Design and Build of Ras Bufontas Walkway at Ras Bufontas Free Zone

CABLE LAYING CHECKLIST


DOCUMENT No. R40-POR-SFT-EG-0002 Rev.00
IR No: R40-POR-SIR-EG-1406 Date: 14/08/22
MS No: R40-POR-MS-EG-0026
Subcontractor: DOREX ENGINEERING
Location: CAR PARKING

Inspection Area
SI No. Drawing no. Ckt no. Unit Installed Quantity
From To
R40-POR-SD-EL-0002-01OF03 RYB1-FP-CP-01 R1/FP-CP01-1/2 Y1/FP-CP01-1/2 54

Y1/FP-CP01-1/2 B1/FP-CP01-1/2 54
B1/FP-CP01-1/2 R1/FP-CP01-3/4 61
R1/FP-CP01-3/4 Y1/FP-CP01-3/4 63
Meters
Y1/FP-CP01-3/4 B1/FP-CP01-3/4 67
B1/FP-CP01-3/4 R1/FP-CP01-5/6
R1/FP-CP01-5/6 Y1/FP-CP01-5/6
Y1/FP-CP01-5/6 B1/FP-CP01-5/6

(4C6 mmsq
Total LV Power Cable Cu/XLPE/SWA/PVC) + Meters 299
(1C6 mmsq Cu/PVC)

Note:

Construction Representative QA/QC Representative Supervision Consultant


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:


Design and Build of Ras Bufontas Walkway at Ras Bufontas Free Zone

CABLE LAYING CHECKLIST


DOCUMENT No. R40-POR-SFT-EG-0002 Rev.00
IR No: R40-POR-SIR-EG-1406 Date: 14/08/22
MS No: R40-POR-MS-EG-0026
Subcontractor: DOREX ENGINEERING
Location: CAR PARKING

Inspection Area
SI No. Drawing no. Ckt no. Unit Installed Quantity
From To
R40-POR-SD-EL-0002-01OF03 RYB4-FP-CP-01 R4/FP-CP01-1/2 Y4/FP-CP01-1/2 50

Y4/FP-CP01-1/2 B4/FP-CP01-1/2 58
B4/FP-CP01-1/2 R4/FP-CP01-3/4 30

Meters
Y4/FP-CP01-3/4 B4/FP-CP01-3/4 50

(4C6 mmsq
Total LV Power Cable Cu/XLPE/SWA/PVC) + Meters 188
(1C6 mmsq Cu/PVC)

Note:

Construction Representative QA/QC Representative Supervision Consultant


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:


Design and Build of Ras Bufontas Walkway at Ras Bufontas Free Zone

CABLE LAYING CHECKLIST


DOCUMENT No. R40-POR-SFT-EG-0002 Rev.00
IR No: R40-POR-SIR-EG-1406 Date: 14/08/22
MS No: R40-POR-MS-EG-0026
Subcontractor: DOREX ENGINEERING
Location: CAR PARKING

Inspection Area
SI No. Drawing no. Ckt no. Unit Installed Quantity
From To
R40-POR-SD-EL-0002-01OF03 RYB3-FP-CP-01 R3/FP-CP01-1/2 Y3/FP-CP01-1/2 50

Y3/FP-CP01-1/2 B3/FP-CP01-1/2 58

R3/FP-CP01-3/4 Y3/FP-CP01-3/4 58
Meters
Y3/FP-CP01-3/4 B3/FP-CP01-3/4 50

(4C6 mmsq
Total LV Power Cable Cu/XLPE/SWA/PVC) + Meters 216
(1C6 mmsq Cu/PVC)

Note:

Construction Representative QA/QC Representative Supervision Consultant


Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date:


Design and Build of Ras Bufontas Walkway at Ras Bufontas Free Zone

CABLE LAYING CHECKLIST


DOCUMENT No. R40-POR-SFT-EG-0002 Rev.00
IR No: R40-POR-SIR-EG-1406 Date: 14/08/22
MS No: R40-POR-MS-EG-0026
Subcontractor: DOREX ENGINEERING
Location: CAR PARKING

Inspection Area
SI No. Drawing no. Ckt no. Unit Installed Quantity
From To
R40-POR-SD-EL-0002-01OF03 RYB2-FP-CP-01 R2/FP-CP01-1/2 Y2/FP-CP01-1/2 49

Y2/FP-CP01-1/2 B2/FP-CP01-1/2 58
B2/FP-CP01-1/2 R2/FP-CP01-3/4 30
R2/FP-CP01-3/4 Y2/FP-CP01-3/4 56
Meters
Y2/FP-CP01-3/4 B2/FP-CP01-3/4 52
B2/FP-CP01-3/4 R2/FP-CP01-5/6 30
R2/FP-CP01-5/6 Y2/FP-CP01-5/6 52
Y2/FP-CP01-5/6 B2/FP-CP01-5/6 56

(4C6 mmsq
Total LV Power Cable Cu/XLPE/SWA/PVC) + Meters 383
(1C6 mmsq Cu/PVC)
Note:

Construction Representative QA/QC Representative Supervision Consultant


Name: Name: Name:

Signature: Signature: Signature: