General Notes FB
General Notes FB
THESE NOTES SHOULD BE READ IN CONJUNCTION WITH THE "LTA CIVIL DESIGN 3.1 BLINDING CONCRETE 4.1 REINFORCEMENT SHALL BE HIGH YIELD DEFORMED BAR CLASS B, WITH A
1.1 2.1 DESIGN CODES CHARACTERISTIC STRENGTH OF 500 MPa UNLESS NOTED OTHERWISE.
CRITERIA, MATERIAL AND WORKMANSHIP SPECIFICATION". ANY DISCREPANCY
UNLESS OTHERWISE STATED, A 75mm BLINDING CONCRETE (GRADE C16/20) LAYER SHALL
SHALL BE CLARIFIED WITH THE QUALIFIED PERSON (DESIGN) (QPD). 4.2 REINFORCEMENT SHALL BE UNCOATED UNLESS NOTED OTHERWISE.
WHERE APPLICABLE ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO BE PROVIDED ON ALL SOIL SURFACES FORMING THE UNDERSIDE OF ANY
THE LATEST ISSUE OF THE RELEVANT LTA MATERIALS AND WORKMANSHIP SPECIFICIATIONS, REINFORCED CONCRETE BEAMS, SLABS, RAFTS, PILECAPS OR DRAINS. THE
PARTICULAR SPECIFICATION AND TO THE FOLLOWING SINGAPORE/EUROCODE STANDARDS. THICKNESS AND STRENGTH OF BLINDING CONCRETE MAY NEED TO BE 4.3 UNLESS STATED OTHERWISE, ALL STEEL REINFORCEMENT BARS AND MESH
ANY OTHER RELEVANT CODES OF PRACTICE SHALL BE REFERRED TO, AS AND INCREASED DEPENDING ON THE SOFTNESS AND IRREGULARITY OF THE SOIL SHALL COMPLY WITH THE REQUIREMENTS OF SS 560 AND SS 561
1.2 SITE VERIFICATION OF DIMENSIONS WHEN NECESSARY. RESPECTIVELY. STEEL REINFORCEMENT BARS SHALL BE CUT AND BENT TO
BS 8666
a) CONTRACTOR SHALL FIELD MEASURE AND VERIFY POSITION OF ALL GRID 3.2 STRUCTURAL CONCRETE
LINES, EXISTING STRUCTURES AND FEATURES RELEVANT TO THE SS EN 1990 EUROCODE 0: BASIS OF STRUCTURAL DESIGN 4.4 ALL LAP LENGTHS SHALL COMPLY WITH THE REQUIREMENTS OF SS EN 1992 -1 AS
CONSTRUCTION PRIOR TO COMMENCING CONSTRUCTION GIVEN IN CLAUSE 5 OF THIS DRAWING
3.2.1 UNLESS NOTED OTHERWISE, FOLLOWING CONCRETE GRADES SHALL BE
SS EN 1991 EUROCODE 1: ACTIONS ON STRUCTURES USED
ALL DISCREPANCIES SHALL BE CLARIFIED WITH THE QPD BEFORE
4.5 CRANKING OF COLUMN BARS SHALL NOT EXCEED A SLOPE OF 1:10
BEGINNING WORK.
