Book 1

The document is a mechanical completion checklist for pumps. It lists 8 items that were checked to confirm the pumps were installed correctly, including verifying proper installation according to design documents, visual inspection, alignment checks, bolt tensioning, nameplate verification, cleanliness, installation according to drawings, and completion of preservation procedures. The second page of the document notifies the client that mechanical completion has been achieved for the system and it is ready for pre-commissioning.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views2 pages

Book 1

The document is a mechanical completion checklist for pumps. It lists 8 items that were checked to confirm the pumps were installed correctly, including verifying proper installation according to design documents, visual inspection, alignment checks, bolt tensioning, nameplate verification, cleanliness, installation according to drawings, and completion of preservation procedures. The second page of the document notifies the client that mechanical completion has been achieved for the system and it is ready for pre-commissioning.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Project :

Client :
MECHANICAL COMPLETION FOR PUMPS

SYSTEM : DATE : ………………………………..

SUB-SYSTEM : LOCATION :
TAG NUMBER : REVISION : ………………………………..
DOCUMENT NO. : PAGE : 1

RESULT
No ITEM CHECK LIST DATE SIGNATURE REMARKS
YES NO N/A
Installed as per PID/construction drawings
1
approval
Visual Inspection for complete and correction
2
installation
3 Check initial alignment

4 Bolt Tensioning

5 Check Name plate

6 Cleanliness equipment
Pump skid and support installed base on
7
contruction drawing approval
Preservation has been done as Procedure
8
Preservation

Noted :

Received in apparent good Condition


Conforms to contract specifications

Prepared By, Checked By, Checked By, Approved By,


Client
Project :
Client :

MECHANICAL COMPLETION CERTIFICATE

SYSTEM : DATE : ………………………………..

SUB-SYSTEM : LOCATION :

TAG NUMBER : PAGE : 2


DOCUMENT NO. :

XXX herewith notify XXX & XXXX, that all sub-system/system/discipline for…....................for the…...............
have been achived Mechanical Completion and is ready for pre-commissioning activities.

This certificate confirms that the above items, as defined, have been pre-commisioning in full accordance with all applicable drawings,
specification and procedures. That all specified test have been completed to consider the system as mechanical completion

Noted :

Received in apparent good Condition


Conforms to contract specifications

Prepared By, Checked By, Checked By, Approved By,

You might also like