Lecture W203 - IBS PF2
Lecture W203 - IBS PF2
MALAYSIA
PERLIS
By:
PM Ir. ABDUL GHAPAR BIN AHMAD
Faculty of Technology Civil Engineering
Universiti Malaysia Perlis
[email protected]
012-5252416
26 okt 2020
THE DEVELOPMENT OF STUDENT HOSTEL FOR
UNIVERSITI MALAYSIA PERLIS
THROUGH PUBLIC PRIVATE PARTNERSHIP
QUANTITY SURVEYOR:
JBB CONSULTANTS SDN BHD
1.1 INTRODUCTION
Food Courts
Student Activity Centre
Surau
Aminities
- Guard House / Rubbish Collection House / Pump House
- Sub-Station/ Security Fencing around the proposed area
- Covered Walkway / Other Infrastructure works that needed
Sport Courts
UNIMAP BORDER
THE SITE
UNIMAP BORDER
The proposed
development with an
Site area: 25 Acres
approximate land area
of 25 acres form a
portion from the overall
campus area.
FRONT ELEVATION
REAR ELEVATION
FRONT ELEVATION
REAR ELEVATION
FRONT ELEVATION
REAR ELEVATION
FRONT ELEVATION
REAR ELEVATION
SIDE ELEVATION
- DESIGN CONCEPT -
The miracle of nature fosters a sense of peace and tranquility that has led to therapeutic relief and wonderment for all campus residents
“beautiful setting will surely enhance the pleasure of the campus environment”
Main Entrance
W E
3 meter
Floor to floor height = 4.5 meter
Floor to ceiling height = 3.5
meter
IBS Score of
No. Block Name Area(m2) Coverage Area (%) Building IBS Score Project
1 Block Administration 7980.00 7980 / 62701.5 x 100 = 12.73% 66.59 0.127 x 66.59 = 8.47
2 Hostel A/B - 1 4038.50 4038.5 / 62701.5 x 100 = 6.44% 74.27 0.064 x 74.27 = 4.78
3 Hostel A/B - 2 4038.50 4038.5 / 62701.5 x 100 = 6.44% 74.27 0.064 x 74.27 = 4.78
4 Hostel A/B - 3 4038.50 4038.5 / 62701.5 x 100 = 6.44% 74.27 0.064 x 74.27 = 4.78
5 Hostel A/B - 4 4038.50 4038.5 / 62701.5 x 100 = 6.44% 74.27 0.064 x 74.27 = 4.78
6 Hostel A/B - 5 4038.50 4038.5 / 62701.5 x 100 = 6.44% 74.27 0.064 x 74.27 = 4.78
7 Hostel A/B - 6 4038.50 4038.5 / 62701.5 x 100 = 6.44% 74.27 0.064 x 74.27 = 4.78
8 Hostel A/B - 7 4038.50 4038.5 / 62701.5 x 100 = 6.44% 74.27 0.064 x 74.27 = 4.78
9 Hostel A/B - 8 4038.50 4038.5 / 62701.5 x 100 = 6.44% 74.27 0.064 x 74.27 = 4.78
10 Hostel A/B - 9 4038.50 4038.5 / 62701.5 x 100 = 6.44% 74.27 0.064 x 74.27 = 4.78
11 Hostel A/B - 10 4038.50 4038.5 / 62701.5 x 100 = 6.44% 74.27 0.064 x 74.27 = 4.78
12 Hostel A/B - 11 4038.50 4038.5 / 62701.5 x 100 = 6.44% 74.27 0.064 x 74.27 = 4.78
13 Hostel A/B - 12 4038.50 4038.5 / 62701.5 x 100 = 6.44% 74.27 0.064 x 74.27 = 4.78
14 Hostel C/D - 1 2086.50 2086.5 / 62701.5 x 100 = 3.33% 73.23 0.033 x 73.23 = 2.44
15 Hostel C/D - 2 2086.50 2086.5 / 62701.5 x 100 = 3.33% 73.23 0.033 x 73.23 = 2.44
16 Hostel C/D - 3 2086.50 2086.5 / 62701.5 x 100 = 3.33% 73.23 0.033 x 73.23 = 2.44
17 Hostel C/D - 4 2086.50 2086.5 / 62701.5 x 100 = 3.33% 73.23 0.033 x 73.23 = 2.44
Sustainability &
Energy Saving
Lightweight
Soundproofing
Fire Resistance
Compatibility
23/02/201
6
Aerial View – Block A to F
SITE PHOTO
23/02/201
6
Aerial View – Block G to L
SITE PHOTO
23/02/201
6
Aerial View – Block A to F
SITE PHOTO
23/02/201
6
Aerial View – Block G to L