Guidelines for calibrating a binder
distributor and ensuring satisfactory
performance
Published by Sabita
Postnet Suite 56
Private Bag X21
Howard Place 7450
SOUTH AFRICA
ISBN 978-1-874968-53-5
Published June 2011
Disclaimer
Considerable effort has been made to ensure the accuracy and reliability of
the information contained in this publication. However, neither Sabita nor any
of its members can accept any liability whatsoever for any loss, damage or
injury resulting from the use of this information. The contents of this
publication do not necessarily represent the views of all members of Sabita.
ii
Manuals published by Sabita
Manual 1 Construction of bitumen rubber seals
Manual 2 Bituminous binders for road construction and maintenance
Manual 3* Test methods for bitumen rubber
Manual 4* Specifications for rubber in binders
Manual 5 Manufacture and construction of hot mix asphalt
Manual 6* Interim specifications for bitumen rubber
Manual 7 SuperSurf: Economic warrants for surfacing unpaved roads
Manual 8 Safe and responsible handling of bituminous products (CD only)
Manual 9 Bituminous surfacings for temporary deviations
Manual 10 Appropriate standards for bituminous surfacings
Manual 11 Labour enhanced construction for bituminous surfacings
Manual 12 Methods for labour intensive construction of bituminous surfacings (CD only)
Manual 13 LAMBS – The design and use of large aggregate mixes for bases
Manual 14*** GEMS – The design and use of granular emulsion mixes
Manual 15* Technical guidelines for seals using homogeneous modified binders
Manual 16** REACT – Economic analysis of short-term rehabilitation actions
Manual 17 The design and use of porous asphalt mixes (CD only)
Manual 18 Appropriate standards for the use of sand asphalt
Manual 19 Guidelines for the design, manufacture and construction of bitumen rubber asphalt wearing courses
Manual 20 Sealing of active cracks in road pavements
Manual 21*** ETBs – The design and use of emulsion treated bases
Manual 22 Hot mix paving in adverse weather
Manual 23 Code of Practice: Loading bitumen at refineries (CD only)
Manual 24 User guide for the design of hot mix asphalt
Manual 25 Quality management in the handling and transport of bituminous binders
Manual 26 Interim guidelines for primes and stone precoating fluids
Manual 27 Guideline for thin layer hot mix asphalt wearing courses on residential streets
Manual 28 Best practice for the design and construction of slurry seals (CD only)
Manual 29 Guide to the safe use of solvents in a bituminous products laboratory (CD only)
Manual 30 A guide to the selection of bituminous binders for road construction (CD only)
Manual 31 Guidelines for calibrating a binder distributor and ensuring satisfactory performance
* Withdrawn and their contents have been incorporated in Technical Guideline 1 (see below)
** Withdrawn and its software incorporated in TRH12: Flexible pavement rehabilitation investigation and design
***These manuals have been withdrawn and contents incorporated in Technical Guideline 2 (see below).
Technical Guidelines
TG1 The use of modified binders in road construction
TG2 Bitumen stabilised materials
TG3 Asphalt reinforcement for road construction
DVDs
DVD100 Testing of bituminous products
DVD200 Repair of blacktop roads
DVD300 Hot mix asphalt
DVD410 The safe handling of bitumen
DVD420 Treatment of bitumen burns
DVD430 Working safely with bitumen
DVD440 Firefighting in the bituminous product industry iii
CONTENTS
ACKNOWLEDGEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . vi
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
iv
PART C: CHECKS, PROCEDURES AND TESTS TO BE FOLLOWED
WHEN A DISTRIBUTOR ARRIVES ON SITE . . . . . . . . . . . . . . . 32
C.1 Log book inspection . . . . . . . . . . . . . . . . . . . . . . . . . . 32
C.1.1 Calibration certificate . . . . . . . . . . . . . . . . . . . . . . 32
C.1.2 Current modifications . . . . . . . . . . . . . . . . . . . . . . 32
C.1.3 Routine maintenance . . . . . . . . . . . . . . . . . . . . . . 32
C.1.4 ‘Bucket test’ . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
C.1.5 Recent work . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
C.2 Physical checks on vehicle . . . . . . . . . . . . . . . . . . . . . . 33
C.2.1 Nozzles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
C.2.2 Spray bar height. . . . . . . . . . . . . . . . . . . . . . . . . 33
C.3 On site transverse distribution test (‘Bucket test’) . . . . . . . . . . . 34
C.4 Road speed indicator calibration. . . . . . . . . . . . . . . . . . . . 34
C.5 Spray joints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
C.6 Trial section . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
C.7 Repeat visits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
APPENDIX A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Binder Distributor inspection check lists
APPENDIX B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Modification and maintenance log
APPENDIX C . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
“Bucket Test” record
APPENDIX D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
Spray performance log
APPENDIX E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Check list before spraying commences on site
APPENDIX F. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
Checks required after each day's spraying
v
ACKNOWLEDGEMENTS
This manual was originally prepared by a team from VelaVKE
Consulting Engineers, led by Simon Kotze and assisted by a number
of persons in the industry. Their contribution is gratefully
acknowledged.
