limit Extension/JDTP-KDN/2045/.—Whereas, Kalyan-
Dombivali Municipal Corporation (hereinafter referred to as the said "Planning Authority") has declared
its intention to make Town Planning Scheme No. 1 and 2 vide Resolution No.63 dated the 19th September
2018 and published a notice of declaration of the Draft Town Planning Scheme No. 1 and 2 (hereinafter
referred to as the "said draft scheme") under section 60(2) of the Maharashtra Regional and Town
Planning Act, 1966 (hereinafter referred to as "the said Act") Maharashtra Government Gazette, dated
the 15th September, 2018 ;
And whereas in accordance with the provision of sub-sections (1) and (3) of section 61 of the said
Act, the said draft scheme is to be published by means of notice within a period of nine months from the
date of the declaration of intention or within such further period as may be extended by the State
Government, but such extended period not to exceed more than three months ;
And whereas, in accordance with the provisions of section 148-A of the said Act vide Maharashtra
Act No. XXXVIII of 2014, in computing the period, in relation to any Development Plan, Regional Plan
or Scheme under the provision of Chapter II, III, IV and V of the said Act, the periods during which any
code of conduct by the Election Commission of India or the State Election Commission in respect of any
election, shall be excluded ;
And whereas, the said Planning Authority has requested to extend the period of three months of
making and publication of the said Draft Scheme under section 61(3) of the said Act, vide its letter dated
the 22nd August 2019 and dated the 28th August 2019.
And whereas, the Government in Urban Development Department vide Nitification No. TPS. 1813/
3211/CR 508/UD-13, dated the 1st December 2016 has delegated power to extend the period under
section 61(3) of the said Act to the Joint Director of Town Planning of respective divisions ;
And whereas, after considering the reasons mentioned by the Planning Authority, the Joint Director
of Town Planning, Konkan Division is of the opinion that, it is expedient to extend the period for the
making and publication of Draft Scheme under section 61(3) of the said Act by 3 months i.e upto and
inclusive of dated the 1st January 2020.
Now therefore, in exercise of the powers delegated to him under above Government Notifiction
dated 1st December 2016, the Joint Director of Town Planning, Konkan Division, Navi Mumbai is pleased
to extend the period of making and publication of the said Draft Scheme under sub-section (3) of section
61 of the said Act upto and inclusive of dated the 1st January 2020.
iªÉÉ+lÉÔ, +ÉiÉÉ, ºÉÆSÉɱÉEò, xÉMÉ®ú®úSÉxÉÉ, ¨É½þÉ®úɹ]Åõ ®úÉVªÉ, {ÉÖhÉä ªÉÉuùÉ®äú ºÉÉä¤ÉiÉ VÉÉäb÷±É䱪ÉÉ +xÉÖºÉÖSÉÒ-+ ¨ÉvªÉä xɨÉÚnù Eäò±Éä±Éä 1.18 ½äþC]õ®ú <iÉEäò IÉäjÉ,
ªÉÉ{ÉÚ´ÉÔ =CiÉ ±ÉÉäEäò¶ÉxÉ±É {É®ú´ÉÉxÉMÉÒ |ÉÉ{iÉ +ºÉ±É䱪ÉÉ BEòÉÎi¨ÉEÞòiÉ xÉMÉ®ú ´ÉºÉɽþiÉ |ÉEò±{É IÉäjÉÉiÉ ºÉ¨ÉÉʴɹ]õ Eò®úhªÉɺÉ, ¶ÉɺÉxÉÉxÉä ¨ÉÚ³ý ±ÉÉäEäò¶ÉxɱÉ
{É®ú´ÉÉxÉMÉÒ´Éä³ýÒ (ÊnùxÉÉÆEò 27 ¨Éä, 2019 ®úÉäVÉÒSªÉÉ +ÊvɺÉÚSÉxÉäiÉ) xɨÉÚnù Eäò±É䱪ÉÉ +]õÒ ´É ¶ÉiÉÔ ªÉÉ ´ÉÉføÒ´É IÉäjÉɺÉÉ`öÒ ºÉÖrùÉ EòÉªÉ¨É `äö´ÉÚxÉ ¨ÉÉxªÉiÉÉ näùiÉ +ɽäþiÉ.
(2) |ɺiÉÉ´ÉÉJÉɱÉÒ±É ±ÉÉäEäò¶ÉxÉ±É {É®ú´ÉÉxÉMÉÒ |ÉÉ{iÉ |ÉEò±{ÉÉiÉ ºÉ¨ÉÉʴɹ]õ Eò®úɴɪÉÉSªÉÉ ´ÉÉføÒ´É IÉäjÉÉSÉÉ iÉ{ÉÊ¶É±É ºÉÉä ¤ÉiÉSªÉÉ
‘‘ +xÉÖºÉÚSÉÒ-+ ’’ ¨ÉvªÉä nù¶ÉÇÊ´ÉhªÉÉiÉ +ɱÉÉ +ºÉÚxÉ, ´ÉÉføÒ´É IÉäjÉɺɽþ |ÉEò±{ÉÉSÉÒ ½þqù nù¶ÉÇÊ´ÉhÉÉ®úÉ xÉEòɶÉÉ ‘‘+xÉÖºÉÚSÉÒ-¤É ’’ +ÊvɺÉÚSÉxÉäºÉÉä¤ÉiÉ VÉÉäb÷±ÉÉ +ɽäþ.
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò----EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, MÉÖ¯û´ÉÉ®ú iÉä ¤ÉÖvÉ´ÉÉ®ú, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 15
(3) =CiÉ BEòÉÎi¨ÉEÞòiÉ xÉMÉ®ú ´ÉºÉɽþiÉ |ÉEò±{ÉÉÆiÉMÉÇiÉ ´ÉÉføÒ´É IÉäjÉÉSªÉÉ VÉʨÉxÉÓSÉÉ iÉ{ÉÊ¶É±É +ÉÊhÉ ½þqùÒ nù¶ÉÇÊ´ÉhÉÉ®úÉ xÉEòɶÉÉ ¨½þhÉVÉäSÉ
‘‘ +xÉÖºÉÚSÉÒ-+ ’’ ´É ‘‘ +xÉÖºÉÚSÉÒ-¤É ’’ iɺÉäSÉ +ÊvɺÉÚSÉxÉÉ xÉÉMÉ®úÒEòÉÆSªÉÉ +´É±ÉÉäEòxÉÉlÉÇ EòɪÉÉDZɪÉÒxÉ ´Éä³äý¨ÉvªÉä EòɨÉEòÉVÉÉSªÉÉ Ênù´É¶ÉÒ JÉɱÉÒ xɨÉÚnù
EòɪÉÉDZɪÉɨÉvªÉä 1 ¨ÉʽþxªÉÉSªÉÉ EòɱÉÉ´ÉvÉÒEòÊ®úiÉÉ ={ɱɤvÉ ®úɽþÒ±É.
(+) ¨É½þÉxÉMÉ®ú +ɪÉÖCiÉ, ¨ÉÖƤÉ<Ç ¨É½þÉxÉMÉ®ú |Énäù¶É Ê´ÉEòÉºÉ |ÉÉÊvÉEò®úhÉ, ¤ÉÉÆpùÉ-EÖò±ÉÉÇ ºÉÆEÖò±É, ¤ÉÉÆpùÉ ({ÉÚ´ÉÇ), ¨ÉÖ¤Æ É<Ç 400 051.
(¤É) ºÉ½þºÉÆSÉɱÉEò, xÉMÉ®ú®úSÉxÉÉ, EòÉäEòhÉ Ê´É¦ÉÉMÉ, EòÉäEòhÉ ¦É´ÉxÉ, xÉ´ÉÒ ¨ÉÖ¤Æ É<Ç.
(Eò) ÊVɱ½þÉÊvÉEòÉ®úÒ, ®úɪÉMÉb÷-+ʱɤÉÉMÉ.
(b÷) ºÉ½þɪÉEò ºÉÆSÉɱÉEò, xÉMÉ®ú®úSÉxÉÉ, ®úɪÉMÉb÷-+ʱɤÉÉMÉ.
(4) ºÉnù®ú +ÊvɺÉÚSÉxÉÉ ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉÉiÉ |ÉʺÉrù ZÉɱªÉÉSªÉÉ ÊnùxÉÉÆEòÉ{ÉɺÉÚxÉ +ƨɱÉÉiÉ ªÉä<DZÉ.
(5) ºÉnù®úSÉÒ +ÊvɺÉÚSÉxÉÉ xÉMÉ®ú®úSÉxÉÉ ºÉÆSÉɱÉxÉɱɪÉÉSªÉÉ www.dtp.maharashtra.gov.in ªÉÉ ´Éä¤ÉºÉÉ<Ç]õ´É®ú näùJÉÒ±É |ÉʺÉrù Eò®úhªÉÉiÉ
ªÉÉ´Éä.
‘‘ +xÉÖºÉÚSÉÒ--+ ’’
Description of land added to the Notified Integrated Township Project and Village
Dhokwade, Tal. Alibag, Dist. Raigad.
N. R. SHENDE,
Pune, Director of Town Planning,
dated the 6th November 2019. Maharashtra State, Pune.
PRANAYA ASHOK,
Dy. Commissioner of Police (Operations),
and Executive Magistrate Greater Mumbai.
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò----EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, MÉÖ¯û´ÉÉ®ú iÉä ¤ÉÖvÉ´ÉÉ®ú, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 19
BY THE DEPUTY COMMISSIONER OF POLICE (OPERATION), BRIHAN MUMBAI
AND EXECUTIVE MAGISTRATE
No. O.W. No. CP/XI(6) General Election-01-2019.—Whereas polling in Legislative Assembly
election of (1) 152-Borivali (2) 153- Dahisar (3) 154- Magathane (4) 155- Mulund (5) 156- Vikroli
(6) 157- Bhandup (W) (7) 158- Jogeshwari (8)159-Dindoshi (9) 160-Kandivali (10) 161-Charkop
(11) 162- Malad (W) (12) 163- Goregaon (13) 164-Varsova (14) 165- Andheri (W) (15) 166- Andheri
(E) (16) 167-Vileparle (17) 168-Chandivali (18) 169-Ghatkopar (W) (19) 170-Ghatkopar (E)
(20) 171-Mankhurd Shivaji Nagar (21) 172-Anushakti Nagar (22) 173-Chembur (23)
174-Kurla (24) 175-Kalina (25) 176-Bandra (E) (26) 177-Bandra (W) (27) 178-Dharavi (28) 179-Sion
Koliwada (29) 180-Wadala (30) 181-Mahim (31) 182-Worli (32) 183-Shivdi (33) 184-Byculla (34)
185- Malbar Hill (35) 186-Mumbadevi (36) 187-Colaba Mumbai Constituencies is to take place at a
number of polling stations in above constituencies on the 21st October 2019 ;
And whereas, a large number of voters are likely to visit various polling stations to exercise
their right of voting ;
And whereas, I consider it necessary for the purpose of preventing obstruction, annoyance
and injury or risk of obstructing, annoyance and injury to persons lawfully employed and for the
purpose of preventing the disturbance of the public tranquaility, to so direct ;
Now, therefore I, Pranaya Ashok, Dy. Commissioner of Police (Operation), Brihan Mumbai
and Executive Magistrate specially empowered under section 144 of the Code of Criminal
Prodecure (Act 2 of 1974) read with sub-section (2) of section 10 of the Bombay Police Act, 1951
(Bom. Act XXII of 1951) do hereby in exercise of the above said powers order :—
First, that no person not being a candidate in connection with the election for which polling
is to take place at a polling station or the accredited agent of such a candidate or an official
engaged in connection with the election or any public servant engaged in duty at or in the vicinity
of such polling station shall between 6-00 a.m. and 12 midnight on the 21st October, 2019, loiter
or join or form any assembly or group of persons of any public through fare, highway road, street
lane, bye-lane or any other public place within a distance of one hundred meters radius from any
polling station in (1) 152-Borivali (2) 153- Dahisar (3) 154-Magathane (4) 155- Mulund
(5) 156- Vikroli (6) 157- Bhandup (W) (7) 158- Jogeshwari (8)159-Dindoshi (9) 160-Kandivali
(10) 161-Charkop (11) 162- Malad (W) (12) 163- Goregaon (13) 164-Varsova (14) 165- Andheri (W)
(15) 166- Andheri (E) (16) 167-Vileparle (17) 168-Chandivali (18) 169-Ghatkopar (W) (19)
170-Ghatkopar (E) (20) 171-Mankhurd Shivaji Nagar (21) 172-Anushakti Nagar (22) 173-Chembur
(23) 174-Kurla (24) 175-Kalina (25) 176-Bandra (E) (26) 177-Bandra (W) (27) 178 Dharavi (28) 179-
Sion Koliwada (29) 180-Wadala (30) 181-Mahim (31) 182-Worli (32) 183-Shivdi (33) 184-Byculla
(34) 185-Malbar Hill (35) 186-Mumbadevi (36) 187-Colaba Mumbai Constituencies.
