Project Information
Proposed To: Mr. Zarrar C/o Qamar Iqbal
Location: Karachi
Project Title: On-Grid 10kW Solar Solution
Page |2
Our Vision
To be the leading Solar Energy Company in Pakistan that provides the most efficient
and latest technology to our customers.
Our Mission
Our Values
Page |3
7/18/2022
Dear Sir,
Thank you for showing interest in HS Engineering Corporation products and services. With
reference to our conducted survey and shared information. Please find complete
customized proposal for your Residential building attached herewith. All aspects including
technical and financial proposal have been covered in this document.
We at HS Engineering Corporation maintain a 100% client satisfaction rate, enabling us to
become the preferred choice for residential and commercial sector.
Should you require any further assistance, our technical & sales team members shall be
available at your service.
Regards,
Page |4
Contents
Technical Proposal
Technical Aspects
On Grid Conceptual Diagram
PV Module Operation & Maintenance
Financial Proposal
Warranty:
Financial Analysis:
Terms & Conditions
Page |6
Technical Aspects
Page |7
The solar photovoltaic system will perform best when there is simple and periodic maintenance
tasks carried out to ensure safe, efficient and reliable operation.
To increase the average output, solar panels should be cleaned at least twice in a
week if environment is dusty.
Accumulation of dust on the surface of PV panel can reduce the performance of solar PV system by
50%
Cleaning of solar panels should be done only after 5:30 pm till 6:30 am.
Do not stand on the module while cleaning
Do not clean the module when the cable and glass are broken, which may trigger a risk of
electric shock
Do not use hard material or steel wire.
Tools
Water bucket
Window Viper / Microfiber cleaning cloth
Cleaning process
Step 1: Dusting
Dusting process should be taken by dried microfiber cloth to remove any dirt deposits on
panels.
Step 2: Washing
Step 3: Drying
Use dry microfiber cloth or window wiper to remove any remaining water.
Page |9
P a g e | 10
Note:
1. DC Cable, AC Cable, wiring length and other electrical equipment can vary and are adjustable as per site
conditions.
2. Client is responsible to provide a clear and safe access to installation point
3. HS Engineering Corporation’s cost for roof mounted structure doesn’t include roof bearing capacity or its
associated inputs/analysis.
4. Structure design, tilt angle, inter-row spacing and other technical design factors can vary and are adjustable.
5. Production is affected by weather conditions and load shedding
6. System’s maximum capacity is proposed by client.
7. Client is responsible for providing space which is to be consumed by PV Panels and Inverter
Warranty:
Product Warranty
Financial Analysis:
Unit Cost (PKR) 24
Energy Inflation per year 5%
solar PV Energy loss per year 0.80%
Average solar insolations 6 hours
Average Environmental Losses 30%
Payback Period 4.5 Years
P a g e | 11
The above given rates are only valid till the current 209 PKR to 1 USD conversion rate.
Price
Any fluctuation in the dollar exchange rate will reflect on the pricing.
Payment
Advance Payment of 100% or as per standard payment terms.
Mode
All payments made must be paid in cash to HS Engineering’s representative. If any amount
Payment
required earlier then the specified time it can be requested. For any unforeseen holidays the
Terms
days won’t be counted in it.
Price Quoted is based on current exchange rate to USD and with all
Duties, Taxes & duties & Taxes are considered as per current Pakistan Taxes laws. If there is
Devaluation any change in duties, taxes and exchange rates etc. then it will be applied as
per Govt. Laws pertaining to the time of award of job.
Delivery Time Within 15 working days after confirmation of order with advance payment.
2 Years Free Service.
After Sales
A team of well-qualified and factory trained service engineers & technicians are available
Services
and provide after sale service to our Valued Clients
1. Load for testing at site. System Availability, Load Application & Maintenance as per
principal’s recommendation.
2. Cleaning of PV modules as per recommendation of manufacturer’s will be customer
Customer responsibility.
Responsibility 3. Voltage stabilization from AC grid/AC input of inverter will be customer’s responsibility.
4. Providing of shade free area will be customer’s responsibility.
5. Lightning arrestors are not quoted, if required it will be charged as per actual.
6. Internet will be provided by the customer on site to access the online monitoring portal
Customer’s Scope:
Customer will be only charged for Net Metering associated costs such as,
Meter Name change, Sanction load change, New meter charges.
Net Metering
Net-Metering demand notice payment (if HS Engineering Corporation is chosen to assist,
payment will be made to HS Engineering Corporation for further processing)
Bi-Directional meter cost and NEPRA Payorder of respective amount.
Note:
It will be applicable as per the laws of NEPRA and local DISCO. This is an additional service
for customer support. Timeline for net metering to be operational depends on the DISCO/
NEPRA approvals; it does not fall under HS Engineering Corporation scope of work.
Availability of
Yes they are available with us.
spare parts
Relocation of
Client will be charged for relocation of system from one site to another, as per actual.
System
Quotation
3-Days
Validity