SS EN 1992 EUROCODE 2: DESIGN OF CONCRETE STRUCTURES 4.6 UNLESS NOTED OTHERWISE, NOMINAL COVER TO ALL REINFORCEMENT
CYLINDER STRENGTH INCLUDING LINKS SHALL BE AS FOLLOWS :
b) THE CONTRACTOR SHALL CHECK,VERIFY AND CONFIRM ALL DIMENSIONS GRADE
MATERIAL ELEMENTS 2
FE
FE
IN
IN
SLAB, BEAM XC3 35 45 35 45 35 45
CONSTRUCTION WORKS. SS EN 206-1 CONCRETE: SPECIFICATION, PERFORMANCE, PRODUCTION AND CONFORMITY
PRO
PRO
EE
EE
INTERNAL HULL ELEMENTS
ALL IN SS 544
R
R
OF CAST IN-SITU TUNNEL 340 0.45 WALL,COLUMN,PIER XC3 35 45 35 45 35 45 CIVIL GEOTECHNICAL
SS EN 197-1 CEMENT: COMPOSITION,SPECIFICATION AND CONFORMITY CRITERIA TABLE A6
ELEMENTS
FOR COMMON CEMENTS
SOON WON MOI NG CHEW CHIAT
1.4 INCORPORATION OF M & E REQUIREMENTS IN STRUCTURE
3972 4334
SS 544-1 CONCRETE - COMPLEMENTARY SINGAPORE STANDARD TO SS EN 206-1: S S
ALL MECHANICAL, SANITARY AND ELECTRICAL WORKS, TO BE EMBEDDED IN 3.2.4 CRACK WIDTHS IN E IN E
1. FOR THE INTERNAL ELEMENTS CMIN IS GOVERNED BY BONDING (CMIN,B) GA POR GA POR
THE CONCRETE, OR OPENING FOR PIPE OR DUCT WORK SHALL BE METHOD OF SPECIFYING AND GUIDANCE FOR THE SPECIFIER
INCORPORATED AND ALL DISCREPANCIES CLARIFIED WITH THE QPD FOR MEMBERS EXPOSED TO EARTH AND/OR WATER, THE CRACK WIDTH ON THE EXTERNAL 2. FOR THE D-WALL, PILE, ROOF AND BASE SLAB CMIN IS GOVERNED BY BOTH DURABILITY
BEFORE CONCRETING. FACE SHALL NOT EXCEED 0.25mm WHEN SUBJECTED TO PERMANENT LOAD EFFECTS. (CMIN,DUR) AND BONDING (CMIN,B).
2.2 GROUND LEVEL WATER TABLE
HOWEVER, ON THE EXTERNAL FACE OF SUCH MEMBERS, THE CRACK WIDTH SHALL NOT
FOR DESIGN, GROUND WATER TABLE ASSUMED AT GROUND LEVEL. EXCEED 0.3mm WHEN SUBJECTED TO TRANSIENT LOAD EFFECTS. ON INNER FACES, 3. DEVIATION ALLOWANCE ( C,DEV) IS TAKEN AS 50MM FOR DWALL, 25MM FOR SLABS
THE CRACK WIDTH SHALL NOT EXCEED 0.3mm. CAST AGAINST THE GROUND, AND FOR ALL OTHER STRUCTURES IT IS TAKEN AS 10MM.
2.3 DESIGN LOADS FLOOD WATER LEVEL 1m ABOVE GROUND LEVEL
LOWEST WATER TABLE LEVEL 5m BELOW GROUND LEVEL
4. COVER FOR INTERNAL ROOF SLAB IS GOVERNED BY THE PS6 REQUIREMENT
2.3.1 SELF WEIGHT : FOLLOWING BULK DENSITIES OF MATERIALS ARE OR THE LOWEST MEASURED GWL 3.2.5 CONCRETE REPAIR
USED FOR LOAD CALCULATIONS
5D
TO MINIMISE CRACKING DUE TO SHRINKAGE IN LARGE AREA SLABS
3.2.9
OR
50m
AND WALLS, THE CONTRACTOR SHALL PROVIDE SHRINKAGE JOINTS
OC 20 1.0
(POUR STRIPS) AT APPROPRIATE INTERVALS AS ACCEPTED BY THE QPD.
m
OB 21 1.0
D
3.2.10 CONCRETING OF THICK SECTIONS SHALL BE ON THE RECOMMENDATIONS
5
R R
m
O
O
GIVEN SECTION 11.11 OF LTA M&W SPECIFICATIONS FOR CIVIL AND STRUCTURE
m
OA 21 1.0
0
5
5
WORKS
REINFORCED 5
0
>10m m
>20m m
<50m m
- 25.0 - B ,
CONCRETE U 100, BUT
>1.40
> T
>20
5 > 70mm
>10m m
WATER - 10.0 - 0
m
m
PREMIX - 25.0 - A 14.06.21 SABJ ISSUED FOR CONSTRUCTION (ST780) AT AKM DW
22
MASS CONCRETE - 24.0 - >070 - 16.03.21 LW ISSUED FOR CONSTRUCTION (ST100) AT AKM DW
A) TUNNEL B) FACILITY BUILDING NOTE: FOR C) AND D) THE COVER SHOULD NOT BE LESS THAN EITHER 30 OR 50mm
TYPE OF SUPER-IMPOSED DEAD LOAD MINIMUM LOADING TYPE OF LIVE LOAD THE CLEAR DISTANCE BETWEEN BARS SHALL NOT BE LESS THAN
TYPE OF SUPER-IMPOSED DEAD LOAD MINIMUM LOADING MINIMUM LOADING 100mm, EXCEPT AT LAPS WHERE IT SHALL NOT BE LESS THAN 75mm
SCREED - 100mm THICK) 4.10 THE CONTRACTOR SHALL PROVIDE ADEQUATE CHAIRS, SPACING LINKS
TO SUPPORT THE TOP LAYER OF REINFORCEMENT IN THE SLABS AND SPACING LINKS
M&E SERVICES ON ROOF TUNNEL 1.5 kN/m
2
GENERAL M&E ROOM 7.5 kN/m
2
PARTITION WALLS (200mm THICK) 2 SHALL BE PROVIDED TO KEEP VERTICAL WALL REINFORCEMENT IN ITS Contractor
2.0 kN/m
CORRECT ALIGNMENT.
