4) What is the out of roundness radius tolerance measured at 1 foot above the shell to
bottom for a reconstructed 70-foot diameter tank?
Answer: 420.75 " to 419.25 " Ref: API 653, Table 4.4
D= 70 Feet , R = 35 feet = 35 x 12 = 420 in. +/- ¾
R= 420.75 " to 419.25 "
5) Reference to the figure below, Does cut the extend past or stop short of extend
beyond an existing bottom plate weld is meet the requirements of API 653 if the
shell thickness is 0.5 inches?
Answer: No,the cut shall extend past or stop short of extend beyond an existing
bottom plate weld by at least 3 ‘’ Ref: API 653, Figure 9.1, Note 3
C = 3 inches or 5t, use the greater value
C= 3 inches or 5 x 0.5’’ =2.5 so C = 3 in.
Answer: not less than 3/16” (Must know ½ max. and 3/16-inch min. rules)
9) What is allowed to be done to tombstone type reinforcing plate when adding new
bottom to tank?
Answer: a) Trim reinforcing plate to increase spacing between welds. / b) Move The existing
penetration by cutting the section of the shell containing the fitting and reinforcing plate,
and raising the entire assembly to the correct elevation / c) Remove the existing reinforcing
plate carefully install a new reinforcing plate. All of the above
11) Minimum number of additional spot radiographs required for 1 in. rectangular
shell plate replacement shell as per API-653 is
Answer: 6 films Ref: API 653, 12.2.1.6.2
12.2.1.6.2 For square and rectangular replacement plates, at least one radiograph shall be taken in a vertical joint,
and at least one in a horizontal joint, and one in each corner. When the square or rectangular replacement plate is
located in a shell plate with thickness exceeding 1 in., the vertical joints shall be fully radiographed.
11) New tank constructed from ASTM A 36 shell plate with wall thickness of 1.6
inches. What Minimum preheat Temperature is Required?
Answer: 200 °F (93°C ) Ref: API 650, TABLE 7.1b
13) What is the maximum filling rate for the top shell course during a hydro test for a
repaired tank having a ½” thick bottom shell course?
14) Using data from below, calculate MRT. (metal loss from the bottom side corrosion). Or
= 10 years, RTbc = .200, RTip = .190, StPr = .002 and UPr = .010
Answer: 0.080 in. Ref: 650, 4.4.5.1
15) Using data from below, calculate MRT. (metal loss from internal corrosion). Or =
10 years, RTbc = .200, RTip = .190, StPr = .002 and UPr = .010
Answer: 0.070 in. Ref: 650, 4.4.5.1
16) What is the Sulfuric acid corrosion rate if the Sulfuric acid 85% and Temperature
125 ºF?
Test questions will be based on the following mechanisms only:
Section 3: Definitions
4.2.7 - Brittle Fracture
4.2.16 - Mechanical Fatigue
4.3.2 - Atmospheric Corrosion
4.3.3 - Corrosion Under Insulation (CUI)
4.3.8 - Microbiologically Induced Corrosion (MIC)
4.3.9 - Soil Corrosion
4.3.10 – Caustic Corrosion
4.5.1 - Chloride Stress Corrosion Cracking (Cl-SCC)
4.5.3 - Caustic Stress Corrosion Cracking (Caustic Embrittlement)
5.1.1.10- Sour Water Corrosion (Acidic)
5.1.11 - Sulfuric Acid Corrosion
18) What will be Allowable hydrostatic test stress for ASTM A-516, Grade 65 in
bottom shell course in reconstruction tank?
Answer: 30,700 psi. Ref: API 653, Table 4.1
19) What will be Allowable product test stress for ASTM A-285, Grade C for Bottom
Course in new tank?
Answer: 20,000 psi. Ref: API 650, Table 5.1b
20) A new tank is to be hydrostatically tested. The tank is constructed from ASTM
A36 steel. What allowable stress must be used to determine the maximum
hydrostatic test head for the tank?
Answer: 24,900 psi. Ref: API 650, Table 5.1b
22) During an inspection, you are required to calculate the retirement thickness for
the bottom course of a tank. The information available is as follows: -
Nominal tank diameter 150 ft , Total height of tank 30 ft
Maximum fill height 30 ft , Number of courses equally spaced 5
Specific gravity of contents 0.85 , Construction code API 650 basic standard 5th edition
Material of construction A283 C
25) What is the minimum size fillet weld required on each side of the shell plate
attaching to the annular plate? The shell plate is 1.25” thick.
