Transmitted herewith is the draft copy of connection agreement re: the connection of the DPC 15MW Thermal
Power Plant at NPC’s Transmission System, requesting for your comments and approval.
Thank you.
PART D: SENDER
R. B. BARRUELA
Vice President, CAG
NPC-001.F05
Rev. No. 1
National Power Corporation CAG-CPD-23-0083
DT No.: CAG-SPD-23-036
Date: 15-Mar-23
8.
9.
10.
Transmitted herewith is the draft copy of connection agreement re: the connection of the DPC 15MW Thermal
Power Plant at NPC’s Transmission System, requesting for your comments and approval.