WATER PROOFING ON ROOF TUNNEL 2.0 kN/m
2
TRANSFORMER ROOM 16 kN/m
2
< 50m m
GROUND LEVEL SURCHARGE TEMPORARY 20.0 kN/m
2
2
Design Consultant
MCC 10 kN/m 152 Beach Road
LINE LOADS OF CONCRETE WALLS 2
< 40
2.5 x (THICKNESS OF WALL) x (HEIGHT OF WALL) kN/m
#35-00 Gateway East
GENERAL LEVEL SURCHARGE PERMANENT 25.0 kN/m
2
ALUMINIUM CLADDING 2
LV 10 kN/m
2 >0.3I
o I
o M Singapore 189721
0.2 kN/m Fs
PUBLIC ASSEMBLY AREA LOAD 5.0 kN/m
2
a
2
16.0 kN/m 2 Fs
TVF ROOM 10 kN/m
2.0m THICK SOIL FILL 2
Fs
38 kN/m I Project title
ALL OTHER PLANT ROOM 2 Fs bd
7.5 kN/m
0
2
> 20m m
2
I
b
> 20
DAMPER 7.5 kN/m
2 DESIGN AND CONSTRUCTION OF
SUPER IMPOSED DEAD LOAD ADDITIONAL REQUIREMENT ON ROOF AS PER,
LTA CDC 3.3.2.3.1(a) & (b) CONSIDERED
FCC 7.5 kN/m
2
Ibd =DESIGN ANCHORAGE LENGTH NORTH-SOUTH CORRIDOR (TUNNEL)
UNLESS NOTED OTHERWISE IN THE PARTICULAR SPECIFICATION. PUMP ROOM 7.5 kN/m
2 Drawing Title
2.3.4 FAN AND WIND LOADS ACTIVE CARBON FILTER 16 kN/m
FAN WIND LOAD ± 3.0 KN/m ESCAPE STAIR CASE AND CORRIDORS 5.0 kN/m
2
ABOVE GROUND STRUCTURES SS EN 1991-1-4:2009, BASIC WIND SPEED=20m/s MOTORCYCLE REST AREA 5.0 kN/m
2
GENERAL PLANT, MAINTENANCE 7.5 kN/m Drawn SABJ 14/06/21 Approved DW 15/06/21
"This document is issued for the party which commissioned it and for specific purposes connected with the above captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility
for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties."
"This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it."
