FLUCTUATION CLAUSE PRICE LIST FOR NAIROBI ZONE
SEPTEMBER 2022 PRICE LIST REF: 09/2022
All prices include current 16% V.A.T. rating and are valid as at 1st JULY 2022 - 30th SEPTEMBER 2022.
Issued in SEPTEMBER 2022(third quarter)
The prices are published by the Joint Building and Construction Council for operation of the Building
Contract Fluctuation Clause and where these prices have been cited in the Contract Documents.
++ 0.1 CEMENT IN BAGS
01.1 Cement type OPC 32.5 [for 32.5N/mm2]
[1442Kg/M3] Kshs. 25,790.17 per cubic meter (kshs 17,885.00/= per tonne)
F.O.R.
W.E.F. 01.11.2021. Index =186.43
01.2 Cement type PPC 42.5 [for 42.5N/mm2]
[1442Kg/M3] Kshs. 38,256.26 per cubic meter (kshs 26,530 per tonne)
F.O.R.
W.E.F. 01.11.2021. Index =117.30
++ 0.2 SAND PER TONNE
Kshs. 3,685.03 per cubic meter [Kshs. 2,555 per ton] delivered in Nairobi Area
[W.E.F 01.07.2022]. Index = 282.27
++ 0.3 AGGREGATE (BALLAST)
Kshs. 5,224 per cubic meter [Kshs. 3,623 per ton] delivered in Nairobi Area
[W.E.F. 01.07.2022] Index = 425.30
++ 0.4 STEEL REINFORCEMENT
16mm High Tensile Steel [Kshs. 140.60per Kg.] Index = 339.57 [w]
[W.E.F. 01.07.2022]
Type A142 Mesh (2.22kg/m2) (sm) kshs. 164.38 per kg or kshs. 364.94 per m2 (sm) Index = 325.79
[W.E.F. 01.07.2022]
FLUCTUATION CLAUSE PRICE LIST FOR NAIROBI ZONE
SEPTEMBER 2022 PRICE LIST REF: 09/2022
05. STRUCTURAL STEEL [W.E.F 01.07.2022]
05.1 Steel Hollow Sections [Kshs. 175.56 per Kg] Index = 297.18
05.2 Steel Angles [Kshs. 196.25 per Kg.] Index = 328.77
06. CONCRETE BLOCK [500 Lbs./Sq.in] [W.E.F. 01.07.2022]
SOLID BLOCKS
06.1 3” x 9” x 18” [Kshs. 80 each] Index = 146.83
06.2 4” x 9” x 18” [Kshs. 88 each] Index = 135.50
06.3 6” x 9” x 18” [Kshs. 129 each] Index = 126.56
06.4 9” x 9” x 18” [Kshs. 200 each] Index = 129.04
06.5 90mm x 190mm x 390mm [Kshs. 59.00 each] Index = 137.19
06.6 140mm x 190mm x 390mm [Kshs. 96.00 each] Index = 132.93
06.7 190mm x 190mm x 390mm [Kshs. 129.00 each] Index = 143.22
HOLLOW BLOCKS
06.8 140mm x 190mm x 390mm [Kshs. 71.00 each] Index = 162.30
06.9 190mm x 190mm x 390mm [Kshs. 90.00each] Index = 159.44
07. BUILDING STONE [W.E.F. 01.07.2022]
07.01 140mm x 190mm x 390mm [Kshs. 66.00 each] Index = 229.43 [w]
07.02 190mm x 190mm x 390mm [Kshs. 74.50 each] Index = 283.29[w]
FLUCTUATION CLAUSE PRICE LIST FOR NAIROBI ZONE
SEPTEMBER 2022 PRICE LIST REF: 09/2022
++ 08. CLAY PRODUCTS [W.E.F. 01.07.2022]
08.1 90mm partition block Kshs. 59,430/00 [per 1000 ex Ruaraka Factory ] Index = 284.85
08.2 100mm maxspan “ Kshs. 74,100/00 [per 1000 x “ “ ] Index = 273.05
08.3 160mm “ “ Kshs. 90,000/00 [per 1000 x “ “ ] Index = 305.20
08.4 200mm “ “ Kshs. 110,200/00 [per 1000 x “ “ ] Index = 274.70
