EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A. General Requirements
Material Handling & Storage instructions from manufacturer are available SAES-N-001,
A1
at site. (INSC2000/INSH2000, Para. 4.2). Section 3
Materials that exceeded their shelf life are removed from site & replaced SAES-N-001,
A4
with new material. (PIP INSC2000/INSH2000, Para. 4.4) Section 3
Mastics, adhesives & sealers are stored properly & material exposed to
SAES-N-001,
A5 temperatures outside recommended temperature ranges during storage is
Section 3
removed from site & replaced. (INSC2000/INSH2000, Para. 4.3)
Insulation materials are protected at all times from foreign elements & SAES-N-001,
A7
have adequate drainage (INSC2000/INSH2000, Para. 4.1) Section 3
Insulation that becomes wet shall be removed and replaced with dry
SAES-N-001,
A9 insulation, and the wet insulation shall be discarded. Damaged insulation
Section 3
shall be replaced (PIP INSC2000/INSH2000, Para. 5.11.1 & 5.11.2)
Flammable materials are stored safely away from ignition sources. SAES-N-001,
A10
(INSC2000/INSH2000, Para. 5.12.4) Section 3
REMARKS:
REFERENCE DOCUMENTS:
1. SAES-N-001 -- Basic Criteria, Industrial Insulation (16 January 2014)
2. Process Industry Practice (PIP) INSC2000 -- Installation of Cold Service Insulation Systems (April, 1999)
3. Process Industry Practice (PIP) INSH2000 -- Installation of Hot Service Insulation Systems (October, 1997)
4. Process Industry Practice (PIP) INTG1000 -- Insulation Inspection Checklist (Oct, 2005)