Answer: 5/16 in. Ref: API 650, 5.1.5.7 (a)
26) Reconstructed AST has product specific gravity less than 1 of unknown material and
thickness of first shell course is 0.5 in and its Stress 23,600 psi, the required annular
bottom plate minimum Thickness is
Answer: 0.17. Ref: API 653,4.4.6.2 /Table 4.5
27) If the first course of a new tank fabricated from the material Group I and the
design metal temperature is -7 °C (20 °F), determine the thickness of the material
that not require impact test?
Answer: 0.5 in. Ref: API 653, 4.2.10.1/ Figure 4.1b
28) What is the maximum Internal Inspection interval for a ¼ in. bottom that has a a
fiberglass lining?
Answer: 15 years. Ref: API 653, 6.4.2.1.1/Table 6.1
10 years (initial) + 5 years (fiberglass lining)) = 15 years
29) What is the maximum Internal Inspection interval for a ¼ in. bottom that has a
release prevention barrier and a fiberglass lining?
Answer: 25 years. Ref: API 653, 6.4.2.1.1/Table 6.1
10 years (initial) + 5 years (fiberglass lining) + 10 years (release prevention barrier) = 25 years
30) What is the maximum Internal Inspection interval for a ¼ in. bottom that has a
release prevention barrier and Thin-film coating?
Answer: 22 years. Ref: API 653, 6.4.2.1.1/Table 6.1
10 years (initial) + 2 years (Thin-film coating) + 10 years (release prevention barrier) = 22 years
33) What is the allowable edge settlement of a 120 feet diameter tank that has an area
of settlement that starts to slope (radius of settled area) 4 feet from the shell and
the bottom lap weld is approximately parallel to the shell?
Answer: 4.6 inches Ref: API 653, B.3.4.1 /Fig. B11
Answer: an engineer experienced in storage tank design and the evaluation methodologies
used.
36) What is allowed to be done to tombstone type reinforcing plate when adding
new bottom to tank?
Answer: The existing reinforcing plate may be removed, modified and re-installed after
the new shell-to-bottom weld is complete Ref: API 653, 9.9.4 (e)
37) When removing an existing tank bottom, All arc-gouged areas of the tank shell-
to-bottom weld shall be , and defective areas repaired and re-
examined.
Answer: magnetic particle examined. Ref: API 653, 9.10.2.3
38) With regard to installation of primary and secondary seals, what must be done if
the roof rim thickness is less than 0.10 inch?
Answer: It shall be replaced. The new roof rim shall be 3/16 inch thickness minimum.
9.13.6.2 If the roof rim thickness is less than 0.10-in. thick, it shall be replaced. The new roof rim shall be 3/16-in. thickness,
minimum. Ref: API 653, 9.13.6.2
39) If a repair/modification weld is made on a tank shell plate that is thicker than 1ʺ,
the base metal within 3ʺ inches of the welding shall be heated to a temperature
of approximately degrees.
Answer: 140 F (Preheat worm to hand) Ref: API 653, 10.4.2.3
40) When welding horizontal and vertical joints constructed of material that is over
1.5” thick, based on the thickness of the thicker part, what is the required preheat
temperature?
Answer: 200°F Ref: API 653, 10.4.4.3
41) Roof Insulation Inspect for
Answer: wet insulation under the weather coat. Ref: API 653, C.1.4.6
46) What is required for repair to vertical joints in a tank that has a MDMT of 15 F?
Answer: impact tests required Ref: API 650, 9.2.2.3
47) {What liner is best suited for crude storage at 200 F (94 C)?}
Answer: Epoxy/amine Ref: API 652,6.4
Epoxy/amine Water, light products, distillates, aromatics, crude, and gasoline 160–220 (71–104 C)
Vinyl Water, crude oil, aromatics, solvents, alcohols, gasohol, oil, and chemicals 180 – 220 F (82 –
104 C)
49) Regarding extent of MFL, the numbers of measurements taken for a statistical
sampling will depend on the size of the tank and the degree of soil-side corrosion
found, Typically_______________.
Answer: 0.2% to 10% of bottom should be scanned randomly using statistical sampling
Ref: API 575, 8.4.4
50) What current shall be applied to determine if adequate CP has been achieved?
Answer: 850 mV Ref: API 651, 8.2.2.1
61) To check swing lines, scribe the flexible joint across the two moving faces and
raise end of swing line to check the joint’s _.
Answer: freedom of movement. Ref: API 653, C.2.11.6 (b)
62) Name plate information, drawings, specification, results of test and analysis shall
be part of which type of records.
Answer: Repair/alteration history, operational records, construction records.
