CV Wawan

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

Hermawan

Perumahan Sierra Blok D22 A # Batu aji,Batam Riau Island 29438• (+62-821-8600-0458 )
[email protected]
CURRENT POSITION : NDT Inspector

EDUCATION & ACTIVITIES TRAINING


 High School at SMU NEGERI 10 PALEMBANG, South Sumatera 2013
 ASNT MT Level II at dB School of NDT Batam
 ASNT PT Level II at dB School of NDT Batam
 English Conversation Survival Certified By ETC Batam 2019
 Pipe Fitter Training atSAFECO INTERNATIONAL Batam 2018
 Safety Award as pipe fitter at VME Process Batam 2016
 Basic Life Support atSiemens Oil &Energy,Batam 2015
 Microsoft Office Application PalComTech Palembang 2013

WORKING EXPERIENCE
 SUCOFINDO INDONESIA
Position : NDT Technician
Location : PT. Indah kiat Pulp and Paper
Period of service : Nov 2019 – Nov 2019
CLIENT : IKPP
PROJECT : TURN AROUND MAINTENANCE IKPP 2019

 SUCOFINDO INDONESIA
Position : NDT Technician
Location : PT.CANDRA ASIH PETROCEMICAL, CILEGON
Period of service : August 2019 – Sept 2019
CLIENT : CAP, CILEGON
PROJECT : TURN AROUND MAINTENANCE 2019

 GREATSWAYS ENGINEERING SERVICE


Position : NDT Technician
Location : PT. Lontar Papyrus pulp&paper
Period of service : July 2019 – Augt 2019
CLIENT : SINARMAS
PROJECT : SHUTDOWN

 PT.KNN KONTRUKSI INDONESIA


Position : PIpe Fitter 1
Location : PT.TRIPATRA ENGINEERS AND CONTRUCTORS GUNUNG SITOLI
Period of service : Nov 2018 – March 2019
PROJECT : MPP NIAS 25 MW

 AG IRM SERVIS INDONESIA


Position : NDT Technician
Location : PT. Smoe Indonesia
Period of service : Jun 2017 – August 2017
CLIENT : YAMGAS
PROJECT : YAMAL LNG
 AG IRM SERVIS INDONESIA
Position : NDT Technician support document controller
Location : PT. Smoe Indonesia
Period of service : Dec 2016 – April 2017
CLIENT : YAMGAS
PROJECT : YAMAL LNG

 PT.CITRA TUBINDO ENGINEERING


Position : PIpe Fitter 1
Location : Citra Tubindo Kabil, Batam
Period of service : August 2016 – Nov 2017
CLIENT : CHEVRON
PROJECT : WHEATSTONE

 PT.KNN KONTRUKSI INDONESIA


Position : PIpe Fitter 1
Location : VME PROCESS BATU AMPAR, BATAM
Period of service : June 2016 – june 2016
PROJECT : J-1429 HUSKY KNOOC MADURA

 PT.L.A ENGINEERING
Position : Scaffolder
Location : Batam
Period of service : Jan 2016 – May 2016

 AG IRM SERVIS INDONESIA


Position : NDT Technician support document controller
Location : Siemens Oil &Energy, Batam: Finish Contract
Periode of service : Feb 2014 – Sept 2014
Client : DSME
Project : UPPER ZAKUM 750

 PT.ANGKASA ENGINEERS INDONESIA


Position : PIpe Fitter 1
Location : PT.SMOE INDONESIA
Period of service : Feb 2014 – Sept 2014

 PT.PRO-SPECS INDOPRATAMA
Position : NDT Technician support document controller: Job Completion
Location : BintanMaritimTech(BMT),Lobam,Kepluaun Riau
Period of service : Jan 2014 - jan 2014
Project : Seconded conducted project in PT. Alstom Power Energy Surabaya
for projectLinkou and TanjungBintan

You might also like