0% found this document useful (0 votes)
89 views7 pages

Comparison of Retaining Structure

The document compares different types of retaining structures including wing wall, return wall, U-through retaining wall, and retaining wall. It provides specifications for each structure type such as dimensions, quantities of materials used, rates, and total costs. The maximum total cost is for a U-through retaining wall at 8.38 lacs and the minimum is for a return wall at 4.49 lacs, with a cost variation of 86.78% between the maximum and minimum.

Uploaded by

Accrete Gurgaon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views7 pages

Comparison of Retaining Structure

The document compares different types of retaining structures including wing wall, return wall, U-through retaining wall, and retaining wall. It provides specifications for each structure type such as dimensions, quantities of materials used, rates, and total costs. The maximum total cost is for a U-through retaining wall at 8.38 lacs and the minimum is for a return wall at 4.49 lacs, with a cost variation of 86.78% between the maximum and minimum.

Uploaded by

Accrete Gurgaon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

COMPARISON OF DIFFERENT TYPE OF RETA

Sn Description Unit Total Qty


SOR REF No Return
Wing Wall
Wall
A Structure Work (ROB)
12.1 I B 1 Excavation for Foundation Cum 98.01 11.38
12.4 2 PCC Foundation/Footing Base (M10.) Cum 2.28
12.8 A 3 PCC Foundation/Footing Base (M15.) Cum 12.65 7.65
12.8 E Case I 4 Rcc in Wall/Toe Wall M20 Cum 0.00 11.38
5 Reinforcement MT 2.30 0.53
12.38 B (i) 6 RCC in Foundation M30 Cum 17.91
12.38 C (i) 7 RCC in Wall M30 Cum 7.67 7.04
15.1 8 Boulder Apron 150mm Thick Embeded with Pcc Cum 1.58 1.58
15.2 9 Flexible Boulder Apron 750mm Thick Cum 33.75 33.75
15.4 10 Stone Pitching on Slopes Cum 17.59
15.5 11 Granular Fill Cum 13.30
12 Filter Media Cum 9.49

183.36 106.46
ERENT TYPE OF RETAINING STRUCTURE OPTIONS
Total Qty Rate Amount
U-through Retaining
Approx Wing Wall Return Wall U-through Wall Retaining Wall
Wall Wall

68.11 111.59 90.00 8821 1024 6130 10043


2.28 5500.00 0 12518 0 12544
8.84 12.53 5800.00 73389 44370 51250 72697
0.00 11.38 6000.00 0 68283 0 68283
2.69 2.63 70000.00 161119 36938 187972 184338
20.06 19.14 6800.00 121765 0 136417 130152
6.79 18.48 6800.00 52142 47843 46184 125664
1.58 4000.00 6300 6300 0 6300
42.40 33.75 3600 121500 121500 152633 121500
13.39 3600 0 63309 0 48188
1.61 3500.00 0 46541 0 5624
13.58 15.03 3500.00 33214 0 47543 52599
578250 448626 628129 837932
162.47 243.38 5.78 4.49 6.28 8.38
Lacs Lacs Lacs Lacs
Remarks

Variation
Max to Min.
3.89 86.78%
Lacs
S.NO TOTAL HEIGHT 2 3 4 5 6 7 8
1 H 1.00 2.00 2.80 3.50 4.50 5.00 6.00
2 A 3.40 4.60 5.80 7.10 8.20 9.60 10.90
3 B 0.40 0.60 0.80 1.30 1.50 2.10 2.50
4 C 0.30 0.40 0.50 0.60 0.70 0.80 0.90
5 D 2.70 3.60 4.50 5.20 6.00 6.70 7.50
6 E 1.00 1.00 1.20 1.50 1.50 2.00 2.00
7 K 0.00 0.00 0.00 2.60 2.90 3.30 3.90
8 T 0.40 0.50 0.60 0.60 0.70 0.90 1.00
Excavation 3.96 5.28 7.80 11.68 13.44 20.58 23.31
PCC M-15 0.36 0.48 0.6 0.73 0.84 0.98 1.11
RCC M-30 in f/n 1.205 1.88 2.685 3.285 4.24 6 7.4
RCC M-30 in wall 0.48 0.875 1.36 1.98 2.65 3.355 4.2

Length of Wing Wall 2.12 Length Avg. Width Depth


No of Wing Wall 4.00 1.12 0.6 2.1
Total 1.00 0.6 1.6
Excavation 55.04 55.04 1.5 3.5 0.15
PCC M-15 5.00 5.00 1.5 3.5 0.3
RCC M-30 in f/n 17.91 17.91 5 4.5 0.75
RCC M-30 in wall 7.67 7.67 5 4.5 0.1
5.65 Sum of Above four
Filter Media
3.84 9.49
Apron 150 mm thick 1.58 1.58 5 1.7 2.25
PCC Below Apron M15 3.15 3.15 5 1.7 0.1
Flexible Apron 33.75 33.75 5 1.5 0.325
Pcc Below Flexible Apron M15 4.50 4.50 5 0.2 1.675
Excavation for Apron 42.98 42.98
Reinforcement 2.30 2.30