The manual has subsequently been edited by Dave Wright to take
into account the changes in requirements for certification of binder
distributors as set out in SANS 3001-BT20 to BT24.
This manual is published under the auspices of the Road Pavement
Forum task team on binder distributors.
vi
INTRODUCTION
This document sets out procedures to ensure that a binder distributor
is functioning properly and capable of delivering the required
application of binder uniformly during construction of bituminous
seals and other spray applications. The procedures essentially
include two parts:
NOTE
The reader should note that there are also a number of safety
and risk assessment procedures to be followed during loading,
heating and application and disposal of bituminous binders to
ensure that binder distributor operators, site staff, equipment
and the environment are not unduly exposed to incidents of loss
of life, injury or damage. While these measures are crucially
important this document will focus only on best practice
pertaining to the performance of binder distributors and process
control with respect to the application thereof. The reader is
referred to Sabita Manual 8: Guidelines for the safe and
responsible handling of bituminous products for best practice in
the safe handling of binders.
7
It is also encumbent on the owner of the binder distributor to
ensure that the driver and sprayer operator are not only
competent to carry out the operational procedures as required
but that they are trained to apply the prescribed safety
procedures and are equipped with the necessary safety
equipment.
It is recommended that all the personnel associated with the
handling of binders during the spraying operating should have
completed the BitSafe training course.
8
PART A: GENERAL INFORMATION
Binder distributors consist of a number of components each of which
needs to be in good working order to ensure that the required
application rate of binder is achieved. The following paragraphs
provide some general information regarding the condition of the
various distributor mechanisms and procedures applicable to ensure
good performance.
A.2 Vehicle
It is the supplier’s responsibility to ensure that the distributor is in a
roadworthy condition at all times. The distributor should be able to
accelerate fast enough from a standing start with the tank filled to
capacity to reach and maintain the speed required to apply the
required rates of application. The vehicle shall also comply with all
the legal requirements covering the vehicle and its equipment.
9
Except for distributors that are used solely for spraying cold
bituminous materials, the distributor tank is covered with suitable
non-combustible insulation of adequate thickness. The insulation is
such that without circulating and heating the product the temperature
drop of a full load of binder at a temperature of 150°C should not
exceed 10°C in any one hour.
An overflow pipe, capable of discharging overflow from the tank and
readily accessible for cleaning, is mounted inside the tank at or near
the mid-length of the tank. The internal diameter of the overflow pipe
is normally not less than 75 mm.
A.3.1 Manhole
A manhole with readily removable cover is mounted on top of the
tank, preferably at or near the mid-length of the tank.
10
Figure 1: Burners that heat up the flues
11
A.3.3 Temperature gauges (thermometers)
Two mercury-in-steel or other suitable thermometers are fitted to the
tank. They are conveniently located and easily readable from the cab
of the vehicle and at the back by the operator. The elements of the
thermometers protrude a reasonable distance into the contents of
the tank. It is useful to have another thermometer located on the
spray bar to provide an accurate indication of the temperature of the
material as it is being circulated prior to and during spraying
operations. The thermometers are to be calibrated and marked at
intervals of not greater than 5°C and able to measure temperatures
between 10°C and 230°C.
