1. RELAY DATA
RATINGS:
Current 1/5 A Model No. P345311K3N0360K
Voltage 100-120VAC S. No. 965449T
Frequency 60Hz Software Ref. 360K
2. CHECKS
Contact Status
Terminals Remarks
Relay De- energized Relay Energized
M11-M12 Closed Open OK
M13-M14 Open Closed OK
4. FIELD VOLTAGE
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
Date 16-10-12 16-10-12
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 2 of 16
6. OPTO-COUPLER STATUS
This is to verify the healthiness of the DC Opto inputs.
- Apply a rated voltage at each spare binary input and verify the status of the input at Front panel.
- Opto Inputs status can be monitored using front LCD “System Data “.
- Scroll down “System Data “ to Opto input status , using the Key. Use key to identify which
bit correlates to under test.
Note: Only spare inputs shall be checked with external voltage initiation and other inputs shall be checked
during respective functional test.
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
Date 16-10-12 16-10-12
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 3 of 16
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 4 of 16
Generator Protection Relays Site Test
Report
Manufacturer ALSTOM Consultant SEC-SOA
Equipment MiCOM P345 Contract # 41021031/00
Designation MAIN-1 Contractor ALSTOM
Test date 16-10-2012 PP Name NAJRAAN P/P
Name of Bay GENERAT.N˚3 REMOTE CONTROL BOARD
FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345
7. LED CHECK
Check the operation of all LED’s on the relay front panel
LED No. Allocation Result
LED 01 REVERSE POWER OK
LED 02 FIELD FAILURE OK
LED 03 NPS THERMAL OK
LED 04 GEN. DIFFERENTIAL OK
LED 05 ROTOR EARTH FAULT OK
LED 06 100% STATOR EARTH FAULT OK
LED 07 UNDER VOLTAGE OK
LED 08 OVER VOLTAGE OK
Note: Only spare outputs shall be checked using above procedure and other Outputs shall be checked
during respective functional test.
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
Date 16-10-12 16-10-12
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 5 of 16
Generator Protection Relays Site Test
Report
Manufacturer ALSTOM Consultant SEC-SOA
Equipment MiCOM P345 Contract # 41021031/00
Designation MAIN-1 Contractor ALSTOM
Test date 16-10-2012 PP Name NAJRAAN P/P
Name of Bay GENERAT.N˚3 REMOTE CONTROL BOARD
FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
Date 16-10-12 16-10-12
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 6 of 16
Generator Protection Relays Site Test
Report
Manufacturer ALSTOM Consultant SEC-SOA
Equipment MiCOM P345 Contract # 41021031/00
Designation MAIN-1 Contractor ALSTOM
Test date 16-10-2012 PP Name NAJRAAN P/P
Name of Bay GENERAT.N˚3 REMOTE CONTROL BOARD
FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345
9. MEASUREMENT CHECK
Note:
- This test is intended to verify the CT/VT inputs and CT Ratio, VT Ratio setting in the local relay.
- During the injection on one phase, the LCD will show that the angle of that phase changing randomly but
angle measurement is not required.
When inject 3ph current, the LCD will display correct angles.
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
Date 16-10-12 16-10-12
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 7 of 16
The through current is calculated as the average of the scalar sum of the current entering and leaving the
zone of protection. This calculated through current is then used to apply a percentage bias to increase the
differential setting. The percentage bias can be varied to give the operating characteristic shown in Figure
2.
3 K1 0%
4 K2 150%
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 8 of 16
Date 16-10-12 16-10-12
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 9 of 16
Generator Protection Relays Site Test
Report
Manufacturer ALSTOM Consultant SEC-SOA
Equipment MiCOM P345 Contract # 41021031/00
Designation MAIN-1 Contractor ALSTOM
Test date 16-10-2012 PP Name NAJRAAN P/P
Name of Bay GENERAT.N˚3 REMOTE CONTROL BOARD
FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
Date 16-10-12 16-10-12
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 10 of 16
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 11 of 16
Date 16-10-12 16-10-12
Signature
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 12 of 16
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
Date 16-10-12 16-10-12
Signature
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 13 of 16
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
Date 16-10-12 16-10-12
Note: The current should be 180 degree phase displaced from the reference voltage phases.
