Sistem Bas PDF
Sistem Bas PDF
ANGGARAN BIAYA (RAB)
Pembangunan Terminal Tipe B Ciledug
BAHAN + UPAH
a b c d g h
1 PEKERJAAN MEKANIKAL -
2 PEKERJAAN ELEKTRONIC -
3 PEKERJAAN BUILDING AUTOMATION SYSTEM (BAS) -
4 PENGADAAN MATERIAL BAS -
5 Web Controller Onboard Ios DI8DO12 & AI8AO4 2.00 unit -
6 - RAM memory 128 MB, CPU PowerPC 220 MHz, NV-RAM battery buffered 2 MB -
7 - Fast Ethernet 2 x 10/100 BaseT (RJ45) -
8 - Up to 5 IO Module -
9 - Gateway Modbus OR BACnet -
10 - Control and monitoring from Browser -
11 Software Management OPENweb basic package for up to 250 physical data points, an 1.00 lot -
12 PC Server 1.00 unit -
13 - OS Windows Home, Core I7 -
14 - Monitor 50 -
15 IO Module DI8DO8T CPU ARM7 Architecture, c/w Accessories 1.00 unit -
16 IO Module DI16 CPU ARM7 Architecture, c/w Accessories 2.00 unit -
17 IO Module DO8 CPU ARM7 Architecture, c/w Accessories 2.00 unit -
18 IO Module AI8 CPU ARM7 Architecture, c/w Accessories 1.00 unit -
19 Coupler module integrated bus terminating resistor 4.00 unit -
20 Bridge Bus Connector 9.00 unit -
21 Room Temperature (PT1000) 1.00 unit -
22 Room Temperature & Humidity Sensor 1.00 unit -
23 Motion Sensor 22.00 unit -
24 Box Panel I/O Module, with Electronic Terminal Block clamp type, label cable, wiring & 2.00 unit -
25 Power Supply with Input voltage 85 .. 264 V AC, Output voltage 24 V DC 2.00 unit -
26 INSTALAI PEKERJAAN BAS -
27 Installation, UTP Cat-6 cable to LAN for Controller 2.00 titik -
28 Installation, UTP Cat-6 cable to LAN for PC Server 1.00 titik -
29 Installation, NYM 3X1.5mm2 cable for BAS Panel power supply 2.00 titik -
30 Installation, STP 18 AWG cables for BAS Panels Data Communication 2.00 titik -
31 Installation, STP 18 AWG 1P cable, modbus point integration for Electrical Panel Powe 22.00 titik -
32 Installation, ITC 2x0.6mm2 cable for digital points 72.00 titik -
33 Installation, NYAF 2x0,75mm2 cable for analog points 4.00 titik -
34 Pekerjaan Dali Lighting Control -
35 Pekerjaan Dali -
36 Web Controller 1.00 unit -
37 Ram Memory 128 MB, CPU Power PC 220 MHz, NV-RAM Battery Buffered 2 MB -
38 Fast Ethernet 2 x 10 /100 Base T ( RJ 45 ) -
39 - Controller with 4 DALI Interface -
40 - Gateway Modbus OR BACnet -
41 - Control and monitoring from Browser -
42 On/Off Module DALI to control lighting 1 channel 5.00 unit -
43 Touch Screen Glass On/Off DALI 1 Group 5.00 unit -
44 On/Off Module DALI to control lighting 2 channel 25.00 unit -
45 Touch Screen Glass On/Off DALI 2 Group 25.00 unit -
46 INSTALASI PEKERJAAN DALI -
47 Installation, cable UTP Cat-6 for DALI Controller 1.00 titik -
48 Installation, cable NYM 3X1.5mm2 Digital Switch DALI & Module DALI 60.00 titik -
49 TESTING, COMMISSIONING & TRAINING -
50 Testing and Commissioning 1.00 lot -
51 Training operator 2 person 2 days 1.00 lot -
‐