0% found this document useful (0 votes)
189 views8 pages

Epcc-2 Package (RFCC Unit) ) For Petrochemical and Lube Integration Project "Lupech" (J-18)

This document provides load calculations for a pipe rack structure. It defines multiple load cases including dead loads from structural members, gratings and handrails; equipment loads from a deaerator; pipe loads when empty, operating and during testing; wind loads based on the basic wind speed at the location; and friction loads from pipes on the structure. Self and imposed loads are applied in the structural analysis software STAAD, along with design wind pressures calculated according to Indian standards.

Uploaded by

phanikrishnab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
189 views8 pages

Epcc-2 Package (RFCC Unit) ) For Petrochemical and Lube Integration Project "Lupech" (J-18)

This document provides load calculations for a pipe rack structure. It defines multiple load cases including dead loads from structural members, gratings and handrails; equipment loads from a deaerator; pipe loads when empty, operating and during testing; wind loads based on the basic wind speed at the location; and friction loads from pipes on the structure. Self and imposed loads are applied in the structural analysis software STAAD, along with design wind pressures calculated according to Indian standards.

Uploaded by

phanikrishnab
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

EPCC-2 PACKAGE (RFCC UNIT)) FOR PETROCHEMICAL AND LUBE

INTEGRATION PROJECT “LuPech” (J-18).

CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01

5 LOAD CALCULATIONS

Load Calculation for Primary Load Cases are as follows.

5.1 LC 1 : DL (Dead Load)

A) Self-weight of Structural Members are generated in STAAD by defining the self-weight command.In addition to
selfweight 10% considered for connections and fixtures.
* Note: Vermiculite based lightweight cementitious Fire proofing is considered and applied through STAAD pro.
Specification command.
B) Self Weight of Grating = 0.5 kN/m2

C) Self Weight of Handrail 0.16 kN/M

D) Cable Duct load (1200 x400 assumed 2 Ducts Lvs) 960 kg/m per duct

E) Cable Tray Load 600 mm (Total gravity load considered) 0.85 kN/m + 0.85 kN per each level

F) Blind Flooring load below Air Cooler (150 mm thick assumed) .It has been considered in Staad Model.

5.2 LC 2 : IL (Imposed Load)

Imposed loads on Platforms = 3.0 kN/m2


Imposed loads on Air Cooler Platforms = 5.0 kN/m2
5.3 LC 3 : EE (Equipment Erection/ Empty Load)

* However Aircooler Equipment load considered = 10.0 kN/sqm


*1803-V-609-DEAERATOR load (Assumed from priliminary ITB laod data) = 175 kN

5.4 LC 4 : EO (Equipment Operating Load)

*1803-V-609-DEAERATOR load (Assumed from priliminary ITB laod data) = 477 kN


EPCC-2 PACKAGE (RFCC UNIT)) FOR PETROCHEMICAL AND LUBE
INTEGRATION PROJECT “LuPech” (J-18).

CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01
5.5 LC 5 : ET (Equipment Test Load)

*1803-V-609-DEAERATOR load (Assumed from priliminary ITB laod data) = 647 kN

5.6 LC 6 : Bp (Bundle Pull Load)

Not Applicable

5.7 LC 7 : vL (Impact Load/Vibratory Load)

Not Applicable

5.8 Pipe Loads

LC 8: PE (Pipe Empty Load)


Pipes less than 300 mm diameter considered as a distributed load = 0.75 kN/m2

LC 9: PO (Pipe Operating Load)


Pipes less than 300 mm diameter considered as a distributed load = 1.25 kN/m2

LC 10 : PT = Piping Test Load


Pipes less than 300 mm diameter considered as a distributed load = 2 kN/m2

Note
1) Intermediate beam at tier level is designed for 25% of load on main portal beams in transverse direction.
Reduction of 10% in vertical loading shall be considered for main portal beams if intermediate beams are provided.

LC 11 : TL (Friction Load)

The friction force at each tier on every portal in both longitudinal and transverse directions shall be considered
as follows
For four or more pipes supported on a tier : 10% of the design vertical loading of the pipes,
For single to three pipes supported on a tier : 30% of the design vertical loading of the pipes.

Friction forces considered as uniformly distributed over the entire span of the beam at each tier.

10 % of load in Longitudinal Direction


10 % of load in Transverse Direction

LC 12 : TA (Thermal Anchor / Guide Load)

5 % of load in Longitudinal Direction


5 % of load in Transverse Direction

5.9 LC 15 : CRL (Crane Load)

Not Applicable
EPCC-2 PACKAGE (RFCC UNIT)) FOR PETROCHEMICAL AND LUBE
INTEGRATION PROJECT “LuPech” (J-18).

CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01

5.10 Wind Load

Basic wind speed Vb = 44 m/s For Vadodara, Annex-A, IS: 875 (Part-3)-2015

Design Factors :
Risk coefficient factor k1 = 1.07 *From Table-1, IS: 875 (Part-3) - 2015
Terrain & Height factor k2 = *From Table-2, IS: 875 (Part-3) - 2015 (Category-2)
Topography factor k3 = 1 *From CL-6.3.3,IS: 875 (Part-3) - 2015
Imp. Fact. for cyclonic reg. k4 = 1 *From CL-6.3.4, IS: 875 (Part-3) - 2015

Design Wind Pressure :

Design wind speed Vz = Vb x k1 x k2 x k3 x k4

Wind pressure at height z Pz = 0.6 x Vz2

Design wind pressure Pd = Kd x Ka x Kc x Pz *From CL-7.2, IS: 875 (Part-3) - 2015

*Value of Pd shall not be less than 0.7 Pz


Wind directionality factor Kd = 0.9 *From CL-7.2.1, IS: 875 (Part-3) - 2015
Area averaging factor Ka = 0.9 *From Table-4, IS: 875 (Part-3) - 2015 (tributary>100 m
Combination factor Kc = 1 *From CL-7.3.3.13, IS: 875 (Part-3) - 2015

Ht, (m) k2 Vz (m/s) Pz (kN/m2) Pd (kN/m2)


10 1.00 47.080 1.33 1.08
15 1.05 49.434 1.47 1.19
20 1.07 50.376 1.52 1.23
30 1.12 52.730 1.67 1.35
50 1.17 55.084 1.82 1.47
100 1.24 58.379 2.04 1.66
EPCC-2 PACKAGE (RFCC UNIT)) FOR PETROCHEMICAL AND LUBE
INTEGRATION PROJECT “LuPech” (J-18).

CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01

LC 16 : WLx+ (Wind Load in positive X direction)

Longitudinal Wind loads on structure are generated in staad

LC 17 : WLx- (Wind Load in negative X direction)

Same loads are applied as per Load 16 in negative direction.

LC 18 : WLz+ (Wind Load in positive Z direction)

Wind loads on structure are generated in staad

Transverse Wind loads on pipe & strucrure are calculated as per design basis as below
EPCC-2 PACKAGE (RFCC UNIT)) FOR PETROCHEMICAL AND LUBE
INTEGRATION PROJECT “LuPech” (J-18).

CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01

Wind Load for Cable ducts :

Refer Appendix - E

LC 19 : WLz- (Wind Load in Negative Z direction)

Same loads are applied as per Load 18 in negative direction.

5.11 Seismic Loads

Description Design data


Reference Seismic Zone III (As per IS : 1893 Part-1)
Zone Factor 0.16 (As per IS : 1893 Part-1)

1.5 (For Industrial Structures including Stack-like


Importance Factor
Structures as per Table 3 IS:1893 Part-IV)

Soil Type 2
5.0 (Transvers Direction)
Response Reduction Factor (R)
4.5 (Longitudinal/Braced direction)
Damping Factor 0.02

LC 20 : Slx (Seismic Load Longitudinal)

seismic load generated by STAAD.pro software by using seismic response spectrum definition command
EPCC-2 PACKAGE (RFCC UNIT)) FOR PETROCHEMICAL AND LUBE
INTEGRATION PROJECT “LuPech” (J-18).

CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01

LC 21 : Slz (Seismic Load Transverse)

seismic load generated by STAAD.pro software by using seismic response spectrum definition command
EPCC-2 PACKAGE (RFCC UNIT)) FOR PETROCHEMICAL AND LUBE
INTEGRATION PROJECT “LuPech” (J-18).

CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01

LC 22 : Sly (Seismic Load Vertical)

seismic load generated by STAAD.pro software by using seismic response spectrum definition command
EPCC-2 PACKAGE (RFCC UNIT)) FOR PETROCHEMICAL AND LUBE
INTEGRATION PROJECT “LuPech” (J-18).

CONTRACTOR: OWNER:
PROJECT No:
MEGHA ENGINEERING & INFRASTRUCTURE LTD INDIAN OIL CORPORATION LIMITED
OWNER 1803
ENG. CONTRACTOR: PMC:
CONTRACTOR 2047
INTECSA INDUSTRIAL TECHNIP ENERGIES INDIA LIMITED
EQUIPMENT / PACKAGE:
DOC NUMBER: 2047-1803-ECV-CAL-1000 REV: D CAT.: R
PIPE RACK 1803-PR-01

5.12 LC 23 : (PSV_POP)

Not Applicable

5.13 LC 24 : Hd (Maintainance Load)


Not Applicable

5.14 LC 25 : LB (Local Check of Beams (vertical))


25% of load on transverse beams is applied on long beams

5.15 LC 26 : EP (Earth Pressure)


Not Applicable

5.16 LC 27 : LP (Liquid Pressure)


Not Applicable

5.17 LC 28 : BL (Blast Loads)


Not Applicable

5.18 LC 29 : FL (Equipment Thermal Load)


Since Vendaor data not available 50% of excess to operating load assumed.

5.19 LC 30 : Contigency Load


Not Applicable