4.12 ALL LAPS SHOWN ON THE DRAWINGS ARE INDICATIVE ONLY. THE CONTRACTOR
SHALL PREPARE THE SHOP DRAWINGS TO THE QPD'S ACCEPTANCE
4.14 STANDARD RADIUS BENDS (MANDREL DIAMETER) 5.2 ASSUMED BOND CONDITIONS
MAIN BAR
A A
A) THE MINIMUM DIAMETER TO WHICH A BAR IS BENT SHALL BE SUCH AS TO
AVOID BEDING CRACKS IN THE BAR, AND AVOID FAILURE OF THE CONCRETE
INSIDE THE BEND OF THE BAR
h
B
CKNESS
ROOF
B) IN ORDER TO AVOID DAMAGE TO THE REINFORCEMENT THE DIAMETER TO
a
h < 250mm
THI
45°< a < 90°FOR ALL VALUES B3 - LAYER
300
OF h (E.G. COLUMNS)
B1 - LAYER
A A
4.14.1 FOR BARS AND WIRE :
ST
SL
h
BAR MINIMUM MANDREL DIAMETER
ST
DIAMETER FOR BEND, HOOKS AND LOOPS LO
NG SL
h > 250mm h > 600mm ITU ION
16mm DI ST CT
250
NA R E
L DI
DI
RE SE
NOTES: CT
SL
VER
ION S
AN
A) UNHATCHED ZONE - 'GOOD' BOND CONDITIONS TR
B) HATCHED ZONE - 'POOR' BOND CONDITIONS
C) ADIRECTION OF CONCRETING NOTE: ONAL EN ONAL EN
I I
S G S G
1. DISTRIBUTION BARS ARE NOT SHOWN S S
4.14.2 FOR WELDED BENT REINFORCEMENT AND
FE
FE
IN
IN
PRO
PRO
EE
EE
MESH BENT AFTER WELDING : 2. SHEAR REINFORCEMENTS SHALL BE
5.3 COUPLERS
R
R
HOOKED AT BOTTOM MAIN REINFORCEMENT B1 AND B3 CIVIL GEOTECHNICAL
MINIMUM MANDREL DIAMETER LAYERS ALTERNATIVELY.
SOON WON MOI NG CHEW CHIAT
d 3972 4334
OR 5.3.1 CONTRACTOR TO ALLOW FOR COUPLERS AS REQUIRED TO SUIT
OR S S
THE FINAL CONSTRUCTION SEQUENCE. IN E IN E
GA POR GA POR
b) LINKS/HOOKS FOR BASE SLAB
5.3.2
TO BE A PROPRIETARY TYPE CAPABLE OF DEVELOPING THE FULL
STRENGTH OF THE PARENT BAR.
5.3.3
THE CONTRACTOR IS TO NOTE THAT DIFFERENT COUPLER TYPES
5 LAP AND ANCHORAGE LENGTHS FOR CLASS B HIGH YIELD REINFORCEMENT. SHALL BE REQUIRED DEPENDING ON THE FIXING REQUIREMENTS OF MAIN BAR
EACH BARS. E.G. ROTATING OF BARS INTO COUPLERS CAST INTO A
DIAPHRAGM WALL.
5.1.1 LAP LENGTHS PROVIDED (FOR NOMINAL BARS, etc.) SHOULD NOT BE LESS THAN 15 TIMES THE BAR
SIZE OR 200mm WHICHEVER IS GREATER.
CKNESS
6 LEGENDS
BASE
5.1.2 IT IS ASSUMED 100% OF THE BARS ARE LAPPED AT ONE PLACE FOR COLUMNS AND WALLS. SLAB &
THI
BEAM OPTIONS FOR 25%, 33% AND 50% LAPPING AT SAME PLACE ARE ALSO PROVIDED. FOR OTHER
CASES REFERENCES SHALL BE MADE TO SS EN 1992-1-1.
6.1 REINFORCEMENT NOTATION ON THE DRAWINGS :
B. TYPICAL VALUES OF ANCHORAGE AND LAP LENGTHS IN BAR SIZE FOR BEAMS (FOR UPTO 32 dia BARS): B 14.06.21 SABJ ISSUED FOR CONSTRUCTION (ST780) AT AKM DW
WA
LL
TA AND TL FOR BEAMS TA AND TL FOR BEAMS c) LINKS/HOOKS FOR WALLS TH A 10.05.21 DR ISSUED FOR CONSTRUCTION (ST100) AT AKM DW
BOND fck/fcu BOND fck/fcu
ICK
(WITH PERCENTAGE OF CONDITION 32/40 (WITH PERCENTAGE OF CONDITION 32/40 NE
SS - 16.03.21 LW ISSUED FOR CONSTRUCTION (ST100) AT AKM DW
LAPPED REBARS-50%) LAPPED REBARS-100%)
Rev Date Drawn Description Dsg'd Chk'd App'd
GOOD GOOD 6.1.1
FULL TENSION/COMPRESSION FULL TENSION/COMPRESSION Client
ANCHORAGE, TA POOR ANCHORAGE, TA POOR ' '
