Comparison of Retaining Structure
Comparison of Retaining Structure
183.36 106.46
ERENT TYPE OF RETAINING STRUCTURE OPTIONS
Total Qty Rate Amount
U-through Retaining
Approx Wing Wall Return Wall U-through Wall Retaining Wall
Wall Wall
Variation
Max to Min.
3.89 86.78%
Lacs
S.NO TOTAL HEIGHT 2 3 4 5 6 7 8
1 H 1.00 2.00 2.80 3.50 4.50 5.00 6.00
2 A 3.40 4.60 5.80 7.10 8.20 9.60 10.90
3 B 0.40 0.60 0.80 1.30 1.50 2.10 2.50
4 C 0.30 0.40 0.50 0.60 0.70 0.80 0.90
5 D 2.70 3.60 4.50 5.20 6.00 6.70 7.50
6 E 1.00 1.00 1.20 1.50 1.50 2.00 2.00
7 K 0.00 0.00 0.00 2.60 2.90 3.30 3.90
8 T 0.40 0.50 0.60 0.60 0.70 0.90 1.00
Excavation 3.96 5.28 7.80 11.68 13.44 20.58 23.31
PCC M-15 0.36 0.48 0.6 0.73 0.84 0.98 1.11
RCC M-30 in f/n 1.205 1.88 2.685 3.285 4.24 6 7.4
RCC M-30 in wall 0.48 0.875 1.36 1.98 2.65 3.355 4.2
0.00
183.36
INPUTS Box Details
Length of Return Wall 3.98 Top Slab 0.3
No of Return Wall 4.00 Wall 0.3
Min Height 0.30 Base Slab 0.35
Max Height 2.65 Pcc 0.1
Thickness of Wall 0.30 Vent Height 2
QUANTITY
Excavation Toe Wall 0.00 0.00
PCC M-15 0.00 0.00
RCC M-30 in f/n 0.00 0.00
RCC M-30 in wall 7.04 7.04 Length Avg. Width Depth
Reinforcement 0.53 0.53 6.32
Toe Wall Both Side 4 6.32 0.9 0.5
Excavation Toe Wall 11.38 11.38 6.32 0.9 0.1
Pcc M10 2.28 2.28 6.32 0.5 0.9
Pcc in Toe Wall 11.38 11.38 Area 29.3 0.3
Stone Pitching 17.59 17.59 22.2 0.15
Granular Fill 13.30 13.30 1.5 3.5 0.15
Apron 150 mm thick 1.58 1.58 1.5 3.5 0.3
PCC Below Apron M15 3.15 3.15 5 4.5 0.75
Flexible Apron 33.75 33.75 5 4.5 0.1
Pcc Below Flexible Apron M15 4.50 4.50
INPUTS
Length of U-through Wall 3.68 Box Details
No of U-through Wall 2.00 Top Slab 0.3
Min Height 0.60 Wall 0.3
Max Height 2.48 Base Slab 0.35
Thickness of Wall 0.30 Pcc 0.1
Vent Height 2