Alarm observed when the injected fault Impedance above 9.5<-30ºΩ deg after 5.04 Sec.
Calculated Operated
Total Impedance Applied Voltage (V) Applied Current (A)
Impedance
(Xa1+Xb1)
15Ω+240Ω
100 V, 0˚ deg 1A , 270˚deg 100 Ohm
1.)Apply the following voltage and current: Va = 100V∠0°, Ia = 0.25A∠+90°. The applied impedance is at
position “A” of the polar diagram in Figure 8.
2) Increase the current until the relay operates. This should occur at roughly 0.40A (100V/(220+15)) and indicates
that we are now at the outer edge of the circle – point “B” (Xa1+Xb1).
3) Increase the current to 0.5A. The relay should be operating strongly as the relay impedance is now at
point C.
4) Rotate the phase angle of the current anti-clockwise until the relay drops off 310° and it is possible to reset it.
Slowly rotate the current phase angle clockwise until the relay just operates again at 295° . Record the phase
angle between the current and voltage (θ1 on the polar diagram). 15°
5) Without changing the magnitude of the current and voltage, rotate the current phase angle clockwise, passing
ALSTOM Grid Najran Power Plant –SEC-SOA
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
Date 16-10-12 16-10-12
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 16 of 16
through the operating area, until once again it is possible to reset the relay at 225°. Slowly rotate the current
phase angle anti-clockwise until the relay again just operates at 240°. Measure the new angle, θ2 on the polar
diagram.
The relay characteristic angle is the mean of the two measured angles and should be
roughly 0°.
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 17 of 16
Date 16-10-12 16-10-12
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 18 of 16
Generator Protection Relays Site Test
Report
Manufacturer ALSTOM Consultant SEC-SOA
Equipment MiCOM P345 Contract # 41021031/00
Designation MAIN-1 Contractor ALSTOM
Test date 16-10-2012 PP Name NAJRAAN P/P
Name of Bay GENERAT.N˚3 REMOTE CONTROL BOARD
FINAL SETTING TEST OF GENERATOR PROTECTION RELAY TYPE: MICOM P345
18.2 Calibration:
R Compensation = 110 Ω
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
Date 16-10-12 16-10-12
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 19 of 16
19.2 Loss of all 3 phase voltages under load condition test(detect 3p):
Fixed Setting: a- for fuse fail pick up; V1=10 volts.
b- for fuse fail reset; V1=30 volts.
Pick up
Reset measurement
measurement
voltage(v)
voltage(v)
10 V 30 V
Pick-up current set for phase and N: 0.1A , Current injected for phase and N : 0.2 A
CBF start initiated through operation of other protection.
Stage 1
Delay Set Delay Mesured in Sec
in Sec R Y B N
0.150 0.170 0.171 0.170 0.170
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 20 of 16
Date 16-10-12 16-10-12
Signature
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 21 of 16
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
Date 16-10-12 16-10-12
FINAL CHECKS
1 All test equipment, leads, shorts and test block removed safely? OK
2 Disturbed customer wiring re-checked? OK
3 All commissioning tests disabled? OK
4 Circuit breaker operations counter reset? OK
5 Current counters reset? OK
6 Event records reset? OK
7 Fault records reset? OK
8 Disturbance records reset? OK
9 Alarms reset? OK
10 LEDs reset? OK
11 Secondary front cover replaced? (If applicable) OK
Remarks:
…………………….……………………………………………………………………………………………………………….
…………………….……………………………………………………………………………………………………………….
…………………….……………………………………………………………………………………………………………….
…………………….……………………………………………………………………………………………………………….
…………………….……………………………………………………………………………………………………………….
ALSTOM Grid Najran Power Plant –SEC-SOA
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 22 of 16
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
Date 16-10-12 16-10-12
…………………….……………………………………………………………………………………………………………….
ALSTOM/PRT/RELAYS/P345_Final Setting REV-00 Page 23 of 16
ALSTOM Grid Najran Power Plant –SEC-SOA
Signature
Name LAKSHMANAN PAULRAJ ENGR. MOHAMMED A. ALMAKRAMI
Date 16-10-12 16-10-12