Mizu Tecnica Systems, Inc. submitted a proposal to Delos Santos Medical Center to design and build a 150 cubic meter per day sewage treatment plant. The total cost of the project is 7,128,390 PHP including taxes. Payment will be made in three installments - 50% as a deposit, 40% after completion, and 10% upon passing regulatory requirements. The proposal includes engineering design, construction, equipment, installation, supervision and a 10 month warranty period.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views5 pages

Mtsi DSMC

Mizu Tecnica Systems, Inc. submitted a proposal to Delos Santos Medical Center to design and build a 150 cubic meter per day sewage treatment plant. The total cost of the project is 7,128,390 PHP including taxes. Payment will be made in three installments - 50% as a deposit, 40% after completion, and 10% upon passing regulatory requirements. The proposal includes engineering design, construction, equipment, installation, supervision and a 10 month warranty period.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

MIZU TECNICA SYSTEMS, INC.

UNIT 1101 - JAFER PLACE BUILDING,


NO. 19 EISENHOWER STREET, BARANGAY GREENHILLS,
SAN JUAN CITY 1502, METRO MANILA, PHILIPPINES

+63917-5112288
[email protected]

December 17, 2021

Attention: ENGR. FERNANDO DALANGIN


Facilities and Engineering Head
Delos Santos Medical Center

Re: DESIGN AND BUILD OF 150 CMD SEWAGE TREATMENT PLANT FOR
DELOS SANTOS MEDICAL CENTER

Dear Engr. Dalangin,

Through this letter, our company MIZU TECNICA SYSTEMS, INC. extends its warmest
greetings and present our services to your company.

We are submitting this Letter of Intent to notify your good office of Mizu Tecnica Systems,
Inc.’s intent to submit a proposal and quotation for the Design and build of 150 cmd
sewage treatment plant for Delos Santos Medical Center.

MIZU TECNICA SYSTEMS, INC. is a company that specializes in wastewater


treatment that aims to address the country’s growing environmental concern by generating
high quality treated water to meet the requirements of regulatory agencies. As a company,
we aim to make a positive impact by making our services accessible, flexible to the needs
of the client and affordable for many businesses.

MIZU TECNICA SYSTEMS, INC. is also currently upgrading, operating and


maintaining the Wastewater System and Sewage Treatment Plant of Chinese General
Hospital and Medical Center (CGHMC).

The attached proposal and quotation price are for the design and build cost and all
applicable taxes are included.

If you have any questions, please do not hesitate to contact MIZU TECNICA SYSTEMS,
INC.

We look forward to receiving your favorable response and we will be very grateful for the
future opportunity to serve your company.

Sincerely,

Jeffrey Dy Tan
Chief Executive Officer
MIZU TECNICA SYSTEMS, INC.
MIZU TECNICA SYSTEMS, INC.
UNIT 1101 - JAFER PLACE BUILDING,
NO. 19 EISENHOWER STREET, BARANGAY GREENHILLS,
SAN JUAN CITY 1502, METRO MANILA, PHILIPPINES

+63917-5112288
[email protected]

DATE : December 17, 2021


TO : DELOS SANTOS MEDICAL CENTER
ATTENTION : ENGR. FERNANDO DALANGIN

DESIGN AND BUILD OF 150 CMD SEWAGE TREATMENT PLANT FOR DELOS
SANTOS MEDICAL CENTER
SECTION 1 : QUOTATION
SECTION 2 : SCOPE OF SERVICE
SECTION 3 : PAYMENT AND VALIDITY

1. QUOTATION.

We are pleased to present to you the following quotation:


MIZU TECNICA SYSTEMS, INC.
UNIT 1101 - JAFER PLACE BUILDING,
NO. 19 EISENHOWER STREET, BARANGAY GREENHILLS,
SAN JUAN CITY 1502, METRO MANILA, PHILIPPINES

+63917-5112288
[email protected]

DESCRIPTION PRICE

Design and build of 150 cmd sewage


treatment plant for delos santos medical
center

Inclusions:

