The document is a request from the National Power Corporation (NPC) to two vice presidents for review and approval of connection agreements for a 15MW thermal power plant on Palawan. It includes draft connection and fixed asset boundary documents, diagrams, and a dispute resolution annex regarding connecting the power plant to NPC's transmission system. NPC requests comments and approval on the documents from the two vice presidents.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views2 pages

2023.03.15 Do

The document is a request from the National Power Corporation (NPC) to two vice presidents for review and approval of connection agreements for a 15MW thermal power plant on Palawan. It includes draft connection and fixed asset boundary documents, diagrams, and a dispute resolution annex regarding connecting the power plant to NPC's transmission system. NPC requests comments and approval on the documents from the two vice presidents.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

National Power Corporation CAG-CPD-23-0083

DT No.: CAG-SPD-23-036
Date: 15-Mar-23

PART A: ADDRESSEE(S) / ACTION REQUESTED


Action Requested Acknowledgment
Name Designation/Station
(Refer to Part B) Initial Date
1 2 3 4 5 6 7 8
1. Atty. R. T. Teves Vice President, PES x x
2. L. I. Sabellina Vice President, SPUG x x
3.
4.
5.
6.
7.

8.
9.
10.

PART B: CODES AND INSTRUCTIONS:


1 - For review/comment/evaluation/recommendation 5 - For compliance/submission of report or documents
2 - For information/reference/filing/consideration 6 - Reply directly/ attend or send representative(s)
3 - For initial/signature/approval 7 - Prepare a reply for the President's signature
4 - For clarification/discussion/dissemination 8 - Others : __________________________________
for your appropriate action
Notes/Remarks :

Transmitted herewith is the draft copy of connection agreement re: the connection of the DPC 15MW Thermal
Power Plant at NPC’s Transmission System, requesting for your comments and approval.

Thank you.

PART C. RECORD/ DOCUMENT DETAILS


Document/ Number of Set
Date Description
Item No. Original E-Copy
15MW DPC Palawan Thermal Power Plant Draft Connection
1 1
Agreement
15MW DPC Palawan Thermal Power Plant Draft Fixed Asset
2 1
Boundary Document (FABD)
3 Annex A Single Line Diagram 1

4 Annex B Dispute Resolution 1

5 Annex C Asset Boundary Diagram 1


-Nothing Follows-

PART D: SENDER

R. B. BARRUELA
Vice President, CAG

NPC-001.F05
Rev. No. 1
National Power Corporation CAG-CPD-23-0083
DT No.: CAG-SPD-23-036
Date: 15-Mar-23

PART A: ADDRESSEE(S) / ACTION REQUESTED


Action Requested Acknowledgment
Name Designation/Station
(Refer to Part B) Initial Date
1 2 3 4 5 6 7 8
1. Atty. R. T. Teves Vice President, PES x x
2. L. I. Sabellina Vice President, SPUG x x
3.
4.
5.
6.
7.

8.
9.
10.

PART B: CODES AND INSTRUCTIONS:


1 - For review/comment/evaluation/recommendation 5 - For compliance/submission of report or documents
2 - For information/reference/filing/consideration 6 - Reply directly/ attend or send representative(s)
3 - For initial/signature/approval 7 - Prepare a reply for the President's signature
4 - For clarification/discussion/dissemination 8 - Others : __________________________________
for your appropriate action
Notes/Remarks :

Transmitted herewith is the draft copy of connection agreement re: the connection of the DPC 15MW Thermal
Power Plant at NPC’s Transmission System, requesting for your comments and approval.

Thank you.

PART C. RECORD/ DOCUMENT DETAILS


Document/ Number of Set
Date Description
Item No. Original E-Copy
15MW DPC Palawan Thermal Power Plant Draft Connection
1 1
Agreement
15MW DPC Palawan Thermal Power Plant Draft Fixed Asset
2 1
Boundary Document (FABD)
3 Annex A Single Line Diagram 1

4 Annex B Dispute Resolution 1

5 Annex C Asset Boundary Diagram 1


-Nothing Follows-

PART D: SENDER

R. B. BARRUELA
Vice President, CAG

NPC-001.F05
Rev. No. 1