0% found this document useful (0 votes)
133 views1 page

Lso Lan PDF

1. This document provides a diagram of a substation automation system architecture. 2. It shows the connections between various components like routers, meters, HMIs and Intelligent Electronic Devices using different communication protocols. 3. The components are connected in a ring structure using Ethernet with fiber optic cables for reliability and high-speed data transmission.

Uploaded by

Lê Hiếu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
133 views1 page

Lso Lan PDF

1. This document provides a diagram of a substation automation system architecture. 2. It shows the connections between various components like routers, meters, HMIs and Intelligent Electronic Devices using different communication protocols. 3. The components are connected in a ring structure using Ethernet with fiber optic cables for reliability and high-speed data transmission.

Uploaded by

Lê Hiếu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10

To WAN of NPT

NRLDC (A1)
AC1
ROUTER TO WAN I/O

TARIFF METERS & COPORATE LAN


COLLECTOR COMPUTER AC2

IEC 60870-5-104

IEC 60870-5-104
TARIFF METER I/O
110KV BAYS

RS485/RS232
AC3
DLL_D01 I/O
CHECK POINT CHECK POINT
ANTEN
DC1
GPS CLOCK I/O
HOST 1, HMI HOST 2, HMI ENGINEERING HMI HIS, HMI

DC2
I/O

A4 LASER
PRINTER

A4 COULOR
LASER PRINTER

IEC 61850
ETHERNET 10/100Mbits F.O RING STRUCTURE

DT DLL_D01 EBB ETI EBC ELL_E01 ELL_E03 ELL_E04 ELL_E05

7 PORT 4 PORT 4 PORT 2 PORT 4 PORT 3 PORT 3 PORT 3 PORT 3 PORT

F87T1
DPS
F87 F87L F87L F87L F87L
F87B
I/O F67 F21

F21 F67 F67 F67 F67

BCU
F87T2 BCU
BCU
BCU BCU BCU BCU
F87B

BCU F81.1 F81.2

EPS
F50.1 F50.2 I/O

F87B

TRANS.MONITOR F90

Rev Revision description Drawn date Drawn by Checked date Checked by Project:
A BASIC DESIGN 02.02.20 Vu.h.t 13.02.20 HUNG.D.H
COMPUTERIZED SYSTEM 220KV LANG SON SUBSTATIONS
220KV LANG SON SUBSTATIONS Job No. Drawing No. Page A1-1
PECC2-20-03 LSO_LAN