UDCPR An Illustrative Manual Edited
UDCPR An Illustrative Manual Edited
UDCPR An Illustrative Manual Edited
Chapter 1 1
Administration
1.3 Definitions 2
9
Chapter 2
Development permission and Commencement certificate
13
Chapter 3
General Land Development Requirements
3.1 Requirements of Site 14
3.2 Means of access 14
3.3 Regulations for land sub-division and layout 15
3.4 Recreational open spaces 17
3.9 Net plot area and computation of FSI 18
3.11 Relocation of DP- RP sites/Roads 18
3.12 Amalgamation of Plots 19
3.13 Development of cycle track along river and nallah 19
21
Chapter 4
Land Use Classification & Permissible Uses
4.3 Residential Zone - R-1 22
4.4 Residential Zone - R-2 22
4.6 Future Urbanisable Zone 22
4.7 Commercial Zone 23
4.8 Industrial Zone 23
4.9 Loom Industry cum Residential Zone 26
27
Chapter 5
Additional provisions for Regional plan areas
5.0 Generals 28
5.1 For all Regional plan areas 28
Index
Regulation Particulars Page no.
no.
31
Chapter 6
General building requirements- setback, marginal distance, height and
permissible FSI
6.1 Permissible FSI for congested areas/ goathans in metropolitan region & regional 32
plans
6.2 Regulation for outside congested area ( non-congested area ) 34
6.3 Permissible FSI 36
6.4 Industrial buildings 37
6.5 FSI of Green belt 38
6.6 Calculation of Built-up area for the Purposes of FSI 38
6.7 Permissible projections in Marginal open spaces/ Distances 39
6.9 Interior and exterior chowk 40
Chapter 7 41
Higher FSI for certain uses
7.10 Incentive for Green buildings 42
7.12 Building of Smart Fintech Centre 42
Chapter 8 43
Parking Loading & Unloading spaces
8.1 Parking Spaces 44
47
Chapter 9
Requirements of part of Building
9.1 Plinth 48
9.2 Habitable rooms 48
9.3 Kitchen 48
9.4 Bath Rooms, Water Closets, Combined Bath Room and Water Closet 49
9.5 Ledge or Tand/Loft 49
9.6 Cupboard 49
9.7 Mezzanine floor 50
Index
Regulation no. Particulars Page no.
47
Chapter 9
Requirements of part of Building
9.9 Garage 50
9.11 Basement 50
9.14 Balcony 51
9.28 Exit Requirement 51
9.29 Other Requirements of Individual Exit at Each Floor 52
9.30 Architectural Projections 53
9.33 Service floor 53
55
Chapter 10
City Specific Regulations
57
Chapter 11
Aquisition and development of reserved sites in development plans
61
Chapter 13
Special Provisions for Certain Buildings
13.1 Provisions for Barrier free access 62
13.2 Installation of Solar Assisted Water Heating (SWH) System/ Roof Top 65
Photovoltaic
(RTPV) System
67
Chapter 14
Special Schemes
14.1 Integrated township projects 68
14.2 Transit oriented development(TOD) 70
14.3 Affordable housing scheme 72
14.4 Pradhan Mantri Awas Yojana 73
14.7 Slum Rehabilitation Scheme for Other Municipal Corporations 74
14.8 Urban Renewal Scheme 75
14.9 Development of Tourism and Hospitality Services under Community Nature 77
Conservancy Around Wild Life Sanctuaries and National Parks
14.10 Integrated Information Technology Township (IITP) 77
14.11 Integrated logistics park 78
Graphical Dictionary for UDCPR 2020
22
Graphical Dictionary for UDCPR 2020
Chapter I
Administration
1.3 Definitions
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
1
Graphical Dictionary for UDCPR 2020
Chapter I - Administration
Regulation : 1.3 Defintions
15. Atrium– Means a sky lighted and natural/mechanically ventilated area in a building, with no intermediate
floors and used as circulation space or entrance foyer.
Atrium Atrium
Road Road
Atrium
Atrium
16. Balcony– means a horizontal cantilever projection, including parapet, handrail or balustrade to serve as a
passage or sitting out place with at least one side open, except for the railing or parapet wall for safety.
Balcony
Balcony Balcony
2
Graphical Dictionary for UDCPR 2020
Chapter I - Administration
Regulation : 1.3 Defintions
23. Building Height – means the vertical distance measured in the case of flat roofs, from the average level of the ground
around and contiguous to the building or as decided by the Authority to the terrace of last floor of the building adjacent to
the external walls; to the highest point of the building and in the case of pitched roofs, up to the point where the external
surface of the outer wall intersects the finished surface of the sloping roof; and in the case of gable facing road, the mid-
point between the eaves level and the ridge. Architectural features serving no other function except that of decoration,
terrace water tank, staircase roof and parapet wall shall be excluded for the purpose of measuring heights.
LMR
Height of Building
Ht of building
Ht
Avg. Gr lvl
Avg. Gr lvl
Gr.lvl
25. Carpet Area – means the net usable floor area of an apartment.
Enclosed
Balcony Open
Balcony
Second Floor
Canopy
First Floor
Plinth
Ground floor
plinth
Road Side
Margin
3
Graphical Dictionary for UDCPR 2020
Chapter I - Administration
Regulation : 1.3 Defintions
36. Corridor – means a common passage or circulation space including a common entrance space
room
Lift
corridor lobby/Corridor corridor
37. Curb Cut- means a small solid (usually concrete) 38. Detached Building- means a building whose walls
ramp that slopes down from the top surface of a sidewalk and roofs are independent of any other building with
or footpath to the surface of an adjoining street. marginal distances on all sides
Footpath Footpath
Curb cut
46. Enclosed Stair case – means a stair case separated 49.Exit – means a passage, channel or means of
by fire resistant walls and door(s) from the rest of the egress from any building, storeys or floor area to a
building. street or other open space of safety
Exit
Exit
Access
Lift Lobby
FRD
Exit Discharge
4
Graphical Dictionary for UDCPR 2020
Chapter I - Administration
Regulation : 1.3 Defintions
63. Floor space index (F. S. I) – means the quotient 66. Front Open Space/Margin/Setback
obtained by dividing the area covered by P line as
mentioned in Regulation No. 6.6 by the net area of the
plot.
