This document contains a ground floor plan and drainage layout for an administration building, shop, and fast aid office. The plan shows the layout of rooms and drainage pipes. Round half pipes will be used to drain rainwater from the gutters into 110mm rainwater drainage pipes that flow to storm drains. The plumbing layout includes a 32mm cold water supply line from an elevated water tank with isolation valves.

Uploaded by

febous
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views3 pages

06 - Admin & Shops

This document contains a ground floor plan and drainage layout for an administration building, shop, and fast aid office. The plan shows the layout of rooms and drainage pipes. Round half pipes will be used to drain rainwater from the gutters into 110mm rainwater drainage pipes that flow to storm drains. The plumbing layout includes a 32mm cold water supply line from an elevated water tank with isolation valves.

Uploaded by

febous
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Ø100 U.

G To Septic Tank
IC
Slope 1:100

Ø100 U.G

Gt

Ø50

Ft
Ø40

Store Re
SHOP
FAST AID
OFFICE

ADMIN
OFFICE WAITING AREA

Store
Entrance

GROUND FLOOR PLAN-


ADMIN, SHOP & FAST AID OFFICE
TITLE GROUND FLOOR PLAN-ADMIN, SHOP & FAST AID OFFICE CLIENT. ELIZABETH KAMENE NDOLO, PREPARED BY: W.N.F DRWG SIZE:
DRAINAGE LAYOUT P.O. BOX 54, SULTAN HAMUD
PROJECT PROPOSED COMMERCIAL DEVELOPMENT ON
LR. 1757/28, SUB PLOT A1& B1. MAKUENI COUNTY DRAWING REF. ADMN & SHOPS - 101 VERIFIED BY: ............. SCALE: N.T.S

ARCHITECT PLANOCONSULT ARCHITECTS AND PLANNERS P.O BOX 47761 - 00100 NAIROBI REVISION:- REASON:- DATE: FEB 2023 APPROVED BY: ............. DATE: FEB 2023
MWS From Elevated Tank

Isolation valve

Ø32 CWS F/B

Store SHOP
FAST AID
OFFICE

ADMIN
OFFICE WAITING AREA

Store
Entrance

GROUND FLOOR PLAN-


ADMIN, SHOP & FAST AID OFFICE
TITLE GROUND FLOOR PLAN-ADMIN, SHOP & FAST AID OFFICE CLIENT. ELIZABETH KAMENE NDOLO, PREPARED BY: W.N.F DRWG SIZE:
PLUMBING LAYOUT P.O. BOX 54, SULTAN HAMUD
PROJECT PROPOSED COMMERCIAL DEVELOPMENT ON
LR. 1757/28, SUB PLOT A1& B1. MAKUENI COUNTY DRAWING REF. ADMN & SHOPS - 102 VERIFIED BY: ............. SCALE: N.T.S

ARCHITECT PLANOCONSULT ARCHITECTS AND PLANNERS P.O BOX 47761 - 00100 NAIROBI REVISION:- REASON:- DATE: FEB 2023 APPROVED BY: ............. DATE: FEB 2023
ADMIN, SHOP & FAST AID OFFICE

Gutter 150Ø Half-Round 150Ø Half-Round Gutter


Outlets UPVC Pipe UPVC Pipe Outlets

To storm Drain To storm Drain


Landing Shoe Landing Shoe
110Ø RWDP F/A 110Ø RWDP F/A

Store SHOP
FAST AID
OFFICE fall

fall fall
ADMIN
OFFICE WAITING AREA fall
Store
Entrance
110Ø RWDP F/A 110Ø RWDP F/A
Landing Shoe Landing Shoe

To storm Drain To storm Drain

Gutter 150Ø Half-Round ROOF PLAN 150Ø Half-Round Gutter


GROUND FLOOR PLAN- UPVC Pipe UPVC Pipe
Outlets Outlets
ADMIN, SHOP & FAST AID OFFICE

TITLE GROUND FLOOR PLAN-ADMIN, SHOP & FAST AID OFFICE CLIENT. ELIZABETH KAMENE NDOLO, PREPARED BY: W.N.F DRWG SIZE:
RAINWATER DRAINAGE LAYOUT P.O. BOX 54, SULTAN HAMUD
PROJECT PROPOSED COMMERCIAL DEVELOPMENT ON
LR. 1757/28, SUB PLOT A1& B1. MAKUENI COUNTY DRAWING REF. ADMN & SHOPS - 103 VERIFIED BY: ............. SCALE: N.T.S

ARCHITECT PLANOCONSULT ARCHITECTS AND PLANNERS P.O BOX 47761 - 00100 NAIROBI REVISION:- REASON:- DATE: FEB 2023 APPROVED BY: ............. DATE: FEB 2023