12
A.3.4 Pressure Gauge
The distributor is fitted with a suitable pressure gauge with a range
greater than that of the normal working range. The pressure gauge
may be fitted to the pump outlet or the spray bar.
13
A.3.5 Dipstick and guide
The dipstick guide is of a rigid construction mounted at the centre of
the tank. It is constructed to maintain the dipstick in a vertical
position, to prevent the scraping of material from the dipstick as it is
withdrawn, or the welling of material as the dipstick is being lowered
into the tank. The dipstick is constructed in the form of a T-piece
which provides the fixed reference point of the dipstick readings. The
space between the tip of the dipstick and the bottom of the tank
should be at least 50 mm.
14
A.4 Pump
The pump of a binder distributor is a positive displacement gear
pump which means that the quantity of binder that is delivered is
directly proportional to the speed of the pump. The pump is normally
driven by means of an independent engine, but some newer models
are driven by the power take off (PTO) from the gearbox of the
vehicle. On some distributors pressure is governed by variable pump
speed and on others by constant pump speed and a pressure relief
valve.
When a pressure relief valve is used, the pump runs at a constant
speed and the pressure is automatically maintained in the spray-bar.
The manufacturer supplies charts for determining the discharge in
litre per minute for each size nozzle as well as the required truck
speeds for various application rates and the corrections for
temperature-viscosity variations.
15
A.5 Pipework
All pipes and couplings which are part of the distributor circuit shall
be able to handle the maximum pressure and temperature required.
A.6 Strainers
Provision is made for filtering bituminous materials. Every vehicle
should be fitted with a loading strainer and a spraying strainer. On
the loading side this can be achieved either by an external strainer
which should be available with the distributor at all times, or by an
in-line removable strainer in the suction pipe. An additional
removable strainer should be fitted on the discharge side of the
pump. Strainers should be checked and cleaned regularly and spare
strainers should be readily available on the distributor.
Figure 9: Strainer
16
A.7 Spray bar
The spray bar is an important component of the distributor, as the
required quantity of binder has to be sprayed through the spray
nozzles in such a way that the binder is spread uniformly on the road
surface. The spray bar and related binder delivery pipe work is
normally designed to minimise pressure loss over the length of the
spray bar and hence ensure that an equal amount of binder is
delivered through each of the nozzles.
The spray bar is provided with a height adjustment mechanism so
that its height can be set to deliver the exact desired spray fan
overlap pattern. Normally this is the height where the third overlap of
the spraying fans makes contact with the road surface. On the older
distributors the height of the spray bar can be adjusted mechanically
at the bar where it is attached to the chassis. Modern vehicles
normally have a hydraulic adjustment mechanism which may be
operated either from the cab or at the spray bar.
A.8 Nozzles
To achieve good results the prescribed nozzles for the particular task
must be used. For example, if nozzles are too large for the desired
application, pulsation of the spray may occur. This results in uneven
longitudinal spreading of the binder.
Each distributor manufacturer has specific recommendations
regarding spray nozzle type required for different applications. The
typical nozzles that are used range from small nozzles used for less
viscous materials such as prime coats and diluted emulsions, to
nozzles for conventional and polymer modified binders and large
nozzles for more viscous modified binders such as bitumen-rubber.
Each type of nozzle has an optimum flow rate that will yield the
required spray angle. Information to facilitate the selection of the
appropriate nozzles should be provided by the supplier.
Nozzles are to be cleaned regularly to ensure that they possess
equal discharge capacities. In addition, the nozzle edges wear out
over time and should be checked for wear and replaced when
necessary.
17
The angle of the long axis of the nozzle openings is set so that the
spray fans will not interfere with each other. The nozzle angle varies
according to the make of distributor and normally range between 15
and 30 degrees. The various manufacturers usually furnish special
wrenches for setting the angle of the nozzles. The use of these
wrenches is recommended, as it is extremely difficult to obtain a
uniform spread with a visually set nozzle.
