Notes: Engineering
Fragola Government Services
Department Sequence
Risk Category - 0 Asset Code
Code
Document Type
Number
Revision Code
Page 1 of 11
Contents
1. Purpose......................................................................................................3
2. Objectives..................................................................................................3
3. Scope.........................................................................................................3
4. Compliance.................................................................................................3
5. General......................................................................................................3
6. Responsibilities...........................................................................................3
6.1. Engineering Team Lead...........................................................................3
6.2. Drawing Control Supervisor.....................................................................4
6.3. Project Engineer.....................................................................................4
6.4. Draftsperson and Drawing Checker............................................................5
7. Checking Practice........................................................................................5
8. Checking Method........................................................................................6
9. Drawing Print Checking Colours...................................................................7
10. Drawing Check List.....................................................................................7
Contractual Compliance..................................................................................8
General..........................................................................................................8
Drawing Contents Check.................................................................................8
Mechanical Check List.....................................................................................9
Piping and Tank Check List.............................................................................9
Piping and Tank Check List...........................................................................10
Structural Check List.....................................................................................10
Civil/Earthworks Check List...........................................................................11
Electrical and Instrumentation Check List.......................................................12
Page 2 of 11
1. Purpose
This procedure has been developed to provide a standardized and consistent approach in
checking for and correcting errors in AutoCAD and manual drawings for the FGS Drawing
Office.
2. Objectives
3. Scope
This Procedure outlines standard practices to be adopted when checking and evaluating
completeness and accuracy of Project Drawings.
4. Compliance
All persons involved in checking Project Drawings shall adhere to this Procedure to ensure
that a uniform, complete and quality assured product will result. Compliance is expected in
all cases and any required deviation from this Procedure must receive prior approval from
Engineering Team Lead.
5. General
6. Responsibilities
The positional responsibilities for the proper adherence to this Procedure on all FGS
projects are as follows.
6.1.1. Audit adherence to and compliance with this Procedure on all FGS Projects
managed by the Technical Department/Projects Group.
Page 3 of 11
6.1.3. Review and update of this procedure every three (3) years.
6.2.1. Ensure adherence to and compliance with this Procedure on all projects
managed by the Technical Department/Projects Group.
6.2.3. Provide Drawing Checking assets and ensure all Drawings are properly checked
and corrected.
6.2.6. Review and approval of all Drawings and initiation of approval routing.
6.3.1. Submission of Project Scope, all sketches, specifications and other information
required to complete requested Drawings and associated documentation and
allow proper Drawing Checking.
Page 4 of 11
6.3.4. Review and approval of all Drawings and associated documentation. Ensure
proper application and use of Design Standards, Material Specifications and
Equipment Specifications.
6.4.1. Ensure understanding of this Procedure and all referenced Procedures and
compliance with these Procedures at all times.
6.4.2. Provide all services assigned by the Drawing Control Supervisor in an efficient
and expeditious manner. Ensure all information developed and presented is
accurate, complies with Standard Documentation, complies with Design
Standards and Material Specifications, can be efficiently reviewed and used,
and is practically error free. This will require dedication to detail and diligence
with emphasis on Quality and Added Value.
6.4.3. Provide Check Prints, make corrections, retain marked Check Prints until
Project completion, provide final Drawings and signed Drawings.
7. Checking Practice
7.1. All project Drawings are to be checked for compliance with the Drawing
Office Procedures, clarity, standard structure, technical content, quality
completeness and adherence to design standards. Check prints are to be retained by
the Draftsperson until project completion and are subject to audit.
7.2. All AutoCAD Drawings are to be checked for compliance with the Drawing
Office Procedures and adherence to normal AutoCAD standards.
7.4. Drawing checkers must be familiar with the requirements of the Drawing
Office Procedures, standard drafting Procedures, the project scope and concept,
relevant design standards and any additional information pertinent to the drawing to
be checked.
7.5. Drafting personnel will not be the last check of their own work prior to
seeking approvals.
Page 5 of 11
7.6. When checking drawings, the checker and the draftsperson completing
required changes shall use the colour markings defined in section 9.0.
7.7. The Checker shall use the drawing check lists provided in section 10.0 to
ensure all pertinent factors are included and properly addressed. The checker shall
use his/her judgement to determine applicability and pertinence and shall draw from
the department expertise as required.
7.8. Manual checking of drawings shall be on bond paper Check Prints. A Check
Print shall be so designated by stencilling “Check Print” in large bold lettering
above the title block.
7.9. The checker shall use a “red” pencil to make all changes and comments, all
mark-up text shall be printed and the checker shall give emphasis to neatness,
clarity and conciseness.