And secondly that all intending voters visiting a polling station for the purpose of voting
shall form queues in front of the polling station, one for males and another for females, and that
each intending voter shall enter the polling station serially in accordance with his or her position
in the queue as and when voters are admitted to the polling station in compliance with the
directions of the Presiding Officer.
I direct that this Order shall be published in the Official Gazette and promulgated in Brihan
Mumbai by affixing copies thereof in conspicuous public places and by proclaiming the same
through loudspeakers or megaphones in Brihan Mumbai.
Given under my hand and seal this 17th October 2019.
PRANAYA ASHOK,
Deputy Commissioner of Police (Operations),
Brihan Mumbai and Executive Magistrate.
¦ÉÉMÉ BEò (EòÉä.Ê´É.{ÉÖ.)-----3+
20 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò----EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, MÉÖ¯û´ÉÉ®ú iÉä ¤ÉÖvÉ´ÉÉ®ú, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941
|ɨÉÖJÉ ÊVɱ½þÉ xªÉɪÉÉvÉÒ¶É, ®úɪÉMÉb÷-+ʱɤÉÉMÉ ªÉÉÆVÉEòbÚ÷xÉ
+ÊvɺÉÚSÉxÉÉ
Gò¨ÉÉÆEò ®úÉ. +./6654/2019.---- ¸ÉÒ. Eäò. Eäò. PÉÖ±Éä, 4 lÉä ºÉ½þ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®ú, {ÉxÉ´Éä±É, ªÉÉÆSÉÒ ÊnùxÉÉÆEò 4 xÉÉä´½åþ¤É®ú 2019 iÉä 8
xÉÉä´½åþ¤É®úú 2019 +¶ÉÒ 5 Ênù´ÉºÉÉÆSÉÒ +ÌVÉiÉ ®úVÉÉ, ¨ÉÉÊMÉ±É ÊnùxÉÉÆEò 3 xÉÉä´½åþ¤É®úú 2019 ®úÉäVÉÒSªÉÉ ºÉÖ^õÒºÉ VÉÉäbÚ÷xÉ, ÊnùxÉÉÆEò 2 xÉÉä´½åþ¤É®úú 2019 ®úÉäVÉÒSªÉÉ
EòɪÉÉDZɪÉÒxÉ ´Éä³äýxÉÆiÉ®ú{ÉɺÉÚxÉ iÉä ÊnùxÉÉÆEò 9 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒSªÉÉ EòɪÉÉDZɪÉÒxÉ ´Éä³äý{ÉÚ´ÉÔ{ɪÉÈiÉ ¨ÉÖJªÉÉ±ÉªÉ ºÉÉäb÷hªÉÉSªÉÉ {É®ú´ÉÉxÉMÉҺɽ ¨ÉÆVÉÚ®ú Eò®úhÉäiÉ ªÉäiÉ
+ɽäþ.
{ɪÉÉǪÉÒ ´ªÉ´ÉºlÉäSÉÒ +ɴɶªÉEòiÉÉ xÉɽþÒ.
¸ÉÒ. Eäò. Eäò. PÉÖ±Éä, ªÉÉÆSÉÉ ®úVÉäSÉÉ EòɱÉÉ´ÉvÉÒ ºÉÆ{ɱªÉÉxÉÆiÉ®ú iªÉÉÆSÉÒþ 4 lÉä ºÉ½þ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®ú, {ÉxÉ´Éä±É ¨½þhÉÚxÉ {ÉÖxÉÌxɪÉÖCiÉÒ Eò®úhªÉÉiÉ
ªÉäiÉ +ɽäþ.
¨É½þÉ®úɹ]Åõ xÉÉMÉ®úÒ ºÉä´ÉÉ ÊxɪɨÉ, 1981 ¨ÉvÉÒ±É ÊxÉªÉ¨É 39 xÉÖºÉÉ®ú |ɨÉÉÊhÉiÉ Eò®úhªÉÉiÉ ªÉäiÉ +ɽäþ EòÒ, ¸ÉÒ. Eäò. Eäò. PÉÖ±Éä, ½äþ +ÊvÉEòÉ®úÒ VÉ®úú ={É®úÉäCiÉ
EòɱÉÉ´ÉvÉÒiÉ ®úVÉä´É®ú MÉä±Éä xɺÉiÉä iÉ®ú 4 lÉä ºÉ½þ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®ú, {ÉxÉ´Éä±É ªÉÉ {ÉnùÉ´É®ú ºlÉÉxÉÉ{ÉxxÉ ¨½þhÉÚxÉ EòÉ¨É Eò®úÒiÉ ®úÉʽþ±Éä +ºÉiÉä.
¸ÉÒ. Eäò. Eäò. PÉÖ±Éä, 4 lÉä ºÉ½þ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®ú, {ÉxÉ´Éä±É ½äþ +ÊvÉEòÉ®úÒ ®úVÉä´É®ú VÉÉhªÉÉ{ÉÚ´ÉÔ VÉä ´ÉäiÉxÉ +ɽþÊ®úiÉ Eò®úÒiÉ +ɽäþiÉ iªÉÉSÉ nù®úÉxÉä
´ÉäiÉxÉ EòÉføhÉåiÉ ªÉÉ´Éä.
={É®úÉäCiÉ EòɱÉÉ´ÉvÉÒiÉ iªÉÉÆSÉä xªÉɪÉɱɪÉÉSÉÉ EòɪÉǦÉÉ®ú ¸ÉÒ¨ÉiÉÒ BºÉ. +É®ú. ¤ÉMÉæ, 6 ´Éääú ºÉ½þ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®ú, {ÉxÉ´Éä±É ªÉÉÆVÉEòbä÷ ®úɽþÒþ±É.
+. ºÉÉä. ´ÉÉPɴɺÉä,
+ʱɤÉÉMÉ, |ɨÉÖJÉ ÊVɱ½þÉ xªÉɪÉÉvÉÒ¶É,
ÊnùxÉÉÆEò 2 xÉÉä´½åþ¤É®ú 2019. ®úɪÉMÉb÷--+ʱɤÉÉMÉ.
+. ºÉÉä. ´ÉÉPɴɺÉä,
+ʱɤÉÉMÉ, |ɨÉÖJÉ ÊVɱ½þÉ xªÉɪÉÉvÉÒ¶É,
ÊnùxÉÉÆEò 4 xÉÉä´½åþ¤É®ú 2019. ®úɪÉMÉb÷--+ʱɤÉÉMÉ.
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò----EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, MÉÖ¯û´ÉÉ®ú iÉä ¤ÉÖvÉ´ÉÉ®ú, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 21
|ɨÉÖJÉ ÊVɱ½þÉ xªÉɪÉÉvÉÒ¶É, ®úɪÉMÉb÷-+ʱɤÉÉMÉ ªÉÉÆVÉEòbÚ÷xÉ
+ÊvɺÉÚSÉxÉÉ
Gò¨ÉÉÆEò ®úÉ. +./6702/2019.---- ¸ÉÒ¨ÉiÉÒ B. B. MÉÉäb÷ºÉä, 2 ®äú ºÉ½þ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®ú, {ÉxÉ´Éä±É, ªÉÉÆSÉÒ ÊnùxÉÉÆEò 4 xÉÉä´½åþ¤É®úú 2019 ´É
5 xÉÉä´½åþ¤É®úú 2019 +¶ÉÒ BEÚòhÉ 2 Ênù´ÉºÉÉÆSÉÒ +ÌVÉiÉ ®úVÉÉ ¨ÉÆVÉÚ®ú Eò®úhÉäiÉ ªÉäiÉ +ɽäþ.
{ɪÉÉǪÉÒ ´ªÉ´ÉºlÉäSÉÒ +ɴɶªÉEòiÉÉ xÉɽþÒ.
¸ÉÒ¨ÉiÉÒ B. B. MÉÉäb÷ºÉä, ªÉÉÆSÉÉ ®úVÉäSÉÉ EòɱÉÉ´ÉvÉÒ ºÉÆ{ɱªÉÉxÉÆiÉ®ú iªÉÉÆSÉÒþ 2 ®äú ºÉ½þ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®ú, {ÉxÉ´Éä±É ªÉälÉä {ÉÖxÉÌxɪÉÖCiÉÒ Eò®úhªÉÉiÉ
ªÉäiÉ +ɽäþ.
¨É½þÉ®úɹ]Åõ xÉÉMÉ®úÒ ºÉä´ÉÉ ÊxɪɨÉ, 1981 ¨ÉvÉÒ±É ÊxÉªÉ¨É 39 xÉÖºÉÉ®ú |ɨÉÉÊhÉiÉ Eò®úhªÉÉiÉ ªÉäiÉ +ɽäþ EòÒ, ¸ÉÒ¨ÉiÉÒ B. B. MÉÉäb÷ºÉä, ÁÉ VÉ®úú ={É®úÉäCiÉ
EòɱÉÉ´ÉvÉÒiÉ ®úVÉä´É®ú MÉ䱪ÉÉ xɺÉiªÉÉ iÉ®ú 2 ®äú ºÉ½þ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®ú, {ÉxÉ´Éä±É ªÉÉ {ÉnùÉ´É®ú ºlÉÉxÉÉ{ÉxxÉ ¨½þhÉÚxÉ EòÉ¨É Eò®úÒiÉ ®úɽþÒ±ªÉÉ +ºÉiªÉÉ.
¸ÉÒ¨ÉiÉÒ B. B. MÉÉäb÷ºÉä, ÁÉ ®úVÉä´É®ú VÉÉhªÉÉ{ÉÚ´ÉÔ VÉä ´ÉäiÉxÉ +ɽþÊ®úiÉ Eò®úÒiÉ +ɽäþiÉ iªÉÉSÉ nù®úÉxÉä ´ÉäiÉxÉ EòÉføhÉåiÉ ªÉÉ´Éä.
={É®úÉäCiÉ EòɱÉÉ´ÉvÉÒiÉ iªÉÉÆSÉä xªÉɪÉɱɪÉÉSÉÉ EòɪÉǦÉÉ®ú ¸ÉÒ¨ÉiÉÒ BxÉ. BºÉ. ºÉ®úÉ¡ò, 3 ®äú ºÉ½þ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®ú, {ÉxÉ´Éä±É ªÉÉÆVÉEòbä÷ ®úɽþÒþ±É.
+. ºÉÉä. ´ÉÉPɴɺÉä,
+ʱɤÉÉMÉ, |ɨÉÖJÉ ÊVɱ½þÉ xªÉɪÉÉvÉÒ¶É,
ÊnùxÉÉÆEò 4 xÉÉä´½åþ¤É®úú 2019. ®úɪÉMÉb÷--+ʱɤÉÉMÉ.
+. ºÉÉä. ´ÉÉPɴɺÉä,
+ʱɤÉÉMÉ, |ɨÉÖJÉ ÊVɱ½þÉ xªÉɪÉÉvÉÒ¶É,
ÊnùxÉÉÆEò 4 xÉÉä´½åþ¤É®úú 2019. ®úɪÉMÉb÷--+ʱɤÉÉMÉ.
22 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò----EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, MÉÖ¯û´ÉÉ®ú iÉä ¤ÉÖvÉ´ÉÉ®ú, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941
|ɨÉÖJÉ ÊVɱ½þÉ xªÉɪÉÉvÉÒ¶É, ®úɪÉMÉb÷-+ʱɤÉÉMÉ ªÉÉÆVÉEòbÚ÷xÉ
+ÊvɺÉÚSÉxÉÉ
Gò¨ÉÉÆEò ®úÉ. +./6705/2019.---- ¸ÉÒ¨ÉiÉÒ BxÉ. BºÉ. ºÉ®úÉ¡ò, 3 ®äú ºÉ½þþ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®ú, {ÉxÉ´Éä±Éú, ªÉÉÆSÉÒ ÊnùxÉÉÆEò 6 xÉÉä´½åþ¤É®úú 2019 iÉä
ÊnùxÉÉÆEò 8 xÉÉä´½åþ¤É®ú 2019 +¶ÉÒ 3 Ênù´ÉºÉÉÆSÉÒ +ÌVÉiÉ ®úVÉÉ, ÊnùxÉÉÆEò 5 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒSªÉÉ EòɪÉÉDZɪÉÒxÉ ´Éä³äýxÉÆiÉ®ú{ÉɺÉÚxÉ iÉä ÊnùxÉÉÆEò 9 xÉÉä´½åþ¤É®ú 2019
®úÉäVÉÒSªÉÉ EòɪÉÉDZɪÉÒxÉ ´Éä³äý{ÉÚ´ÉÔ{ɪÉÈiÉ ¨ÉÖJªÉÉ±ÉªÉ ºÉÉäb÷hªÉÉSªÉÉ {É®ú´ÉÉxÉMÉҺɽþÒiÉ ¨ÉÆVÉÚ®ú Eò®úhÉäiÉ ªÉäiÉ +ɽäþ.
{ɪÉÉǪÉÒ ´ªÉ´ÉºlÉäSÉÒ +ɴɶªÉEòiÉÉ xÉɽþÒ.
¸ÉÒ¨ÉiÉÒ BxÉ. BºÉ. ºÉ®úÉ¡ò, ªÉÉÆSÉÉ ®úVÉäSÉÉ EòɱÉÉ´ÉvÉÒ ºÉÆ{ɱªÉÉxÉÆiÉ®ú iªÉÉÆSÉÒþ 3 ®äú ºÉ½þ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®ú, {ÉxÉ´Éä±Éú ¨½þhÉÚxÉ {ÉÖxÉÌxɪÉÖCiÉÒ
Eò®úhªÉÉiÉ ªÉäiÉ +ɽäþ.
¨É½þÉ®úɹ]Åõ xÉÉMÉ®úÒ ºÉä´ÉÉ ÊxɪɨÉ, 1981 ¨ÉvÉÒ±É ÊxÉªÉ¨É 39 xÉÖºÉÉ®ú |ɨÉÉÊhÉiÉ Eò®úhªÉÉiÉ ªÉäiÉ +ɽäþ EòÒ, ¸ÉÒ¨ÉiÉÒ BxÉ. BºÉ. ºÉ®úÉ¡ò, ÁÉ +ÊvÉEòÉ®úÒ VÉ®úú
={É®úÉäCiÉ EòɱÉÉ´ÉvÉÒiÉ ®úVÉä´É®ú MÉ䱪ÉÉ xɺÉiªÉÉ iÉ®ú 3 ®äú ºÉ½þ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®ú, {ÉxÉ´Éä±Éú ªÉÉ {ÉnùÉ´É®ú ºlÉÉxÉÉ{ÉxxÉ ¨½þhÉÚxÉ EòÉ¨É Eò®úÒiÉ ®úÉʽþ±ªÉÉ
+ºÉiªÉÉ.
¸ÉÒ¨ÉiÉÒ BxÉ. BºÉ. ºÉ®úÉ¡ò,þ ÁÉ +ÊvÉEòÉ®úÒ ®úVÉä´É®ú VÉÉhªÉÉ{ÉÚ´ÉÔ VÉä ´ÉäiÉxÉ +ɽþÊ®úiÉ Eò®úÒiÉ +ɽäþiÉ iªÉÉSÉ nù®úÉxÉä ´ÉäiÉxÉ EòÉføhÉäiÉ ªÉÉ´Éä.
ÊnùxÉÉÆEò 6 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒSªÉÉ EòɪÉÉDZɪÉÒxÉ ´Éä³äýxÉÆiÉ®ú{ÉɺÉÚxÉ iÉä ÊnùxÉÉÆEò 10 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒSÉÉ EòɪÉÉDZɪÉÒxÉ ´Éä³äý{ÉÚ´ÉÔ{ɪÉÈiÉ iªÉÉÆSÉä
xªÉɪÉɱɪÉÉSÉÉ EòɪÉǦÉÉ®ú ¸ÉÒ¨ÉiÉÒ BºÉ. +É®ú. ¤ÉMÉæ, 6 ´Éä ºÉ½þ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®ú, {ÉxÉ´Éä±É ªÉÉÆVÉEòbä÷ ®úɽþÒ±É.
ÊnùxÉÉÆEò 10 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒSªÉÉ EòɪÉÉDZɪÉÒxÉ ´Éä³äý{ÉɺÉÚxÉ iÉä ÊnùxÉÉÆEò 11 xÉÉä´½åþ¤É®ú 2019 ®úÉäVÉÒSªÉÉ EòɪÉÉDZɪÉÒxÉ ´Éä³ýä {ÉÚ´ÉÔ{ɪÉÈiÉ iªÉÉÆSÉä xªÉɪÉɱɪÉÉSÉÉ
EòɪÉǦÉÉ®ú ¸ÉÒ. Eäò. Eäò. PÉÖ±Éä, 4 lÉä ºÉ½þ Ênù´ÉÉhÉÒ xªÉɪÉÉvÉÒ¶É, Eò. ºiÉ®,ú {ÉxÉ´Éä±É ªÉÉÆVÉEòbä÷ ®úɽþÒ±É.
+. ºÉÉä. ´ÉÉPɴɺÉä,
+ʱɤÉÉMÉ, |ɨÉÖJÉ ÊVɱ½þÉ xªÉɪÉÉvÉÒ¶É,
ÊnùxÉÉÆEò 5 xÉÉä´½åþ¤É®úú 2019. ®úɪÉMÉb÷--+ʱɤÉÉMÉ.
याअथ
ृ , महारा औ यो गक वकास अ ध नयम, 1961 (1962 चा महा-तीन) चे
कलम एक, पोट कलम (3) अ वये काढ यात आलेल व दनांक 27 जून 2019 या महारा शासनाचे
काढ यात आलेल दनांक 11 जून 1993 ची शासक य अ धसूचना, उ योग, ऊजा व कामगार वभाग
1962 या या नयम 28 अ वये िज हा धकार यांना दान केलेले उपरो त अ ध नयमाचे कलमे 32, 33
उप वभागीय अ धकार कजत, उप वभाग कजत, िज हा रायगड यांना वशेष र या ा धकत केलेले आहे .
अनुसूची
52 9 1क 0.309 97 21 3 0.223
53 9 1ड 0.121 98 21 4 0.352
54 9 1ई 0.187 99 21 5 0.385
चतु: समा -
उ रे स : मौजे गोठ वल स ह नंबर 22/1, 22/3, 23, 40, 24, 27/7, 27/6, 28/1, 28/2, 29 व 32.
द णेस : मौजे करंबेल शीव, करं बेल स ह नंबर 11, 5/1, 5/2, 5/3, 5/4, 5/5, 5/6, 5/7, 5/8, 4/1, 4/4, 4/2,
4/3.
पूवस : मौजे चलठणची शीव.
पि चमेस : मौजे गोहे ची शीव, मौजे गोहे स ह नंबर 9/2, 17/2, 17/8, 17/11, 17/13, 18/1, 21/7 अ, 21/7 ब व
अनुसूची
4 2 2 0.088 44 6 9ब 0.082
5 2 3 0.099 45 6 9क 0.051
6 3 1ब 0.107 46 6 9ड 0.040
7 3 1क 0.084 47 6 10 0.278
8 4 1 0.099 48 6 11 0.051
9 4 3 0.104 49 6 12 0.061
10 4 4अ 0.050 50 6 14 अ 0.078
11 4 4ब 0.256 51 6 14 ब 0.040
12 4 5अ 0.111 52 6 15 0.020
13 4 5ब 0.040 53 7 1 1.651
14 4 5क 0.038 54 7 2 0.291
15 4 7 0.187 55 7 3 0.134
16 4 8 0.071 56 7 4 0.018
17 5 1 0.086 57 8 0 0.177
18 5 2 0.096 58 9 1 0.660
19 5 3 0.091 59 9 2 0.510
20 5 4 0.180 60 9 3/4 अ 1.190
25 5 9 0.180 65 10 0 0.223
26 5 11 0.140 66 11 1 0.180
27 5 12 0.023 67 11 2 1.116
28 5 13 0.088 68 11 3 0.030
29 5 14 0.140 69 11 4 0.110
30 5 15 0.169 70 11 5 0.180
31 5 16 0.124 71 11 6 0.300
32 5 17 0.100 72 11 7अ 0.070
33 5 18 0.025 73 11 7ब 0.090
34 6 1 0.150 74 11 8 0.112
35 6 2 0.125 75 11 9 0.360
36 6 3 0.110 76 11 10 0.239
37 6 4अ 0.156 77 11 11 0.289
38 6 4ब 0.126 78 11 13 1.097
39 6 5 0.050 79 11 14 0.154
40 6 6 0.086 80 11 15 0.060
32 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941
चतु: समा –
उ रे स : मौजे गोहे स ह नंबर 41/9, 42/9 अ, 42/9 ब, 43, 10, 43/11, 43/5, 43/6, 43/3, 43/14, 43/16,
43/17, 44 व 47.
द णेस : मौजे गोहे स ह नंबर 27/3, 27/1 ब/अ, 27/2, 29/43, 29/46 व मौजे खर वल ची शीव.
पूवस : मौजे गोठ वल स ह नंबर 36/2, 36/5+8 अ, 36/9, 35/1 अ, 35/2, 35/7, मौजे गोठ वल स ह नंबर
32, मौजे खरीवलीची शीव.
पि चमेस : मौजे गोहे स ह नंबर 41/9, 41/7/2, 41/1अ, 37/1/3, 37/9, 37/10, 37/14, 36, 35/10,
35/12ब/अ, 35/14, 35/12, 30/3, 30/4, 30/10.
38 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941
अनुसूची
10 2 4ब 0.373 51 7 2 0.167
11 3 1 0.033 52 7 3अ 0.238
12 3 2 0.048 53 7 3ब 0.324
13 3 3 0.068 54 7 4 0.740
14 3 4अ 0.170 55 8 1 0.137
15 3 4ब 0.462 56 8 2 0.389
16 3 4क 0.300 57 8 3 0.086
17 3 5 0.408 58 8 4 0.230
18 3 6 0.360 59 8 5 0.647
19 3 7 0.326 60 8 6 0.190
20 4 1 0.250 61 9 1अ 0.280
21 4 2 0.400 62 9 1ब 0.290
22 4 3 0.270 63 9 2 0.180
23 4 4 0.025 64 9 3 0.490
24 4 5 0.200 65 10 1 0.438
25 4 6 0.315 66 10 2 0.583
26 5 1 0.163 67 10 3 0.860
27 5 2अ 0.340 68 11 1 0.030
28 5 2ब 0.700 69 11 2 0.050
29 5 2क 0.328 70 11 3 0.020
30 5 3 0.150 71 12 1 0.276
31 5 4 0.153 72 12 2 0.690
32 5 5 0.356 73 12 3 0.273
33 6 1 0.330 74 12 4 0.402
34 6 2अ 0.164 75 12 5 0.453
35 6 2ब 0.249 76 13 1 0.280
36 6 2क 0.126 77 13 2 0.120
37 6 3 0.116 78 13 3 0.090
38 6 4 0.180 79 13 4 0.180
39 6 5 0.035 80 13 5 0.180
40 6 6 0.126 81 14 1 0.025
41 6 7 0.130 82 14 2 0.228
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 39
चतु: समा –
उ रे स : मौजे नंदनपाडा स ह नंबर 47, 46/10, 46/11, 45/7 क, 44/8, 44/9, 43/4, 43/5, 41/2 ब व
मौजे वालीची शीव.
द णेस : मौजे खरवल स ह नंबर 52, 53, 55, 56/1, 56/2, 2, 5/1, 5/2, 5/3.
पूवस : मौजे वाल , नारं गी व चलठणची शीव, मौजे चलठण स ह नंबर 20, मौजे खरीवली गट नंबर 8, स ह
नंबर 7/1, 7/2, 7/5, व स ह नंबर 6.
पि चमेस : मौजे गोहे स ह नंबर 45/4, 45/12, 45/14 अ, 45/1 ब, 45/15, 45/16, 45/18, 45/19, 45/24,
45/29, 44, मौजे गोठीवली स ह नंबर 32, 33, 24.
अनस
ु च
ू ी
एकूण 1.122
चतु: समा –
अनुसूची
7 1 11 0.420 14 2 2 0.106
17 2 4ब 0.066 60 5 12 0.590
18 2 4क 0.043 61 5 13 0.290
19 2 5 0.086 62 5 14 0.520
20 2 6अ 0.446 63 5 15 0.160
21 2 6ब 0.121 64 5 17 0.380
22 2 7 0.018 65 5 21 0.490
23 2 8 0.197 66 6 1 अ/1 0.449
26 2 11 0.160 69 6 2 0.040
27 3 1 0.043 70 6 3 0.083
28 3 2 0.104 71 6 4 0.235
29 3 3 0.134 72 6 5 0.255
30 3 4 0.058 73 7 1 0.010
31 3 5 0.033 74 7 2 0.053
32 3 6 0.038 75 7 3 0.277
33 3 7 0.015 76 7 6 0.258
34 3 8 0.157 77 7 7अ 0.347
35 3 9 0.152 78 7 7ब 0.344
36 3 10 0.264 79 7 7क 0.342
37 3 11 0.030 80 7 8 0.200
38 3 12 0.035 81 8 1 0.172
39 3 13 0.068 82 8 2अ 0.253
40 3 14 0.134 83 8 2ब 0.313
41 4 2 0.015 84 8 2क 0.177
42 4 3 0.182 85 8 2ड 0.294
43 4 4 0.105 86 8 6 0.126
44 4 5 0.587 87 8 7 0.446
45 4 6 0.040 88 9 1अ 0.587
46 4 7 0.061 89 9 1ब 0.830
47 4 8 0.117 90 9 1क 0.083
48 4 9 0.005 91 9 2अ 0.433
49 4 10 0.053 92 9 2ब 0.292
50 4 11 0.060 93 10 1अ 0.526
51 4 12 0.135 94 10 1ब 0.702
52 5 1अ 0.372 95 10 2 0.731
53 5 1ब 0.138 96 10 3 0.002
54 5 2 0.360 97 10 4 0.002
55 5 4 0.450 98 11 1अ 0.286
56 5 5 0.160 99 11 1ब 0.700
एकूण 95.437
चतु: समा –
उ रे स : मौजे खरवल स ह नंबर 27/2, 27/3, 28, 32/8, 32/11, 32/9, 32/14, 32/15, 32/17,
32/19, 32/21.