0.00
183.36
INPUTS Box Details
Length of Return Wall 3.98 Top Slab 0.3
No of Return Wall 4.00 Wall 0.3
Min Height 0.30 Base Slab 0.35
Max Height 2.65 Pcc 0.1
Thickness of Wall 0.30 Vent Height 2

QUANTITY
Excavation Toe Wall 0.00 0.00
PCC M-15 0.00 0.00
RCC M-30 in f/n 0.00 0.00
RCC M-30 in wall 7.04 7.04 Length Avg. Width Depth
Reinforcement 0.53 0.53 6.32
Toe Wall Both Side 4 6.32 0.9 0.5
Excavation Toe Wall 11.38 11.38 6.32 0.9 0.1
Pcc M10 2.28 2.28 6.32 0.5 0.9
Pcc in Toe Wall 11.38 11.38 Area 29.3 0.3
Stone Pitching 17.59 17.59 22.2 0.15
Granular Fill 13.30 13.30 1.5 3.5 0.15
Apron 150 mm thick 1.58 1.58 1.5 3.5 0.3
PCC Below Apron M15 3.15 3.15 5 4.5 0.75
Flexible Apron 33.75 33.75 5 4.5 0.1
Pcc Below Flexible Apron M15 4.50 4.50
INPUTS
Length of U-through Wall 3.68 Box Details
No of U-through Wall 2.00 Top Slab 0.3
Min Height 0.60 Wall 0.3
Max Height 2.48 Base Slab 0.35
Thickness of Wall 0.30 Pcc 0.1
Vent Height 2

QUANTITY Length Avg. Width Depth


Excavation Bse Slab 20.06 20.06 3.188 4.84 0.65
PCC M-15 3.18 3.18 3.288 4.84 0.1
RCC M-30 in f/n 20.06 20.06 3.188 4.84 0.65
RCC M-30 in wall 6.79 6.79 3.68 0.30 1.54
Filter Media 13.58 13.58 3.68 0.6 1.54
Flexible Apron 42.40 42.40 6.28 4.5 0.75
Pcc Below Flexible Apron M15 5.65 5.65 6.28 4.5 0.1
Excavation for Apron 48.05 48.05 Sum of Above Two
Reinforcement 2.69 2.69
6.28 1.7 2.25
6.28 1.7 0.1
6.28 1.5 0.325
6.28 0.2 1.675
162.47
S.NO TOTAL HEIGHT 3 4 5 6 7 8 9
1 H 1 2 3 4 5 6 7
2 A 2.9 3.5 4.5 5.2 6 7 8.3
3 B 0.6 0.8 1.1 1.5 1.8 2.15 2.55
4 C 0.5 0.5 0.6 0.7 0.9 1.25 1.75
5 D 1.8 2.2 2.8 3 3.3 3.6 4
6 E 2 2 2 2 2 2 2
7 F 0.3 0.3 0.3 3 0.3 0.5 0.5
8 K 0 0 2.5 3 3.8 4 5.6
9 T 0.4 0.5 0.6 0.7 0.9 1.1 1.35
Excavation 6.20 7.40 9.40 10.80 12.40 14.40 17.00
PCC M-15 0.31 0.37 0.47 0.54 0.62 0.72 0.85
RCC M-30 in f/n 1.04 1.45 2.12 8.82 3.87 5.98 8.42
RCC M-30 in wall 1.04 1.40 1.98 2.65 3.66 5.35 7.84

Length of Retaining Wall 3.30


No of Retaining Wall 4.00
QUANTITY
Excavation 97.68 97.68 Length Avg. Width Depth
PCC M-15 4.88 4.88 3.30 0.6 2.3
RCC M-30 in f/n 19.14 19.14 Area 22.3 0.3
RCC M-30 in wall 18.48 18.48 17.3 0.15
Reinforcement 2.63 2.63 1.5 3.5 0.15
Filter Media 15.03 15.03 1.5 3.5 0.3
Stone Pitching 13.39 13.39 5 4.5 0.75
Excavation Toe Wall 13.91 13.91 5 4.5 0.1
Pcc M10 2.28 2.28
Pcc in Toe Wall 11.38 11.38 6.322455
Granular Fill 1.61 1.61
Apron 150 mm thick 1.58 1.58
PCC Below Apron M15 3.15 3.15
Flexible Apron 33.75 33.75
Pcc Below Flexible Apron M15 4.50 4.50
243.38