C. TYPICAL VALUES OF ANCHORAGE AND LAP LENGTHS IN BAR SIZE FOR COLUMNS (FOR UPTO 32 dia BARS): LINK/HOOK DIAMETER
TA AND TL FOR COLUMNS BOND fck/fcu fck/fcu TA AND TL FOR COLUMNS BOND fck/fcu fck/fcu
ON
FOR SLAB: LONGITUDINAL SPACING mm Contractor
(WITH PERCENTAGE OF (WITH PERCENTAGE OF
RECTI
CONDITION 32/40 40/50 CONDITION 32/40 40/50 FOR WALLS: HORIZONTAL SPACING mm
LAPPED REBARS-50%) LAPPED REBARS-100%) Su
FOR SLAB: TRANSVERSE SPACING mm
Engineering & Construction
C AL DI
FULL TENSION/COMPRESSION GOOD FULL TENSION/COMPRESSION GOOD FOR WALLS: VERTICAL SPACING mm MAIN BAR
ANCHORAGE, TA ANCHORAGE, TA
TYPE
VERTI
Su
Design Consultant
FULL TENSION/COMPRESSION GOOD FULL TENSION/COMPRESSION GOOD 152 Beach Road
BAR SHAPE
LAPPING, TL LAPPING, TL #35-00 Gateway East
M Singapore 189721
D. TYPICAL VALUES OF ANCHORAGE AND LAP LENGTHS IN BAR SIZE FOR DWALLS, RETAINING WALLS,PILES (UPTO 32 dia BARS):
MOTT
M Telephone (65) 62931900
Fax (65) 62931911
Su E-mail [email protected]
TA AND TL FOR WALLS, TA AND TL FOR WALLS, MACDONALD
BOND fck/fcu fck/fcu BOND fck/fcu fck/fcu
DWALLS, RETAINING WALLS, DWALLS, RETAINING WALLS,
CONDITION 32/40 40/50 CONDITION 32/40 40/50 Project title
PILES (WITH PERCENTAGE OF PILES (WITH PERCENTAGE OF
LAPPED REBARS-50%) LAPPED REBARS-100%)
SH
CONTRACT N101
SH ON DESIGN AND CONSTRUCTION OF
FULL TENSION/COMPRESSION GOOD FULL TENSION/COMPRESSION GOOD
CTI
ANCHORAGE, TA ANCHORAGE, TA 6.2 REINFORCEMENT LAYERING TAGS RE
DI NORTH-SOUTH CORRIDOR (TUNNEL)
SH AL
FULL TENSION/COMPRESSION FULL TENSION/COMPRESSION ONT
GOOD GOOD Z
RI
BETWEEN ECP AND VICTORIA STREET
LAPPING, TL LAPPING, TL HO
NOTE:
1. DISTRIBUTION BARS ARE NOT SHOWN
1. IT IS ASSUMED NOT MORE THAN 50% OF THE BARS ARE LAPPED AT ONE PLACE FOR BEAMS,
SLABS, COLUMNS AND WALLS. FOR OTHER CASES REFERENCES SHALL BE MADE TO SS EN 1992.1-1. GENERAL NOTES SHEET 2
2. FOR BAR SIZES GREATER THAN 32mm THE VALUES GIVEN IN THE TABLES SHALL BE MULTIPLIED
6.3 NOTATION OF SLABS ON THE DRAWINGS :
B 7 PROTECTION OF EXPOSED REINFORCEMENT
3. BOND CONDITION - THE ULTIMATE BOND STRESS IS RELATED TO THE QUALITY OF THE BOND
200 DENOTES SLAB THICKNESS = 200mm
CONDITION AND POSITION OF THE BARS ARE SHOWN ON NOTE 5.2.
STARTER BARS AND OTHER STEEL BARS WHICH ARE EXPOSED TO THE
Designed AT 15/03/21 Eng. Chk. AKM 15/06/21
ENVIROMENT DUE TO DELAY IN CONCRETING OPERATION OR STAGED
CONSTRUCTION THAT MAY CAUSE CORROSION OF BARS SHALL BE COATED Drawn SABJ 14/06/21 Approved DW 15/06/21
FOR CONSTRUCTION
W/101/FB/GN/0202 B
"This document is issued for the party which commissioned it and for specific purposes connected with the above captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility
for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties."
"This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it."
14 GEOTECHNICAL 16. GROUND IMPROVEMENT
1. THE QUALITY OF IMPROVED GROUND SHALL BE CONFIRMED IN ACCORDANCE WITH LTA M&W
CHAPTER 7.