M.O.S.
R.O.S
P Line
Area counted in FSI
building
Area deducted in FSI M.O.S.
S.O.S M.O.S.
S.O.S
Duct
F.O.S.
F.O.S
Plot Road
Road
Building B
Internal Access road
Building C Building D
Plot
6m
Road
>12m wide Road
5
Graphical Dictionary for UDCPR 2020
Chapter I - Administration
Regulation : 1.3 Defintions
87. Mezzanine Floor – means an intermediate floor 96. Parking Space– means an enclosed or unenclosed
between two floors of any story. ,covered or open area or area provided by mechanical
means sufficient in size to park vehicle.
First Floor
Perpendicular Parking
Perpendicular Parking
Parking
Parking
Min. 2.1 mts
Perpendicular Parking
Plinth
Angled Parking
Angled Parking
Angled Parking
Angled Parking
Access Lane
Access Lane
Access Lane
Access Lane
Access Lane
Access Lane
Access Lane
Access Lane
Perpendicular
Perpendicular
L
97. Partition – means an interior non – load – bearing 102. Porch– means a covered surface supported on
barrier, one storey or part – storey in height pillars or otherwise for the purpose of pedestrian or
vehicular approach to an entrance in building.
Third floorFloor
Second
First
Firstfloor
Floor
Partition Wall
Max. Height Partition
= Floor Height Porch
Wall
Ground
Plinth floor
Road Side
Margin
103. Podium – means a floor of a building extending 105. Refuge Area– means an unenclosed space in a
beyond building line’s and used for parking, recreational multi – storied building specifically provided to serve
open space, recreation, fire and building services/ utilities as fire- proof to gather easily for evacuation of the
and incidental purpose, as specified in these regulations. occupants.
Main
Building
Refuge Area
Height of Refuge
15m
building Area
Podium
Plot 24m
Boundary
6m 6m Road
6
Graphical Dictionary for UDCPR 2020
Chapter I - Administration
Regulation : 1.3 Defintions
110. Room Height – means the vertical distance 130.Supported Double Height Terraces – means open
measured from the finished floor surface to the terraces, unenclosed on at-least one side with railing and
finished slab surface of a room. lying wholly within building line with supports underneath
and having minimum height of two floors.
1.50 m 1.50 m
4.50 m
Finished 4.50 m
slab surface
Double ht terrace
of room
Top of Height of
Floor Room
Double ht terrace
Plot
Boundary
Building line
134.Travel Distance – means the distance from the remotest point on a floor of a building to a place of safety, be it a
vertical exit, horizontal exit or an outside exit measured along the line of travel.
7
Graphical Dictionary for UDCPR 2020
8
Graphical Dictionary for UDCPR 2020
Chapter II
Development permission and Commencement certificate
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
9
Graphical Dictionary for UDCPR 2020
Chapter II - Development permission and c.c.
Regulation : Chapter 2 – Development Permission and C.C.
2.4
2.4
Discretionary
powers-relaxation in specific cases
can be granted by Authority
except FSI , FOS & Parking , If
applicable
If proposal is refused
2.5
2.5
Drafting errors
in D.P/R.P may be corrected
by the Authority, if applicable
2.6
Refusal of Grant of
permission permission
10
Graphical Dictionary for UDCPR 2020
Chapter II - Development permission and c.c.
Regulation : Chapter 2 – development permission and c.c.
2.10
2.10
Occupancy Certificate
Authority to issue occupancy certificate
after inspection of work & if no deviation
from sanctioned plan
2.9 2.11
2.9 2.11
Completion certificate
B.C.C. to be furnished by Architect/ Part Occupancy certificate
Licensed Engineer/ town planner/ on request of owner the authority may
supervisor with plans, lift issue part occupancy certificate for a
certificate,structural stability certificate & building or part thereof
CFO NOC etc.
2.8
2.8
Procedure during construction
plinth checking to be done by Architect /
Licensed Engineer/Supervisor.
(10% plinth shall be certified
by the officers of authority /subordinate
officers each shall inspect)
2.7
2.7
Commencement of work
(validity 4 years) * This flow chart may vary from proposal to proposal
if work not commenced with renewal
11
Graphical Dictionary for UDCPR 2020
12
Graphical Dictionary for UDCPR 2020
Chapter III
General Land Development Requirements
3.1. Requirements of Site
3.3. Regulations for land sub-division and
layout
3.4. Recreational open spaces
3.11. Relocation of DP- RP sites/Roads
3.12. Amalgamation of Plots
3.13. Development of cycle track along river
and nallah
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
13
Graphical Dictionary for UDCPR 2020
If the entire site is within a distance of 6 m. from the edge of water mark of a minor water course (like nallah, canal) and
15 m. from the edge of water mark of a major water course (like river).
No construction area
15m
6m
Minor water course/Nallah
Major water course /River
Top of hill
Base of hill
5M
• In case of plot not abutting on a public means of access like street/ roads etc , it shall have access from internal roads.
(a) The width of such access ways in non congested (b) In congested areas, the width of such access ways
areas shall be as follows: shall not be less than 4.5m.
