Edoc - Pub - Transformer Foundation Design
Edoc - Pub - Transformer Foundation Design
Edoc - Pub - Transformer Foundation Design
r
o
POWER GRID COMPANY OF BANGLADESH LIMITED (PGCB ) e
s
u
,
n
CONTRACT NO. : PGCB/DANIDA/1 o
i
t
c
u
DESIGN-BUILD AND TURNKEY CONTRACT FOR CONSTRUCTION OF d
o
r .
p n
132kV JOYDEVPUR - KABIRPUR - TANGAIL TRANSMISSION LINE e e
R d
d
. i
PROJECT n b
i
e r
r o
e f
h y
TI TL E : t l
t
c
n i
o r
i t
s
a s
m i
r y
t
o i
f
Design Calculation for Foundation of Auto Transformer r
n o
i
h
e t
h
t u
D O CU M E N T N O . : S U B M I T T A L N O. : a
d s
n s
a e
JDP/A26/001 CT I O N : 1 2 , Building and civil engineering works
S E CT t r
p
n x
e e
m t
DESIGNED BY : Md. Giasuddin CH E C K E D B Y : A P P R OV E D B Y : u u
c o
o
d h
t
i
s w
i
DATE : h s
R EV . N O. : M A N U F A CT U R E R : t e
19 Nov '05 n i
i t
r
s a
t p
h d
E:\PROJECTS FOR EXECUTION\Joydevpur - Kabirpur - g r
i i
r h
Paper Size Tangail OHL\Joydevpur Substation\Design l
l t
ID: a o
A4 Calculation\Static Cal of Foundation For Auto e t
v
r e
Transformer r
e u
s s
e o
r l
c
CONTRACTOR : MTH JGAARD A/S - LINDPRO A/S JV e i
s
W d
EMPLOYER : r
o
POWER GRID COMPANY OF BANGLADESH LIMITED (PGCB ) e
s
u
,
n
CONTRACT NO. : PGCB/DANIDA/1 o
i
t
c
u
DESIGN-BUILD AND TURNKEY CONTRACT FOR CONSTRUCTION OF d
o
r .
p n
132kV JOYDEVPUR - KABIRPUR - TANGAIL TRANSMISSION LINE e e
R d
d
. i
PROJECT n b
i
e r
o
r f
e
h y
l
TI TL E : t t
c
n i
o r
i t
s
a s
m i
r y
t
o i
f
Design Calculation for Foundation of Auto Transformer n r
i o
h
e t
h
t u
DOCUM EN T N O. : SUBM I TTA L N O. : a
d s
n s
a e
JDP/A26/001 S E CT I O N : 1 2 , Building and civil engineering works t r
n p
e x
e
m t
DESIGNED BY : Md. Giasuddin CH ECK ED B Y : A P P R OV ED BY : u u
c o
o
d h
t
i
s w
i
DATE : h
REV. N O. : M A N UFA CTURER : t s
e
19 Nov '05 n i
i t
r
s a
t p
h d
E:\PROJECTS FOR EXECUTION\Joydevpur - Kabirpur - g r
i
r i
h
Paper Size Tangail OHL\Joydevpur Substation\Design l
l t
ID: a o
A4 Calculation\Static Cal of Foundation For Auto e t
v e
r
Transformer r
e u
s s
e o
r l
c
CONTRACTOR : MTH JGAARD A/S - LINDPRO A/S JV e i
s
W d
MT H J GAARD A/S - L INDPRO A/S J V
Design of Transformer Foundation ; J oydevpur 132/33kV Sub-station
1. GENERAL
1.1 Considerations :
a) Raft foundation is considered for a 132kV Transformer.
b) The bottom of the raft is at a depth of 1.0m from existing ground surface.
2
c) Soil bearing capacity is considered 90.04 kN/m minimum value from BH-4, BH-5 & BH-7.
d) The Top of bund wall is 200mm above the finished switchyard surface level.
Center of
Foundation
MT H J GAARD A/S - L INDPRO A/S J V
Design of Transformer Foundation ; J oydevpur 132/33kV Sub-station
Center of
Foundation
R 2;Page 6-53)
Where, Z = Seismic Zone Co-efficient = 0.15 ( for Zone 2 )
I = Structure Importance Factor = 1.25 ( with essential Facilities )
R = Response Modification Coefficient = 6 ( For RCC wall System )
1.25S
C = Numerical coefficien t system is given by : C = 2
T 3
2
Pressure due to Backfill P1= 1/2*K pγh *1.0 = 4.40 kN ( Per meter of width )
MT H J GAARD A/S - L INDPRO A/S J V
Design of Transformer Foundation ; J oydevpur 132/33kV Sub-station
Let us check with minimum reinforcement. As per ACI code, Ratio of minimum reinforcement ( in SI unit) is given by =1.4/fy
ρmin= 0.003373494
⎛ ρf y ⎞
M u =φρf y bd 2 ⎜1-0.59 ⎟ ...;Where φ = 0.9
⎝ f'c ⎠
Mu
∴ d= =
ρf y 85 mm ; d Provided =200-100-10/2= 95 mm; OK
φρf y b(1-0.59 )
fc'
Vertical Reinforcement
Mdes =Mu/0.9 = 9.725 kN.m
Assuming depth of stress block, a = 6.94 mm
Area of steel, As = M*1000000/(0.9*fy*(d-a/2)) = 284.47 mm2
(Ref. -Design of concrete structure, By-Nilson & Winter,Page 83 ,10th Ed.)
