JCF-C009 - Ceiling Works Request
JCF-C009 - Ceiling Works Request
JCF-C009 - Ceiling Works Request
CONTRACT ID
CONTRACT NAME:
LOCATION:
DATE REQUESTED: RFI No.:
STRUCTURE AREA/FLOOR ACTUAL INSPECTION DATE/TIME:
LEVEL:
GRIDLINE:
CHECK THAT THE FOLLOWING COMPLY WITH APPROVED SUBMITTALS FOR CONSTRUCTION DRAWINGS AND TECHNICAL SPECIFICATIONS.
COMPLIED ACTIONS
COMPONENTS REMARKS
DFC YES NO N/A REQUIRED
A. GENERAL
1. Materials passed the required testing or necessary
inspection (with attached test result or EC)
2. Required tools and equipment are on site
B. ALIGNMENTS
3. Vertical and horizontal alignment control
4. Attainability of required ceiling height
5. Squareness between corners of walls, beams
C. ARCHITECTURAL CHECKLIST
6. Readiness of walls and beams as to the required finish
prior to installation of framings (i.e. plastered)
7. Waterproofing on areas with slab soffit required to be
covered with ceiling
8. Manhole, air vent, locations, type, according to
approved drawings
D. MEPF CHECKLIST
9. Roughing-ins for Electrical, Mechanical, Plumbing,
Auxiliary, etc.
10. Complete Flood Test on waterproofed areas with
Satisfactory Results
11. Complete Pressure/Leak Test with Satisfactory Results
on pipes running on slab soffit
12. Complete Flow Test for sewer/sanitary pipes running
on slab/ slab soffit
E. CONSTRUCTION SAFETY REQUIREMENTS
13. Stable scaffoldings for safe access of workers on the
work area particularly on elevated areas
14. Personal Protective Equipment (PPE)
REMARKS: DFC = Dimension for Compliance