Access
Y
6.0 M
Plot B
X
Public Road
75 M
Access Y
Plot C
X Y
Access 9.0 M
Plot A
X
150 M
14
Graphical Dictionary for UDCPR 2020
Plot A R.O.S.
Internal Road Y
Road
Table No.3A- Internal Roads for Residential Table No.3B - Internal Roads for Non-
Development Residential Development
Y Internal Road
Y
Internal Road
9.0 M 12 M
X X
150 M 150 M
Y Y
Internal Road Internal Road
12 M 15 M
X X
150 M upto 300 M 150 M upto 300 M
Y Y
Internal Road
15 M Internal Road
18 M or more
X X
Above 300 M Above 300 M
C) For Group Housing Scheme Table No.3C- Internal Roads for Group Housing Scheme
Plot Y
Internal Road
3 2 1
7.5m
X Upto 150 M
Internal Road
4
Y
Public road
5
Internal Road X 150 M- 300m
6 7 8 Y
Internal Road
12 m
X 300- 600m
Length of Internal Layout Road
The length of internal road shall be measured from Y
Internal Road 15 m
the farthest plot (or building) to the public street.
X Above 600m
15
Graphical Dictionary for UDCPR 2020
The width of the main street on which the plot abuts shall not be less than 12m in non congested area and shall
not be less than 9m in congested area and one end of this street shall join another street width not less than 9m
9.0
12
.0
M
AD
M
W
RO
W
MW
RO
RO
9.0
AD
AD
Road 9m
The dead end shall be at a level higher
9m
than the main road from where the cul-
de-sac road takes off.
Area= 81 sq.m
The turning space in each case should
not be less than 81 sq.m in area, no
dimension being less than 9 m
U
V
2
W/ U
W/2
V U/2
V
U
V/2 W
Fig. 3A rounding of at junctions at right angled intersections Fig. 3B Rounding off at junctions at acute/ obtuse
intersections
16
Graphical Dictionary for UDCPR 2020
Plot A
Road
R.O.S.
Building
Building
R.O.S.
R.O.S. on ground
Road
Fig. 37
Road
Not more than 50% on terrace of Podium
100% R.G. on ground
OPTION 03 - Entire R.O.S. on podium with 1.5 m strip of un-paved area on the ground along the plot boundary
Plot
Podium line
R.O.S.
Building
Road
Min
10 M R.O.S
X< 20 M
R.O.S
17
Graphical Dictionary for UDCPR 2020
R.O.S
Av B < 20m
Min 10m
Gross Plot
Amenity/ Reservation= b(if
Plot Net Plot
to be handed over to the
(a)
Amenity / Authority)
Reservation
(b) Road Widening/Setback= C
(C) Net plot area a= A-b-C
Road
50 sq.m
10 m Wide Road
100 sq.m
original
12 m Wide Road
original
reservation relocated reservation
reservation
<500M
100 sq.m 50 sq.m 100 sq.m
12 m Wide Road
12 m Wide Road
If the Reservation proposed to be relocated is in The alternative location and size is at least similar
Parts. to the location and size of the Development Plan as
regards access, levels, etc
Relocated
Relocated Owner A Owner B reservation
reservation
reservation
300 M
12 m Wide Road
18
Graphical Dictionary for UDCPR 2020
Road
Road
Original Alignment
Plot
ii) The amalgamation of plots from approved layout which is not desirable from planning point of view (e.g. as shown in
below) shall not be permitted.
Road
Road Road
iii) Land separated by Minor water course or nallah or road may be entitled
for amalgamation provided connecting over bridge or underpass of sufficient
width and strength.
Regulation : 3.13 Development of cycle track along with river and nallah
A distance of 6m. from the edge of minor water Net plot boundary
course( nallah) is to be left as marginal distance.
for construction of any building. A 3m strip of land
from the edge of such water course out of this 6m Gate Gate
distance to be left, shall be available for use as cycle
6M
track for general public. The compound wall shall be
Road
3M
Gate Gate
Cycle track
19
Graphical Dictionary for UDCPR 2020
20
Graphical Dictionary for UDCPR 2020
Chapter IV
Land Use Classification & Permissible Uses
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
21
Chapter IV - Land Use Classification and Permissible Uses Graphical Dictionary for UDCPR 2020
Regulation : 4.3 Residential Zone R1
Residential Zone R1 includes Residential plots abutting on roads below 9m. in width in congested area shown on the
Development Plan and on roads below 12m. in width in outside congested area (i.e. in non-congested area). In case of C
Class MCs, Nagarpanchayats and R.P. areas, the above road width of 12 m. shall be 9 m. in non-congested area.
Residential zone R-2 includes Residential plots abutting 4.4.1. In this zone, the following uses, mixed uses
on roads having existing or proposed width of 9m and may be permitted.
above in congested area and 12m and above in non-
congested area
Sr. no Uses Permitted/not
In case of C class MCs , nagarpanchayats and R.P permitted
areas the above road width of 12m shall be 9m in non a Uses in R1
congested area
b All uses in public Semi-public zone
c Service Industry
Sewage Line
Plot
Water Line
Electricity
DP road 18m Wide Road 12m Wide Asphalt Road
>18m Wide Road
22
Chapter IV - Land Use Classification and Permissible Uses Graphical Dictionary for UDCPR 2020
Regulation : 4.7 Commercial Zone
In commercial zones, buildings or premises shall be used for the uses and purposes given below :
Industries shall include any building or part of a building or structure, in which products or materials of all kinds and
properties are fabricated, assembled or processed.
The service industries as listed in Regulation No.4.4.2 (iv) without restrictions on power requirement,
i
employment, floor area and other restrictions.
Existing Industry
23m
Resi./ Comm.