द णे स : मौजे करं बेल स ह नंबर 53/12, 53/9, 53/7, 53/4, 54/3, 54/7, 56/8, 28/2, 29/1, 29/4,
29/8, 32/2 व 31.
पूवस : मौजे उजोल ची शीव.
पि चमेस : मौजे करं बेळी स ह नंबर 32/23, 32/24, 34, 35, 36/2, 36/7 व खरीवलीची शीव.
अनुसूची
2 1 1ब 1.160 5 1 2ब 0.002
8 1 3क 0.250 51 16 1ब 1.080
9 1 8 0.010 52 16 2 0.405
10 2 1 0.150 53 16 3 0.560
11 2 2 1.033 54 16 4 0.300
12 2 3 0.546 55 16 5 0.380
13 2 4 0.588 56 16 6 0.310
14 3 1 1.263 57 16 7 0.620
15 3 2अ 1.200 58 17 1 2.033
16 3 2ब 0.400 59 17 3 0.570
17 4 1 0.120 60 17 4 0.270
18 4 2 1.066 61 20 0 0.110
19 4 3 0.203 62 23 1 8.220
20 4 4 0.220 63 23 2 0.200
21 5 1 0.303 64 24 1 0.486
22 5 2 1.397 65 24 2 0.981
23 7 1 1.042 66 24 3अ 0.890
24 7 2 0.870 67 24 3ब 0.890
25 8 1अ 0.510 68 24 4 0.921
26 8 1ब 1.000 69 25 1 0.943
27 8 2 0.180 70 25 2 0.417
28 8 3 0.150 71 25 3 0.850
29 8 4 0.025 72 25 4 0.350
30 8 5 0.648 73 25 5 0.015
31 8 6 0.246 74 26 0 1.447
32 9 1अ 0.839 75 27 1 1.405
33 10 1 0.779 76 27 2 0.290
34 10 2 0.900 77 28 0 2.730
35 12 3 0.152 78 29 1 1.293
36 12 4 1.163 79 29 2 0.200
37 12 7 0.738 80 29 3 0.076
38 12 8 0.071 81 29 4 0.260
39 12 9 0.020 82 29 5 0.290
40 14 1 0.830 83 30 1अ 1.065
41 14 2 0.951 84 30 1ब 1.070
42 14 3 0.981 85 30 2 0.730
43 14 4 0.324 86 30 3 0.140
44 14 5 0.597 87 31 1 0.233
45 14 6 0.080 88 31 2 0.354
46 14 7 0.577 89 31 3 0.384
47 15 1 0.771 90 31 4 0.495
48 15 2 1.032 91 31 5 0.820
49 15 3 0.230 92 31 6अ 0.245
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 47
चतु: समा –
SCHEDULE
Village –Kharivali Tal - Khalapur Dist. Raigad
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
1 1 1/A 0.435 15 4 2 0.174
2 1 1/B 0.344 16 4 3 0.570
3 1 2 1.414 17 4 4 0.088
4 1 3 0.233 18 4 5 0.257
5 1 4 0.056 19 4 6A 0.560
6 1 5 0.063 20 4 6/B 0.580
7 1 6 0.080 21 4 7 0.068
8 1 7 0.076 22 4 9 0.164
9 2 1 0.220 23 5 1 0.250
10 2 2 0.140 24 5 2/A 0.165
11 2 3 0.280 25 5 2/B 0.340
12 2 4 0.237 26 5 3 0.096
13 2 5 0.104 27 5 4/A 0.174
14 4 1 0.301 28 5 4/B 0.172
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 51
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
29 5 4/C 0.172 68 13 2 0.344
30 5 5 0.038 69 13 3 0.293
31 5 6A 0.465 70 13 4 0.090
32 5 6B 0.465 71 13 5A 0.717
33 5 7A 0.208 72 13 5B 0.716
34 5 7B 0.202 73 13 6 0.116
35 6 0 0.379 74 14 1 1.288
36 7 1 0.280 75 14 2 0.500
37 7 2A 0.380 76 15 0 0.100
38 7 2/B/1 0.225 77 16 1 0.384
39 7 2/B/2 0.216 78 16 2 0.481
40 7 3 0.063 79 16 3A 0.228
41 7 4 0.040 80 16 3B 0.220
42 7 5A 0.728 81 16 4 0.126
43 7 5B 0.467 82 17 1A 0.326
44 7 6 0.140 83 17 1B 0.288
45 8 1A1 0.418 84 17 1C 0.025
46 8 1A2 0.300 85 17 2 0.255
47 8 1B 0.516 86 17 3A 0.224
48 9 1A1 0.340 87 17 3B 0.177
49 9 1A2 0.460 88 18 5A 0.367
50 9 1B1 0.300 89 18 5B 0.215
51 9 1B2 0.330 90 20 1A 0.801
52 9 1C 0.309 91 20 2 0.083
53 9 1D 0.121 92 20 3 0.177
54 9 1E 0.187 93 20 6B 0.550
55 9 2 0.030 94 20 6 C1 0.440
56 9 3A 0.835 95 21 1 0.346
57 9 3B 0.220 96 21 2 0.281
58 9 4 0.045 97 21 3 0.223
59 9 5 0.124 98 21 4 0.352
60 9 6 0.119 99 21 5 0.385
61 10 0 0.200 100 21 6 0.346
62 11 1 0.106 101 22 1 0.511
63 11 2 0.053 102 22 2A 0.294
64 11 3 0.058 103 22 2B 0.288
65 12 A 0.296 104 22 3 0.240
66 12 B 0.260 105 23 1 0.591
67 13 1 0.541 106 23 2 0.225
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
107 23 3 0.288 146 31 2 0.086
108 23 4 0.389 147 31 3 0.045
109 23 5 0.147 148 32 1 0.210
110 24 1A 0.820 149 32 2 0.050
111 24 1B 0.240 150 32 3 0.670
112 24 1C 0.812 151 32 4 0.110
113 24 2 0.627 152 32 5 0.050
114 24 3 0.496 153 32 6 0.560
115 25 1 0.305 154 32 7 0.220
116 25 2A 0.555 155 32 9A 0.250
117 25 2B 0.271 156 32 9C 0.880
118 25 4A 0.592 157 32 10 0.270
119 25 4B 0.589 158 32 11 A 0.100
120 26 1A 0.458 159 32 11 B 0.100
121 26 1B 0.751 160 32 12 0.400
122 27 1 0.529 161 32 13 0.270
123 27 2A 0.406 162 32 14 0.460
124 27 2B 0.300 163 32 15 A 0.290
125 27 3 0.524 164 32 15 B 0.290
126 28 1A 0.440 165 32 16 0.010
127 28 1B 0.150 166 32 17 A 0.370
128 28 2 0.293 167 32 17 B 0.360
129 28 3 0.339 168 32 18 0.060
130 29 1 0.426 169 32 19 0.350
131 29 2 0.263 170 32 20 0.010
132 29 3 0.324 171 32 21 0.470
133 29 4 0.437 172 32 22 0.100
134 29 5 0.480 173 32 23 A 0.200
135 29 6 0.205 174 32 23 B 0.170
136 29 7 0.951 175 32 24 0.400
137 30 1 0.944 176 33 0 0.286
138 30 2 0.319 177 34 1 0.023
139 30 3 0.278 178 34 2 0.319
140 30 4 0.210 179 34 3 0.043
141 30 5 0.126 180 34 4A 0.242
142 30 6 0.301 181 34 4B 0.223
143 30 7 0.314 182 34 4C 0.018
144 30 8 0.116 183 34 5 0.190
145 31 1 0.324 184 34 8 B/1 0.372
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 53
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
185 34 8 B/2 0.475 224 40 7 0.730
186 34 9 0.038 225 40 8 0.250
187 34 11 0.030 226 40 9 0.200
188 34 12 0.025 227 40 11 0.150
189 35 0 0.554 228 40 12 0.260
190 36 1 0.220 229 40 13 0.524
191 36 2 1.980 230 40 14 A 0.870
192 36 3 0.910 231 40 14 B 0.860
193 36 5 2.530 232 40 15 0.580
194 36 6 1.170 233 40 16 0.670
195 36 11 0.620 234 40 17 0.130
196 36 12 A 1.150 235 40 20 0.080
197 37 1 1.210 236 40 21 0.300
198 37 2 0.610 237 40 22 0.230
199 37 3A 2.310 238 40 23 0.200
200 37 3B 2.310 239 40 24 0.250
201 38 1A 0.260 240 40 25 0.320
202 38 1 B/1 0.370 241 40 26 0.110
203 38 1 B/2 0.370 242 40 27 0.160
204 38 2 0.060 243 40 28 0.230
205 38 3 0.540 244 40 29 0.040
206 38 4 0.230 245 40 30 0.470
207 38 5 0.433 246 41 1A 0.213
208 38 7 0.030 247 41 1B 0.060
209 38 8 0.760 248 41 1C 0.174
210 38 10 0.150 249 41 1D 0.089
211 39 1 0.020 250 41 2 0.111
212 39 2 0.162 251 41 3 0.053
213 39 3 0.286 252 41 4 0.020
214 39 4 0.099 253 41 5A 0.137
215 39 5 0.096 254 41 5B 0.400
216 39 6 0.217 255 41 6 0.322
217 40 1A 0.230 256 41 7 0.076
218 40 1B 0.230 257 41 8 0.177
219 40 2 0.260 258 42 1A 0.475
220 40 3 0.300 259 42 1B 0.352
221 40 4 0.443 260 42 2 0.230
222 40 5 0.400 261 42 3 0.448
223 40 6 0.260 262 42 4 0.162
54 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
263 43 1A 0.264 302 46 16 0.060
264 43 1B 0.363 303 46 17 0.070
265 43 2A 0.288 304 46 18 0.090
266 43 2B 0.091 305 46 19 0.070
267 43 2C 0.285 306 46 20 0.130
268 43 2D 0.309 307 46 21 0.120
269 43 3 0.770 308 46 22 0.090
270 43 5 0.100 309 46 23 0.010
271 43 6A 0.248 310 47 A/1 0.710
272 43 6B 0.202 311 47 A/3 0.240
273 44 1 0.149 312 47 A/4 0.070
274 44 2 0.809 313 47 A/5 0.030
275 44 4 0.110 314 47 A/6 A 0.181
276 44 5 0.205 315 47 B 0.0304
277 44 6 0.212 316 47 A/6 B 0.190
278 44 7 0.111 317 47 A/7 0.080
279 44 8A 0.513 318 47 A/8 0.240
280 44 8B 0.688 319 47 A/9 0.050
281 44 9 0.013 320 47 A/10 0.170
282 44 10 0.010 321 47 A/11 0.068
283 45 1A 1.049 322 47 A/12 0.200
284 45 1B 1.040 323 47 A/13 0.260
285 45 2 0.030 324 47 A/14/A 0.183
286 46 1 0.220 325 47 A/14/B 0.189
287 46 3A 0.460 326 47 A/15 0.200
288 46 3 B/5 0.930 327 47 A/16/A 0.100
289 46 4 0.550 328 47 A/16/B 0.100
290 46 6 0.450 329 47 A/17 0.150
291 46 7 0.400 330 47 A/18 0.340
292 46 8 0.040 331 47 A/19 0.380
293 46 9 0.160 332 47 A/20 0.200
294 46 10 0.330 333 47 A/21 0.200
295 46 11 0.150 334 47 A/22/A 0.840
296 46 12 B 0.420 335 47 A/24 0.410
297 46 13 A 0.185 336 47 A/25 1.010
298 46 13 B 0.185 337 47 A/27 0.460
299 46 14 A 0.510 338 47 A/28 0.560
300 46 14 B 0.440 339 47 A/29/A 0.775
301 46 15 0.160 340 47 A/29/B 0.820
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 55
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
341 47 A/30 0.200 360 49 16 0.280
342 47 A/31 0.650 361 49 19 0.410
343 47 A/32 0.720 362 49 21 0.070
344 47 A/33 0.320 363 49 22 0.760
345 47 C 0.0101 364 49 25 A 0.380
346 48 1A 0.177 365 49 25 B 0.380
347 48 1B 0.394 366 50 0 0.382
348 49 1 A/2 0.190 367 51 1 1.190
349 49 1B 0.034 368 51 2 0.610
350 49 1C 0.034 369 52 0 0.187
351 49 2 0.180 370 53 1 0.419
352 49 7 0.390 371 53 2 0.431
353 49 8 1.140 372 56 1 A/1 0.306
354 49 9 0.100 373 56 1 A/2 0.200
355 49 12 A 1.340 374 56 1B 0.966
356 49 12 B 0.080 375 56 2 0.379
357 49 13 0.110 376 56 3 0.233
358 49 14 0.610 377 56 4 0.594
359 49 15 0.630 Total 130.229
Boundaries:-
On the North by : Village Gothivali Survey No. 22/1, 22/3, 23, 40, 24, 27/7, 27/6, 28/1,
28/2, 29 & 32.