Figure 10:
Illustration showing the measurement of the nozzle angle
18
Figure 12: Effect of improper nozzle angles
19
PART B: DETAILS OF THE INSPECTION AND
TEST PROCEDURES TO BE CARRIED OUT
TO OBTAIN A CALIBRATION CERTIFICATE
FOR A BINDER DISTRIBUTOR IN
ACCORDANCE WITH SANS 3001-BT20
The purpose of the calibration procedure and certificate is to provide
an annual check of bitumen distributors to ensure that they are in a
reasonable condition, that the tank is clean and that there is a high
probability of achieving the desired result on site.
A credible and valid Calibration Certificate will give the assurance
that the binder distributor is operating correctly and that it is capable
of delivering the required application rate within the prescribed
tolerances. It is, however, not a guarantee of accurate and uniform
spraying capability. In addition to the annual Calibration Certificate
and depending on the nature and size of the project a number of
tests and inspections may be carried out on site prior to and during
spraying operations to ensure the required quality of spray work.
It is recommended that the calibration tests are carried out in the
order that they are listed below. This will ensure best time and
resource efficiency and will prevent repetition of some steps.
The Calibration Certificate as well as the calibration parameters,
such as road speed and pump output, are to be made available for
inspection on site to assess the extent to which site tests need to be
carried out and on-site performance monitored to ensure compliance
with the specification. The data should be kept on board the
distributor.
20
• SANS 3001 BT-22 Power and road speed indicator tests for a
binder distributor;
• SANS 3001 BT-23 Pump system performance of a binder
distributor; and
• SANS 3001 BT-24 Measurement of transverse distribution
(‘Bucket Test’) for a binder distributor.
NOTE
Where repairs or alterations are made to critical elements of a
certificated distributor which could affect the spray rates and
distribution of binder, the distributor is to be recalibrated.
21
• a government run testing and calibration facility;
• a suitably equipped facility belonging to the distributor owner
or operator; or
• a suitably equipped facility belonging to a third party.
B.4 General
The requirements for each of the SANS 3001-BT tests are clearly set
out in the methods. However, the following general information is
provided regarding the condition the distributor should be in when
presented for testing and also on arrival on site for a specific
project.
The distributor should be clean and operational. Failure to meet
these requirements may cause a delay in testing and result in
additional costs for the applicant. The owner should arrange for an
experienced driver and operator to be present with the distributor
during testing to assist with the tests.
For annual calibration the default fluid to be used is a bitumen
emulsion heated to the recommended spray temperature. The use of
other fluids including a project specific binder or oil is permitted.
22
Visual inspection
Inspect the distributor for any damage or dirty components (tank
included). Check that:
Dipstick
The dipstick is:
NOTE
If these conditions are not met the dipstick is to be replaced or
reconditioned.
Vehicle performance
The vehicle is to be road worthy in terms of current traffic legislation
and/or regulations).
The main engine of the vehicle is to be sufficiently powerful so that it
is capable of driving at a pre-set constant speed without any difficulty
or noticeable jerking for a given road speed within the range of 80 to
300 metres per minute with a full load on any road gradient.
23
Road speed
The vehicle is to be fitted with a speed controller (and fifth wheel on
certain distributor models) to control the spraying road speed
between 80 and 300 metres per minute with an accuracy of + 1
metre per minute.
The road speed controller is to have a valid calibration certificate.
In the case of a fifth wheel system the wheel and mechanical parts
are to be free of any signs of wear.
The speedometer cable is to be in a good condition.
The locking device holding the fifth wheel at bay from the road during
normal travelling is to function satisfactory.
In the case of a mechanical road speed indicator the gauge is to be
fitted with an indicator needle.
The speed indicator needle is to be steady and should not vibrate or
oscillate when the speed of the vehicle, while spraying, is within the
required speed range.
When the vehicle is fitted with an electronic, digital indicator the
digits are to be clearly visible and when the vehicle is stationary the
display is to be free of any drift. The display unit is to be equipped
with a warning signal when the road speed is outside the tolerance
limits of the prescribed speed.
Output pump
The binder output pump is to be capable of delivering a constant
volume of binder i.e. 150 litres/metre/minute for any required length
of spray bar with an accuracy of + 1 litre/metre/minute. It is important
that the pump output rate remains constant throughout the discharge
of the binder from the tank. The rate of delivery of the output pump is
controlled by either the pressure in the output pipe circuit or the
revolutions of the output pump engine. A calibration certificate is to
be available for the output pump discharge indicator.
