Leak Test Reservoir - XLSX Sample
Leak Test Reservoir - XLSX Sample
Leak Test Reservoir - XLSX Sample
This Wall
GL A-E/6
7900mm
2600mm 2 3
3.55m
4200mm 5000mm
2200mm
7
.30m
4 5 6 1
10350mm
GL-A Y
2500mm
GL-6 GL-1
Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 6/E-A
Item X Y Length Remarks
1 750 2200 900 Construction Joint(2nd lift) 6/20/17
This Wall
2 5150 2200 3500 Construction Joint(2nd lift) 6/20/17
3 10600 2200 5000 Construction Joint(2nd lift) 6/20/17
4 6000 2500 600 Transverse Crack 6/20/17
5 2500 2200 2000 *Construction Joint(2nd lift) 6/25/17
6 7300 2200 2200 *Construction Joint(2nd lift) 6/25/17
7 1200 300 500 **Construction Joint(1st lift) 6/30/17
8 6200 300 700 **Construction Joint(1st lift) 7/3/17
9 7500 300 500 **Construction Joint(1st lift) 7/3/17
X
7900mm
6000mm
600mm
5150mm
750mm 4
3.55m
1 2 3
7
.30m
8 9
GL-6 Y
GL-E GL-A
Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 1/A-E
Item X Y Length Remarks This Wall
1 1700 2200 1200 Construction Joint(2nd lift) 6/20/17
2 9200 2200 2000 Construction Joint(2nd lift) 6/20/17
3 3200 2200 1500 *Construction Joint(2nd lift) 6/27/17
4 7100 2200 2000 *Construction Joint(2nd lift) 6/27/17
5 11200 2200 700 *Construction Joint(2nd lift) 6/27/17
X
9200mm
3.55m
1700mm 3 4
1200mm 2000mm 5
2200m
1 2
.30m
GL-1 Y
GL-A GL-E
Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL E/1-6 This Wall
7200mm
6150mm
3.55m
2000mm 500 2
1
2200m
.30m
GL-E Y
GL-1 GL-6
Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
LAMELLAR THICKENER LEAKTEST
14-Jun-17
Start of water pouring
Finish of water pouring up to the
18-Jun-17
design water elevation
Start of water plugging/repair and
Injection 20-Jun-17
GL 6-1/A
Surface Area=160 m2
Prepared by: Noted by: Witnessed and Confirmed by:
Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 6-1/A
This Wall
Item X Y Length Remarks
1 2100 300 100 Construction Joint(1st lift) 7/7/16
2 5500 300 200 Construction Joint(1st lift) 7/7/16
5500mm
3.55m
2100mm
0.3
100mm 200mm
m
GL 6/E-A This Wall
Item X Y Length Remarks
1 12200 300 200 Construction Joint(1st lift) 7/7/16
12200mm
3.55m
0.3
200mm
m
GL E/1-6 Daily Monitoring
Item X Y Length Remarks 21-Jun-17 22-Jun-17 23-Jun-17 24-Jun-17
2 7200 2200 500 Construction Joint(2nd lift) - Chipped-off, Leak source found, Injected with epoxy Removal/ cutting of tubes and - - - - - - -
4 Tubes embeded for Injection grinding
1 10350 0 2500 Between kicker wall and foundation 6/20/17 - Chipped-off, Leak source found, Chipped-off, Leak source found, Injected with epoxy Under observation - - - - - -
21 Tubes embeded for Injection
3 7900 2200 5000 Construction Joint(2nd lift) 6/20/17 - Chipped-off, Leak source found, Chipped-off, Leak source found, Injected with epoxy Under observation - - - - - -
10 Tubes embeded for Injection
Chipped-off,Leak source
not found,Moist only-For
11250 300 500 - - - - - - - - Applied with water plug - Under observation
7 **Construction Joint(1st lift) 6/29/17 observation For observation
3 Tubes embeded for
Injection
=1107.43 m2
Prepared by: Noted by: Witnessed and Confirmed by:
Adam Jay D. Resultay /QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 5/B-G
43200mm
2 3 4 5
7
1200mm 6
8
6.11m
21000mm
3500mm
3500mm
1 24300mm
.30m
48600mm
GL-5 Y
GL-G
GL-B
Adam Jay D. Resultay / QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL G/3-5
Item X Y Length Remarks
1 12750 300 24550 Construction Joint
2 2500 2600 1200 Transeverse Crack
3 13600 1900 600 Transeverse Crack
4 15600 3700 900 Transeverse Crack
5 17700 3300 800 Transeverse Crack
15600mm
4 This Wall
17700mm
5
13600mm 3 6
6.11m
2900mm
2000mm
2
24550mm
1 12750mm
.30m
GL-G Y
GL-3 GL-5
Adam Jay D. Resultay / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 3/B-G
This Wall
Item X Y Length Remarks
1 1200 3800 700 Transeverse Crack
2 1600 4500 800 Transeverse Crack
3 9400 3300 - Tierod
4 10600 4100 500 Transeverse Crack
5 13600 3900 800 Transeverse Crack
6 15600 2000 200 Transeverse Crack
7 20400 3500 1200 Transeverse Crack
8 27650 1900 400 Transeverse Crack
X
20400mm
7
6.11m
4 5
1 3
1200mm
13600mm
6
4100mm
1900m
3900m
2 8
.30m
1600mm
m
m
GL-A Y
9400mm
GL-2' GL-3
Prepared by: Noted by: Witnessed and Confirmed by:
Adam Jay D. Resultay / QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL A/1-1' Daily Monitoring
Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QC Engineer
Name & Position Name & Position Name & Position
GL A/2-4
X
9500mm
4200mm
5 6
9500mm
6200mm
2.3m
3800mm
1 2 3 4
.30m
1000mm 1500mm
GL-A Y
GL-6 GL-1
Racquel Parocha/ Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 2/A-C This Wall
Item X Y Length Remarks
1 750 2200 900
2 5150 2200 3500
3 10600 2200 5000
4 6000 2500 600
5 2500 2200 2000
6 7300 2200 2200
7 1200 300 500
8 6200 300 700
9 7500 300 500
X
7900mm
6000mm
600mm
5150mm
750mm 4
2.30m
1 2 3
7
.30m
8 9
GL-6 Y
GL-E GL-A
Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 1/A-E
Item X Y Length Remarks This Wall
1 1700 2200 1200 Construction Joint(2nd lift) 6/20/17
2 9200 2200 2000 Construction Joint(2nd lift) 6/20/17
3 3200 2200 1500 *Construction Joint(2nd lift) 6/27/17
4 7100 2200 2000 *Construction Joint(2nd lift) 6/27/17
5 11200 2200 700 *Construction Joint(2nd lift) 6/27/17
X
9200mm
3.55m
1700mm 3 4
1200mm 2000mm 5
2200m
1 2
.30m
GL-1 Y
GL-A GL-E
Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL E/1-6 This Wall
7200mm
6150mm
3.55m
2000mm 500 2
1
2200m
.30m
GL-E m Y
GL-1 GL-6
Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
LAMELLAR THICKENER LEAKTEST
14-Jun-17
Start of water pouring
Finish of water pouring up to the
18-Jun-17
design water elevation
Start of water plugging/repair and
Injection 20-Jun-17
GL 2/A-C
GL C/2-4 Finish of water plugging/repair and
Injection 7/4/2017 (morning)
Surface Area=90 m2
Nikko P. Sario / Jr. QC Engineer Mark A. Belo / QA/QC Head Remar Razalan/QA/QC GHD
Name & Position Name & Position Name & Position
GL 6-1/A
This Wall
Item X Y Length Remarks
1 2100 300 100 Construction Joint(1st lift) 7/7/16
2 5500 300 200 Construction Joint(1st lift) 7/7/16
5500mm
3.55m
2100mm
0.3
100mm 200mm
m
GL 6/E-A This Wall
Item X Y Length Remarks
1 12200 300 200 Construction Joint(1st lift) 7/7/16
12200mm
3.55m
0.3
200mm
m