On the South by : Village Karmbeli Shiv, Karmbeli Survey No. 11, 5/1, 5/2, 5/3, 5/4, 5/5, 5/6, 5/7,
5/8, 4/1, 4/4, 4/2, 4/3.
On the East by : Chilthan Shiv.
On the West by : Village Gohechi Shiv, Gohe Survey No. 9/2, 17/2, 17/8, 17/11, 17/13, 18/1,
21/7 A, 21/7 B & 21/8 A, 22/1, 22/3 B/A, 23/3, 24/6.
SCHEDULE
Village –Gohe Tal - Khalapur Dist. Raigad
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
1 1 2 0.091 6 3 1B 0.107
2 1 3 0.038 7 3 1C 0.084
3 2 1 0.051 8 4 1 0.099
4 2 2 0.088 9 4 3 0.104
5 2 3 0.099 10 4 4A 0.050
56 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
11 4 4B 0.256 49 6 12 0.061
12 4 5A 0.111 50 6 14 A 0.078
13 4 5B 0.040 51 6 14 B 0.040
14 4 5C 0.038 52 6 15 0.020
15 4 7 0.187 53 7 1 1.651
16 4 8 0.071 54 7 2 0.291
17 5 1 0.086 55 7 3 0.134
18 5 2 0.096 56 7 4 0.018
19 5 3 0.091 57 8 0 0.177
20 5 4 0.180 58 9 1 0.660
21 5 5 0.020 59 9 2 0.510
22 5 6 0.293 60 9 3/4 A 1.190
23 5 7 0.130 61 9 3/4 B 0.600
24 5 8 0.138 62 9 3/4 C 0.600
25 5 9 0.180 63 9 3/4 D 1.200
26 5 11 0.140 64 9 3/4 E 1.820
27 5 12 0.023 65 10 0 0.223
28 5 13 0.088 66 11 1 0.180
29 5 14 0.140 67 11 2 1.116
30 5 15 0.169 68 11 3 0.030
31 5 16 0.124 69 11 4 0.110
32 5 17 0.100 70 11 5 0.180
33 5 18 0.025 71 11 6 0.300
34 6 1 0.150 72 11 7A 0.070
35 6 2 0.125 73 11 7B 0.090
36 6 3 0.110 74 11 8 0.112
37 6 4A 0.156 75 11 9 0.360
38 6 4B 0.126 76 11 10 0.239
39 6 5 0.050 77 11 11 0.289
40 6 6 0.086 78 11 13 1.097
41 6 7 0.110 79 11 14 0.154
42 6 8 0.050 80 11 15 0.060
43 6 9A 0.056 81 11 16 0.015
44 6 9B 0.082 82 11 17 0.040
45 6 9C 0.051 83 11 18 0.043
46 6 9D 0.040 84 11 19 0.002
47 6 10 0.278 85 12 1 A/1 0.953
48 6 11 0.051 86 12 1 A/2 0.050
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 57
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
87 12 1 A/3 0.060 126 15 17 0.061
88 12 2 0.096 127 16 1 0.025
89 12 3 0.023 128 16 2 0.010
90 12 4 0.140 129 16 3B 0.340
91 12 5 0.080 130 16 4A 0.137
92 12 6 0.091 131 16 5 0.139
93 12 7 0.053 132 16 6 0.066
94 12 8 0.119 133 16 7 0.440
95 12 9 0.197 134 16 8 0.033
96 12 10 0.350 135 16 9 0.035
97 12 11 0.020 136 16 10 0.050
98 12 12 0.137 137 16 11 0.015
99 12 13 0.311 138 17 1A 0.270
100 13 1 0.033 139 17 1B 0.220
101 13 2 0.050 140 17 2 0.690
102 13 3 0.043 141 17 3 0.036
103 13 4 0.260 142 17 4 0.080
104 13 5 0.040 143 17 5 0.005
105 13 6 0.005 144 17 6 0.480
106 13 7 0.025 145 17 7 0.240
107 13 8 0.050 146 17 8 0.240
108 14 1 0.028 147 17 9 0.050
109 14 3 0.101 148 17 10 A 0.110
110 14 4A 0.159 149 17 10 B 0.100
111 14 4B 0.066 150 17 10 C 0.080
112 15 1 0.050 151 17 11 0.770
113 15 2 0.028 152 17 12 0.005
114 15 3 0.063 153 17 13 0.450
115 15 4 0.015 154 17 14 0.164
116 15 5 0.035 155 17 15 0.010
117 15 6 0.320 156 18 1 0.040
118 15 7 0.260 157 18 2A 0.470
119 15 9 0.749 158 18 2B 3.256
120 15 10 0.053 159 18 3 0.060
121 15 11 0.015 160 18 4 0.045
122 15 12 0.404 161 18 5 0.106
123 15 14 0.066 162 18 6 0.220
124 15 15 0.130 163 18 7 0.110
125 15 16 0.058 164 18 8 0.100
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
165 18 9 0.051 204 21 6 0.339
166 18 10 0.002 205 21 7A 0.654
167 18 11 0.109 206 21 7B 0.303
168 18 12 0.090 207 21 8B 0.100
169 18 13 0.091 208 22 1 0.937
170 18 14 0.187 209 22 2 0.150
171 19 1 0.124 210 22 3 A/1 0.801
172 19 2 0.073 211 22 3 A/2 0.200
173 19 3 0.273 212 22 3B 0.370
174 19 4 0.063 213 22 4 A/1 0.260
175 19 5 0.073 214 22 4 A/2 0.261
176 19 6 0.109 215 22 5 0.013
177 19 7 0.400 216 22 6 0.130
178 19 8 A/1 0.169 217 23 1A 0.240
179 19 8 A/2 0.169 218 23 1B 0.230
180 19 9 A/1 0.253 219 23 2 0.137
181 19 9 A/2 0.521 220 23 3 0.819
182 19 9B 0.775 221 24 1 0.800
183 19 10 0.109 222 24 2 0.388
184 19 11 0.076 223 24 3 0.266
185 19 12 0.465 224 24 4 0.361
186 20 1 0.228 225 24 6 0.121
187 20 2 0.460 226 24 7 0.053
188 20 3 0.174 227 24 8 0.043
189 20 4 0.086 228 25 1 0.025
190 20 5 0.018 229 25 2 2.142
191 20 6 0.106 230 25 4 0.066
192 20 7 0.015 231 25 5 0.030
193 20 8 0.110 232 25 6 0.023
194 20 9 0.100 233 26 1 2.494
195 20 10 A 1.205 234 26 2 0.167
196 20 10 B/1 0.526 235 27 4 0.870
197 20 10 B/2 0.340 236 27 10 0.250
198 20 11 0.010 237 27 11 0.010
199 20 12 0.220 238 28 1 0.076
200 21 1 0.045 239 28 2 0.288
201 21 2 0.729 240 28 3 0.301
202 21 3 0.160 241 28 4 0.064
203 21 4 0.167 242 28 5 0.076
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 59
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
243 28 6 0.870 281 29 28 0.200
244 28 7 0.590 282 29 29 0.360
245 28 8 0.109 283 29 30 A 0.690
246 28 9 0.542 284 29 30 B 0.690
247 28 10 A 0.380 285 29 32 0.760
248 28 10 B 0.372 286 29 33 0.560
249 28 11 0.350 287 29 34 0.560
250 28 12 A 0.450 288 29 35 0.400
251 28 12 B 0.460 289 29 36 0.360
252 28 13 0.080 290 29 37 0.660
253 29 2 1.450 291 29 38 A 0.397
254 29 3 0.330 292 29 38 B 0.397
255 29 4 0.400 293 29 39 B 0.630
256 29 5 0.150 294 29 40 0.240
257 29 6 0.610 295 29 41 1.370
258 29 7 0.140 296 29 42 0.710
259 29 8 0.400 297 30 1 0.050
260 29 9A 0.760 298 30 2 2.470
261 29 9B 0.330 299 30 5 0.560
262 29 10 0.120 300 30 6 A/1 0.515
263 29 11 0.810 301 30 6 A/2 0.515
264 29 12 0.300 302 30 7 0.810
265 29 13 0.300 303 30 15 0.530
266 29 14 0.150 304 31 0 0.382
267 29 15 0.240 305 32 1A 0.040
268 29 17 1.880 306 32 1B 0.580
269 29 18 A/1 0.223 307 32 2 0.030
270 29 18 A/2 0.223 308 33 1 0.213
271 29 19 A 0.310 309 33 2 0.149
272 29 19 B/1 0.160 310 34 1 0.169
273 29 19 B/2 0.160 311 34 2 0.020
274 29 20 0.710 312 34 3 0.356
275 29 21 0.350 313 34 4A 0.349
276 29 22 0.150 314 34 4B 0.205
277 29 23 A/1 0.230 315 34 5 0.268
278 29 24 0.220 316 34 6A 0.428
279 29 25 0.820 317 34 6B 0.370
280 29 27 0.180 318 34 7 0.403
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
319 34 8 0.266 357 46 14 0.130
320 34 9 0.336 358 46 15 0.090
321 45 1A 0.350 359 46 16 0.250
322 45 1B 0.350 360 46 18 0.110
323 45 2 0.050 361 46 19 0.160
324 45 3 0.340 362 46 21 0.130
325 45 4 0.020 363 46 22 0.140
326 45 5 0.540 364 46 23 0.240
327 45 7 0.190 365 46 24 0.700
328 45 8 0.070 366 46 25 0.320
329 45 9 0.260 367 46 26 0.560
330 45 10 0.370 368 46 28 0.210
331 45 12 0.070 369 46 29 0.200
332 45 13 0.060 370 46 30 0.030
333 45 14 A 0.160 371 46 31 0.180
334 45 14 B 0.240 372 46 32 0.120
335 45 15 0.120 373 46 33 0.350
336 45 16 0.230 374 46 34 0.230
337 45 17 0.240 375 46 35 0.220
338 45 18 0.200 376 46 36 0.220
339 45 19 0.500 377 46 37 0.120
340 45 20 0.160 378 46 39 0.120
341 45 21 0.080 379 46 40 0.110
342 45 22 0.080 380 46 41 0.610
343 45 23 0.360 381 46 42 0.600
344 45 24 0.200 382 46 43 A 0.100
345 45 25 0.240 383 46 43 B 0.100
346 45 26 0.160 384 46 44 0.210
347 45 27 0.240 385 47 0 0.058
348 45 28 0.200 386 49 1 0.058
349 45 29 0.700 387 49 2 0.138
350 46 1 0.300 388 49 3 0.360
351 46 2 0.260 389 49 4 0.048
352 46 7 0.210 390 49 5 0.120
353 46 9 0.010 391 49 6 0.575
354 46 10 0.460 392 49 7 0.066
355 46 12 0.100 393 49 8 0.649
356 46 13 0.120 394 49 9 0.230
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 61
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
395 49 10 0.063 434 54 10 0.121
396 50 1 0.063 435 54 11 0.025
397 50 2 1.291 436 54 12 A 0.185
398 50 3 0.273 437 54 12 B 0.177
399 50 4 0.015 438 54 14 0.120
400 50 5A 0.111 439 55 1 0.056
401 50 5B 0.319 440 55 2 0.276
402 50 5C 0.120 441 55 3A 0.330
403 50 5D 0.120 442 55 3B 0.324
404 51 2B 0.420 443 55 4 0.078
405 51 2C 0.071 444 55 6 0.104
406 51 2D 0.559 445 56 1 0.166
407 51 2E 0.430 446 56 2 0.278
408 51 2F 0.172 447 56 3 0.491
409 51 3A 0.309 448 56 6A 0.124
410 51 3B 0.374 449 56 6B 0.121
411 52 2A 0.619 450 56 7A 0.058
412 52 2B 0.230 451 56 7B 0.058
413 52 3A 0.564 452 56 8 0.119
414 52 3A/1 0.402 453 56 9 0.035
415 52 3 B/2 0.450 454 56 10 0.142
416 52 4 0.100 455 56 11 0.008
417 53 1 0.040 456 56 12 A 0.056
418 53 2 0.260 457 56 12 B 0.045
419 53 3 0.160 458 56 12 C 0.035
420 53 4 0.458 459 56 13 0.207
421 53 5A 0.404 460 56 14 0.460
422 53 5B 0.798 461 57 1 0.160
423 53 6 0.400 462 57 2A 0.695
424 53 7 0.960 463 57 2B 0.591
425 54 1 0.080 464 57 3 0.177
426 54 2 0.200 465 57 4 0.177
427 54 3 0.640 466 57 5A 0.396
428 54 4 0.066 467 57 5B 0.270
429 54 5 0.367 468 57 5C 0.076
430 54 6 0.471 469 57 6 0.190
431 54 7 0.068 470 58 1 0.033
432 54 8 0.710 471 58 2 0.498
433 54 9 0.040 472 58 3 0.771
62 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
473 58 4 0.430 512 64 9 0.126
474 58 6 0.063 513 64 10 0.033
475 58 7 0.033 514 64 11 0.086
476 58 8 0.066 515 64 12 0.182
477 58 9 0.048 516 64 13 0.063
478 59 1 0.099 517 64 14 0.220
479 59 2 0.534 518 64 15 0.144
480 59 3A 0.144 519 64 17 0.058
481 59 3B 0.129 520 64 18 0.141
482 59 4 0.088 521 64 19 A 0.035
483 59 5 0.071 522 64 19 B 0.040
484 59 6 0.210 523 64 19 C 0.045
485 60 1 0.341 524 64 20 0.051
486 60 2A 0.456 525 64 21 0.066
487 60 2B 0.460 526 64 22 0.090
488 60 3 0.162 527 64 23 0.088
489 60 4 0.422 528 64 24 0.154
490 61 1A 0.566 529 64 25 0.040
491 61 1B 0.334 530 65 1 0.045
492 61 2 0.094 531 65 2 0.311
493 61 3A 0.129 532 65 4 0.160
494 61 3B 0.172 533 65 6 0.090
495 61 4A 0.247 534 65 7 0.290
496 61 4B 0.400 535 65 8 0.040
497 62 1 0.649 536 65 9 0.300
498 62 2 0.913 537 65 10 0.120
499 62 3 0.290 538 65 11 0.010
500 63 1 1.374 539 65 12 0.130
501 63 2 0.040 540 65 13 0.010
502 63 3 0.417 541 65 14 0.020
503 64 1 0.247 542 65 15 0.035
504 64 2 0.030 543 65 16 0.090
505 64 3 0.040 544 65 17 0.120
506 64 4 0.020 545 65 18 0.035
507 64 5 0.066 546 65 19 0.081
508 64 6 0.002 547 65 20 0.160
509 64 7 0.165 548 65 21 0.331
510 64 8A 0.390 549 65 22 0.148
511 64 8B 0.372 550 65 23 0.040
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 63
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
551 65 24 0.220 558 65 31 0.010
552 65 25 0.010 559 65 32 0.013
553 65 26 0.090 560 66 0 0.149
554 65 27 0.078 561 67 1 0.241
555 65 28 0.080 562 67 2 0.053
556 65 29 0.058 563 67 3 0.068
557 65 30 0.005 Total 147.956
Boundaries:-
On the North by : Village Gohe Survey No. 41/9, 42/9 A, 42/9 B, 43, 10, 43/11, 43/5, 43/6, 43/3,
43/14, 43/16, 43/17, 44 & 47.