Transverse distribution
Previous ‘Bucket Test’ reports are to be available.
24
Spray nozzles
All the spray nozzles are to be of the same type (except those at the
end of the spray bar) and are set at the correct angle to the spray bar
as per the manufacturers specifications.
Thermometers
All thermometers are to be calibrated by an accredited metrological
institute. Thermometers are to be capable of indicating temperatures
between 10oC and 230oC with an accuracy of + 5oC.
NOTE
No calibration testing or spraying is to be carried out unless the
above mentioned conditions are met.
25
B.5.1 Dipstick calibration test – (SANS 3001-BT21)
This test is carried out to check that the volume of fluid in the tank as
measured on the readings on the dipstick, match the actual volumes
pumped into the tank. The standards make provision for binder
distributor flow measure indicators to be used instead of a dipstick
provided that it can be demonstrated, using the principles of SANS
3001-BT21, that a similar or improved accuracy can be achieved.
The dipstick, in the shape of a “T with a long leg”, is manufactured
from brass metal. It should resist mechanical wear and distortion
under normal use. The brass strip selected for the dipstick is at least
25 mm wide (30 mm is recommended) and 7 mm thick. The metal
should be easy to calibrate with a sharp chisel. The length of dipstick
is such that the clearance between the bottom of the tank and the
dipstick, when fully dipped in, is 50 mm.
26
discharge from sets of three nozzles. This test may also be carried
out on site to check that the distributor is still able to deliver an even
uniform application of binder.
The test is normally carried out using a spray bar width of 4,2 m split
into three sections, but may be adjusted for other widths. The
apparatus used includes 14 numbered steel troughs fitted with
handles, manufactured from 3 mm mild steel plate and 265 mm
(wide) by 405 mm (long) by 300 mm (high). The troughs are placed
beneath the spray bar so that all the binder is collected for each set
of three nozzles.
27
Figure 14: Apparatus to be used for the 'Bucket Test'
The troughs are weighed before and after each spray and the results
are then calculated and compared with the limits set in the test
method. Three comparisons are made:
28
Figure 15: Weighing each 'Bucket'
When the spray does not comply with the limits the nozzles can be
cleaned or replaced and then a further spray carried out. This
procedure is repeated until a successful outcome is achieved.
Appropriate personal protective equipment is to be worn when
performing this test and should include a pair of safety gloves (heat
resistant), face shield and approved overalls.
It is not necessary to clean the troughs between sprays. Diesel or
other suitable fluid can be used to clean the apparatus after the test
is finished and the troughs have cooled down sufficiently.
29
B.5.7 Volume measurements
All volume measurements for annual calibration are made by taking
mass measurements and converting to volumes. Methods SANS
3001-BT21 and BT23 require the use of a weighbridge and adequate
size tanks or sumps.
B.5.9 Documentation
SANS 3001-BT20 requires that certain documentation, including the
calibration certificate, be kept with the distributor. It is recommended
that this and other relevant data should be kept as part of a vehicle
logbook. The logbook should contain the Calibration Certificate,
performance charts, modification and maintenance log, a record of
‘Bucket’ tests done and a log showing the performance of the
distributor in the field.
30
• ‘Bucket Test’ record (Appendix C): This record will record all
‘Bucket’ tests done on the distributor within the last year,
whether on site or at a testing facility. The object of this record
is to show continuous good performance on transverse
distribution tests so that in future the parties concerned may,
based on the evidence of the ‘Bucket Test’ record, decide not
to repeat the ‘Bucket Test’, especially in cases where products
with low viscosities or low volumes of binder are sprayed.
• Performance log (Appendix D): This is a log showing the
distributor’s performance in terms of rate of application and
the variance thereof on recent projects. The log will not
contain sensitive information such as volumes sprayed and
the client names, but only date of spray, an indication of
satisfaction of the client, the person who approved the spray
and a contact number for this person.
• It is recommended that site staff should keep separate records
indicating the checks made before and after spraying
(Appendices E and F).