Ref: API 650, 6.8.2/ 6.8.3/ 6.8.4
63) Brittle fracture least likely for _.
Answer: a tank shell thickness is no greater than 0.5 in.
Ref: API 653, 5.3.5/ step 4
64) If corrosion is noted on tank roof and top of shell, which statement is true?
Answer: structural members may be twice the rate of thinning of the roof or shell.
Ref: API 575, 8.4.8
65) Corrosion rate of roof structure as compared to shell and roof.?
Answer: double.
Ref: API 575, 8.4.8
66) One of the conditions hydrotesting is not required IF stress in the repair area
shall not exceed .
Answer: 7000 psi. Ref: API 653, 12.3.2.3.3 (C)
69) Prior to blasting surface FOR the area to be lined shall be essentially cleaned
from
Answer: Oil, tar, grease must be removed (all hydrocarbon residues) Ref: API 652, 7.2.1
70) As Per API 650, what action is to be taken if the Openings in tank shells larger
than required to accommodate a NPS 2 flanged nozzle?
Answer: Nozzle shall be reinforced Ref: API 650, 5.7.2.1.
{Note: - No reinforcement required for nozzles 2” and smaller}.
72) The RBI assessment shall be reviewed and approved by a team at intervals not to
exceed .
Answer: 10 years or more often if warranted by process, equipment, or consequence
changes. Ref: API 653, 6.4.2.2.1.
73) Which standard refers for design of partial vacuum condition of tanks?
Answer: 650 Appendix V. Ref: API 653, 4.2.4.2
74) Seams of riveted tank can be checked by .
Answer: running a thin-bladed scraper or knife along the riveted seam.
Ref: API 575, 8.4.4
75) On a fixed roof, planks long enough to span at least----------------- rafters should
laid to use as walkways for inspection?
Answer: TWO (2). Ref: API 575, 8.2.9
Answer: atleast 5 °F (3 °C) above the dew point temperature and the relative humidity
should be below 80 % at the steel surface. Ref: API 652, 8.3
77) What is the primary purpose of post weld heat treatment (PWHT)?
Answer: To reduce (relieve) residual stresses. Ref: API 577, 10.6
78) {Minimum number of radiographs that shall be taken to a circular butt welded
insert plate in a shell 1/2" thick} / {Minimum number of radiographs that shall be
taken to for circular replacement ¾ in. shell plate is .}
Answer: One (6 in.) Ref: API 653, 12.2.1.6.1
{Note: - 100% RT for T > 1 inch}
79) If corrosion rates are known, external UT measurements of a new tank shell
shall be made .
Answer: the smaller of RCA/2N {1/2 Remaining life} years or 15 years.
83) A PQR test uses SMAW process to weld on a 5/8-inch-thick plate. Maximum
thickness of production weld qualified is .
Answer: 1 1/4 inches. (2T = 2x 5/8= 1-1/4 inches) Ref: ASME IX , Table QW-451.1
84) Which of the following must be included in a PQR?
Answer: Certification signature and date Ref: API 577, 6.4.3
Bassam Ghreeb Abdelazeem
+966538391734 [email protected]
www.eliteservices-int.com
19
85) The thickness of plate to be used for shell replacement shall be the maximum
thickness of the adjoining member except in which condition .
Answer: where the adjoining plate is a thickened insert plate. Ref: API 653, 9.2.1
88) Which alternative method can be used if internal inspection is required only to
assess the bottom plate?
Answer: Scanning of bottom using robotic equipment (ultrasonic robotic thickness
measurement). Ref: API 653, 6.4.1.2
89) {Minimum diagnostic length of a radiograph is .} / {What is the
minimum length of radiograph to be taken for a reconstructed tank?
Answer: 6 inches Ref: API 653, 12.2.1.7
90) Calibrations shall include the complete ultrasonic system and shall be
performed .
Answer: prior to use of the system in the thickness range under examination / prior to
and at the completion of an examination. Ref: API 577, 9.9.3.1
91) RT Densitometers shall be calibrated .
Answer: at least every 90 days. Ref: ASME V, T-262.1
Bassam Ghreeb Abdelazeem
+966538391734 [email protected]
www.eliteservices-int.com
20
92) The density of step wedge comparison film and densitometer calibrations shall be
verified by using calibrated step wedge film traceable to .
Answer: National standard (step tablet). Ref: ASME V, T-262.1(a)
93) When a welder is qualified as per an approved WPS under what conditions a
requalification is required?
94) An existing above storage tank, 40 feet Nominal tank diameter, ¾ in. thick shell,
material not known (unknown toughness) requires hot tapping of 4 NPS, 6 NPS, NPS 8
and NPS10 nozzles. Which of the following statement is true?