On the South by : Village Gohe Survey No. 27/3, 27/1 B/A, 27/2, 29/43, 29/46 & Village
Kharivalichi Shiv.
On the East by : Village Gothivali Survey No. 36/2, 36/5+ 8 A, 36/9, 35/1 A, 35/2, 35/7, Village
Gothivali Survey No. 32, Village Kharivali Shiv.
On the West by : Village Gohe Survey No. 41/9, 41/7/2, 41/1 A, 37/1/3, 37/9, 37/10, 37/14, 36,
35/10, 35/12 B/A, 35/14, 35/12, 30/3, 30/4, 30/10.
SCHEDULE
Village –Gothivali Tal - Khalapur Dist. Raigad
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
1 1 1 0.070 17 3 5 0.408
2 1 2 0.169 18 3 6 0.360
3 1 4 0.035 19 3 7 0.326
4 1 5 0.068 20 4 1 0.250
5 1 6 0.144 21 4 2 0.400
6 2 1 0.749 22 4 3 0.270
7 2 2 0.293 23 4 4 0.025
8 2 3 0.233 24 4 5 0.200
9 2 4A 0.360 25 4 6 0.315
10 2 4B 0.373 26 5 1 0.163
11 3 1 0.033 27 5 2A 0.340
12 3 2 0.048 28 5 2B 0.700
13 3 3 0.068 29 5 2C 0.328
14 3 4A 0.170 30 5 3 0.150
15 3 4B 0.462 31 5 4 0.153
16 3 4C 0.300 32 5 5 0.356
64 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
33 6 1 0.330 72 12 2 0.690
34 6 2A 0.164 73 12 3 0.273
35 6 2B 0.249 74 12 4 0.402
36 6 2C 0.126 75 12 5 0.453
37 6 3 0.116 76 13 1 0.280
38 6 4 0.180 77 13 2 0.120
39 6 5 0.035 78 13 3 0.090
40 6 6 0.126 79 13 4 0.180
41 6 7 0.130 80 13 5 0.180
42 6 8 0.099 81 14 1 0.025
43 6 9 0.129 82 14 2 0.228
44 6 10 0.119 83 14 3 0.005
45 6 11 0.080 84 14 4 0.096
46 6 12 0.260 85 14 5 0.070
47 6 13 0.126 86 14 6 0.083
48 6 14 0.488 87 14 7 0.030
49 6 15 0.116 88 14 8 1.007
50 7 1 0.554 89 14 9 0.282
51 7 2 0.167 90 14 10 0.106
52 7 3A 0.238 91 15 1A 0.376
53 7 3B 0.324 92 15 1B 0.370
54 7 4 0.740 93 15 2A 0.450
55 8 1 0.137 94 15 2B 0.340
56 8 2 0.389 95 15 2C 0.025
57 8 3 0.086 96 16 1A 0.179
58 8 4 0.230 97 16 1/B/1 0.264
59 8 5 0.647 98 16 1/B/2 0.264
60 8 6 0.190 99 16 2A 0.206
61 9 1A 0.280 100 16 2 B/1 0.193
62 9 1B 0.290 101 16 2 B/2 0.217
63 9 2 0.180 102 17 1 0.726
64 9 3 0.490 103 17 2 0.278
65 10 1 0.438 104 17 3 0.159
66 10 2 0.583 105 17 4 0.063
67 10 3 0.860 106 17 5 0.903
68 11 1 0.030 107 17 6 0.410
69 11 2 0.050 108 18 1 0.532
70 11 3 0.020 109 18 2/A/1 0.390
71 12 1 0.276 110 18 2/A 2 0.400
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 65
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
111 18 2B 0.524 150 35 1A 0.250
112 18 3 0.005 151 35 1B 0.050
113 18 4 0.005 152 35 2 0.610
114 19 1 0.137 153 35 3 0.330
115 19 2 0.264 154 35 4 0.120
116 19 3A 0.172 155 35 5 0.200
117 19 3B 0.245 156 35 6 0.110
118 19 4 0.050 157 35 7 0.590
119 19 5A 0.050 158 35 8 0.290
120 19 5B 0.038 159 35 9 0.290
121 19 6 0.038 160 35 10 0.370
122 20 1A 0.335 161 35 11 0.150
123 20 1B 0.101 162 35 12 0.220
124 20 2 0.130 163 35 13 0.180
125 20 3 0.246 164 35 14 0.210
126 20 5 0.038 165 35 15 0.290
127 20 6 0.100 166 35 16 0.150
128 20 7 0.231 167 35 17 A 0.045
129 22 1 2.164 168 35 17 B 0.045
130 22 2 0.200 169 35 19 0.300
131 22 3 0.200 170 35 20 A 0.420
132 24 0 0.374 171 35 20 B 0.540
133 26 1 0.170 172 35 21 0.160
134 26 2 0.040 173 35 22 0.300
135 26 3 A/1 0.427 174 35 23/A 0.010
136 26 3 A/2 0.425 175 35 23/B 0.080
137 26 3B 0.344 176 35 23/C 0.010
138 26 4 0.060 177 35 23/D 0.010
139 26 5 0.005 178 35 23E 0.010
140 26 9 0.208 179 35 23/F 0.010
141 27 2 0.382 180 35 23/G 0.010
142 27 6 0.030 181 35 23/H 0.010
143 27 7 0.534 182 35 24 0.040
144 28 1 1.280 183 36 1A 0.340
145 28 2 1.640 184 36 1B 0.340
146 29 1A 0.142 185 36 2 0.160
147 29 1B 0.309 186 36 3 0.410
148 29 1C 0.763 187 36 4 0.400
149 30 0 0.195 188 36 5A 0.470
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
189 36 5B 0.460 221 36 36 0.340
190 36 6 0.120 222 36 37 0.400
191 36 7A 0.250 223 36 38 0.280
192 36 7B 0.240 224 37 1 0.530
193 36 9 0.380 225 37 2A 0.080
194 36 10 0.920 226 37 2B 0.590
195 36 11 1.690 227 37 3 0.170
196 36 12 0.180 228 37 4A 0.330
197 36 13 0.170 229 37 4B 0.350
198 36 14 0.410 230 37 5 0.870
199 36 15 0.220 231 37 7A 0.405
200 36 16 0.300 232 37 7 B/1 0.300
201 36 17 0.200 233 37 7 B/2 0.225
202 36 18 0.130 234 37 8 0.060
203 36 19 0.280 235 37 9 0.320
204 36 20 0.580 236 37 10 1.085
205 36 21 0.140 237 37 11 0.010
206 36 22 0.430 238 37 12 0.020
207 36 23 0.120 239 37 13 0.020
208 36 24 0.080 240 37 14 0.005
209 36 25 0.220 241 38 1A 0.720
210 36 26 A 0.410 242 38 1B 0.694
211 36 26 B 0.450 243 38 1C 0.110
212 36 27 0.110 244 38 2A 0.195
213 36 28 0.210 245 38 2B 0.099
214 36 29 0.100 246 38 2C 0.200
215 36 30 0.410 247 38 2D 0.085
216 36 31 0.100 248 38 2E 0.527
217 36 32 0.050 249 39 1A 0.348
218 36 33 0.310 250 39 1B 0.460
219 36 34 0.030 251 39 2 0.511
220 36 35 0.230 Total 71.136
Boundaries:-
On the North by : Village Nandanpada Survey No. 47, 46/10, 46/11, 45/7 C, 44/8, 44/9, 43/4,
43/5, 41/2 B & Village Swalichi Shiv.
On the South by : Village Kharivali Survey No. 52, 53, 55,56/1, 56/2, 2, 5/1, 5/2, 5/3.
On the East by : Village Swali, Narangi & Chithan Shiv, Village Chilthan Survey No. 20,
Village Kharivali Gut No. 8, Survey No. 7/1, 7/2, 7/5 & Survey No. 6
On the West by : Village Gohe Survey No. 45/4, 45/12, 45/14 A, 45/1 B, 45/15, 45/16, 45/18,
45/19, 45/24, 45/29, 44, Village Gothivali Survey No. 32, 33, 24.
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 67
SCHEDULE
Village –Chilthan Tal - Khalapur Dist. Raigad
Sr.No. Survey No. Hissa No. Area (H.R.)