31
PART C: CHECKS, PROCEDURES AND
TESTS TO BE FOLLOWED WHEN A
DISTRIBUTOR ARRIVES ON SITE
When a distributor arrives on a construction site the site staff will
need to confirm that the driver/operator and its equipment are
capable of delivering the required rate of application to the road
surface in a uniformly distributed manner in accordance with the
specifications. Various inspections, checks and tests that culminate
in spraying a trial section are carried out to confirm the above.
32
is to be applied or the binder is an emulsion or prime (i.e. low
viscosity) which will in any event flow over the road surface, it may
not be necessary to carry out a ‘Bucket Test’ on-site. However, in this
case a short test spray into a drip tray will be required to check that
no nozzles are blocked, the angle of the flares are satisfactory and
the overlapping is as required.
C.2.1 Nozzles
All the nozzles need to be inspected to ensure that they are:
33
For best results, the height of the spray-bar above the surface to be
sprayed should not vary by more than 15 mm. Consequently the site
staff will carry out a check of the procedures put into place to limit the
height variation as the tank empties. The height of the spray-bar
should be checked after each run and any necessary adjustment
made at the time.
34
required. The number of passes of the distributor should be the
same as the number of traffic lanes. The spray pattern leaves a 100
mm to 150 mm wide edge with reduced binder application. This zone
should be left uncovered by chippings prior to the application of an
overlapping spray during a subsequent pass of the distributor with
the correct rate of application and a neat and tidy joint. Much will
depend, however, on the skill of the distributor driver in achieving the
proper overlap.
Transverse joints between sprays are also a problem with the most
common sign being a bleeding strip indicating a double application.
The distributor operator and surfacing foreman should together
devise a suitable procedure to ensure that the distributor is up to
speed when the spray bar is opened with the previous spray section
covered and a clean, neat joint is obtained with no overlap.
35
APPENDIX A
Binder Distributor inspection check lists
A.1 General visual requirements for bitumen distributors Yes No
Is there a plate on the vehicle on Manufacturer:
which the following information is ..................................................
shown:
Nominal capacity:
• The name of the manufacturer?
............................................ (L)
• The nominal capacity of the tank?
• The tank serial number/ Tank serial-/distributor identification
distributor identification number number:
appearing on the tank? ............................................ (L)
Is the contents capacity of the Tank capacity:
tank 5% more than the nominal ............................................ (L)
capacity?
Is the tank covered by insulated material?
Does the tank have a positive circulation system?
Does the distributor identification number appear on all the following:
The distributor vehicle
The tank
The dipstick
The spray bar
The pump
The thermometers
The pressure gauges
The speed tachometers
Is there any apparent damage to the tank itself?
Are all the elements of the logbook present, do they appear to be valid
and do the logbook serial numbers match those on the parts of the
distributor?
(General requirements approved only if all the white blocks are ticked)
These requirements have to be met before further checks and tests are made.
The rest of this check list can be completed as the inspection progresses.
36
A.2 Requirements for the dipstick Yes No
Is the dipstick made of brass?
Are the markings clear and easy to read?
Is the dipstick worn out or welded?
Are the markings accurate to the limits prescribed in
SANS 3001-BT21?
Refer to calibration certificate and outcome of test.
Are the markings spaced in such a way that increments of
50 L can be read off the dipstick?
Does the dipstick hang from a suitable T-piece or any
other suitable method to ensure that readings are always
taken from the same reference point?
Is the dipstick touching the bottom of the tank?
Is the dipstick situated near the middle of the tank?
(Dipstick approved only if the white blocks are ticked)
37
A.4 Requirements for pump output Yes No
Is the inside of the tank clean?
Are there any leakages visible at the joints, pump valve,
auxiliary pump or the tank's hydraulic pump or motor after
the binder has been circulated?
Is the spray bar straight and clean?
Are all the spray nozzles, except the two end nozzles, of
the same type?
Do all the spray nozzles open at the same time?
When the supply is cut off, do all the nozzles close
completely at the same time? (The spray nozzles should
not drip excessively)
Do the fans from individual nozzles overlap too much?
Are the hangers of the spray nozzles attached to the
spray bar at an angle of 90º?