Buffer Proposed
uses as
needed - 25%
Industrial zone Residential zone
Road
Proposed Residential zone
Industry
23m
Buffer Proposed
Residential
Industrial zone
Road
23
Graphical Dictionary for UDCPR 2020
g. Highway amenities as
permitted in Agricultural
a. Parking Lots. zone with FSI at par with
Industrial Zone.
a)
I R/C
24
Graphical Dictionary for UDCPR 2020
b. The lands in the Industrial Zone in Development Plan, Regional Plan excluding the area of Cotton Textile Mills, but
including land areas in industrial zone in Town Planning Scheme, may be utilised for any of the uses permissible in
Residential and Commercial Zone subject to -
Plot
Road
Plot
Plot
Road Road
Amenity
10% of Land area 50% Unbuildable
Plot
Road
Amenity
Road
Required
23 M
Road
Existing obnoxious
industry
25
Graphical Dictionary for UDCPR 2020
Total holding(T)
Plot A E B Plot A B
DP
DP Reservation
Reservation Area
Area ‘a’ sq.m
‘a’ sq.m
Amenity
Area
‘c-a’ sq.m
D F C D C
Road Road
b.xv)
b.xiv) Plot
Amenity
Accomodation Area/
Reservation
X Adjusted
5%/10%
BUA Residential building
amenity
area
Plot
Road
Provisions of Accommodation Reservation mentioned in Regulation Minimum 10% built up area (basic FSI) for area upto 1 ha. and 5% built
No. 11.1 shall not be applicable for development of amenity space up area(basic FSI) for area more than 1 ha., shall be used for offices
provided in this regulation. and commercial purpose,in case of development undertaken under
this regulation, by closing down the existing industry. However, this
provision shall not be applicable, in case of permission being sought
under this regulation, where such plot falls in industrial zone, without
existing industry.
Loom
Industry
Residential
zone
26
Graphical Dictionary for UDCPR 2020
Chapter V
Additional provisions for Regional plan areas
5.0. General
5.1. For all Regional plan areas
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
27
Graphical Dictionary for UDCPR 2020
In addition to the provisions mentioned in these Regulations, following additional provisions shall be applicable for the
areas of
the Regional Plans / Authorities mentioned herein under. These provisions shall prevail over the provisions, if any,
mentioned in this Development Control and Promotion Regulations to that extent.
For the villages in the area of Regional Plans (excluding the area of Local Bodies and SPA where Development Plan or
planning proposal is sanctioned) where no specific residential zone is shown, for such villages, development permissible
in residential zone, may be permitted :
Note - Conditions applicable for development permissible adjacent to Gaothan -Refer UDCPR regulation 5.1.1
Regulation : 5.1.2 Regulations for Development of Tourist Resorts / Holiday Homes / Township in Hill
Stations Type Areas.
• The developments under the Hill Station Policy shall be governed by the Special Regulations as sanctioned by
Government vide notification No.TPS-1893/1231/C.R. 123/96/UD-13, dated 26/11/1996 and its amendments by
the Government from time to time.
28
Graphical Dictionary for UDCPR 2020
All the modification proposals from Regional Plan already sanctioned by the State Government under section 20(4) of
Maharashtra Regional and Town Planning Act, 1966 but not shown in respective zone in Regional Plan shall be treated as
included in respective Zone as per the modification sanctioned by the State Government.
i). In any layout or sub-division of land for residential purpose admeasuring more than 0.4 Ha. (excluding the area of R.P.
roads, road widening and designations) amenity space shall have to be provided for the areas and specified percentages
mentioned in the diagram below:
Amenity
10%
Plot
Road
29
Graphical Dictionary for UDCPR 2020
30
Graphical Dictionary for UDCPR 2020
Chapter VI
General building requirements- setback, marginal distance,
height and permissible FSI
6.1. Permissible FSI for congested areas/
goathans in metropolitan region &
regional plans
6.2. Regulation for outside congested area(
non congested area
6.3. Permissible FSI
6.4. Industrial Buildings
6.5. FSI of Green belt
6.6. Calculation of built-up area for the
Purposes of FSI
6.7. Permissible projections in marginal open
spaces/distance
6.9. Interior/ exterior chowk
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
31
Graphical Dictionary for UDCPR 2020
Chapter VI - General building requirement- setback, marginal dist. height & perm. FSI
Regulation : 6.1 Regulations for congested area in development plans / gaothans of village settle-
ments in metropolitan region development authorities and regional plans.
Non
Residential Residential
60% 80%
Note:
Conditions as per UDCPR
Regulation : 6.1. Regulations for congested area in development plans / gaothans of village settle-
ments in metropolitan region development authorities and regional plans.
ii. Front Marginal Distances/Setback/ Roadside Margin/s in Congested Area
Table 6B
i. i.
Mixed use
Residential building
Building
2.25m 2.25+1.5m
Road Less than 4.50 m Road Less than 4.50m
ii. ii.
1.5m
32
Graphical Dictionary for UDCPR 2020
Chapter VI - General building requirement- setback, marginal dist. height & perm. FSI
Regulation : 6.1. Regulations for congested area in development plans / gaothans of village settle-
ments in metropolitan region development authorities and regional plans.
iii. iii.
1.00m 2.00m
Road 6.00m to less than 12.00m Road 6.00m to less than 12.00m
iv. iv.
Mix use
Residential building
Building
2.00m 2.50m
Table 6C
iii. Side and rear marginal distance in congested areas
i.
ii. 1.00 Plot boundary
Plot boundary
Plot area = Above1000 to 4000 m2
Road Road
iii. Note:-
Plot area > 4000 m2
As per regulation 6.1.1 of UDCPR
Residential building
Regular Open space as per
non congested area.
