SAP EWM TM Integration
SAP EWM TM Integration
1 Overview
In this blog post, I will explain how the TM-EWM integration in the S4HANA 1909 system will
work in an integrated way in outbound delivery process. The article will include more detailed
information about the EWM side and more brief information about the TM-ERP sides.
While providing this integration, the following steps will be examined and exemplified.
TM Side
o Planning for outbound deliveries
o Packaging
o Determine the loading sequence
EWM Side
o Automatic creation of the transport unit with TM integration and PPF in the EWM
system
o Creation of planned transport handling units with TM reference in the EWM
system
o Using PSHU‘s as a reference during creating warehouse orders in the EWM
system and creating PICK-HU with them.
o Operation of collection steps in the warehouse with EWM PICK HU
o Movement of the transport unit in YARD with Yard Management
o Loading the HUs collected in the warehouse with the reference of TM loading
sequence into the vehicle with transport unit
While the above scenarios are being operated, information about the configuration steps that are
seemed important regarding the related steps will also be shared.
While preparing the document and making the system testable a few blog posts that are
considered as references will also be shared.
Sales Orders;
321, 373
Outbound Deliveries;
80000816, 80000831
**** The steps after this step are arranged to include more detailed and technical
explanations.
A freight order is created for the relevant freight units in TM, and after planning, packaging and
loading details are created, the process is now advanced in EWM.
After the loading instruction is sent, firstly the HU number is automatically generated for the EWM
system by taking the freight order with the PPF’s as reference.
Accordingly, the system will try to create TU automatically. Here, while making a plan in TM, a
necessary material is needed for the selected means of transport.
Tcode: /SCWM/PM_MTR
For each TM means type is selected the relevant TM means material. The packaging material
type of this material should also be selected as “A”.
The creation of PSHU in EWM for the HU for each plan in TM will be provided as follows.
In this step, a notification is given that PSHUs will be created from the TM system. And for this
created PSHU, it is decided at which stage Pick-HU will be created. In our scenario, it is
determined this Pick-HU will be created and used during picking in the configuration as above.
IMG Menu SCM Extended Warehouse Management ® Extended
Warehouse Management ® Good Issue
Process ® Cartonization Planning ® Determine process
profiles for cartonization planning
At this stage, in which warehouse numbers, which activity areas and which processes will be
used during the removal from the warehouse task are specified at this stage.
There are several configuration steps that need to be done at this stage. Their details are as
follows.
The marked areas in the screenshot above are important. These configurations need to be
made.
Limit: PSHU
Owing to the configuration below, the system will divide the warehouse orders on the basis of
PSHU.
Owing to the configuration below, the system will create Pick-HU and assign them to the
warehouse order when creating warehouse orders and creating references to PSHUs.
Finally, with this configuration, we indicate which warehouse order creation rule we use when
creating warehouse orders from which activity areas.
With TM plan HUs, it is checked whether PSHU’s is created in the EWM system. The loading
sequence detail also looks like the following.
Warehouse orders are created on the basis of the freight number. The system separates the
warehouse orders it creates at the moment on the basis of PSHU‘s and creates a Pick-HU for
each warehouse order. It also writes to this Pick-HU content which PSHU reference as taken
when this created. In the next steps, this reference will determine the loading sequence.
3.2.4 Step 4: Picking Warehouse order with Pick-HU’s
Tcode: /SCWM/RFUI
04-Outbound Processes
01-Picking
01-System Guided
Pick HU’s WO – At this stage, the same HU is not available in our warehouse with the
features specified by PSHU & Pick-HU, we transfer over an existing HU.
Pick HU’s WO – At this stage, our warehouse has the same HU with the features
specified by PSHU & Pick-HU. When we scan this HU, the system replaces the scanned
HU with PICK HU if the HU contents are the same. While making this change, it
continues to keep the TM reference number on the storage HU. This reference is
important because, if you want to apply the means of transport loading sequence the way
that comes in TM, this reference needs to be kept on the HUs which prepared for
deliveries. In this way you don’t miss the loading sequence.
At this stage, vehicle’s yard entry notification is given. Usually, the user who performs this
operation will be a security guard at the yard entrance.
After;
The transfer of the vehicle to the door which it was assigned from the checkpoint will be operated
by the hand terminal.
06- Loading
You can choose whatever you want, i’m going to do with by door.
When you press the list button you can see whole HUs and load sequence.
When a HU other than the one to be loaded is scanned, it will give an error as follows.
HU number 7000000088 is requested to be scan first because this HU was created based on
PSHU number 00000000003000008481.
The system also triggers notifications in such events as loading start, loading completion, TU
leaving the yard etc. The example is shared only for the above.
Apart from this, the first numbers in TM regarding the HUs collected in the warehouse and their
quantities were replaced with HU numbers in the warehouse. This section contains some
improvement.
Apart from the configurations described above, systematic master data should also be
maintained. For example, the system is looking for a maintenance in PACKSPEC according to
the route information in the TM freight plan. It is also important to perform this maintenance, if not
done, system cannot take into account PSHU at the time of creating warehouse orders.
Apart from these, we have also received a lot of support from our basic teams, while running the
process the work that needs to be done on that side will be the subject of a separate blog posts.
The following blog posts were used during the above configurations and process test translation.
It will helpful for you to browse them.
https://blogs.sap.com/2016/08/22/cartonization-planning-cap-during-picking/
https://blogs.sap.com/2020/01/01/tm-ewm-integration-with-fo-and-tu-in-sap-s-4-hana/