7.10. The checker shall initial and date all comments and mark-ups requiring
action and those not so marked will be deemed to require no action.
7.11. Any errors in mark-ups shall be noted as such and lined through.
8. Checking Method
8.1. The draftsperson shall be aware of the importance of quality work and shall
check his/her own work frequently during drawing development. The Project
Engineer shall work closely with the draftsperson and shall check each drawing at
discreet intermediate stages or at least weekly.
8.3. The supervisor shall make a cursory review of the drawing for basic content,
structure and adherence to drafting standards. Any noted deficiencies shall be
corrected and a new check print produced.
8.4. The Engineering Team Lead shall designate a Drawing Checker and provide
him/her with the check print and all information required (scope, reference
drawings, project criteria, applicable specifications, etc.) to properly review the
drawing.
Page 6 of 11
8.5. The checker is to thoroughly review all information on the drawing, ensure
all standards are met, mark all required changes and return the print to the
draftsperson.
8.6. The draftsperson is to review all mark-ups, clarify any questions and make
the required changes to the drawing, the marked up check print is to be retained for
future reference and a new check print shall be provided to the checker for any
additional changes or corrections.
8.8. After digital check, the drawing is to be printed on vellum, signed by the
Draftsperson and Checker and provided to the Engineering Team Lead.
8.9. The Engineering Team Lead shall initiate routing of the Drawing for
approval as per “General Drafting Practices”.
Colours used for marking of check prints are to be as follows, with no exceptions.
The drawing checker is expected to use the attached standard drawing check list to
facilitate his/her efforts. The list was developed to provide a guide or outline only and is
not intended to include all factors or cover all necessary issues. Documented evidence of
checking is by means of the checkers signature or initial (and date) on mark ups of the
check print so retention of the checklist is not required.
Page 7 of 11
DRAWING CHECK LIST
This drawing check list is to be used by Drawing checkers, Draftspersons and Project
Engineers to facilitate proper development of Project Drawings. This is not intended to
include all factors or cover all necessary issues but to provide a guide to help ensure that all
drawings are complete and comply with the Engineering Procedures – Drawing Office
Procedures.
Page 8 of 11
Dimension lines
Match lines
New works
Existing works
Future works
Drawing to Drawing interface
“HOLDS”
Units of measurement correctly specified
Materials correctly specified
Mechanical Check List Ok Review
Safety, clearances, etc.
Machining tolerances
Surface finish
Surface treatment
Component marking
Signage – cranes
Access to equipment
Safety Guards
Inspection/manhole access
Crane maintenance access
Equipment specification
Piping and Tank Check List Ok Review
Check against P&IDs
Direction of Flow
Line number, size and materials
Valves, elbows, reducers, etc.
Instruments, gauges, etc.
Traps, drains, vents, flushing points
Any special fittings that are specified
All equipment is correctly identified and labelled
Ensure that:
Pipe routes are clear of mechanical and structural works
Piping drawings are in accordance with Engineering Specs
Dimensions are accurate and sufficient for needs required
Dimensions are clear location-wise, BOP, etc.
Clearances between pipelines are standard
A common datum is utilized over a set of drawings
Access to removable equipment and fittings
Match marking of drawings are consistent
Piping and Tank Check List Ok Review
Head clearances have been looked at and are OK
Check: Location, Elevation of mechanical equipment
Page 9 of 11
Tank earthing is provided as required
Structural Check List Ok Review
Safety clearances, etc.
Steelwork tolerances
Surface treatment
Member sized
Member marking
Floor grating – fixed, removable
Floor grating span and direction
Welding – Symbols,
Continuous,
Intermittent,
Seal,
Plug (AWS A 2.4-86)
Temporary bracing
Stair, ladder, handrail and platform requirements/STDs
HD Bolts – mechanical/structural interface – grout allowance
Transportation size considerations
Civil/Earthworks Check List
Foundations
Reinforcements
HD Bolts – mechanical and steelwork interfaces
Grout allowance
Falls and drainage
Structural Check List
Floor sumps
Curbing
Allow for vehicle traffic where necessary
Check interfaces with existing concrete works particularly existing
reinforcement
Concrete treatment
Construction joints
Shrinkage joints
Cast in steel
Isolation joints
Bollards
Civil/Earthworks Check List Ok Review
Compaction
Joint sealant
Architectural Check List
Cladding – roof and walls
Ventilation – ridge vents
Door access – vehicle clearance
Natural lighting
Electrical and Instrumentation Check List
Check drawing against P&ID
Symbology required for project in question
Preferred equipment
Equipment to be used
Equipment numbering
Page 10 of 11