GOVERNMENT OF KUWAIT

MINISTRY OF ELECTRICITY AND WATER


SHUWAIKH POWER GENERATION AND WATER
DESALINATION STATION

COMMON ANNUAL MAINTENANCE FOR


DISTILLERS-2009/2010
CONTRACTOR “SCOPE OF WORK”

1. Cooling sea water valves – Full Maintenance to be done.


2. Cooling sea water strainer for Unit “B” replacement(Leak Condition) and
for “Unit A”&”Unit C” -Full Maintenance
3. LP steam header 62” – inspection, cleaning (hydro jetting) has been
done.
4. Inspection of bulge (patch welding) for LP steam header & repair if
required.
5. Steam pressure reducing station – all MOV and Hand operated Gate
isolating valves – full maintenance have been done.(12”).(HP Steam
reducing station no 5 East pressure control valve 112(Isolating) gasket
leak & drain Valve to be replaced.
6. Heat exchangers ( 6 No’s) – tube cleaning (hydro jetting) and inspection
have been done, Hydraulic Test to be done.
7. Distillate to header “A” & “B” MOV valves HC-425 and HC-426 for all
units (6 No’s)-Full Maintenance.
8. LP header safety valves (6 No’s) – Full Maintenance.
9. All safety valves for HP header inspection and Partial Maintenance.
10. For all distillate units MOV HC-701V and HC-702V (6 No’s) full
maintenance have been done.
11. For all distillate units MOV HC-604 Full Maintenance have been done (3
No’s).
12. For all distillate units MOV HC-605 Partial Maintenance have been done
(3 No’s).
GOVERNMENT OF KUWAIT
MINISTRY OF ELECTRICITY AND WATER
SHUWAIKH POWER GENERATION AND WATER
DESALINATION STATION

13. Maintenance of distillate header valves HV – DIS – 125 A+B distillate to


re-carbonation plant and MOV HC-427V, HC-428V Full Maintenance to
be done.
14. Cooling water pump “C” – Partial Maintenance
15. Cooling water pump “A”,”B” -Full Maintenance
16. Cooling system for distillate units D1,D2,D3 main valves to headers- Full
Maintenance
17. Air compressors room – air receivers No: 1,2,3 inspection & Painting if
required(Inside)
18. Safety valves for air receivers- Full Maintenance to be done.
19. Air compressor “C” -Full Maintenance to be done.
20. Air compressors “A”,”B” Partial Maintenance have been done.
21. Air driers No. 1a,1b, and 2a,2b – inspection , cleaning and maintenance
for all valves .
22. MOV HC-603 for D2 , D3 -Partial Maintenance and D1-Full Maintenance
to be done.
23. Full Maintenance of Deluge v/v’ s(8 No’s) to be done.
24. Partial Maintenance of Isolating (Gate Valves) for Deluge Valves (16
No’s),Isolating valves for control room, sea water & recarbonation area.
25. HC 621 MOV -Full Maintenance to be done.
26. Steam Drain Tank for “D2”unit Full Maintenance to be done (Leak from
Tank).

MMD ENGINEER MMD SUPERINTENDENT


(Mr.Khalid Hawadi) (Mr.Khalid Al saffer)
GOVERNMENT OF KUWAIT
MINISTRY OF ELECTRICITY AND WATER
SHUWAIKH POWER GENERATION AND WATER
DESALINATION STATION
GOVERNMENT OF KUWAIT
MINISTRY OF ELECTRICITY AND WATER
SHUWAIKH POWER GENERATION AND WATER
DESALINATION STATION

ANNUAL MAINTENANCE 2009/2010


COMMON SHUT-DOWN.
“MANPOWER SUPPLY” SCOPE OF WORK

1. Inspection & cleaning of Cooling / Sealing Water Line, Strainers and


valves for Sea Water Supply Pumps.
2. Sea Water Intake - Screen Washing System & Cooling Water Line –
inspection & cleaning (pipes, strainers & valves maintenance).
3. Cooling Water Lines, Drains (for Cooling Pumps), Strainers and Valves
for all pumps for Distillate Units “D1”,”D2” and “D3” – maintenance
( Line to be flushed ).
4. All steam and water leakages near the Distillate Units to be repaired.
5. Expansion Tank – cleaning.
a. Drain v/v – maintenance.

6. S.W.I. System & Distillate Units Common System – all minor defects
to be repaired.
7. Drain Valves for all Pumps on Distillate Units – maintenance.
8. Service water line all valve Full Maintenance.
9. All Steam Traps & Drain Traps Maintenance (For Header).
10.Steam drain line inspection/replacement if required.
11.Bucket Strainer(Cooling water) Gate Valves Full maintenance.(6 Nos)
12.HC-701 Condensate to Drain Isolation valve, Check Valve Drain Valve
Full Maintenance (for D1,D2,D3).

MMD ENGINEER MMD SUPERINTENDENT


(Mr.Khalid Hawadi) (Mr.Khalid Al saffer)
GOVERNMENT OF KUWAIT
MINISTRY OF ELECTRICITY AND WATER
SHUWAIKH POWER GENERATION AND WATER
DESALINATION STATION
GOVERNMENT OF KUWAIT
MINISTRY OF ELECTRICITY AND WATER
SHUWAIKH POWER GENERATION AND WATER
DESALINATION STATION

)
GOVERNMENT OF KUWAIT
MINISTRY OF ELECTRICITY AND WATER
SHUWAIKH POWER GENERATION AND WATER
DESALINATION STATION

You might also like