PDF Quotation VO - Z Preetpal 627 210223 1305
PDF Quotation VO - Z Preetpal 627 210223 1305
PDF Quotation VO - Z Preetpal 627 210223 1305
Date: 21/2/2023
Time: 1:04 pm
Reference No : : M23/02-Zxx
Owner : Preetpal NRIC : S XXX XXXX X Date : : 14-Feb-23
Jobsite : Block 627 Bedok Reservoir Road #06-1624 Singapore 470627
Email : H/P : 91451441
RE : RENOVATION CONTRACT
Item Description Quantity Amount (S$) S Total (S$)
Package ( HDB Flat )
KITCHEN
1 Cabinet with laminated finished with ABS trimming, Internal: White PVC $ 6,888.00
18ft kitchen
With 3 drawers
2 Tall Cabinet
Tall cabinet for oven and microwave ( <2ft L )/ storage
3 Plumbing Works
Install Sink & Tap
Reconnect Sink to original outlet
4 Wet Work
Cement base 9ft
FREE GIFT
2 tier stainless steel dish rack Worth $80
Stainless Steel single bowl sink Worth $236
Total: $ 6,888.00
Page: 2
Date: 21/2/2023
Time: 1:04 pm
Reference No : : M23/02-Zxx
Owner : Preetpal NRIC : S XXX XXXX X Date : : 14-Feb-23
Jobsite : Block 627 Bedok Reservoir Road #06-1624 Singapore 470627
Email : 0 H/P : 91451441
RE : RENOVATION CONTRACT
Item Description Quantity Amount (S$) S Total (S$)
Hacking Works
Supply labour and equipment to carry work as follow,
Living
1 Hack ceiling crown cornice 68 sum $ 220.00
2 Remove wall tiles feature 20 * 8.5 sum $ 220.00
3 Remove wall paper 8 * 8.5 sum $ 120.00
4 Hack border feature 2 sum $ 30.00
Kitchen
1 Hack kitchen cabinet 15 + 6 sum $ 580.00
Main Bedroom
1 Hack skirting tiles sum $ 250.00
2 Hack wardrobe 7 sum $ 280.00
3 Remove wall paper 12.5 * 8.5 sum $ 120.00
Bedroom 2
1 Hack skirting tiles sum $ 250.00
2 Hack wardrobe 3 sum $ 120.00
3 Hack mirror tiles feature 4*3 sum $ 40.00
Bedroom 3
1 Hack skirting tiles sum $ 250.00
2 Hack wardrobe 7 sum $ 280.00
3 Hack mirror tiles feature 4*3 sum $ 40.00
Main Bathroom
1 Hack wall & floor tiles 190 sum $ 1,100.00
2 Hack water closet sum $ 35.00
3 Hack Basin sum $ 35.00
4 Hack shower set and heater sum $ 35.00
5 Hack water piping sum $ 90.00
6 Hack glass door sum $ 90.00
Common Bathroom
Page: 3
Date: 21/2/2023
Time: 1:04 pm
Masonry Works
The propose work have included supply of labour & raw building material.
Tiles finished material is excluded, unless otherwise stated.
3x Bedroom
1 Supply & lay Vinyl floor 450 sqft $ 2,475.00
2 Supply & install wood look alike PVC Laminated skirting sum $ 750.00
3 Labour to make good skirting after old tiles skirting remove sum $ 1,275.00
Main Bedroom
1 Make good wall after wall paper remove 17 * 8.5 sum $ 425.00
Bedroom 2
1 Make good wall after wall paper remove 4*3 sum $ 250.00
Bedroom 3
1 Make good wall after wall paper remove 4*3 sum $ 250.00
Kitchen
1 Make good spoiling concrete for defected ceiling $ 320.00
2x Bathrooms
1 Engage Promotion Package- Wall & floor tiles overlay for 2x Bathrooms $ 12,888.00
>> Refer to attached Package descriptions
Additional
Purchase for floor tiles material - $3.00 psf 460 sqft $ 1,380.00
Purchase for wall tiles material - $2.50 psf 80 sqft $ 240.00
Main Bathroom
1 Make good spoiling concrete for ceiling 1 no $ 320.00
Common Bathroom
1 Make good spoiling concrete for ceiling 1 no $ 320.00
Page: 4
Date: 21/2/2023
Time: 1:04 pm
Carpentry Works
External: Selected laminate
Internal: PVC
Price are subject to change pending final design and material stage.
Design, fabricate & install the following in laminate matching 1mm edgeband,
Soft closing hinges for door & full extension runners for drawers.
All full heigth cabinets in 2400mm ( H ) otherwise stated.
Kitchen
Engage Promotion Package for Kitchen Cabinet 1 $ 6,888.00
>> Refer to attached Package descriptions
Additional
>> Counter work top 4 $ 520.00
>> Additional Kitchen cabinet 6 $ 1,050.00
>> Kitchen cabinet base 6 $ 540.00
>> Back panel (H <1600) <5.5 $ 750.00
Main Bedroom
Fabricate H8 wardrobe 7 $ 2,450.00
Bedroom 2
Fabricate H8 wardrobe 7 $ 2,450.00
Main Bathroom
Fabricate H3 vanity scantilever cabinet 3 $ 525.00
>> Install counter top 3 $ 390.00
Plumbing Works
Supply new stainless steel water piping for Kitchen 3 $ 390.00
Supply inlet pipe for sink 1 $ 120.00
Supply outlet pipe for sink 1 $ 120.00
Supply inlet pipe for washing machine 1 $ 120.00
Labour install sink 1 $ 80.00
Labour install tap 1 $ 35.00
Electrical Work
Bedroom 3
1 13A x 1 power point 2 65 $ 130.00
2 13A x 2 power point 1 75 $ 75.00
Page: 5
Date: 21/2/2023
Time: 1:04 pm
Others
Whole House
Supply & paint wall with sealant Sum $ 450.00
Supply & paint ceiling with sealant Sum $ 200.00
Supply & paint wall with Nippon 5K Vinilux emulsion paint Sum $ 1,250.00
Supply & paint ceiling with Nippon Matex Sum $ 300.00
Miscellaneous Works
"You are entitled for our FLASH SALE spacial EXTRA free gift, do find out more during confirmation."