The document lists 60 instruments with their part numbers and descriptions that are used to monitor various process parameters like level, pressure, temperature etc. at different locations of a power plant. It also mentions the range of each instrument and status of material receipt at site. Some instruments are received at site while status of many instruments is mentioned as "Not Checked", indicating they need to be verified.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
118 views4 pages

STG Instruments

The document lists 60 instruments with their part numbers and descriptions that are used to monitor various process parameters like level, pressure, temperature etc. at different locations of a power plant. It also mentions the range of each instrument and status of material receipt at site. Some instruments are received at site while status of many instruments is mentioned as "Not Checked", indicating they need to be verified.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

SI. No. Part No.

Part Description QTY

1 LSL-300 Level Switch 1


2 LSH-300 Level Switch 1
3 LSHH-300 Level Switch 1
4 LSLL-300 Level Switch 1
5 LH-202 Level Switch 1
6 LS-203 Level Switch 1
7 LG-300 Level Gauge 1
8 LG-201 Level Gauge 1
9 PB-111 TO 118 PUSH BUTTON BOX 8

10 PS-302 Pressure Switch 1


11 PT-300 Pressure Transmitter 1
12 AVR-300 Air Regulator 1
13 AVR-301 Air Regulator 1
14 I/p-300 I/P 1
15 PG-406 Presssure Gauge 1
16 PG-408 Presssure Gauge 1
17 PG-100 Presssure Gauge 1
18 PG-102 Presssure Gauge 1
19 PG-506 Presssure Gauge 1
20 PG-508 Presssure Gauge 1
21 PG-403 Presssure Gauge 1
22 PG-404 Presssure Gauge 1
23 PG-401 Presssure Gauge 1
24 PG-402 Presssure Gauge 1
25 PG-102A Presssure Gauge 1
26 PG-505 Presssure Gauge 1
27 PG-50 Presssure Gauge 1
28 PG-501 Presssure Gauge 1
29 PG-502 Presssure Gauge 1
30 PG-201 Presssure Gauge 1
31 PG-302 Presssure Gauge 1
32 TG-503 Temperature Gauge 1
33 TG-504 Temperature Gauge 1
34 TG-123 Temperature Gauge 1
35 TG-124 Temperature Gauge 1
36 TG-400 Temperature Gauge 1
37 TG-502-1 Temperature Gauge 1
38 TG-502-2 Temperature Gauge 1
39 TG-200 Temperature Gauge 1
40 RTD-50 RTD 1
41 TG-201 Temperature Gauge 1
42 TG-300 Temperature Gauge 1
43 TG-301 Temperature Gauge 1
44 TE-100 Temperature Element 1
45 TE-101 Temperature Element 1
46 TE-102 Temperature Element 1
47 TE-301 Temperature Element 1
48 RTD-218 RTD 1
49 RTD-218A RTD 1
50 RTD-219 RTD 1
51 RTD-500 RTD 1
52 RTD-501 RTD 1
53 EFM-101 Extraction STEAM FLOW TRANSMETER 1
54 JB-777 Junction Box (Alternator vibration probe) 1
55 PG-511 Pressure Gauge 1
56 PG-512 Pressure Gauge 1
57 PG-513 Pressure Gauge 1
58 PG-514 Pressure Gauge 1
59 PT-310 Pressure Transmitter 1
60 LT-300 Level Transmeter 1
Material Status Date- 27-02-2023 Cheking
Location Range
By Mr. Ambika & F/E Manoj

Hotwell Tank Not Checked


Hotwell Tank Not Checked
Hotwell Tank Not Checked
Hotwell Tank Not Checked
Hotwell Tank Not Checked
over head tank oil Not Checked
over head tank oil Not Checked
Hotwell Tank Not Checked
over head tank oil 8 nos received at site but some is faulty

CEP Received At site


CEP Received At site
CEP (Howell Level Controller) Received At site
CEP (Hotwell Level Controller) Received At site
CEP (Hotwell Level Controller) Received At site
Ejector Water Outlet (0-10)kg/cm2 Received At site
Ejector Water inlet (0-20)kg/cm2 Received At site
Main Steam Line Turbine Inlet At Turbine Floor (0-100)kg/cm2 Received At site
Extraction Steam Line At Turbine Floor (0-10)bar
Alternator Cooling Water Line Outlet (0-4)kg/cm2
Alternator Cooling Water Line inlet (0-4)kg/cm2
Ejector Steam Line Stage-2 (0-20)kg/cm2 Received At site
Ejector Steam Line Stage-1 (0-20)kg/cm2 Received At site
Ejector Steam Line Hogger (0-10)bar Received At site
Vaccum Gauge Air Line (-1.0 - +1.0)kg/cm2 Received At site
Extraction Steam Line At Turbine Floor (0-10)lb/in2 Received At site
Oil Cooler (0-4)kg/cm2
Oil Cooler Oil Inlet (0-6)kg/cm2 Received At site
Cooling Water Main Line Outlet (0-10)kg/cm2 Received At site
Cooling Water Main Line Inlet (0-4)kg/cm2
Turbine MOP (0-16)kg/cm2
Condensate Pr After LCV-301 (0-20)kg/cm2
Alternator Cooling Water Line Inlet (0-200)deg C
Alternator Cooling Water Line Outlet (0-200)deg C
Ejector Water Line Inlet At Ejector TG Floor (0-200)deg C
Ejector Water Line Outlet At Ejector TG Floor (0-200)deg C
Ejector Steam Line (0-400)deg C
Oil Cooler1 Water Line (0-200)deg C
Oil Cooler2 Water Line (0-200)deg C
Inlet Oil Cooler (0-120)deg C
COOLING TOWER WATER LINE HEADER
Inlet Oil Cooler (0-120)deg C
Hotwell Discharge (0-200)deg C
CEP Discharge (0-200)deg C
Main Steam Line Turbine Inlet At Turbine Floor
Condensor Inlet System At Turbine
Extraction Steam Line
CEP
Oil Outlet Common At Oil Cooler
Oil Cooler Inlet2
Cooler1 Inlet1
Main Cooling Water Line Inlet
Main Cooling Water Line Outlet
AT 0 METER LEVEL NEAR CEP PUMPS
Alternator Vibration Props with Transdures
cooling tower pipe line HEADER (0-10)kg/cm2
cooling tower pipe line HEADER (0-10)kg/cm2
MOTIVE STEAM LINE (0-16)kg/cm2
cooling tower pipe line HEADER (0-10)kg/cm2
cooling tower pipe line HEADER