Check for a
a = As*fy/(.85*fc'*b) = 6.94 mm
Consideration is OK, So As = 284.47 mm2/m
As per Code Min Rebar Required = 0.004bt = 400.00 mm2/m
Consider bar Size = 10.0 mm
So Nos. of Bars = 5 Nos
Spacing = 200.00 mm
Provide φ 10mm @ 200mm at both face of the wall.
Horizontal Reinforcement :
As per Code Min Rebar Required = 0.002bt = 400.00 mm2/m
Consider bar Size = 10.0 mm
So Nos. of Bars = 5 Nos
Spacing = 1000/5 = 200.00 mm
Provide φ 10mm @ 200mm at both face of the wall.
Check for shear :
Stresse is within acceptable limit, so no rebar is r equired from structural point of view.
MT H J GAARD A/S - L INDPRO A/S J V
Design of Transformer Foundation ; J oydevpur 132/33kV Sub-station
2 2
But as per code Minimun Rebar = 0.0018*Ag = 0.0018*3890*2680 mm . = 18766 mm .
So Use 94 nos. of dia 16mm Bar for Vertical Reinforcement.
Use dia 10mm bar @ 200mm c/c for tie.
5.3. Design of Base Slab
Foundation Layout
Center of
Tx.
Center of
Foundation
5.3.1 Check for P unching of the Base :
Base Thickness, t = 300 mm
Clear Cover = 60 mm
Consider Max Bar size = 20 mm
d =300-60-20/2 = 230 mm
Punching Perimeter = (2680+3890)*2 = 13140 mm
Punching Area = 13140*230 = 3022200 mm2
Vertical Forces = 1026.50 kN
Punching stress developed by Tx. = 1026.5*1000/ 3022200 = 0.340 Mpa
AS per ACI Shear Stress applied to concrete should be less than 0.33 f c ' Mpa
In present case which is coming 1.48 Mpa. So OK.
Max Moment Developed at 0.75 m far from Pedestal face at Bottom = 35.6*1.41^2/2 = 35.392 kN.m/m
Design moment = 35.392/0.9 = 39.325 kN.m/m
Base Thickness, t = 300 mm
Clear Cover = 60 mm
Consider Bar size = 12 mm
d =300-60-12/2-20 =214 mm ( Bars to be placed on top of long Bars)
Assuming depth of stress block, a = 12.37 mm
Area of steel, As = M*1000000/(0.9*fy*(d-a/2)) = 506.64 mm2
Check for stress block,a
a = As*fy/(0.85*fc'*b) = 12.37 mm
Consideration is OK, So As = 506.64 mm2
Minimum reinforcement = 0.18 % = 540.00 mm2/m
Consider bar Size = 12 mm
So Nos. of Bars = 4.77 Nos
MT H J GAARD A/S - L INDPRO A/S J V
Design of Transformer Foundation ; J oydevpur 132/33kV Sub-station
Spacing = 209 mm Say 180 mm
Point of curtailment = 750+(12 times dia of bar ; i.e 12*12 = 144mm use 250mm) 250 = 1000mm from face of Padestal.
L ayout of Gr atings :
⎢
⎣ ⎥
⎦
Where C b = 1.75 + 1 .05 * (M 1 / M 2) + 0.3(M 1 / M 2)
2
Consider ends of channel are not to carry any moment so 2nd and 3rd term of the above equation can be ignored.
So C b = 1.75
Bending Stress = M/Z = 12.1*10^6/182500 = 66.32 Mpa
∴ Fb = 0.535*275 = 147.13 Mpa > 66.32 Mpa ; So OK.
Check for shear stress :
Shear stress = V/A = 19.327*1000/2828 = 6.83 Mpa
Allowable Shear stress = 0.346*Fy = 0.346*275 = 95.15 Mpa > 6.83 Mpa ; So OK.
MT H J GAARD A/S - L INDPRO A/S J V
Design of Transformer Foundation ; J oydevpur 132/33kV Sub-station
1.1 Considerations : 03
3. Load Calculation : 04
5. Structural Design : 05
6. Design of Grating : 09
1.1 Considerations : 03
3. Load Calculation : 04
5. Structural Design : 05
6. Design of Grating : 09