Answer: only diameter of 4 in. NPS nozzle can be made. Ref: API 653, 9.14.1.1 (b)(1)
95) All fasteners and washers used for Internal Floating Roofs for installation of seal
joints, including fabric seal joints, shall be .
97) {Welder symbol is not required for which type of joints?} / {Which of the
following types of welds do not need welder identification?}
Answer: Roof plate welds and flange-to-nozzle-neck welds. Ref: API 653, 11.2.2
99) {Who should carry out RBI assessment} / {The RBI assessment shall be
performed by }
Answer: Personal knowledge in RBI methodology and Tank Design
Ref: API 653 ,6.4.2.2.2
100) For Recertification purpose, as per API 653 "Actively engaged as inspector " is
defined as which of the following .
Bassam Ghreeb Abdelazeem
+966538391734 [email protected]
www.eliteservices-int.com
21
101) When checking for hydrogen blisters during an internal inspection of the shell
and bottom of a tank using flashlight, the flash light beam gives best results when
held .
Answer: Parallel and closed to the surface to be inspected. Ref: API 575, 8.2.8.
102) Which Type of corrosion most likely to occur around connections for internal
heating units or coils at the tank wall?
Answer: Caustic stress corrosion cracking. Ref: API 575, 8.2.8.4
103) While altered by adding new plate material to increase the height of the tank she
l. The modified shell height shall be in accordance with the requirements of the
current applicable standard and shall take into consideration .
Answer: all anticipated loadings (wind and seismic). Ref: API 653, 9.5
104) While replacing a shell plate on a horizontal joint what is the minimum length of
horizontal joint to be cut on either side of new vertical joint?
Answer: 12 in. beyond the new vertical joints. Ref: API 653, Figure 9.1 Note 2
105) API 650, Appendix M Shall be used to evaluated for suitability of shell tank
service if tanks of welded construction that operate at elevated
temperatures
Answer: above 200 °F. Ref: API 653, 4.3.10
106) What is Maximum interval for Routine in-service visual inspections of the
external condition of the tank shall?
Answer: one month. Ref: API 653, 6.3.1.2
108) If there is any doubt about the condition of the grounding connection, its
resistance can be checked. The total resistance from tank to earth should
109) Materials to be used at a design metal temperature below , the qualification of the
welding procedure for vertical joints shall include impact tests of the weld metal.
Answer: 50°F. Ref: API 650, 9.2.2.3
110) What is the number of locations where UT thickness measurement shall be taken in
tank?
Answer: as determined by owner/operator. Ref: API 653, 6.3.3.1
111) Special safety procedures must comply with any federal or safety regulations
pertaining to .
Answer: confined space entry. Ref: API 653, 1.4
112) to measure settlement in an area where there is a bottom lap weld in the settled area
that is essentially to the shell.
Answer: parallel (±20°). Ref: API 653, B.2.3.3
113) How many settlement points are required for an external settlement of AST If the
nominal diameter is 65 feet?
Answer: 8 {N= D/10 = 65/10 =6.5 (but not less than 8). }
Ref: API 653, 12.5.2/ Annex B, Fig.B-1
114) {Where does the new nameplate need to be attached to a reconstructed tank?} /
{Where the name plates shall be attached to re-constructed tank?}
Answer: Adjacent to the existing nameplate. Ref: API 653, 13.1.1.2
115) {How much time do you need to keep the radiographs of a reconstructed
tank?} / {How many years’ radiographs shall be retained?
Answer: at least one year. Ref: API 653, 13.2.3 (d)
120) No known tank failures attributed to brittle fracture have occurred at shell metal
temperatures of
Answer: 60 °F and above. Ref: API 653, 5.3.6 Step 5
121) According to industry experience and laboratory tests, what membrane stress is
required to caused failure due to brittle fracture?
Answer: 7 ksi. Ref: API 653, 5.3.7 Step 6
122) When reviewing a group of UT thickness measurements reports, which of the
following information must be required and documented on UT thickness
measurements reports?
Answer: Type of instrument / Standardization blocks, size and material type / Size,
frequency, and type of search unit/ Scanning method/ Maximum and minimum
thickness measurements. / Location of measurements/ Personnel data,
certification level. /Results. f: ASME V, ARTICLE 23, SE-797, 11
123) Tanks fabricated from steels of unknown material specifications, 1/2 in. and
operating at a shell metal temperature 20 °F , these tanks
Answer: safe for use. Ref: API 653, Figure 5-2
124) How many essential variables for SMAW Welding Procedure Specifications
(WPS)?
