Itp R2
Itp R2
Inspection/ Verifying
Inspection Test Documents RESPONSIBILITY REPORT
ACTIVITY Frequency
NO. Test REFERENCE DOCUMENTS Acceptance Criteria REFERENCE
DESCRIPTION
Method NO
TYCO CCTC TPI QP
Inspection/ Verifying
Inspection Test Documents RESPONSIBILITY REPORT
ACTIVITY Frequency
NO. Test REFERENCE DOCUMENTS Acceptance Criteria REFERENCE
DESCRIPTION
Method NO
TYCO CCTC TPI QP
3 Final Inspection
Approved AFC drawings Approved AFC drawings
VEN-4211-QPSFA-9-FE-0001-001 VEN-4211-QPSFA-9-FE-0001-001
Approved material submittal Approved material submittal
4211-9-MS-0042 4211-9-MS-0042 Factory acceptance test
Quality requirement for Quality requirement for procurement procedure Final
Final acceptance for
Visual procurement of materials & equipment of materials & equipment 100% 4211-9-FAT-0043 Inspection
3.1 Factory acceptance
inspection QP-STD-Q-003-Rev. 1 completion Final Inspection Check-off H W W W
test
QP-STD-Q-003-Rev. 1 check off
Approved project specification Approved project specification sheet
Sheet
4211-QPSFA-9-F14-0008 4211-QPSFA-9-F14-0008
Factory acceptance test procedure Factory acceptance test procedure
4211-9-FAT-0043 4211-9-FAT-0043
NFPA 3, NFPA 11, NFPA 16, NFPA 25 NFPA 3, NFPA 11, NFPA 16, NFPA 25
Approved AFC drawings
Approved AFC drawings
VEN-4211-QPSFA-9-FE-0001-001
VEN-4211-QPSFA-9-FE-0001-001
Approved material submittal
Approved material submittal Factory acceptance test
4211-9-MS-0042
4211-9-MS-0042 procedure
Quality requirement for
Quality requirement for 100% 4211-9-FAT-0043
Punch List procurement of materials & equipment
Verification of FAT procurement of materials & equipment completion
3.2
Punch List closeout
overview & QP-STD-Q-003-Rev. 1
QP-STD-Q-003-Rev. 1 W W W R Punch List
Verification Approved project specification
Approved project specification
4211-QPSFA-9-F14-0008
4211-QPSFA-9-F14-0008
Factory acceptance test procedure
Factory acceptance test procedure
4211-9-FAT-0043
4211-9-FAT-0043
NFPA 3, NFPA 11, NFPA 16, NFPA 25
NFPA 3, NFPA 11, NFPA 16, NFPA 25
Inspection/ Verifying
Inspection Test Documents RESPONSIBILITY REPORT
ACTIVITY Frequency
NO. Test REFERENCE DOCUMENTS Acceptance Criteria REFERENCE
DESCRIPTION
Method NO
TYCO CCTC TPI QP
NOTE:
W WITNESS CHECK RFI to be issued to client. Work may proceed beyond “W” point if client representative does not attend.
H HOLD POINT Work shall not proceed beyond “H” point without approval / waiver from responsible party. RFI to be issued.
S SURVEILLANCE Client / Others may carryout surveillance of work in progress on an unscheduled basis. No notification required.