Adaptive Reuse Terminal Medan Kidd
Adaptive Reuse Terminal Medan Kidd
Literature Review
Analysis Of Capacity And Level Of Service Of Medan Kidd, Ipoh by Tang Ang Khian
Approved by Dr. Madzlan Bin Napiah
Mohd Zolkafly said the location of the Medan Kidd bus station was no
longer strategic to the extent of making the movement of buses difficult
while the main roads around it were always congested with other
vehicles.
Source: The STAR, Thumbs up for new bus station plan, 08 July 2020 – Manjit Kaur
The overall picture of the whole proposal is to made Ipoh the
central station that connects the multiple mode of public There’s a planning by Ipoh’s
transporation. Municipal Council to
REPLACE Terminal Medan
However at present, there’s a lacking of integration between Kidd for a brand new public
Ipoh’s KTM service and public bus. By foot, pedestrian are transportation hub, Ipoh
Proposed transit route in Bandar Ipoh
forced to walk 500 metres to interchange between KTM to Sentral.
Source: Draf Rancangan Tempatan Bandaraya Ipoh 2035, Jilid 1 Pernyataan Bertulis
Dan Strategi Pembangunan public bus and vice versa. As the 60 years old building
is deemed UNSAFE as per
Agensi Pengangkutan Awam
Datuk Zolkafly Harun Darat(APAD) safety
Committee Chairman requirement apart from it’s
State Infrastructure, Energy,
Water and Public Transportation
UNSTRATEGIC location for
bus circulatory
Taxi stand A bus waiting turn to enter the premise near the roundabout
1 2 3
“ T O d e v e l o p B a n d a r I p o h ’ s f i r s t T r a n s p or t a t i o n H u b
t h a t l i n k s I p o h ’ s m u l t i p l e p u b l i c t r a n s p or t a t io n m o d e s
t h a t r e f l e c t s o n t h e n e i g h b o u r h oo d c o n t ex t
“ 1
Integration
Between Different
Transportation
Mode (KTM,LRT,
2
Pedestrian
Friendly. By
strategizing traffic
flow and
3
Upgrading Existing
Infrastructure. By
introducing
additional facilities,
Bus And Taxi). By walkability route amenities and
introducing key business
linkages that opportunities.
connects the
facilities.
B O A R D 1 : Site Studies
Factors to consider:
SITE AREA
13 ACRES
4