Br. 923-1 Ch.165.345kM
Br. 923-1 Ch.165.345kM
Br. 923-1 Ch.165.345kM
Name of work :-
CONDUCTING GEOTECHNICAL INVESTIGATION (INCLUDING STATION
BUILDINGS), PREPARATION OF ESP OF STATIONS, DETAILED
STRUCTURAL DRAWINGS FOR STATION BUILDINGS, QUARTERS, GAD &
DETAILED DESIGN DRAWINGS OF MAJOR BRIDGES, MINOR BRIDGES,
ROBS & RUBS INCLUDING ITS APPROACHES, ETC. INCLUDING MARKING
OF CENTRE LINE OF PROPOSED ALIGNMENT, FIXING OF BOUNDARY
STONES ON BOTH SIDES OF ALIGNMENT AND AT JUNCTIONS OF ROW,
COUNTING OF TREE AND GIRTH MEASUREMENT, ETC. FROM CHAINAGE
KM 157 (EXCLUDING DIGRAS STATION) TO KM. 285.5 (EXCLUDING
NANDED STATION) IN CONNECTION WITH YAVATMAL-NANDED NEW
B.G. LINE PROJECT IN STATE OF MAHARASHTRA, INDIA
Client :-
Prepared By:
Flood Estimation:
3
50 years design flood discharge (m /s) = Q50 = 0.278 C I A (From Cl: 2.1, RDSO Report No. RBF - 16)
Where,
C= Runoff coefficient
50 year rainfall intensity (mm/h) lasting for tc hour duration
I=
where tc is the time of concentration
2
A= Catchment area in Km
0.2
Now, C= X (R F) (From Cl: 2.1.1, RDSO Report No. RBF - 16)
Value of "X" depends upon the soil type and location as given in Chart No 1
Chart No 1
Sl. No. Description of catchment Value of X
1 Sandy Soil/sandy loam/arid areas 0.249
2 Alluvium / silty loam / coastal areas 0.332
Value of F
Catchment area Duration of rainfall
2
km < 30 mins 30 to 60 mins 60 to 100 mins
A < 2.5 0.72 0.81 0.88
2.5≤A≤5 0.71 0.8 0.87
5<A≤13 0.7 0.79 0.86
13<A<25 0.68 0.78 0.85
Note: Rainfall duration shall be equal to the calculated t c for the catchment
F= 0.72
And, For Black cotton/ clayey soil / lightly covered / lightly wooded / plain and barren / (select soil type as given)
submontane and plateau
X = 0.456
STEP-5:- Calculation of I :
From Fig. 2
The location of this bridge lies in sub-zone 3f of Hydrometerological Subzones of India
From Fig. 4
Thus, for curve corresponding to Zone 3
And,
For T = tc hrs = 0.302 h,
Ratio of 50 yrs tc hrs rainfall / 50 yrs 24 hrs rainfall = 0.175
For T = 1 h,
Ratio of 50 yrs 1 hr rainfall / 50 yrs 24 hrs rainfall = 0.38
Therefore, Ratio of 50 yrs tc hrs rainfall / 50 yrs 1 hr rainfall (K)= [ 0.175/0.38 ] = 0.461
3
Calculation of Regime width for discharge of 7.99 m /s
Pw=1.811 X C X Q^1/2 (As per cl No. 4.5.3 of IRS Substructure foundation code.)
Where, P= Wetted perimeter in meters which can be taken as the effective width of waterway
From the above data and also considering the suitable abutment location and site condition,the proposed
bridge has been fixed as the details given below:
No. of Span = =2
Span Arrangement =2x12.2M _psc slab
Total bridge length (dirt wall inner to inner) = 26.82
C/C of abutment = 26.800 m
Let,
Width of abutment = 1.200 m
Width of pier = 1.200 m
Width of Clear waterway, B'= 26.8-(2-1)x1.2-1.2x2/2 = 24.4 m
Rugosity coefficient, n= = 0.05
Slope, S = 0.0438152
2/3 1/2
Q50=(B'xd)x(1/n)x((B'xd)/(B'+2d)) x (S) = 7.99 m3/s
Depth of flow,d = = 0.219 m
LBL = = 412.493 m
Hence, Calculated HFL = = 412.712 m
Survey HFL = = 0m
Take calculated HFL
2/3 1/2
Velocity = (1/n)x((B'xd)/(B'+2d)) x (S) = 1.503 m/s
Afflux and Maximum scour level calculations
HFL = 412.712 m ( From Calculated data)
LBL = 412.493 m ( From survey data)
Width of side wall = 1.200 m
Width of mid wall = 1.200 m
·
CATCHMENT AREA= 240300 Sqm.
20°1'30"N
20°1'30"N
20°1'20"N
20°1'20"N
.
m
K
9
. 16
1
c e=
n
ta
is
D
Centroid
20°1'10"N
20°1'10"N
LEGEND
20°1'0"N
20°1'0"N
Bridge Location
Origin
Centroid
Origin
Longest Stream
River
Proposed Railway
Catchment
Elevation in metre
418 - 423
20°0'50"N
423 - 427
20°0'50"N
427 - 431
431 - 436
436 - 441
441 - 447
447 - 453
Longest Stream Length- 1.169 Km.
453 - 464
464 - 476
476 - 495