08.5 Mangalore roofing tiles Kshs. 57,000/00 [per 1000 x “ “ ] Index = 302.48
++ 09. RESINCOT CORRUGATED SHEETING [W.E.F. 01.07.2022]
09.1 Unpainted Corrugated Sheet 0.25mm thick gauge30 Kshs. 850 per 2m [762mm cover width]
Index =281.43
09.2 Painted Corrugated Sheet 0.25mm thick gauge30 Kshs. 1240 per 2m [762mm cover width]
Index = 318.04
09.3 MAX COVER BOX PROFILE SHEET 0.25 MM THICK GAUGE28 Kshs. 1329.00 per 2m
[1015mm cover width] Index = 268.80
09.4 MAX COVER BOX PROFILE SHEET 0.25 MM THICK GAUGE28 Kshs. 1662.00 per 2m
[1015mm cover width] Index = 265.78
09.5 TEKDEK COVER SHEET 0.40 MM THICK GAUGE26 Kshs. 1350.00per 1m [910mm cover width]
Index = 100
09.6 TEKDEK COVER SHEET 0.50 MM THICK GAUGE24 Kshs. 1665.00per 1m [910mm cover width]
Index = 100
++ 10. FLOOR TILES [W.E.F. 01.07.2022]
10.1 300mm x 300mm x1.5mm thick vinyflex tile Kshs 1430.00 per sqm Index = 330.37
300mm x 300mm x2.0mm thick vinyflex tile Kshs 1797.00 per sqm Index = 300.10
10.2 300x300x6mm thick ceramic wall tiles Kshs 1400 per sqm Index = 163.17
320x320x8mm thick ceramic tiles Kshs 1496.40 per sqm Index = 140.90
10.3 300mmx300mmx8mm thick Porcelain tiles Kshs 2500per sqm Index = 140.06
10.4 Matt finish granito tiles 600mmx600mmx8mm Kshs 2850per sqm Index = 140.06
10.5 Polished finished granito tiles 600mmx600mmx8mm Kshs 3050 sqm= Index 100
FLUCTUATION CLAUSE PRICE LIST FOR NAIROBI ZONE
SEPTEMBER 2022 PRICE LIST REF: 09/2022
11. CLEAR GLASS PARTITION [W.E.F 01.07.2022]
11.1 6mm clear ordinary glass [Kshs 170.0 ] Index = 122.03
11.2 6mm tinted glass [Kshs 185.0] Index = 82.22
12. PVC [LG] DRAINPIPES [W.E.F. 01.07.2022]
12.1 110mm PVC diameter Kshs. 1,600 [per six meters piece] Index = 400.96
12.2 160mm PVC diameter Kshs. 3,500 [per six meters piece] Index = 393.90
13. TIMBER [W.E.F 01.07.2022]
13.1 100 x 75mm Cypress [Kshs. 532.20 per M] Index = 508.10
13.2 100 x 75mm Mahogany [Kshs. 1712/00 per M1] Index = 290.15
13.3 Plain Block-board not exceeding 18mm thick 3050/2 per board [kshs. 1525.00 per m2]
Index = 307.90
13.4 25mm mahogany veneered block board both sides Kshs 8120.20 per board [Kshs. 2819.44 per m2]
Index= 100
13.5 20mm ordinary MDF board Kshs3770 per board [Kshs. 1309.02 per m2] Index= 100
++ 14. PAINT [W.E.F. 01.07.2022]
14.1 Plastic Emulsion [Kshs. 2,708/- per 4 litres ex Factory] Index = 203.91
14.2 Enamel Paint [Kshs. 3533.75/- per 4 litres ex Factory] Index = 222.92
14.3 Wall-master 40kg bag [Kshs. 3,500/-] Index = 100
14.4 Aluco-bonds panel 1220mmx2440mm [Kshs. 6,800/-] Index = 100
FLUCTUATION CLAUSE PRICE LIST FOR NAIROBI ZONE
SEPTEMBER 2022 PRICE LIST REF: 09/2022
15. MONTHLY INTEREST RATE APPLICABLE TO DELAYED PAYMENTS
1.5 % PERCENT PER MONTH [W.E.F 01.09.2022]