Are the nozzle angles set to the manufacturer's
specifications? (In relation to the spray bar)
Are strainers supplied and are they fitted properly?
Can the strainers be taken out easily?
Are the strainers clean?
Are the strainers damaged?
FOR DISTRIBUTORS EQUIPPED WITH PUMP SUPPLY
PRESSURE METERS:
Does the pressure meter react immediately to pressure
changes?
Does the pressure meter have a range of twice the
normal working pressure?
Is the pressure meter gauge more than 80 mm in
diameter?
Does the pressure meter have a valid (less than 12
months old) Calibration Certificate?
38
Is the pressure meter visible and readable from the
operator's position?
Is the pressure meter between the sieve and the spray
nozzles?
Is the pressure release valve set on 150 kPa above the
normal binder pressure level?
(Pump delivery approved only if the white blocks are
ticked)
39
40
APPENDIX B
Modification and maintenance log
Distributor Identification Number
Date Modification or Maintenance Reason Re-calibrated
APPENDIX C
“Bucket Test” record
Distributor Identification Number
Comparisons of results expressed
in percentage differences
Individual Approved Contact number
Date Tested by Product Left and Left
troughs by signed
right spray versus
versus
bar versus right
mean
centre spray bar
(highest)
41
42
APPENDIX D
Spray performance log
Distributor Identification Number
2
Spray No Application rates (L/m )
Stake eg Prime,
Date first spray, Binder Accepted Signature
values Required Actual Difference
second
spray
APPENDIX E
Check list before spraying commences on site
Distributor Identification Number
No. Item Yes No
1.1 Does the distributor have a valid Calibration
Certificate?
• Was the calibration issued by a SANAS
accredited facility?
• Is the certificate within its validity period?
• Does the certificate specify which
components of the distributor have been
calibrated and is there proof of calibration
from an accredited facility that other
components have also been calibrated and
are their certificates valid?
1.2 Check the Modification and maintenance log:
are all modifications acceptable and recorded
and have these modifications been re-calibrated
(If deemed necessary) and is there proof of it in
the logbook.
1.3 Check if all the relevant equipment mentioned in
the above two items correspond (In terms of
identification) to the respective certificates of
calibration.
1.4 Inspect the 'Bucket' Test record.
1.5 Inspect the Performance log.
1.6 Has the distributor inspection check been carried
out successfully (see Appendix A).
1.7 After inspection of the 'Bucket Test' record and
the Performance log; does the client or his agent
require that a 'Bucket Test' be done?
43
1.8 Was the 'Bucket Test' satisfactory?
or if 'Bucket Test' not deemed necessary
Has a short preliminary spray been done to
check for blocked nozzles, incorrect nozzle
angles and to check that all the spraying
equipment is in an acceptable working condition?
1.9 Update 'Bucket Test' record.
1.10 Check that product information is as required and
complete, i.e. Base Bitumen, Batch Number etc.
Specify reference numbers:
………………………………………………………
…………………………………………….......……
1.11 Verify spray applications for the project:
• Rate of application: …………………….
• Spray width: ...………………………….
• Spray length: ...…………………………
• Spray temperature: ...………………….
1.12 Are the following in place and/or correct (If
applicable):
• Fishplate;
• Spray bar height (overlap as required);
• Has the spray bar been heated up;
• Nozzles all of the same size and type, and
all at the correct angle;
• Sieves clean and spares available;
• Cut off paper in place (start and end of
run);
• Kerbs or other features protected from
binder;
• Are there sufficient tins available for
sampling the binder.
44
1.13 Is the trial section satisfactory?
• Required rate of application ………………..
• Actual rate of application …………………...
If all of the above items are found satisfactory to the client or his
agent, spraying may commence.
45
APPENDIX F
Checks required after each day's spraying
Distributor Identification Number
No. Item Yes No
2.1 Has the Client/Engineer approved the application
rate and has he signed the supplier's delivery note /
spray register?
2.2 Has all spilled binder been removed from site?
2.3 Has the Spray performance log been updated?
2.4 Has routine cleaning of the distributor, spray bar,
strainers and nozzles been carried out?
46