1 17 0 0.162
2 18 0 0.760
3 19 0 0.200
Total 1.122
Boundaries:-
SCHEDULE
Village - Karambeli Tal - Khalapur Dist. Raigad
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
1 1 7 0.340 21 2 6B 0.121
2 1 8 0.430 22 2 7 0.018
3 1 9 0.290 23 2 8 0.197
4 1 10/A/1 0.240 24 2 9 0.071
5 1 10/B 0.260 25 2 10 0.669
6 1 10/C 0.430 26 2 11 0.160
7 1 11 0.420 27 3 1 0.043
8 1 12 0.220 28 3 2 0.104
9 1 13 0.060 29 3 3 0.134
10 1 14 0.160 30 3 4 0.058
11 1 15 0.110 31 3 5 0.033
12 2 1A 0.018 32 3 6 0.038
13 2 1B 0.020 33 3 7 0.015
14 2 2 0.106 34 3 8 0.157
15 2 3 0.048 35 3 9 0.152
16 2 4A 0.126 36 3 10 0.264
17 2 4B 0.066 37 3 11 0.030
18 2 4C 0.043 38 3 12 0.035
19 2 5 0.086 39 3 13 0.068
20 2 6A 0.446 40 3 14 0.134
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
41 4 2 0.015 80 7 8 0.200
42 4 3 0.182 81 8 1 0.172
43 4 4 0.105 82 8 2A 0.253
44 4 5 0.587 83 8 2B 0.313
45 4 6 0.040 84 8 2C 0.177
46 4 7 0.061 85 8 2D 0.294
47 4 8 0.117 86 8 6 0.126
48 4 9 0.005 87 8 7 0.446
49 4 10 0.053 88 9 1A 0.587
50 4 11 0.060 89 9 1B 0.830
51 4 12 0.135 90 9 1C 0.083
52 5 1A 0.372 91 9 2A 0.433
53 5 1B 0.138 92 9 2B 0.292
54 5 2 0.360 93 10 1A 0.526
55 5 4 0.450 94 10 1B 0.702
56 5 5 0.160 95 10 2 0.731
57 5 6 0.130 96 10 3 0.002
58 5 7 0.280 97 10 4 0.002
59 5 8 0.250 98 11 1A 0.286
60 5 12 0.590 99 11 1B 0.700
61 5 13 0.290 100 11 1C 0.131
62 5 14 0.520 101 11 2 0.511
63 5 15 0.160 102 12 1 0.324
64 5 17 0.380 103 12 2 0.025
65 5 21 0.490 104 12 3 0.412
66 6 1 A/1 0.449 105 12 4 0.418
67 6 1 A/2 0.210 106 12 5 0.053
68 6 1 A/3 0.076 107 12 6 0.114
69 6 2 0.040 108 13 1 0.342
70 6 3 0.083 109 13 2 0.350
71 6 4 0.235 110 13 3 0.237
72 6 5 0.255 111 13 4 0.207
73 7 1 0.010 112 13 5 0.094
74 7 2 0.053 113 14 1 0.420
75 7 3 0.277 114 14 2 0.270
76 7 6 0.258 115 14 3 0.130
77 7 7A 0.347 116 14 4 0.341
78 7 7B 0.344 117 14 5 0.311
79 7 7C 0.342 118 14 6 0.055
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 69
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
119 15 1 0.309 158 18 3 0.018
120 15 2 0.240 159 18 4 0.523
121 15 3 0.260 160 18 5 0.099
122 15 4 0.137 161 18 6 0.346
123 15 5 0.101 162 18 7 0.291
124 15 6 0.018 163 18 8 0.030
125 15 7 0.139 164 19 1 0.324
126 15 8 0.637 165 19 2 0.382
127 15 9 0.223 166 19 3 0.040
128 15 10 0.293 167 19 4 0.066
129 15 11 0.051 168 19 5 0.521
130 16 1 0.170 169 19 6 0.683
131 16 2B 0.142 170 19 7 0.228
132 16 2 B/1 0.082 171 19 8 0.569
133 16 2C 0.193 172 20 1 0.043
134 16 2D 0.140 173 20 2 0.018
135 16 2E 0.240 174 20 3 0.058
136 16 3 0.126 175 20 4 0.033
137 16 4 0.167 176 20 5 0.010
138 16 5 0.109 177 20 6 0.094
139 16 6 0.319 178 20 7A 0.139
140 16 7 0.174 179 20 7B 0.152
141 16 8 0.139 180 20 7C 0.212
142 16 9 0.142 181 20 8 0.566
143 16 10 0.180 182 21 1 0.410
144 16 11 0.063 183 21 2 0.126
145 17 1 0.336 184 21 3 0.040
146 17 2 0.291 185 21 4A 0.616
147 17 3 0.053 186 21 4B 0.606
148 17 4 0.256 187 21 5 0.073
149 17 5 0.149 188 21 6 0.020
150 17 6 0.525 189 22 1 0.130
151 17 7 0.260 190 22 2 0.160
152 17 8A 0.205 191 22 3 0.160
153 17 8B 0.051 192 22 4 0.250
154 17 8C 0.101 193 22 5 0.180
155 17 9 0.215 194 22 6 0.580
156 18 1 0.458 195 22 7A 0.340
157 18 2 0.238 196 22 7B 0.470
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
197 22 7C 0.290 236 24 7 0.114
198 22 7D 0.100 237 24 8 0.270
199 22 7E 0.540 238 25 1 0.043
200 22 8 0.090 239 25 2 0.410
201 22 13 0.550 240 25 3 0.015
202 22 14 0.540 241 25 4 0.025
203 22 15 0.150 242 25 5 0.013
204 22 17 0.250 243 25 6 0.043
205 22 18 0.120 244 25 7 0.068
206 22 19 0.560 245 26 1 0.060
207 22 21 0.190 246 26 2 0.297
208 22 23 0.630 247 26 3 0.672
209 22 24 0.300 248 26 4 0.259
210 22 25 1.360 249 26 6 0.437
211 22 26 0.340 250 26 7 0.619
212 23 1 1.320 251 26 8 0.190
213 23 2 0.060 252 26 9 0.175
214 23 3 0.240 253 26 10 0.320
215 23 4 1.230 254 27 1A 0.704
216 23 5 0.530 255 27 1B 0.345
217 23 6 0.610 256 27 1C 0.661
218 23 8 0.260 257 53 1 0.300
219 23 9 0.380 258 53 3A 1.060
220 23 10 0.300 259 53 3B 0.400
221 23 11 0.330 260 53 6 0.120
222 23 12 0.700 261 53 8 A/1 1.280
223 23 13 1.880 262 53 8 A/2 0.250
224 23 14 0.970 263 53 8 A/3 1.010
225 23 15 0.800 264 53 8 A/4 1.420
226 23 16 1.720 265 53 8 B/1 0.220
227 23 17 1.620 266 54 1 0.160
228 23 18 0.530 267 54 2 0.840
229 23 19 0.280 268 54 6 2.190
230 24 1 0.045 269 56 1 0.150
231 24 2 0.174 270 56 2 0.190
232 24 3 0.104 271 56 3 0.110
233 24 4 0.289 272 56 4 0.650
234 24 5 0.342 273 56 5 0.310
235 24 6 0.230 274 56 6 0.370
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 71
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
275 56 7 0.200 295 61 1B 0.246
276 56 11 0.190 296 61 1C 0.235
277 57 1A 0.273 297 61 2 0.056
278 57 1B 0.815 298 61 3 0.116
279 57 3 0.094 299 61 4 0.025
280 58 1 0.795 300 63 1 0.050
281 58 2 1.008 301 63 2 0.380
282 59 1 0.040 302 63 3 0.103
283 59 2 1.440 303 63 4 0.060
284 59 3 0.050 304 63 5 0.120
285 59 4 0.150 305 63 6 0.805
286 59 5 0.100 306 64 1 1.580
287 59 6 0.130 307 64 2 0.040
288 59 7 0.619 308 64 3 0.100
289 60 1A 0.635 309 65 1 0.341
290 60 1B 0.187 310 65 2 0.025
291 60 2 0.066 311 65 3 0.328
292 60 3 0.076 312 65 4 0.402
293 60 4 0.622 313 65 5 0.111
294 61 1A 0.180 314 65 6 0.153
Total 95.437
Boundaries:-
On the North by : Village -Kharivali Survey No. 27/2, 27/3, 28, 32/8, 32/11, 32/9, 32/14, 32/15,
32/17, 32/19, 32/21.
On the South by : Village- Karambeli Survey No. 53/12, 53/9, 53/7, 53/4, 54/3, 54/7, 56/8, 28/2,
29/1, 29/4, 29/8, 32/2 & 31.
On the East by : Village Ujolichi Shiv.
On the West by : Village – Karambeli Survey No. 32/23, 32/24, 34, 35, 36/2, 36/7, & Kharivali
Shiv.
SCHEDULE
Village - Nandanpada Tal - Khalapur Dist. Raigad
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
1 1 1/1 A 0.247 5 1 2B 0.002
2 1 1B 1.160 6 1 3A 0.800
3 1 2 A/1 0.238 7 1 3B 0.630
4 1 2 A/2 0.002 8 1 3C 0.250
72 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
9 1 8 0.010 48 15 2 1.032
10 2 1 0.150 49 15 3 0.230
11 2 2 1.033 50 16 1A 1.100
12 2 3 0.546 51 16 1B 1.080
13 2 4 0.588 52 16 2 0.405
14 3 1 1.263 53 16 3 0.560
15 3 2A 1.200 54 16 4 0.300
16 3 2B 0.400 55 16 5 0.380
17 4 1 0.120 56 16 6 0.310
18 4 2 1.066 57 16 7 0.620
19 4 3 0.203 58 17 1 2.033
20 4 4 0.220 59 17 3 0.570
21 5 1 0.303 60 17 4 0.270
22 5 2 1.397 61 20 0 0.110
23 7 1 1.042 62 23 1 8.220
24 7 2 0.870 63 23 2 0.200
25 8 1A 0.510 64 24 1 0.486
26 8 1B 1.000 65 24 2 0.981
27 8 2 0.180 66 24 3A 0.890
28 8 3 0.150 67 24 3B 0.890
29 8 4 0.025 68 24 4 0.921
30 8 5 0.648 69 25 1 0.943
31 8 6 0.246 70 25 2 0.417
32 9 1A 0.839 71 25 3 0.850
33 10 1 0.779 72 25 4 0.350
34 10 2 0.900 73 25 5 0.015
35 12 3 0.152 74 26 0 1.447
36 12 4 1.163 75 27 1 1.405
37 12 7 0.738 76 27 2 0.290
38 12 8 0.071 77 28 0 2.730
39 12 9 0.020 78 29 1 1.293
40 14 1 0.830 79 29 2 0.200
41 14 2 0.951 80 29 3 0.076
42 14 3 0.981 81 29 4 0.260
43 14 4 0.324 82 29 5 0.290
44 14 5 0.597 83 30 1A 1.065
45 14 6 0.080 84 30 1B 1.070
46 14 7 0.577 85 30 2 0.730
47 15 1 0.771 86 30 3 0.140
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941 73
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
87 31 1 0.233 126 36 5 0.577
88 31 2 0.354 127 36 6 0.972
89 31 3 0.384 128 37 1 0.210
90 31 4 0.495 129 37 2 0.890
91 31 5 0.820 130 37 3A 0.627
92 31 6A 0.245 131 37 3B 0.355
93 31 6B 0.200 132 37 4B 0.500
94 31 7 0.253 133 38 1 0.326
95 31 8A 0.236 134 38 2 0.068
96 31 8B 0.270 135 38 3 0.486
97 31 9A 0.316 136 38 4 0.063
98 31 9B 0.210 137 38 5A 0.510
99 32 1A 0.401 138 38 5B 1.360
100 32 1B 0.360 139 39 1A 0.546
101 32 2 0.180 140 39 1B 0.549
102 33 1 1.436 141 39 1C 0.938
103 33 2 0.400 142 39 1D 1.147
104 33 3 0.130 143 39 2 0.126
105 33 4A 0.805 144 39 4 0.124
106 33 4B 0.800 145 41 1 1.012
107 33 4C 0.800 146 41 2 A/1 0.864
108 33 4D 0.800 147 41 2 A/2 0.460
109 33 5 1.294 148 41 2B 0.698
110 34 1 0.981 149 41 2C 0.220
111 34 2 0.577 150 41 2D 0.193
112 34 3 0.941 151 42 1 0.050
113 35 1 0.728 152 42 2 0.610
114 35 2 0.415 153 43 1 1.573
115 35 3A 0.200 154 43 2 0.402
116 35 3B 0.498 155 43 3 0.438
117 35 4 0.537 156 43 4 0.073
118 35 5 0.090 157 43 5 0.367
119 35 6 0.659 158 44 1 0.043
120 35 7 0.900 159 44 2 0.040
121 36 1A 0.392 160 44 3 0.043
122 36 1B 0.530 161 44 4A 0.224
123 36 2 0.759 162 44 4B 0.223
124 36 3 0.982 163 44 5A 0.270
125 36 4 0.270 164 44 5B 0.250
74 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ ¦ÉÉMÉ BEò---EòÉäEòhÉ Ê´É¦ÉÉMÉÒªÉ {ÉÖ®ú´ÉhÉÒ, xÉÉä´½åþ¤É®ú 21-27, 2019/EòÉÌiÉEò 30-+OÉ 6, ¶ÉEäò 1941
Sr.No. Survey No. Hissa No. Area (H.R.) Sr.No. Survey No. Hissa No. Area (H.R.)