-Engineering Design for 150 cmd


Sewage Treatment Plant
-Wastewater Laboratory Testing
-Construction of Sewage Treatment
Facility
-Supply and Installation of the following
-Sewage Treatment Plant Equipment

 3-Lobes Air Blower 25HP,


3Phase, 230V
 Transfer Pump 5HP, 3Phase Php 7,128,390.
 Sludge Transfer Pump 3HP,
3Phase WITHHOLDING TAX AND VAT
 Chemical Dosing System (PE INCLUSIVE
Tank 100L w/ 1 hp Dosing
Pump and Mixing Agitator) / For
CMT and CCT)
 Chlorine Dosing System
 Tertiary Polishing Tanks ACF
and MMF
 Gear Motor with Agitator (For
CMT)
 SBR Fine Bubble Diffusers
(DISC type 10”)
 MCC and other Electrical
accessories
 Plumbing pipes (Transfer Pipes
and Air Blower Pipings)

Supervision and Technical Expertise

2. SCOPE OF SERVICE.

Supply of Materials and Installation of the said project:

OVER ALL DESIGN AND CONSTRUCION/BUILD OF WHOLE SEWAGE


TREATMENT PLANT/FACILITY FOR DELOS SANTOS MEDICAL CENTER

INCLUSIONS OF THE QUOTATION:


MIZU TECNICA SYSTEMS, INC.
UNIT 1101 - JAFER PLACE BUILDING,
NO. 19 EISENHOWER STREET, BARANGAY GREENHILLS,
SAN JUAN CITY 1502, METRO MANILA, PHILIPPINES

+63917-5112288
[email protected]

 Engineering Design for 150 cmd Sewage Treatment Plant


 Wastewater Laboratory Testing
 Construction of Sewage Treatment Facility
 Supply and Installation of the following Sewage Treatment Plant Equipment
 3-Lobes Air Blower 25HP, 3Phase, 230V
 Transfer Pump 5HP, 3Phase
 Sludge Transfer Pump 3HP, 3Phase
 Chemical Dosing System (PE Tank 100L w/ 1 hp Dosing Pump and
Mixing Agitator) / For CMT and CCT)
 Chlorine Dosing System
 Tertiary Polishing Tanks ACF and MMF
 Gear Motor with Agitator (For CMT)
 SBR Fine Bubble Diffusers (DISC type 10”)
 MCC and other Electrical accessories
 Plumbing pipes (Transfer Pipes and Air Blower Pipings)

Supervision and Technical Expertise

3. PAYMENT AND VALIDITY.

The Client will pay MIZU TECNICA SYSTEMS, INC. 50% deposit amounting to
Php 3,564,195.00, 40% after completing the project amounting to Php
2,851,316.00 and the remaining 10% amounting to Php 712,839.00 upon
passing the DENR parameters. A Warranty of 10 months upon turnover is
included.

All invoices shall be paid to MIZU TECNICA SYSTEMS, INC. at the address
provided above, unless the Client is notified of another name/or address to which
to make payment.

MIZU TECNICA SYSTEMS, INC. shall not be liable for any delay due to
circumstances beyond its control including strikes, acts of God or general
unavailability of materials.

The agreement is valid until the completion of the project.

Please feel free to contact us should you have any questions with our offer. Thank you.

Noted by:

Engr. Martin Angelo De Castro


Sanitary Engineer
Mizu Tecnica Systems, Inc.

CONFORME:
MIZU TECNICA SYSTEMS, INC.
UNIT 1101 - JAFER PLACE BUILDING,
NO. 19 EISENHOWER STREET, BARANGAY GREENHILLS,
SAN JUAN CITY 1502, METRO MANILA, PHILIPPINES

+63917-5112288
[email protected]

Jeffrey Dy Tan ENGR. FERNANDO DALANGIN


Chief Executive Officer Facilities and Engineering Head
Mizu Tecnica Systems, Inc. Delos Santos Medical Center

You might also like