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH DEEP FOUNDATION ELEMENT DRAWING
2. GROUTING PARAMETERS SHALL BE VERIFIED AND CONFIRMED AFTER TRIAL TESTS. NO INSTALLATION
OF GROUND IMPROVEMENT SHALL BE CARRIED OUT PRIOR TO SUCCESSFUL COMPLETION OF TRIAL
2. ALL CONCRETE SHALL BE GRADE 32/40 UNLESS OTHERWISE SHOWN
TESTS. THE CONTRACTOR SHALL SUBMIT DETAILED PROPOSALS FOR CARRYING OUT THE TRIAL
TESTS.
3. REINFORCEMENT BAR TO HAVE YIELD STRENGTH AT 500N/mm?
3. THE CONTRACTOR IS TO PROPOSE FOR THE ENGINEER'S ACCEPTANCE AND APPROVAL THE
VERIFICATION METHOD(S) APPRORIATE TO THE LOCATION AND TYPE OF GROUND IMPROVEMENT BEING
4. THE ESTIMATED EMBEDMENT OF DEEP FOUNDATION ELEMENT (DFE) SHALL BE VERIFIED ACCORDING TO GROUND CONDITIONS
IMPLEMENTED.
ENCOUNTERED DURING EXCAVATION OR BORING FOR DFE IN ORDER TO ENSURE THAT THE REQUITED GEOTECHNICAL
RESISTANCE IS ATTENDED
5. THE ALLOWABLE DFE SETTLEMENT IS 15mm AND 25mm FOR SHORT AND LONG TERM CONDITIONS RESPECTIVELY
7. THE MAXIMUM PERMITTED DEVIATION OF THE CONSTRUCTED DFE FROM THE VERTICAL IS1(H) IN 75(V)
8. THE MAXIMUM PERMITTED DEVIATION OF THE CENTRE OF THE CONSTRUCTED DFE FROM ITS CENTRE SHOWN ON THE DRAWING
SHALL NOT EXCEED 75mm IN ANY DIRECTION
9. THE VIBRATION LIMIT FOR THE CONSTRICTION OF DFE IS 15mm/sec PEAK PARTICLE VELOCITY
10. PRELIMINARY LOAD TEST AND WORKING LOAD TEST SHALL BE UNDERTAKEN TO VERIFY DESIGN PARAMETERS
11. THE ESTIMATED DFE TOE LEVEL SHALL BE VERIFIED WITH THE RESULT OF THE ULTIMATE LOAD TEST AND ANY NEW BOREHOLE
INFORMATION
12. THE ALLOWABLE GEOTECHNICAL CAPACITY OF THE DFE ARE CALCULATED TO SATISFY THE FOLLOWING FORMULAS
ONAL EN
I ONAL EN
I
S G S G
S S
FE
FE
IN
IN
PRO
PRO
I-COMPRESSION
EE
EE
R
R
CIVIL GEOTECHNICAL
1. DL + MAX OF (1.11 LL OR NSF) < (Qb/ gs) /(1.35xMF)(EC DA1 - COM 1)
g b+Qs/
SOON WON MOI NG CHEW CHIAT
g s) / MF (EC DA1 - COM 2)
g b+Qs/
2. DL + MAX OF (1.3 LL OR NSF ) < (Qb/ M2
3972 4334
S E S E
IN IN
GA POR GA POR
3. DL + MAX OF (LL OR NSF) < Qs/1.5 (LTA CDC)
5. TEMPLOAD < Qs/1.2 (GROUND WATER LEVEL AT THE BOTTOM OF EXCAVATION) (LTA CDC)
II-TENSION
LL IS LIVE LOAD
13. REFER TO TUNNEL DIAPHRAGM WALL SCHEDULE DRAWING 101/TUN/PL/1306 FOR THE
ADOPTED GEOTECHNICAL RESISTANCE DESIGN PARAMETERS.
Contractor
Design Consultant
152 Beach Road
#35-00 Gateway East
END BEARING COMBINATION 1 COMBINATION 2
M Singapore 189721
COEFFICIENT
qb(kPa) MOTT
M Telephone (65) 62931900
Fax (65) 62931911
R1 R4 *R4 MACDONALD E-mail [email protected]
Project title
BASE gb
1.00 2.00 1.70
CONTRACT N101
Drawing Title
Scale Status
Project: 406785
FOR CONSTRUCTION
W/101/FB/GN/0203 A
"This document is issued for the party which commissioned it and for specific purposes connected with the above captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility
for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties."
"This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it."