165 44 6A 0.070 187 46 7 0.190
166 44 6B 0.117 188 46 8 0.450
167 44 7 0.172 189 46 10 1.890
168 44 8 0.230 190 46 11 0.340
169 44 9 0.068 191 48 1 A/1 0.382
170 45 1 0.169 192 48 1 A/2 0.392
171 45 2 0.205 193 48 1B 0.425
172 45 3A 0.624 194 48 1C 0.389
173 45 3B 1.056 195 48 2 0.086
174 45 4 0.339 196 48 3 0.076
175 45 5 0.033 197 48 4 0.720
176 45 6 0.030 198 48 5 0.030
177 45 7A 0.111 199 48 6 0.053
178 45 7B 0.314 200 48 7A 0.128
179 45 7C 0.500 201 48 7B 0.125
180 45 8 0.200 202 48 8 0.058
181 46 1 0.380 203 48 9A 0.167
182 46 2 0.640 204 48 9B 0.260
183 46 3 0.300 205 48 10 A 0.154
184 46 4 0.250 206 48 10 B 0.035
185 46 5 0.200 207 48 11 0.270
186 46 6 0.180 Total 113.547
Boundaries:-
ON BEHALF OF GOVERNMENT PRINTING, STATIONERY AND PUBLICATION, PRINTED AND PUBLISHED BY DIRECTOR
DR. NAMDEO KONDAJI BHOSALE, PRINTED AT GOVERNMENT CENTRAL PRESS, 21-A, NETAJI SUBHASH ROAD, CHARNI
ROAD, MUMBAI 400 004 AND PUBLISHED AT DIRECTORATE OF GOVERNMENT PRINTING, STATIONERY AND PUBLICATIONS,
21-A, NETAJI SUBHASH ROAD, CHARNI ROAD, MUMBAI 400 004 EDITOR : DIRECTOR DR. NAMDEO KONDAJI BHOSALE.
201
202
203
204
205
206
207
208
209
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ +ºÉÉvÉÉ®úhÉ ¦ÉÉMÉ nùÉxä É, Êb÷ºÉå¤É®úú 23, 2019/{ÉÉè¹É 2, ¶ÉEäò 1941 1
RNI No. MAHBIL/2012/46121
+ºÉÉvÉÉ®úhÉ Gò¨ÉÉÆEò 91
|ÉÉÊvÉEÞòiÉ |ÉEòɶÉxÉ
VªÉÉ+lÉÔ, ¶ÉɺÉxÉÉxÉä Eò±ªÉÉhÉ-b÷ÉåʤɴɱÉÒ ¨É½þÉxÉMÉ®ú{ÉÉʱÉEäòSªÉÉ Ê´ÉEòÉºÉ ªÉÉäVÉxÉäºÉ ´É Ê´ÉEòÉºÉ ÊxɪÉÆjÉhÉ ÊxɪɨÉɴɱÉÒºÉ ¨ÉÆVÉÖ®úÒ |ÉnùÉxÉ Eäò±Éä±ÉÒ +ɽäþ ;
+ÉÊhÉ VªÉÉ+lÉÔ, ¨É½þÉ{ÉÉʱÉEòÉ IÉäjÉɨÉvÉÒ±É =kÉ®ú Eò±ªÉÉhÉ Ê´É¦ÉÉMÉ (¨ÉÉèVÉä ºÉÉ{ÉÉb÷ ´É ´ÉÉbä÷PÉ®ú) ªÉälÉÒ±É 294.80 ½äþC]õ®ú IÉäjÉÉSÉÉ ºÉÖÊxɪÉÉäÊVÉiÉ
Ê´ÉEòÉºÉ Eò®úhªÉÉEòÊ®úiÉÉ ¨É½þÉ®úɹ]Åõ |ÉÉnäùʶÉEò ÊxɪÉÉäVÉxÉ ´É xÉMÉ®ú®úSÉxÉÉ +ÊvÉÊxɪɨÉ, 1966 (ªÉÉ{ÉÖfäø “=CiÉ +ÊvÉÊxɪɨɔ +ºÉÉ =±±ÉäÊJɱÉä±ÉÉ) SÉä Eò±É¨É 59
iÉä 112 (xÉMÉ®ú®úSÉxÉÉ {ÉÊ®úªÉÉäVÉxÉÉ iɪÉÉ®ú Eò®úhÉä) xÉMÉ®ú®úSÉxÉÉ {ÉÊ®úªÉÉäVÉxÉÉ Gò¨ÉÉÆEò 1 ´É 2 ®úɤÉÊ´ÉhÉäSÉÒ EòɪÉÇ´ÉɽþÒ Eò®úhªÉÉiÉ ªÉäiÉ +ɽäþ ;
+ÉÊhÉ VªÉÉ+lÉÔ, ºÉnù®ú½Úþ xÉMÉ®ú®úSÉxÉÉ {ÉÊ®úªÉÉäVÉxÉÉ Gò¨ÉÉÆEò 1 ´É 2 SÉÉ <®úÉnùÉ =CiÉ +ÊvÉÊxɪɨÉÉSÉä Eò±É¨É 60(1) ´É 60(2) +x´ÉªÉä,
VÉɽþÒ®ú Eò®úhªÉɤÉɤÉiÉ ¨ÉÉ. ºÉ´ÉǺÉÉvÉÉ®úhÉ ºÉ¦ÉäxÉÒ `ö®úÉ´É Gò¨ÉÉÆEò 63, ÊnùxÉÉÆEò 10 ºÉ{]åõ¤É®ú 2018 xÉÖºÉÉ®ú Ênù±É䱪ÉÉ ¨ÉÉxªÉiÉäSªÉÉ +xÉÖ¹ÉÆMÉÉxÉä ºÉnù®ú {ÉÊ®úªÉÉäVÉxÉäSÉÉ
<®úÉnùÉ ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉɨÉvªÉä ÊnùxÉÉÆEò 15 ºÉ{]åõ¤É®ú 2018 ®úÉäVÉÒ ´É nèùÊxÉEò ´ÉÞkÉ{ÉjÉÉƨÉvªÉä ÊnùxÉÉÆEò 17 ºÉ{]åõ¤É®ú 2018 ®úÉäVÉÒ |ÉʺÉrù Eò®úhªÉÉiÉ
+ɱÉä±ÉÉ +ɽäþ ;
+ÉÊhÉ VªÉÉ+lÉÔ, =CiÉ +ÊvÉÊxɪɨÉÉSÉä Eò±É¨É 61(1) +x´ÉªÉä ¨É½þÉxÉMÉ®ú{ÉÉʱÉEäòxÉä |ÉÉ°ü{É xÉMÉ®ú®úSÉxÉÉ {ÉÊ®úªÉÉäVÉxÉÉ Gò¨ÉÉÆEò 1 ´É 2 SÉÉ |ÉÉ°ü{É ¨ÉºÉÖnùÉ
¨ÉÉ. ºÉÆSÉɱÉEò, xÉMÉ®ú®úSÉxÉÉ, ¨É½þÉ®úɹ]Åõ ®úÉVªÉ, {ÉÖhÉä ªÉÉÆSÉä ºÉ±±ÉɨɺɱÉiÉÒEòÊ®úiÉÉ ÊnùxÉÉÆEò 12 Êb÷ºÉå¤É®ú 2018 ®úÉäVÉÒ ºÉÉnù®ú Eäò±ÉÉ +ºÉiÉÉ iªÉÉÆxÉÒ ºÉÆSɱÉxÉɱɪÉÉSÉä
+ʦÉ|ÉÉªÉ ÊnùxÉÉÆEò 30 +ÉìMɺ]õ 2019 ®úÉäVÉÒSÉä {ÉjÉÉx´ÉªÉä ¨É½þÉ{ÉÉʱÉEäòºÉ Eò³ýʴɱÉä±Éä +ɽäþ ;
+ÉÊhÉ VªÉÉ+lÉÔ, |ÉÉ°ü{É xÉMÉ®ú®úSÉxÉÉ {ÉÊ®úªÉÉäVÉxÉÉ Gò¨ÉÉÆEò 1 ´É 2 SÉÉ |Éɯû{É ¨ÉºÉÖnùÉ =CiÉ +ÊvÉÊxɪɨÉÉSÉä Eò±É¨É 61(1) +x´ÉªÉä xÉÉMÉÊ®úEòÉÆSªÉÉ
+´É±ÉÉäEòxÉÉlÉÇ |ÉʺÉrù Eò®úhÉäºiÉ´É ¨ÉÉ. ºÉ´ÉǺÉÉvÉÉ®úhÉ ºÉ¦ÉäxÉÒ `ö®úÉ´É Gò¨ÉÉÆEò 80, ÊnùxÉÉÆEò 20 Êb÷ºÉå¤É®ú 2019 xÉÖºÉÉ®ú ¨ÉÉxªÉiÉÉ Ênù±Éä±ÉÒ +ɽäþ ;
(1)
¦ÉÉMÉ nùÉxä É-----91---1
210
2 ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ +ºÉÉvÉÉ®úhÉ ¦ÉÉMÉ nùÉxä É, Êb÷ºÉå¤É®úú 23, 2019/{ÉÉè¹É 2, ¶ÉEäò 1941
+ÉÊhÉ VªÉÉ+lÉÔ, =CiÉ +ÊvÉÊxɪɨÉÉSÉä Eò±É¨É 61(1) +x´ÉªÉä =CiÉ |ÉÉ°ü{É xÉMÉ®ú®úSÉxÉÉ {ÉÊ®úªÉÉäVÉxÉäSÉÉ ¨ÉºÉÖnùÉ, xÉEòɶÉÉ ´É <iÉ®ú iÉ{ɶÉÒ±É ºÉ½þɪÉEò
ºÉÆSÉɱÉEò, xÉMÉ®ú®úSÉxÉÉ, Eò±ªÉÉhÉ-b÷ÉåʤɴɱÉÒ ¨É½þÉxÉMÉ®ú{ÉÉʱÉEòÉ ªÉÉÆSÉä EòɪÉÉDZɪÉɨÉvªÉä ÊxÉ®úÒIÉhÉÉEòÊ®úiÉÉ ={ɱɤvÉ Eò®úhªÉÉiÉ +ɱÉä±ÉÉ +ɽäþ.
iªÉÉ+lÉÔ, ¨É½þÉ{ÉÉʱÉEòÉ IÉäjÉɨÉvÉÒ±É ºÉ´ÉÇ xÉÉMÉÊ®úEòÉÆxÉÉ ºÉÚÊSÉiÉ Eò®úhªÉÉiÉ ªÉäiÉä EòÒ, |ÉÉ°ü{É xÉMÉ®ú®úSÉxÉÉ {ÉÊ®úªÉÉäVÉxÉÉ Gò¨ÉÉÆEò 1 ´É 2 SªÉÉ |ÉÉ°ü{É
¨ÉºÉÖtɤÉɤÉiÉ VªÉÉ xÉÉMÉÊ®úEòÉÆºÉ ½þ®úEòiÉÒ/ºÉÚSÉxÉÉ tɴɪÉÉSªÉÉ +ºÉiÉÒ±É iªÉÉÆxÉÒ Ê±ÉÊJÉiÉ º´É°ü{ÉÉiÉ ½þÒ ºÉÚSÉxÉÉ ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉÉSªÉÉ ®úÉVÉ{ÉjÉÉiÉ |ÉʺÉrù
ZÉɱªÉÉSÉä ÊnùxÉÉÆEòÉ{ÉɺÉÚxÉ iÉÒºÉ (30) Ênù´ÉºÉÉSÉä +ÉiÉ Eò±ªÉÉhÉ-b÷ÉåʤɴɱÉÒ ¨É½þÉxÉMÉ®ú{ÉÉʱÉEäòSªÉÉ ºÉ½þɪÉEò ºÉÆSÉɱÉEò, xÉMÉ®ú®úSÉxÉÉ, ªÉÉÆSÉä EòɪÉÉDZɪÉɨÉvªÉä ºÉÉnù®ú
Eò®úÉ´Éä.
+hhÉɺÉɽäþ¤É ʨɺÉɳý,
Eò±ªÉÉhÉ, +ɪÉÖCiÉ,
ÊnùxÉÉÆEò 21 Êb÷ºÉå¤É®ú 2019. Eò±ªÉÉhÉ-b÷ÉåʤɴɱÉÒ ¨É½þÉxÉMÉ®ú{ÉÉʱÉEòÉ, Eò±ªÉÉhÉ.
211
¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉ ®úÉVÉ{ÉjÉ +ºÉÉvÉÉ®úhÉ ¦ÉÉMÉ nùÉxä É, Êb÷ºÉå¤É®úú 23, 2019/{ÉÉè¹É 2, ¶ÉEäò 1941 3
ANNASAHEB MISAL,
Kalyan, Commissioner,
dated 21st December 2019. Kalyan-Dombivli Municipal Corporation.
ON BEHALF OF GOVERNMENT PRINTING, STATIONERY AND PUBLICATION, PRINTED AND PUBLISHED BY DIRECTOR, RUPENDRA DINESH MORE, PRINTED AT
GOVERNMENT CENTRAL PRESS, 21-A, NETAJI SUBHASH ROAD, CHARNI ROAD, MUMBAI 400 004 AND PUBLISHED AT DIRECTORATE OF GOVERNMENT
PRINTING, STATIONERY AND PUBLICATIONS, 21-A, NETAJI SUBHASH ROAD, CHARNI ROAD, MUMBAI 400 004. EDITOR : DIRECTOR, RUPENDRA DINESH MORE.
212
171
213
214
215
216
217
218
219
220
221
KALYAN DOMBIVLI MUNICIPAL CORPORATION, KALYAN, CORPORATION
OFFICE, CHHATRAPATI SHIVAJI MAHARAJ CHOWK, KALYAN (W).