Plot boundary
Road
33
Graphical Dictionary for UDCPR 2020
Chapter VI - General building requirement- setback, marginal dist. height & perm. FSI
Regulation : 6.1. Regulations for congested area in development plans / gaothans of village settle-
ments in metropolitan region development authorities and regional plans.
Note:-
vi. Height
sq.m of non
SOS SOS congested
x Above 1000 & x,y x+1, y+1
x area
upto 4000 sqm
Above x,y x+1, y+1
Plot 4000sqm
Road
Regulation : 6.1. Regulations for congested area in development plans / gaothans of village settle-
ments in metropolitan region development authorities and regional plans.
6.1.2 Other buildings like Public/ Semi-Public, Educational, Medical, Institutional, Commercial,
Mercantile, etc..
Road
34
Graphical Dictionary for UDCPR 2020
Chapter VI - General building requirement- setback, marginal dist. height & perm. FSI
Regulation : 6.2 Regulation for outside congested area ( non-congested area )
3. Min 10.00
4.
Min 10.00
Min Plot area 200
Min Plot area 250 1.50 sq.mt.
2.0 sq.mt. 10m height G+2 or Stilt+3
Min Plot size
excluding 6m 200 sq.m Floor
Min Plot size
250 sq.m Parking floor Residential mix
use building
Residential mix
use building 1.50 1.50
2.0 2.0
3.00
4.5
1.50
Pathway
Row housing Row housing Row housing Row housing Row housing 0.9
EWS/LIG EWS/LIG EWS/LIG EWS/LIG EWS/LIG
0.9
2.25
Road
35
Graphical Dictionary for UDCPR 2020
Chapter VI - General building requirement- setback, marginal dist. height & perm. FSI
Regulation : 6.3 Permissible FSI
Note (iv): -
If the plot is abutting the service road or layout road or plots facing major road, then width of the highway or major road
shall be considered for maxm. perm. FSI.
Subdivided plots
W
Width of road to be
Highway/ Major Road considered= W
W
Service Road
Plot Plot
Strip of land for road widening
W
Note (xiv): -
For maxm. FSI calculations:
I. Basic FSI on net plot area after deducting area under roads, reservations / amenity open space.
II. For premium FSI & TDR gross area of the plot is to be considered i.e., including roads, reservations / amenity open
space, if it is surrendered to authority
Max. Build-
Area under
Net plot= A reservation ing Potential
Amenity
space = B
36
Graphical Dictionary for UDCPR 2020
Chapter VI - General building requirement- setback, marginal dist. height & perm. FSI
Regulation : 6.3 Permissible FSI
Note (xii): -
In case of plot having approach by dead end, the maxm. perm. FSI willl be permitted if the length of road does not
exceeding 100 mts.
Internal Road
Plot
Plot
>100 mts
Internal Road
<100 mts
w
Municipal road
W
Municipal road
W
6m
Existing 6m wide road
9m
1.5m
the maxm. perm. FSI/T.D.R shall be considering 9.00 mts
wide road.
R.L. of 9.00 mts
Table No. 6 H
1. 2.
3.00
2.25
3. 4.
3.00 4.50
37
Graphical Dictionary for UDCPR 2020
Chapter VI - General building requirement- setback, marginal dist. height & perm. FSI
Regulation : 6.4 Industrial building
5.
6.00
Above 500 and Note:-Permissible FSI =
Sp Industrial being • Basic FSI(1.00) + Premium FSI(0.40)
6.00 building 6.00 special building. • 80% ancillary FSI on proposed BUA
6.00
FSI of green belt zone will be permitted on remaining land by counting the area of green zone in gross plot area.
a) Maximum permissible FSI to be on gross plot area a + b as per road width and to be utilised on net plot A.
b) Green belt to be always under tree cover.
Road
W
Road
38
Graphical Dictionary for UDCPR 2020
Chapter VI - General building requirement- setback, marginal dist. height & perm. FSI
Regulation : 6.6 Calculation of Built-up area for the Purposes of FSI
SERV. SERV.
DUCT C.B
BALC. BALC. C.B DUCT
F.F.
LOBBY
Indicates BUA line
DUCT
ELEC
DUCT
Indicates free of FSI line
UP DN
UP DN
TOIL. SERV. SERV. TOIL.
DUCT SERV.DUCT SERV.DUCT DUCT
2 1
W.C. W.C.
BATH BATH
D2
M. BED RM. LIV. / DIN. LIV. / DIN. M. BED RM.
PASS PASS
BALC. BALC.
KIT. KIT.
BED RM. BED RM.
C.B.
C.B.
AS PER UDCPR
d. 1.50 MOS
Canopy
Entrance
5.0
Building to building
2.5
Plot Gate
Road
39
Graphical Dictionary for UDCPR 2020
Chapter VI - General building requirement- setback, marginal dist. height & perm. FSI
Regulation : 6.9 Interior and exterior chowk
Habitable room
or kitchen deriving
ventilation through
chowk
Section XX
Y Y
External Chowk
H/7
HT upto 17m x=2.4m
HT beyond 17 m x= H/7
Section YY
40
Graphical Dictionary for UDCPR 2020
Chapter VII
Higher FSI for certain uses
7.10 Incentive for Green buildings
7.12 Building of Smart Fintech Centre
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
41
Graphical Dictionary for UDCPR 2020
Incentive
for Green
Building
3% on 5% on 7% on
basic basic basic
FSI FSI FSI
•Incentive FSI will be awarded only after certification from empanelled agency.
•The incentive FSI will be exclusive of limits specified in UDCPR.
