This installation guide provides instructions for installing the Infra-Red and
White-Light SPARTAN series of explosion protected floodlights.
Overview
1 Safety Instructions
2 Installation
3 Maintenance
4 Technical Specification
5 Trouble Shooting
Important information
The SPARTAN series of explosion protected floodlights are specialist devices,
certified for use in specific operating environments.
The units must be installed in accordance with these instructions, must be correctly
certified for the specific operating environment and must be installed by suitably
qualified personnel.
If you have any queries about the installation or the certification of the unit – please
contact Raytec for immediate assistance and advice.
1. Safety instructions
1. Read this leaflet carefully before commencing to install the SPARTAN unit and retain it for future use.
Installation can only be carried out by suitably qualified personnel.
2. Check the certification and “T” rating to ensure that the mains supply and the ambient temperature
present is suitable for the unit being installed.
3. If the SPARTAN unit is to be installed in areas of high vibration, please consult with Raytec.
4. Externally the SPARTAN unit housing is constructed from marine grade aluminium, and toughened
glass, stainless steel brackets/fasteners and silicone gaskets, internally there are many non metallic
components. The end user must ensure that these materials are suitable for the environment the
SPARTAN unit will be installed in; Zone 1 and Zone 2 Hazardous areas.
5. SPARTAN units are designed to withstand marine environments and are tested in accordance with
IEC60068-2-52. However if the SPARTAN unit is to be installed in a very high corrosive environment
such as coastal and offshore the following good practice should be followed:
During installing ensure there are no scratches, chips or defects in external paint surface that
would allow ingress of water to bare aluminium. If so touch up with suitable paint
During installation apply an anti corrosive jointing compound to screw threads such as PSU cover
and external earth points.
During installation ensure exterior surface of the product is not in direct contact with a dissimilar
metal such as galvanised steel. If so fit a nylon barrier to prevent galvanic corrosion.
During maintenance regularly wash down external surface of fitting with clean, fresh water to
remove any deposits of mineral salts on the exterior surface.
6. Check certification nameplate on side of floodlight to ascertain type of threaded cable entry on the
luminaire. Select suitably certified ATEX/IEC Ex /UKEX cable glands and stopper plugs, these must
be parallel thread, have a minium of 5 full thread engagement and be of a medium/fine tolerance to
ISO965-1 and ISO965-3. The cable entry devices selected must maintain the IP rating of the luminaire
7. The incoming mains cable should not exceed a temperature rise of 20°C above the ambient
conditions; select suitable cable.
8. When the unit is installed correctly and in accordance with these installation instructions it will not
harm humans or animals.
9. Before installing emergency luminaires please check the last charge date of the battery. This is shown
on the external product packaging and also on the battery label, alternatively consult date shown on
the declaration at the back of this leaflet. If the last charge date was in excess of 3 months (if stored
at 5°C to 25°C) or 1 month (if stored outside this range) from date of installation, please consult
Raytec document 0010-D-00001 Battery Handling Guide
312
185
185
B B
C C
49 49
STANDARD
STANDARD EMERGENCY
EMERGENCY
D D
25
49
25
49
E E
50 50
9 9
100 100
150 150
DEBUR AND DEBUR ANDSHEET A SHEET
UNLESS OTHERWISE
UNLESSSPECIFIED:
OTHERWISE SPECIFIED:
A3
BREAK SHARPBREAK SHARP
DIMENSIONS DIMENSIONS
ARE IN MILLIMETERS
ARE IN MILLIMETERS
EDGES EDGES
CERTIFICATE
CERTIFICATE
RELATED
RELATED
DRAWING
DRAWING
TOLERANCES:TOLERANCES:
(LINEAR) (LINEAR)
XXX XXX
+/- 0.5mm +/- 0.5mm
XXX.X XXX.X
+/- 0.1mm +/- 0.1mm Unit 3 Wansbeck Business
Unit 3 Wansbeck
Park, Business Park,
Rotary Parkway. Rotary Parkway. TITLE: TITLE:
Tel: 01670 520055.
Tel: 01670 520055.
MEDIUM
MEDIUM
SPARTAN
SPARTAN
ANGULAR: ANGULAR:
+/- 0.5° +/- 0.5° Ashington. Ashington.
