This document is a pre-commissioning checklist for a Vacon 8000 solar drive system. It contains 24 checklist items to verify the installation and configuration of the solar panel, drive, wiring, and inverter. The engineer will check items like the environment, physical components, wiring continuity, voltage and frequency settings, and output power. Once all items are verified, the control box will be commissioned and final documents handed over to the customer for signoff.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100%(1)100% found this document useful (1 vote)
1K views1 page
Pre Commissioning Check List
This document is a pre-commissioning checklist for a Vacon 8000 solar drive system. It contains 24 checklist items to verify the installation and configuration of the solar panel, drive, wiring, and inverter. The engineer will check items like the environment, physical components, wiring continuity, voltage and frequency settings, and output power. Once all items are verified, the control box will be commissioned and final documents handed over to the customer for signoff.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
PRE- COMMISSIONING CHECKLIST
Customer Name:
Drive Details: Sr. No: Date:
Application: Vacon 8000 Solar Engineer Name: Job order no: S/N Check List Points Status Remarks 1 Check the Environment Ok / Not ok 2 Check the panel & Drive mounting Ok / Not ok
3 Physical checking of the panel Ok / Not ok
4 Check GA & BOM with drawing Checked/ Didn’t check 5 Physical checking of the panel, Door lock & Ok / Not ok SFU Handle operation. 6 Check the continuity of control & Power Checked/ Didn’t check wiring 9 Check the shield earthing of controls Checked/ Didn’t check 10 Are the control wire clamping is ok Checked/ Didn’t check 11 Check the power cable & Bus bar size as per Checked/ Didn’t check in GA 12 Earthing cable size is ok ( 50% of power Checked/ Didn’t check cable) 13 Check the input voltage variation level
14 Check the input voltage programmed limit
value at inverter 16 Check the input frequency low value and 48.5hz below this value has set in inverter to avoid tripping at low frequency limit. 17 Check the input frequency high value and 51.5hz above this value has to set in inverter to avoid tripping at high frequency limit. 18 Check the solar cell DC voltage level at Checked/ Didn’t check different row and ensure the perfection. 19 Check whether separate earth bit is made to Ok / Not ok avoid earth fault tripping. 20 Check the solar cell total wattage and Checked / Didn’t check inverter rating wattage. 22 Measure the inverter output kilo wattage at Done / Yet to make peak sunlight. 23 Control box commissioned Ok / Not ok 23 Make the MOM copy Done / Yet to make 24 Handover the corrected final drawing to Done / Yet to make customer