•In case developer fails to achieve the committed rating, penalty at the rate of 2 times the land cost as per ASR for the
incentive FSI for the rating not achieved
Plot Plot
24 m or
18 m Road Road
more
ii) Amenity open space is not required for plot area up to 2.00 hectare.
iii) At least 85% of total proposed built-up area (excluding parking area) shall be permitted for business of fin-tech
(start-ups, incubators and acclerators), banking and financial service including nbfc and insurance, and it/ites with focus
on fin tech.
42
Graphical Dictionary for UDCPR 2020
Chapter VIII
Parking loading & unloading spaces
8.1. Parking spaces
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
43
Graphical Dictionary for UDCPR 2020
Chapter VIII -Parking loading & unloading spaces
Regulation : 8.1 Parking spaces
Regulation 8.1.1 General Space requirements
ii) Size of parking spaces
Note : In the case of parking spaces for motor vehicle, upto 50
Transport vehicle /
present of the prescribed space
Ambulance / Mini Bus.
may be of the size of 2.3 m. x 4.5 m
≥7.5 M
5M
4.5M
2M
car parking
Plot
Building
scooter parking
Road
Aisle
Fig. 116
44
Graphical Dictionary for UDCPR 2020
Chapter VIII -Parking loading & unloading spaces
Regulation : 8.1 Parking spaces
Regulation 8.1.1 General Space requirements
v) Composite parking.
The composite parking of vehicles like one car with two scooters may be allowed. Also, six scooters’ parking may be
allowed to be converted in one car parking. In such cases, drives or aisles shall be required taking into consideration
entire composite parking.
Driveway 3 M Driveway 3 M
6 scooter’s parking
converted to 1 car park
Driveway 3 M Driveway 3 M
Driveway 3 M
Driveway 3 M
45
Graphical Dictionary for UDCPR 2020
46
Graphical Dictionary for UDCPR 2020
Chapter IX
Requirements of part of Building
9.1. Plinth 9.30 Architectural projections
9.2. Habitable rooms 9.33 Service floor
9.3. Kitchen
9.4. Bath Rooms, Water Closets, Combined
Bath Room and Water Closet
9.5. Ledge or Tand/Loft
9.6. Cupboard
9.7. Mezzanine floor
9.9. Garage
9.11. Basement
9.14. Balcony
9.28. Exit Requirement
9.29. Other Requirements of Individual Exit at
Each Floor
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
47
Graphical Dictionary for UDCPR 2020
Chapter IX - Requirements of part of Building
Regulation : 9.1 Plinth
Building Building
Plinth level
Plinth level 45cm
30cm
Stilt/covered
parking
Plinth level
15cm
Ground level
Min 2.75 m.
Min 2.40 m.
Max 4.50 m.
Max 4.50 m.
2. Pitched Roof
Regulation : 9.3 Kitchen
Av. ridge LVL
48
Graphical Dictionary for UDCPR 2020
Chapter IX - Requirements of part of Building
Regulation : 9.4 Bathrooms, water closets, combine bathrooms & water closet
1.2m
0.9m
v=0.3m2 v
1m 0.9m
0.3m
1.5m
v
1m v
min. 2.1m
Height
2m Max 1.50m
Plan Section
(In commercial building) (In commercial building)
Plot boundary
w
0.6m
Bedroom
6m
49
Graphical Dictionary for UDCPR 2020
Chapter IX - Requirements of part of Building
Regulation : 9.7 Mezzanine floor
1.80
Min 2.10m Habitable floor
Area=X
Section
2.50
F.O.S
3.00
Garage 5.0 Garage size not more than
3.00 x 6.00m
S.O.S Main Building S.O.S
7.50
F.O.S
Road
c) e)
building line building line
Basements 02 Basements 02
2.40 2.40
Strictly for parking Strictly for parking
Basements 03 Basements 03
2.40 Strictly for parking 2.40 Strictly for parking
50
Graphical Dictionary for UDCPR 2020
Chapter IX - Requirements of part of Building
Regulation : 9.14 Balcony
Balcony
Parapet upto 24m 24m &
2.00 in HT
Balcony First floor above in
height
<1m>2m
6.00m Ground floor
4.50
Section in non-congested area upto 24m height 9.14 i). Section in non congested area
24m & above in height
Max. travel dist. Max. travel dist. Max. travel dist. Max. travel dist.
22.5m 22.5m 30.0m 30.0m
51
Graphical Dictionary for UDCPR 2020
Chapter IX - Requirements of part of Building
Regulation : 9.28.7 Staircase
15m
Refuge Floor
Cantilever
floor projection
Refuge Floor
39m 24m
39 m
24m
Gr. lvl
Gr. lvl
a) Refuge area for building with height 24 - 39 M b) Refuge area for building with height > 39 M
52
Graphical Dictionary for UDCPR 2020
FIRE TOWER
Horizontal
projection
H/20 sub to min
0.3 and max
3m exclusive of
margin necessary
for fire fighting
vehicles
HT > 70m
53
Graphical Dictionary for UDCPR 2020
54
Graphical Dictionary for UDCPR 2020
Chapter X
City Specific Regulations
10.0. General 10.12. Maharashtra Airport Development
10.1. Pune City Municipal Corporation Company Notified Area
10.2. Thane Municipal Corporation area 10.13. Bhiwandi Surrounding Notified Area.
10.3. Nagpur Municipal Corporation 10.14. CIDCO Area Excluding NAINA Area
10.4. Nagpur Metropolitan Region Development 10.14A. CIDCO Area within Panvel Municipal
Authority Corporation
10.5. Nashik Municipal Corporation 10.15. Certain Regulations Cease to Operate in
10.6. Vasai-Virar City Municipal Corporation Future
10.7. Mira-Bhayandar Municipal Corporation
10.8. Ulhasnagar City Municipal Corporation
10.9. Kolhapur Municipal Corporation
10.10. Navi Mumbai Municipal Corporation
10.11. National Park and Tungareshwar Eco
Sensitive Zone.