16. LABOUR [BASIC MINIMUM WAGE RATE PER NORMAL WORKING DAY MON. – SAT.]
NAIROBI, MOMBASA The Area of all All other Areas
AND KISUMU Municipalities, all towns and
Urban Councils
2021 Labourers Kshs. 739.05 Kshs. 692.20 Kshs. 560.40
2022 Labourers Kshs. 827.70 Kshs. 775.54 Kshs. 616.54
[W.E.F 1/5/2022]
In accordance with the Memorandum of Agreement between the Kenya Association of Building and
Civil Engineering Contractors and the Kenya Building Construction and Allied Workers Union dated 16
th July 2019 and registered by Industrial Court Ref RCA No.186 OF 2019 , the revised
Basic Daily Rates with effect from 1st May 2022, are as above. In assessing the overall percentage
increase consideration has been given to Housing, Travel Allowance, N.S.S.F. Contribution, Annual
Leave, Sick Leave with Pay and Medical treatment allowance, and the resultant increase to be applied
to labour for the purpose of the Fluctuation Clause is assessed at 11.94 per cent for the year 2022 with
effect from 1st May 2022.
Labour content is evaluated as follows:
A. At 25.00% of Builders work for jobs tendered prior to 31.12.1995.
B. At 20.00% of Builders work for jobs tendered from 01.01.1996 to 31.03.1998.
C. At 19.00% of Builders work for jobs tendered from 01.04.1998 up-to this date.
FLUCTUATION CLAUSE PRICE LIST FOR NAIROBI ZONE
SEPTEMBER 2022 PRICE LIST REF: 09/2022
PRACTICE NOTES
INDEXING [W.E.F. 01.06.2021]
NO.2020/01
CEMENT
The prices of 42.5N/MM2 Cement will apply in this index W.E.F 01/03/2020 in addition to 32.5 N/mm2
Cement.
NO.2020/02
VINYL FLOOR TILES
Rates for Vinyl floor tiles will not be collected and therefore substituted with ceramic floor and wall
tiles.
NO.2020/03
BITUMEN AND MASTIC ASPHALT
Bitumen for waterproofing purposed is no longer in much use and therefore other materials will be
recommended in subsequent lists.
NO.2017/01
BITUMEN AND MASTIC ASPHALT
Mastic asphalt is not available and therefore other materials will be recommended in subsequent listing
NO.2017/02
CORRUGATED ASBESTOS CEMENT SHEETING AND GALVANIZED MILD STEEL PIPES
Corrugated Asbestos cement sheeting is no longer in production and considered obsolete material and
galvanized mild steel pipes were replaced as building material by use of PPR pipes.
NO.2014/02
CONTRACTS ENTERED INTO BEFORE 3OTH APRIL 2002
Contracts entered into on or before 30 th April 2002 are deemed to have been concluded. The related Prices
and indices have been removed from this price list WEF 01.05.2014.
FLUCTUATION CLAUSE PRICE LIST FOR NAIROBI ZONE
SEPTEMBER 2022 PRICE LIST REF: 09/2022
NO.2011/01
BUILDING STONE
With effect from 31st January 2011, the use of imperial units for the description of stone has been
changed to metric. The index remains unchanged.
NO. 2011/02
IT4 ROOFING SHEETS
IT4 Roofing sheets are no longer in production. Therefore, the prices of IT5 will apply with effect from
31.1.2011.
NOTE
xx Denotes new items
++ Denotes revised prices
xxx Corrected items
[w]Means weighted average