Pre Commissioning Check List

This document is a pre-commissioning checklist for a Vacon 8000 solar drive system. It contains 24 checklist items to verify the installation and configuration of the solar panel, drive, wiring, and inverter. The engineer will check items like the environment, physical components, wiring continuity, voltage and frequency settings, and output power. Once all items are verified, the control box will be commissioned and final documents handed over to the customer for signoff.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views1 page

Pre Commissioning Check List

This document is a pre-commissioning checklist for a Vacon 8000 solar drive system. It contains 24 checklist items to verify the installation and configuration of the solar panel, drive, wiring, and inverter. The engineer will check items like the environment, physical components, wiring continuity, voltage and frequency settings, and output power. Once all items are verified, the control box will be commissioned and final documents handed over to the customer for signoff.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PRE- COMMISSIONING CHECKLIST

Customer Name:

Drive Details: Sr. No: Date:


Application: Vacon 8000 Solar
Engineer Name:
Job order no:
S/N Check List Points Status Remarks
1 Check the Environment Ok / Not ok
2 Check the panel & Drive mounting Ok / Not ok

3 Physical checking of the panel Ok / Not ok


4 Check GA & BOM with drawing Checked/ Didn’t check
5 Physical checking of the panel, Door lock & Ok / Not ok
SFU Handle operation.
6 Check the continuity of control & Power Checked/ Didn’t check
wiring
9 Check the shield earthing of controls Checked/ Didn’t check
10 Are the control wire clamping is ok Checked/ Didn’t check
11 Check the power cable & Bus bar size as per Checked/ Didn’t check
in GA
12 Earthing cable size is ok ( 50% of power Checked/ Didn’t check
cable)
13 Check the input voltage variation level

14 Check the input voltage programmed limit


value at inverter
16 Check the input frequency low value and 48.5hz
below this value has set in inverter to avoid
tripping at low frequency limit.
17 Check the input frequency high value and 51.5hz
above this value has to set in inverter to
avoid tripping at high frequency limit.
18 Check the solar cell DC voltage level at Checked/ Didn’t check
different row and ensure the perfection.
19 Check whether separate earth bit is made to Ok / Not ok
avoid earth fault tripping.
20 Check the solar cell total wattage and Checked / Didn’t check
inverter rating wattage.
22 Measure the inverter output kilo wattage at Done / Yet to make
peak sunlight.
23 Control box commissioned Ok / Not ok
23 Make the MOM copy Done / Yet to make
24 Handover the corrected final drawing to
Done / Yet to make
customer

Engineer Signature Customer Signature