Mv-20 Schematic Wiring Diagram & Sequence of Operation
Mv-20 Schematic Wiring Diagram & Sequence of Operation
Mv-20 Schematic Wiring Diagram & Sequence of Operation
EX.A.F-04
Date :
905/542 CFM
F.A.F-03 F.A.F-02 F.A.F-01
N/2022/0003504
EX.A.F-08 13872/8323 CFM 14838/8903 CFM 14646/8788 CFM
1190/713 CFM CONSULTANT'S ENDORSEMENT
I, ENGR. ROMEO BENID PLASENCIA AN MECHANICAL ENGINEER WITH UPDA/QCD REGISTRATION NO. 1239,
BEING THE CONSULTANT, HEREBY CERTIFY THAT THE FIRE SAFETY WORKS SHOWN ON THIS AIR CONDITIONING
F.A.F-04
AND MECHANICAL VENTILATION (ACMV) ARE IN ACCORDANCE WITH THE QCD TECHNICAL REQUIREMENTS
905/542 CFM
EX.A.F-07 GUIDE 2022.
1083/650 CFM
F.A.F-03 F.A.F-02 F.A.F-01
13872/8323 CFM 14838/8903 CFM 14646/8788 CFM FURTHER, I HEREBY CERTIFY THAT I AM FULLY AWARE ON THE APPROVAL OF FIRE SAFETY ENGINEERING
EX.A.F-05
281/169 CFM PLANS AND DO NOT RELIEVE MYSELF OF BEING THE CONSULTANT ON THE RESPONSIBILITY IN CONTINUED
COMPLIANCE TO THE QCD TECHNICAL REQUIREMENTS GUIDE 2022, APPLICABLE/ACCEPTABLE NFPA CODES,
STANDARDS, PROCEDURES AND PRACTICES IMPLEMENTED BY THE GDCD.
AFFIXED IS MY NAME AND COMPANY STAMP TO ATTEST WITH THE ABOVE UNDERTAKING.
F.A.F-05
281/169 CFM (SIGNATURE OF CONSULTANT)
ENGR. ROMEO BENID PLASENCIA
P. O. BOX 2118 , DOHA QATAR.
FROM EMDB TEL. 44443445 FAX. 44443224
EMCC
TO FACP TO PLC/DDC. THE PLC/DDC WILL SEND SIGNALS TO THE VFD OF BOTH (EX.A.F-01,02 & 03) & (F.A.F-01,02 & 03)
LOBBY PRESSURIZATION:-
THE pressurization FF & SMOKE STOP LOBBY will be kept smoke free by pressurization ,Fresh air there is S.D, supplied via 2 hours FIRE
TO INCREASE ITS SPEED AND OPERATE TO 10 ACH (10 AIR CHANGES PER HOUR).
RATED DUCT 2HR from axial belt driven fans located at the upper roof & ground, will be injected in each floor through Fresh Air Registers.
IN CASE OF DUTY FAN FAILS, STAND-BY FAN SHALL OPERATE. - The amount of supplied fresh air in each floor is designed to fulfill the criteria of not higher pressure in the exit staircase, pressurization air at Location : MUSHAIREB Pin No. : 13230013
lobby calculated by leakages..
- The pressurization fans are interfaces with the fire alarm system. The activation of any water flow switch and/or (smoke or heat) detector at all Total Area : Street : Plot No. :
floors in the building, will operated all fans position to achieve the required .
-Each fan will also be individually controlled by a manual local on-off switch on the Fire Fighter's Fan Control Panel located in FCC room.
-This manual control will override all other control sequences. DRAWING TITLE/SHEET CONTENT
- A differential pressure switch that monitors the fan static pressure across the fan inlet and outlet will indicate fan failure after 30 seconds if the
differential pressure is not present (after the fan is energized) and initialize a trouble alarm.
SCHEMATIC WIRING DIAGRAM &
SEQUENCE OF OPERATION