NOTE-To be referred in UDCPR
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
55
Graphical Dictionary for UDCPR 2020
56
Graphical Dictionary for UDCPR 2020
Chapter XI
Acquisition and development of reserved sites in
Development plans
11.2. Regulations for grant of transferable
development rights
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
57
Graphical Dictionary for UDCPR 2020
Chapter XI - Aquisition and development of reserved sites in development plans
Regulation : 11.2 Regulations for grant of transferable development rights
TDR Surrender of area of land, subject to LAR Act at the rate given below :-
Note :-
i) The quantum of TDR generated having total legal impediment / constraint on construction or
development like CRZ / Hazardous zone / Low Density zone, shall be 50% of TDR generated
as prescribed above.
ii) The quantum of TDR generated for Bio Diversity Park reservation shall be 8% of gross area.
iii) To be handed over free from all encumbrances and free of cost.
iv) In case leveling / compound wall is not possible then TDR shall be reduce 1:1.85 and 1:2.85
Or pay the cost of leveling / compound wall
Incentive TDR of 5% incase owner, submit the proposal within 2 years.
Incase of lease land, lessee paying the amount of lessor’s interest as per LAR Act 2013.
For Example :-
The land under reservation of _____Market adm 4000 Sq mtr as per reg. for municipal A Class 40% land and
50% construction to be handed over to Authority.
1600 sq Mtr land and 2000 Sq Mtr construction to be handed over to Authority.
The TDR generation = (A /B x 2.00) x Constructed BUA
= 27500 / 20000 x 2.0 x 2000
= 5500 sq.mt.
A B
=cost of construction of amenity in rupees = land rate per sq.m. as per the ASR
as per the rates of construction mentioned in B= 20000
Annual Statement of Rates (ASR)
A= 27500
58
Graphical Dictionary for UDCPR 2020
Chapter XII
Structural safety, water supply, drainage and sanitary
requirements, outdoor display and other services.
12.5 Water supply, Drainage and Sanitary
requirements
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
59
Graphical Dictionary for UDCPR 2020
Chapter XII - Structural safety, water supply, drainage and sanitary requirements, outdoor display and other
services
Regulation : 12.5 Water supply, Drainage and Sanitary requirements
60
Graphical Dictionary for UDCPR 2020
Chapter XIII
Special Provisions for certain buildings
13.1.3. Site development
13.1.4. Building requirements
13.2 Installation of Solar assisted water heating
(SWH) system/ Roof Top photovoltaic (RTPV)
system.
13.3 Rainwater harvesting
13.4 Grey water recycling and reuse
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
61
Graphical Dictionary for UDCPR 2020
Chapter XIII - Special provisions for certain buildiings
Regulation : 13.1.3 Site Development
3.6m
30M
Ramped approach
Stepped entry
upto 9m
Non slip material
Min clear
800mm
opening 900 mm
Min. 300mm
62
Graphical Dictionary for UDCPR 2020
Chapter XIII - Special provisions for certain buildiings
Regulation : 13.1.4 Building requirements
Min 2000mm
7. Stairways
Extend 300mm on
top and bottom
12
11
10
9
Extend 300mm on 8
7
top and bottom 6
5
4
3
800mm 2 Max. 12 steps per flight
1
Max. 150mm riser
8. Lifts
CONTROL
PANEL
Min 1800mm
≥900
Lift lobby
≥2.0M
900
1000
≥1.1M
Min 1800mm
63
Graphical Dictionary for UDCPR 2020
Chapter XIII - Special provisions for certain buildiings
Regulation : 13.1.4 Building requirements
9. Toilets
900mm
700mm
700mm 350mm
600mm
≥1500mm
1500mm
600 mm-1050 mm
500mm
750 mm
500 mm
550 mm
1080mm
1750mm
Note
300mm 300mm
25mm 25mm 50mm
25mm 25mm
25mm 25mm
300mm
5mm 5mm
35mm 35mm
64
Graphical Dictionary for UDCPR 2020
Chapter XIII - Special provisions for certain buildiings
Regulation : 13.1.4 Building requirements
2. Proper signage
Regulation : 13.2 Installation of Solar assisted water heating (SWH) system/ Roof Top photovoltaic (RTPV) system.
Roof/ Terrace
65
Graphical Dictionary for UDCPR 2020
Chapter XIII - Special provisions for certain buildiings
Regulation : 13.3 Rain water harvesting
Storage tank
Recharge pit 2x2x2m
To Groundwater
These Regulations shall be applicable to all Developments/ Redevelopments/part Developments for the uses as men-
tioned under Regulation No. 13.4.1 to 13.4.6 shall have the provision for treatment, recycling and reuse of Grey Water
Typology Condition
66
Graphical Dictionary for UDCPR 2020
Chapter XIV
Special Schemes
14.1. Integrated township projects
14.2. Transit oriented development(TOD)
14.3. Affordable housing scheme
14.7. Slum Rehabilitation Scheme for Other
Municipal Corporations
14.8. Urban Renewal Scheme
14.9. Development of Tourism and Hospitality
Services under Community Nature
Conservancy Around Wild Life
Sanctuaries and National Parks
14.10. Integrated Information Technology
Township (IITP)
14.11. Integrated Logistics Park
Disclaimer - All contents and the information in this book is a graphical dictionary on UDCPR which for the purpose of better
understanding, however for exact interpretation of the regulation UDCPR dated 02 December 2020 and amendments made from time to
time may be referred and that will be treated as final for all legal interpretation.