Answer: 10. Ref: ASME IX, QW-253
125) How many Supplementary Essential Variables for SMAW Welding Procedure
Specifications (WPS)?
Answer: 10. Ref: ASME IX, QW-253
126) How many Nonessential Variables for SMAW Welding Procedure Specifications
(WPS)?
Answer: 17. Ref: ASME IX, QW-253
127) A SMAW welding procedure specification (WPS) is selected for a repair on cold
service AST. Impact testing of the weldment is required. Which of the following
is /are required on the WPS?
Answer: Allessential, nonessential, and supplementary variables if notch toughness is
required. Ref: ASME IX, QW-200.1 / API 577,6.2
131) Does the WPS show the maximum base metal thickness range that could be
qualified by the PQR - 001?
Answer: No, it should be 3/16 inch to 1 inches. Ref: ASME IX, QW-451.1
C)
132) Do tensile test results shown on PQR - 001 meet the requirements for WPS?
Answer: No, specimen 2 does not meet requirements.
Ref: ASME IX, Table QW-451.1 & QW-150 (151/152/153) & QW-422 Tables
1. In order to pass the tension test, the specimen shall have a tensile strength (70,00 psi) that is
not less than the minimum specified tensile strength of the weld metal. So specimen No. (1)
mentioned on PQR breaking in the weld metal is OK at 76,200
136) Does the WPS show the electrode that could be qualified by the PQR – 001?
Answer: No, it should be E7018 or use the alternate electrode E7016 or E7015 (weld is
rejected) Ref: ASME IX, table QW-253 &Table QW-432
137) Check whether the A number provided in the WPS was correct or not?
Answer: correct (because A-No. 1 shall qualify for A-No. 2 and vice versa)
Ref: ASME IX, table QW-253 & QW- 404.5
138) Check whether the P-No. material used in PQR and corresponding was correct or
not?
Answer: correct
Ref: ASME IX, table QW- 442
JOINTS(QW-402) DETAILS
Joint design Singe V
Backing: Yes X No X
Backing Material (Type) Weld Metal
Refer to both backing amd retainers
Nonmetallic Other
GAS (QW-408)
PREHEAT (QW-406) Percent composition
Preheat temperature, Minimum 50 °F Gas(es) Mixture Flow rate
Interpass temperature, Maximum --
Preheat Maintenance Yes, preheat during 5minutes Shielding N/A N/A N/A
Other Trailing N/A N/A N/A
(Continuous or special heating, where applicable, should be recorded) Backing N/A N/A N/A
Other N/A N/A N/A
Filler metal
Other (e.g., Remarks,
Weld Current Wire Feed Energy or Travel
Comments, Hot Wire
Passes Process Classifi- Type and Amps (Range) Speed Power Volts (Range) Speed Addition, Technique,
Diameter Polarity (Range) (Range) (Range)
cation Torch Angle, etc.)
1 SMAW E7018 3/32" - 1/8" DCEP 40-70, 80-120 N/A N/A 26-29 2 - 51 ipm --
Amps and vots, or power or energy range, should be recorded for each electrode size, position, and thickness,etc.
TECHNIQUE (QW-410)
String or Weave Bead String or weave
Orifice, nozzle, or gas Cup Size N/A
Initial and Interpass Cleaning (Brushing, grinding, etc.) Hand or power tools may be used
--
Method of Back Gouging Angle grinder
Oscillation --
Contact Tube to Work Distance --
Nultiple or Single Pass (per side) E-6010 SINGLE E-7018 MULTIPLE
Multiple or Single Electrodes --
Electrode Spacing --
Peening NO PEENING
Other
FORM QW-483 SUGGESTED FORMAT FOR PROCEDURE QUALIFICATION RECORDS (PQR)
(See QW-200.2, Section IX, ASME Boiler and Pressure Vessel Code)
Record Actual Variables Used to Weld Test Coupon
JOINTS (QW-402)
Impact Values
Specimen No. Notch Location Specimen size Test temperature Drop Weight Break (Y/n)
ft-lb or J % Shear Mils (in) or mm
-- -- -- -- -- -- -- --
-- -- -- -- -- -- -- --
-- -- -- -- -- -- -- --
-- -- -- -- -- -- -- --
-- -- -- -- -- -- -- --
-- -- -- -- -- -- -- --
-- -- -- -- -- -- -- --
Comments
Other Tests
We certify that the statements in this record are correct and that the test welds were prepared, welded, and tested in accordance
with the requirements of Section IX of the ASME Boiler and Pressure Vessel Code.