Long Lead Acid Battery 12v 7ah
Long Lead Acid Battery 12v 7ah
Long Lead Acid Battery 12v 7ah
Specifications
Nominal Voltage(V) 12V
Nominal Capacity
20 hour rate (0.35A to 10.50V) 7Ah
10 hour rate (0.665A to 10.50V) 6.65Ah
5 hour rate (1.19A to 10.20V) 5.95Ah
1C (7A to 9.60V) 4.43Ah
3C (21A to 9.60V) 2.8Ah
15 min rate (168W to 9.60V) 42Wh
(0.25)
4.75
6.35
5 seconds: 105A
(0.03)
0.8
0.8
Cycle use: F1 F2
1 month 92%
12.0
3 month 90%
6 month 80% 11.0
0.665A 0.35A
10.0 1.19A
8.0
Terminal F1 or F2 (Faston Tab 187 or 250) 1 2 4 6
minutes
8 10 20 40 60 2 5 6
hours
8 10 20
Discharge Time
WP7-12(28W)
Effect of Temperature on Capacity 25℃(77℉) Capacity Retention Characteristic
(%)
120 100
0.05CA
0 ℃(32 ℉)
100 0.1CA
Remaining Capacity
75
Capacity %
0.25CA
80 0.6CA 10 ℃(50℉)
1CA
60 2CA
50 20 ℃(68℉)
40 40 ℃(104℉) 30℃(86℉)
25
20
0
-20 -10 0 10 20 30 40 50 ℃ 0
-4 14 32 50 68 86 104 122 ℉ 3 6 9 12 15 18
Storage Time (months)
Temperature
100
Capacity %
5
Life (years)
3 80
2
60
Discharge Depth 100% Discharge Depth 30%
Discharge Depth 50%
40
(1) Discharge : 0.17CA
0.5 (2) Charge : CV 2.4V/cell*16H Imax 0.3CA
20 (3) End of life discharge voltage : 1.65 Vpc
(4) Temperature : 25±2℃
20 30 40 50 (℃ )
68 86 104 122 (℉ ) 0 200 400 600 800 1000 1200 1400 1600
Ambient Temperature Number of Cycles (times)
- PERFORMANCE DATA
Discharge Rates in Watts to Various End Voltages at 25℃(77℉)
End Voltage 1.85V 1.80V 1.75V 1.70V 1.67V 1.65V 1.60V
Time
5 min 43.8 47.0 49.0 51.0 51.8 52.8 54.3
10 min 30.0 31.8 33.2 34.3 34.8 35.5 36.5
15 min 24.0 25.2 25.8 26.5 26.8 27.3 28.0
30 min 12.1 12.9 13.6 14.1 14.3 14.4 14.6
60 min 7.70 8.38 8.63 8.87 8.97 9.08 9.23
120 min 4.10 4.52 4.72 4.92 4.98 5.07 5.20
180 min 3.08 3.32 3.48 3.62 3.67 3.72 3.80
240 min 2.85 2.93 3.00 3.05 3.07 3.10 3.15
300 min 2.47 2.53 2.58 2.62 2.63 2.65 2.68
600 min 1.36 1.40 1.42 1.43 1.44 1.44 1.45
1200 min 0.690 0.705 0.718 0.728 0.732 0.737 0.743
Contents in this data sheet are subject to change for improvement without prior notice to users. For clarifications and updated information, please contact us.