67
Graphical Dictionary for UDCPR 2020
Bridge
ROAD
lla
Na Bridge
WIDE
18 M
ad
ay Ro
ilw
Ra
Plot
ii). If the Integrated Township area is more than 200 Ha., it can be segregated as long as each parcel is more
than 40 Ha. and is located within a radius of 5 kms. Provided that the land use mix is maintained in each par-
cel.
40 Hectares 40 Hectares
5km 5km
40 Hectares
5km 5km
40 Hectares 40 Hectares
68
Graphical Dictionary for UDCPR 2020
Approval
Process Declaration of project as ITP
(14.1.1.4) 90 Days
Government consultation
Time period to
apply LOI
2 years+2years
PP applies
for LOI
Working
10 Days PP applies 45 Days
For MLP
2 months
Remarks
to PP applies With EC
Collector for building Clearance
permission 30 Days
1 month
Apply for EC
69
Graphical Dictionary for UDCPR 2020
500m
Last
metro
station 500m
Longitudnal
500m
`` ``
70
Graphical Dictionary for UDCPR 2020
Road Road
9-15 M & Above
9 M & < 12m
``
9M & <12M
`` ``
Road Road
12M & <15M 15M & Above
H/2-4 H/5
H/2-4 H/5
Building Building
Road
Road
ht<15m ht=>15<24m
H/2-4 H/5
Plot Plot
71
Graphical Dictionary for UDCPR 2020
6.0m residential,commercial,
special buildings NOTE 2:
max 12m The Municipal Commissioner may relax the
side & rear marginal distances as per Regu-
max 12m
H/5 lation No. 2.4 of UDCPR subject to following
H/5 provisions.
A) If clear minimum marginal distance is
Building
proposed from one side as per these Regula-
ht>24m
Road
tion then other side marginal distance may be
relaxed up to 50%.
B) Front margin relaxation to allow additional
max 12m
H/5
FSI may be granted subject to condition
Plot
that the Minimum road width shall be 12 m.
and above.
b) Minimum plot
(A x B) - (C x D) - (E x F) = min plot 4000 sq.m E e) & f) To be handed over
to ULB
1/4 th
Existing or Proposed
land 3/4 th
DP
C Affordable Free sale
Reservation
Access
Setback
housing
F
B A X B = Gross Plot component
15% shops/
C x D = Dp reservation commercial
D
Plot FSI 3 FSI 3
18.0 m
A
Road
Table 14 S
72
Graphical Dictionary for UDCPR 2020
Affordable housing for EWS/LIG shall be permitted, in following areas, subject to conditions
2km 1km
Municipal
Municipal Council/
Corporation Nagar
panchayat
73
Graphical Dictionary for UDCPR 2020
Passage
6.1.1 ( 60% to R & 80% to NR ancillary area. Not applicable to Rehab flat 1 Rehab flat 1
D
SRA schemes.
• Amendment proposed vide notice dated 2.12.2020
FSI =4.00 or Rehab area + incentive FSI whichever is more A
with minimum tenement density of 650 per net hectare. Due
to local planning constraints and viability of slum rehabilitation
project , tenement density norms of 650 net per hectare may be
reduced upto 25% by CEO , SRA subject to minimum tenement
density of 500 per net hectare
2. Anganwadi
9. WEC
74
Graphical Dictionary for UDCPR 2020
Determination of
Preparation of URP Selection of eligibility of occupants
by authority URC>10000MR by authority
Proposal to HPC
Forward
for final
proposal
HPC State Govt. Final Implementation agency
Approval
75
Graphical Dictionary for UDCPR 2020
A A
A x B = 10000m2 (min) A x B = 4000m2 (min)
B (Municipal corporation B (Municipal corporation
non congested area) congested area)
Note:
• If plot is not bounded, cluster to be finalized by municipal corporation in consultation with High power committee
(HPC).
• In case of demonstrable hardship in non congested area, min. area can be reduced to 8000m2 by Municipal
commissioner with HPC.
Regulation : 14.8.9 Planning for Rehabilitation and Free Sale Plots in URS
Road
76
Graphical Dictionary for UDCPR 2020
Regulation : 14.9.2
Max Height 9m
Gr
Plot
Divide by nalla, canal
or by
Min- 10 ha (25 acres) existing or prop. roads
(one place, inbroken, & railways etc
continous)
Bridge IRD made by
developer
Any suitable area in Regional plan or Development plan Integrated IT Township is divided by one or more water
having access by means of an existing courses (such as nallahs, canal,
road or a proposed Regional plan/Development Plan etc.)existing or proposed roads of any width or
road having a minimum width of 18.0 m. railways, etc. then such area shall be considered to be
can be identified for the purpose of development as continuous, unbroken and uninterrupted, subject to the
Integrated IT Township. condition that the developer shallconstruct necessary
connecting roads or bridges as per site requirements.
77
Graphical Dictionary for UDCPR 2020
River/ Lake
20%
Park
Max. perm.
FSI
Plot 5 acres
30%
Support Industrial use
&
70% Logistic services
common
facility
78
Graphical Dictionary for UDCPR 2020
Note:
20,000 sq.ft. BUA with
• LOI. - from Department of Industries. base FSI
• Min validity = 3 years of LOI 20%
Support
• Extension = 3yrs + 3yrs = 6yrs &
common 80% Logistic services
facility
Regulation : 14.11.6 Upto 200% Additional FSI for Integrated Logistics Park & Logistics Park
For Integrated Logistic Parks & Logistic Parks, the FSI permissible for Industrial Zone as per these regulations shall be
applicable. Upto 200% of additional FSI shall be admissible over and above the basic FSI for development of Integrated
Logistic Park & Logistics Park with or without premium as follows :-
Premium
as per
location of
parks
For Integrated Logistic Park & Logistics Park, height of building upto 24.mt. or as per requirement shall be permitted.
79
Graphical Dictionary for UDCPR 2020