Northumberland. NE63 8QW. UK. NE63 8QW. UK.Fax: 01670 819760
Northumberland. Fax:. 01670 819760 .
NO MODIFICATIONS
NO MODIFICATIONS ALLOWED
ALLOWED NAME NAME
SIGNATURE SIGNATURE
DATE MATERIAL:
DATE MATERIAL:
GENERAL
GENERAL
DIMENSIONS
DIMENSIONS
F WITHOUT
F WITHOUTTHE THE
APPROVAL
APPROVAL
OF OF DRAWN JWalsh
DRAWN JWalsh 27/05/15 27/05/15
THE THE
AUTHORISED
AUTHORISED
PERSON.
PERSON.
CHK'D CHK'D FINISH: FINISH: DWG NO. DWG NO. REVISION
ALL DIMENSIONS
ALL DIMENSIONS
IN MM. IN MM.
IF INIF
DOUBT
IN DOUBT
ASK!ASK! DO NOTDOSCALE
NOT SCALE
DRAWING
DRAWING C
IF IN DOUBT
IF IN DOUBT
ASK ASK WEIGHT: WEIGHT: SCALE SCALE SHEET 1 SHEET
OF 1 1 SHEETS
OF 1 SHEE
1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8
12.5
25
50
9
100
150
STANDARD EMERGENCY
WHITE/RED WHITE/RED
WHITE/RED WHITE/RED
4. Installer should earth the unit separately – an internal and external earth point
are provided as standard.
7. All SPARTAN floodlights have terminal blocks suitable for looping 4mm2 cable,
only one cable should be connected to each terminal block connection.
9. The battery fuse located in the power supply lid on emergency variants
is disconnected after final manufacturing testing. When installing the
floodlight the battery fuse will need to be reconnected and the unit
charged for 24 hours and then discharged (repeated 3 times) to bring
the battery up to peak capacity.
10. If a 4 core cable is used on emergency luminaires – L1, L2, N and E the
link cable at the front of the terminal block between L1 and L2 should be
removed.
11. During emergency operation the light output and duration will be
determined by the variant purchased.
12. Once wiring is complete replace rear cover. Ensure gasket is located neatly
in channel and no wires are trapped between cover and body. Tighten cover
screws to 3Nm.
13. If carrying out Insulation Resistance tests the normal method of insulation
testing is to connect Live and Neutral together and test between this point and
Earth to prevent the risk of damage to the electronic control gear.
1. It is essential that all SPARTAN units are maintained in accordance with the
requirements of the EN60079-17 standard: (Electrical apparatus for explosive
gas atmospheres – other than mines).
2. IMPORTANT. No modifications are permitted to the unit, all spare parts must
be purchased from the manufacturer, unauthorized modifications or spare parts
will invalidate certification and make the equipment dangerous.
3. Isolate the SPARTAN unit from the mains supply and allow to cool before
carrying out any maintenance work.
4. The unit has 2 independent power supplies, in the event that a power supply
needs to be replaced the cables to the LED and mains terminal block will need
to be disconnected, the four M6 bolts released the power supply can then be
removed. Fitting a new power supply is a reversal of the above procedure.
IP Rating IP66/67
Weight Environment
11.5kg (25.3lbs) 21kg (46.3lbs)
(Emergency variant)
Protection/Certification
1. Ensure the two LED boards are correctly wired to terminal block.
White to White : White/Red to White/Red
5. If LED panel fails to light is it possible to identify if problem is with LED panel
or power supply by swapping LED cables to opposite power supply to help
identify problem.
B 10A 5 2
B 16A 8 4
B 20A 12 8
B 25A 17 8
C 10A 12 6
C 16A 17 8
C 20A 24 12
C 25A 29 14
II 3 GD Ex ec mc IIC T4 Gc
Ta -50oC to +55oC (standard variants)
II 3 GD Ex ec mc IIC T4 Gc
Ta -20oC to +55oC (emergency variants)
Ex tc IIIC T82°C Dc
IP66 & IP67 Ta = -50°C to +55°C
110V-254V AC or 18-48V AC/18-69V DC