C B

4.0000 4.0000 4.0000 4.0000 4.0000 4.0000 4.0000 4.0000

9
NK
R.PERALATAN LOCKER
± 0.00 ± 0.00
R.POMPA
4.0000 ± 0.00 4.0000
LOCKER
± 0.00

8
PARKIRAN MOTOR R.GYM
-0.45 ± 0.00

R.PANEL INDUK R.KEAMANAN


4.0000 ± 0.00 ± 0.00 4.0000

R.GENERATOR 4.0000
4.0000
± 0.00

KM/WC
-0.02
KM/WC
-0.02
6

4.0000 4.0000
PARKIRAN MOBIL
-0.45 RETAIL COURTYARD
± 0.00 -0.45

32.0000 5

GRAND KITCHEN

A
4.0000
± 0.00
4.0000
A
4

STORAGE
± 0.00
4.0000 4.0000

KM/WC MAIL ROOM


-0.02 ± 0.00
4.0000 4.0000

LAUNDRY
PARCEL ± 0.00
± 0.00
2

WAITING AREA R.OPERASIONAL


4.0000 4.0000
± 0.00 ± 0.00

NK

±0.00
-0.15
-0.30

DROP OFF
-0.45

4.0000 4.0000 4.0000 4.0000 4.0000 4.0000 4.0000 4.0000

DENAH LANTAI 1 A B C D
32.0000

E F G H I

UTARA
SKALA 1 : 200
C B

JUDUL TUGAS DOSEN KELAS NAMA MAHASISWA NIM MAHASISWA KETERANGAN HALAMAN

IR. RUDY SURYA, M.M., M.ARS.


STUDIO PERANCANGAN VII
FAKULTAS TEKNIK JURUSAN ARSITEKTUR STUDIO PERANCANGAN VII DOSEN PEMBIMBING ALVIAN TAN 315190036
SEMESTER GANJIL 2022/2023

IR. NURJANTO RACHMAN, M.ARS.