School Ground Beautification Program of Works
School Ground Beautification Program of Works
Department of Education
REGION XII
DIVISION OF SULTAN KUDARAT
MAGANAO ELEMENTARY SCHOOL
Maganao Palimbang Sultan Kudarat
PROJECT PROPOSAL
PP No.: 2022-11-002
The purpose of painting is to protect the building and engineering materials from
VI. Rationale: corrosion and rusting. This will greatly enhances the useful life of the building and
equipments. Painting and coatings also decorative look to the building.
VII. Goals/Objectives: 1. It protects the surface from weathering effects and effect of other gases and fumes.
2. Painting makes the surface smooth for easy cleaning.
VIII. Budget Requirements:
ITEM
Total Remarks
DESCRIPTION
I. MATERIAL COST 18205.00
II. LABOR COST 6371.75
III. INCIDENTAL
1067.97
EXPENSES
IV. TOTAL COST ₱25,644.72
Prepared by:
ADTIS A. ABUBAKAR
School Head
APPROVED:
PROGRAM OF WORKS
PP No.: 2022-11-002
PROJECT TITLE: To be used for painting and School Ground beautification
BUDGET ALLOCATION: PHP 25,644.72
SOURCE OF FUNDS: School MOOE
PERIOD COVERED: Nov-22
Prepared by:
ADTIS A. ABUBAKAR
School Head
APPROVED: